PWS_2019.docx
DOCX document 38 KB Posted
- Attached to
- Uninterrupted Power Supply and Maintenance
- Solicitation number
- W91ZLK-19-Q-0048
About this file
PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cost_Breakdown_Guide.xlsx | XLSX spreadsheet | |
| Salient_Characteristics_Contractor_Technical_Acceptability_Criteria_2019.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT / STATEMENT OF WORK
UPS and Environmental Conditioning Unit Maintenance
C.1 GENERAL:
C.1.1 SCOPE: This procurement is a non-personal services contract for the maintenance of existing mission-critical Uninterrupted Power Supply (UPS) units and Environmental Conditioning units located at Aberdeen Test Center.
C.1.2 BACKGROUND: Aberdeen Test Center (ATC) is a multi-purpose test center with diverse test capabilities and facilities. The unique combination of ATC's experienced personnel, state-of-the-art facilities, instrumentation, equipment, automotive courses, firing ranges, and industrial fabrication/repair capabilities provide a comprehensive facility available for testing a wide variety of military items, both domestic and foreign, as well as commercial items. Testing is conducted on full systems, as well as system components and includes such items as: combat and general purpose vehicles, automotive technologies, weapons and munitions, general support equipment, individual equipment, generators, night vision devices, bridges, sensors, communication systems and robotics. ATC also conducts vulnerability/survivability tests, flammability testing, and crash worthiness testing.
C.1.3 PERIOD OF PERFORMANCE: This maintenance contract shall be in effect for a period of one year base period from date of award, plus two one-year options.
C.1.4 PLACE OF PERFORMANCE: Performance shall take place at the Aberdeen Test Center, 400 Colleran Road, Aberdeen Proving Ground (APG), 21005.
C.1.5 HOURS OF NORMAL OPERATIONS: ATC is currently operating under an alternative work schedule. Currently, normal hours of operation are 0700 - 1630 (including a 30-minute meal period) Monday through Thursday and every other Friday from 0700 – 1530. Fridays alternate between 0700 – 1530 and a Regular Day Off (RDO) Friday.
The following Federal Holidays are observed in 2019/2020:
| Thursday, July 4, 2019 |
| Independence Day |
| Monday, September 2, 2019 |
| Labor Day |
| Monday, October 14 |
| Columbus Day |
| Monday, November 11, 2019 |
| Veterans Day |
| Thursday, November 28, 2019 |
| Thanksgiving Day |
| Wednesday, December 25, 2019 |
| Christmas Day |
| Wednesday, January 1, 2020 |
| New Year’s Day |
| Monday, January 20, 2020 |
| Birthday of Martin Luther King, Jr. |
| Monday, February 17, 2020 |
| Washington’s Birthday |
| Monday, May 25, 2020 |
| Memorial Day |
C.1.6 PERSONNEL
C.1.6.3 Hazardous Conditions: Contractor employees may be exposed to the following conditions during performance of work:
· High noise levels (impulse and steady state).
· Proximity to electric power sources of high voltage and/or amperage.
· Working with lead acid batteries.
C.1.6.5 Identification of Contractor Personnel.
The contractor shall provide a 2” x 1” nametag (black lettering with white background) with the company name and the word Contractor below it. The contractor shall ensure all personnel prominently display their nametags at all times while at work in the Restricted Area.
C.1.6.6 Personal Protective Equipment (PPE).
All contractor personnel shall wear the appropriate PPE when in the following work areas: range areas where entrance is controlled by the Range Operations Team, industrial buildings, at construction sites, test sites and test facilities. Other areas may be reviewed to determine if hazards are present which necessitate the use of PPE. Failure to wear/use PPE may cause removal from the job site and/or seizure of non-compliant equipment/items.
C.1.7 SAFETY: All contractor personnel shall follow the applicable safety standards for the work being performed.
C.1.8 SECURITY
C.1.8.1 Unescorted access into Restricted Areas:
Unescorted access into the APG restricted areas is not expected to be granted under this contract.
