W91RUS24R0020 Cost Workbook.xlsx

XLSX spreadsheet 136 KB Posted

Attached to
160th Theater Signal Brigade, Administration, Information Technology Engineering and Logistical Support (AITEL)
Solicitation number
W91RUS24R0020
Issued by

About this file

This document is a Cost Workbook template related to a federal contract opportunity for 160th Theater Signal Brigade, Administration, Information Technology Engineering and Logistical Support (AITEL) services. The Solicitation Number is W91RUS24R0020.

The workbook provides a detailed cost breakdown for the base period and four option periods, including labor, overtime, insurance, materials, other direct costs, travel, and reporting requirements. It covers services to be performed at the primary locations of Kuwait and Qatar, with the possibility of other locations in Southwest Asia or Central Asia. The contract will be a single award, cost-reimbursable contract awarded to the responsible offeror providing the best value to the government based on Mission Support, Past Performance, and Cost. The workbook template includes instructions for the contractor to insert labor categories, personnel, and pricing information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Phase In Summary

CLINCLIN Description
Contract TypeNo. of PersonnelNumber of HoursCost
Phase In CLIN 0001-0008No. of PersonnelNumber of HoursCost
0001Phase In Labor
0001AA CPFFKuwait
0001AB CPFFQatar

0002 Phase In Call Out/Overtime

0002AA CPFFKuwait8,000.00
0002AB CPFFQatar1,666.67

0003 Phase In DBA Insurance

0003AA CostKuwait
0003AB CostQatar

0004 Phase In ODCs Materials

0004AA CostKuwait
0004AB CostQatar

0005 Phase In ODCs Non-Materials

0005AA CostKuwait29,400.00
0005AB CostQatar9,800.00

0006 Phase In Travel, Housing, Vehicles

0006AA CostKuwait118,547.17
0006AB CostQatar6,250.00

0007 Phase In Service Contract Reporting Cost NSP 0008 Phase In Contract Reporting Other Cost NSP

Phase In Labor Rates Phase-In Labor Rates

Straight Time Hourly Direct Labor RateDanger Pay Allowance ___%Post Differential Allowance ___%Total of Straight Time Labor, Danger Pay and Post Diff AllowancesDefense Base Act Ins___%Fringe ___%Lab OH ___%G & A ___%Fixed Fee @ ___%Total
Prime200
Contractor to insert labor categories by site in
this column and total all labor at bottom of
worksheet. Insert rows as necessary. This
applies to all CLIN worksheets for base and
option periods.

Subcontractor