However, if it is later deemed necessary, unescorted access into the APG restricted areas shall be granted to contractor personnel who possess a current security clearance issued by the Defense Industrial Security Clearance Office (DISCO) or who were the subject of a favorably completed National Agency Check (NAC) or National Criminal Information Check (NCIC). Unescorted access shall be authorized provided no more than 24 months have lapsed since the date of the termination of the security clearance or break of service and there is no known adverse information. The contractor is responsible for providing individuals eligible for unescorted access to service equipment. Since the work to be performed is inside a secure area and all non-US persons are escorted, no foreign nationals (non-US citizens) will be used in this contract.
C.1.8.2 NCIC Requests:
The contractor shall have completed a SSB Form 1199, Application for Civilian ID Card/Security Badge, and FD 258, Application Finger Print Card, for each employee requiring unescorted access who does not meet one of the requirements above. Upon contract award, the contractor shall obtain required forms from the COR and return the completed forms to the COR within 10 working days. Until a favorable NCIC is completed, contractor personnel shall be continually escorted into, out of, and within the restricted areas by other contractor personnel who possess a photographic security identification badge. Processing time for the NCIC is approximately 30-45 days. The contractor shall advise employees that the NCIC shall be used to review criminal history records and that adverse information may result in an employee being denied access into the restricted areas. The contractor shall be responsible for delays in the performance under this contract caused by the disqualification of employees for unescorted access security badges.
C.1.8.3 Security Badges:
Security badges will only be issued to contractor personnel in accordance with APGR 190-4. Security badges shall be approved and issued by ATC Security personnel to contractor personnel upon written request from the TPOC and after the investigation or security clearance has been verified. Contractor personnel shall wear the security badge above the waist at all times while in the restricted (security) areas of APG. Contractor personnel shall only display the security badge while inside the security area and ensure that it is out of sight once they exit the security area. The badge WILL NOT be used as identification to gain access to the installation or for identification off the installation. The contractor is responsible for ensuring compliance by contractor personnel.
C.3 REQUIREMENTS
TASK 1: AIR CONDITIONER MAINTENANCE
The contractor shall provide a comprehensive “full coverage” inspection, preventive maintenance, and emergency service program for the air conditioners specified in the Equipment Covered List as stated below.
| Environmental Conditioning Equipment Covered List |
| Location |
Bldg
| Make |
| Model |
| Serial |
| Common Name |
| Associated Equipment |
| 400 |
| Liebert |
| VS042ADC0EI675A |
| C12B8E0205 |
| B-400 A/C #1 |
| Condenser |
| 400 |
| Liebert |
| VS042ADC0EI675A |
| C12B8E0206 |
| B-400 A/C #2 |
| Condenser |
| 400 |
| Liebert |
| FH125A |
| 333181-001 |
| B-400 A/C #3 |
| Condenser |
| 400 |
| Liebert |
| DH199A-CAEI |
| 794794-001 |
| B-400 A/C #4 |
| Condenser |
| 400 |
| Liebert |
| VS035ADC0EI697A |
| C09K8E0073 |
| B-400 A/C #A1 |
| Condenser |
| 400 |
| Liebert |
| VS035ADC0EI697A |
| C09K8E0074 |
| B-400 A/C #A2 |
| Condenser |
| 400 |
| Liebert |
| MMD36E7YHEDG |
| Y17FBIA320 |
| B-400 A/C #C1 |
| Condenser |
| 400 |
| Liebert |
| MMD36E7YHEDG |
| Y17FBIA323 |
| B-400 A/C #C2 |
| Condenser |
| 436 |
| Liebert |
| * DS042ADC0EI312A |
| C15M8E0013 |
| B-436 A/C #1 |
| Condenser |
| 436 |
| Stulz |
| COS-060-AR-D |
| 10030040 |
| B-436 A/C #2 |
| Condenser |
| 436 |
| Stulz |
| * COS-120-AR-D |
| 10030028 |
| B-436 A/C #3 |
| Condenser |
| 400B |
| Stulz |
| * OHS-040-RCU-O |
| 10090077 |
| B-400B A/C #1 |
| Condenser |
| 400B |
| Stulz |
| * OHS-040-RCU-O |
| 10090078 |
| B-400B A/C #2 |
| Condenser |
| 1099 |
| Stulz |
| COS-060-G-FC-U |
| 10021502 |
| B-1099 A/C |
| Condenser |
* Units with an asterisk (*) are to be quoted as an individual option on a year-by-year basis due to changing needs of the areas that they are located in. In other words, the full Period Of Performance units (which are the non-* ones) can be quoted as a group within one Contract Line Item Number (CLIN) each year, whereas the * units shall each have a price listed separately with an associated unique CLIN per unit per year.
· It shall include a minimum of four preventive maintenance inspections per unit per year during normal working hours. Parts, labor, and travel expenses shall be included.
· The emergency service program shall include a guaranteed response time of less than 4 hours. It shall also include emergency parts and maintenance materials as needed, as well as labor at no additional charge during normal working hours (8 a.m. – 4:30 p.m. Monday through Friday).
Deliverables:
· A deliverable of this task is a minimum of four preventive maintenance inspections per air conditioning unit per year with parts, labor, and travel expenses included.
· A deliverable of this task is emergency service coverage as needed on the air conditioners with parts, labor, and travel expenses included.
· Maintenance performed shall be itemized in a service report presented to the TPOC or COR within 5 working days of the date of the visit.
Quote and CLIN Structure:
· 0001: Base group of units, annual full coverage maintenance
· 0002: Option: B-436 A/C #1, annual full coverage maintenance
· 0003: Option: B-436 A/C #3, annual full coverage maintenance
· 0004: Option: B-400B A/C #1, annual full coverage maintenance
· 0005: Option: B-400B A/C #2, annual full coverage maintenance
TASK 2: UPS INSPECTION, PREVENTIVE MAINTENANCE, AND REPAIR
The contractor shall provide a “full coverage” inspection, preventive maintenance, repair, and emergency service program for the UPS units specified in the UPS Equipment Covered List as stated below:
UPS Equipment Covered List
| Bldg Location |
| Make |
| Model |
| Serial |
| Type/Size |
| Associated Equipment |
| 400 |
| Liebert |
| NPower |
| 37-8801 |
| 80kVA |
| 1 Cabinet of 40 sealed batteries, Enersys HX205FR |
| 400 |
| APC |
| SUVTPF30KB4F |
| PS0811341021 |
| 30 kVA |
| 1 Cabinet of 16 battery modules, SYBTU1-PLP |
| 400 |
| MGE |
| 72-160812-22 |
| B01-10176 |
| 80 kVA |
| 1 Cabinet of 36 sealed batteries, 12-300MR |
| 436 |
| Eaton |
| * 9390-50 |
| ED033CBB04 |
| 50 kVA |
| 1 Cabinet of 32 sealed batteries, Eaton PWHR12200W4FR |
| 350 |
| Eaton |
| 9390IT |
| EF204CAB03 |
| 40 kVA |
| 1 Cabinet of 120 sealed batteries, PWHR1234W2FR |
| 606 |
| Liebert |
| NXb 30 |
| 38-4103 |
| 30 kVA |
| 1 Cabinet of 24 sealed batteries, 12HX330-FR |
| 1099 |
| Eaton |
| 9390-40 |
| EG353CAC05 |
| 40 kVA |
| 1 Cabinet of 32 sealed batteries, PWHR12200W |
* Units with an asterisk (*) are to be quoted as an individual option on a year-by-year basis due to changing needs of the areas that they are located in, similar to Task 1.
· The inspection and preventive maintenance portion shall include semi-annual module PM inspections per year and quarterly battery inspections per year for each UPS unit in the Equipment Covered List. Parts, labor, and travel costs shall be included.
· Provide a detailed written report noting any deficiencies and corrective action needed, taken, and/or planned; delivered to the Technical Point of Contact within 5 working days of the visit. It shall include values and graphs of battery levels.
· The emergency service program shall include emergency parts and maintenance materials as needed, as well as labor at no additional charge during normal working hours (8 a.m. – 4:30 p.m. Monday through Friday).
· Partial (up to 10%) Battery Jar Replacement:
· For battery strings in overall good health, please allow for up to 10% of the battery jars within each string in each unit to be replaced per year if necessary.
· Parts, labor, and travel costs included.
Deliverables:
· A deliverable of this task is semi-annual preventive maintenance and repair visits on the modules of the UPS units listed above.
· A deliverable of this task is quarterly battery inspections on each UPS unit listed above.
· A deliverable of this task is a detailed report with each inspection. For the batteries, this should also include graphs to illustrate the levels of the batteries to be used to analyze their health. The report must be presented to the TPOC or COR within 5 working days of the date of the visit.
· A deliverable of this task is emergency service coverage as needed on the UPS units listed in Task 3 with parts, labor, and travel expenses included.
· A deliverable of this task is partial battery jar replacement as needed, up to 10% of a string per year.
Quote and CLIN Structure:
· 0006: Base group of units, annual full coverage maintenance
· 0007: Option: B-436 Eaton 9390-50 UPS unit, annual full coverage maintenance
TASK 5: UPS SCHEDULED BATTERY STRING & CAPACITOR REPLACEMENTS
The batteries and/or capacitor assemblies in some of these UPS units will be due for replacement during the period of this contract. Full string battery replacements and full AC/DC input/output capacitor assembly replacements will be needed according to the following schedule:
Base Year Replacements (June 2019 – May 2020)
| Bldg Location |
| Make |
| Model |
| Battery Model |
| Battery Quantity |
| Replacement Of: |
| 606 |
| Liebert |
| NXb 30 |
| 12HX330-FR |
| 24 |
| Battery String |
| 400 |
| APC |
| SUVTPF30KB4F |
Capacitors
| 350 |
| Eaton |
| 9390IT |
Capacitors
Option Year 1 Replacements (June 2020 – May 2021)
| Bldg Location |
| Make |
| Model |
| Battery Model |
| Battery Quantity |
| Replacement Of: |
| 400 |
| MGE |
| Comet 72-160812-22 |
| 12-300MR |
| 36 |
| Battery String |
| 1099 |
| Eaton |
| 9390-40 |
Capacitors
Option Year 2 Replacements (June 2021 – May 2022)
| Bldg Location |
| Make |
| Model |
| Battery Model |
| Battery Quantity |
| Replacement Of: |
| 400 |
| APC |
| SUVTPF30KB4F |
| SYBTU1-PLP |
| 16 |
| Battery String |
| 400 |
| Liebert |
| NPOWER |
| Enersys HX205FR |
| 40 |
| Battery String |
| * 436 |
| Eaton |
| 9390-50 |
| Enersys HX205FR |
| 32 |
| Battery String |
Quote and CLIN Structure:
· The costs for these replacements are to be included in the contract cost for the year in which they are scheduled to be performed, but as a separate CLIN for each replacement.
· For instance, Base Year shall include a CLIN for Liebert NXb battery replacement, a CLIN for APC capacitor replacement, and a CLIN for Eaton 9390IT capacitor replacement.
· Option Year 1 shall include a CLIN for MGE Comet UPS battery replacement and a CLIN for Eaton 9390-40 capacitor replacement.
· Option Year 2 shall include a CLIN for APC UPS battery replacement, another CLIN for Liebert NPower UPS battery replacement, and a third CLIN for Eaton 9390-50 UPS battery replacement.
· Replacements are to be scheduled at the customer’s convenience during normal business hours Monday through Friday. (It will most likely will be on an “RDO Friday.”)
· Replacements should include freight and inside delivery of the new batteries & capacitors.
· Replacements should include de-installation of the old batteries & capacitors, along with removal and proper disposal of the old batteries & capacitors.
· Parts, labor, and travel costs included.
· 3 year minimum warranty on the new batteries.
· * Eaton 9390-50 UPS unit in Building 436 is optional pending operational status.
Deliverables:
· A deliverable of this task is full battery string replacements on the Liebert NXb UPS unit, capacitor replacements in the APC UPS unit, and capacitor replacements in the Eaton 9390IT UPS unit in the Base Year
· A deliverable of this task is full battery string replacements on the MGE Comet UPS unit and capacitor replacements on the Eaton 9390-40 UPS unit in Option Year 1.
· A deliverable of this task is full battery string replacements on the APC UPS unit, the Liebert NPower UPS unit, and the Eaton 9390-50 UPS unit in Option Year 2.
C.4 DELIVERABLES AND DELIVERY SCHEDULE
· What – Deliverables have been broken out into their respective tasks.
· When – This contract shall be in effect for one year base period from date of award, plus two one-year options.
· Where – Aberdeen Test Center.
C.8 TECHNICAL POINT OF CONTACT
C.8.1 TPOC and COR: The designated TPOC and COR for this requirement is Johnathan F. Beltz, Data Center Facility Manager, Aberdeen Test Center, 400 Colleran Road, APG, MD 21005. Phone: 410-278-9513, e-mail: johnathan.f.beltz.civ@mail.mil
C.9 NON-PERSONAL SERVICE STATEMENT: Contractor employees performing services under this order will be controlled, directed, and supervised at all times by management personnel of the contractor. Contractor management will ensure that employees properly comply with the performance work standards outlined in the statement of work. Contractor employees will perform their duties independent of, and without the supervision of, any Government official. The tasks, duties, and responsibilities set forth in the task order may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR).
C.10 CONTRACTOR MANPOWER REPORTING (CMR): The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) has established a secure data collection site, entitled Contractor Manpower Reporting System, for the purpose of capturing contractor (and subcontractor) manpower utilized during the performance of this contract. As a result, the contractor shall report all the information required by the Contractor Manpower Reporting System. The information requiring completion by the contractor includes, but may not be limited to the following: (1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative (COR/COTR); (2) Contract number, Requiring activity identification code (UIC), Command; (3) Fiscal Year covered by reporting period; (4) Contractor name, address, phone number, e-mail address, Identity of contactor employee entering data; (5) Direct labor hours, including Subcontractor; (6) Direct labor dollars paid this reporting period, including Subcontractors; (7) Total invoiced amount, including Subcontractors; (8) Predominant Federal Service Code (FSC) reflecting services provide by Contractor; and (9) Locations where Contractor performs the work. The contractor shall submit all required information before final invoice. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. All data for the FY shall be reported no later than October 31 of each calendar year or before final invoice, whichever comes earlier. The contractor shall access the Contractor Manpower Reporting System database on the internet and fill-in the required data entry fields. The system can be accessed at the following internet address: https://cmra.army.mil.
C.11 SECURITY POLICIES:
Per Army Regulation 190-13 (The Army Physical security program), Para. 8-2.c,
(1) A check of records through the National Crime Information Center (NCIC) Interstate Identification Index (III) is the Army minimum baseline background check for entrance onto Army installations for non-CAC holders to include entrance of visitors. The FBI permits the use of NCIC III for vetting visitors to ensure the security of military installations.
(2) A similar records check will be conducted at OCONUS locations per status of forces agreement (SOFA) and other theater regulations.
Per DoD Directive Type Memorandum (DTM) 09-012 (Interim Policy Guidance for DoD Physical Access Control), Attachment 3, Para2.b.(4), Installation government representatives shall query the following government authoritative data sources to vet the claimed identity and to determine fitness, using biographical information including, but not limited to, the person's name, date of birth, and social security number:
(a) The National Crime Information Center (NCIC) database.
(b) The Terrorist Screening Database.
(c) Other sources as determined by the DoD Component or the local commander and/or director. These can include but are not limited to:
1. Department of Homeland Security (E-Verify)
2. Department of Homeland Security (U.S.VISIT)
3. Department of State Consular Checks (non-U.S. citizen)
4. The FVS-CM
File details come from the government source that posted it.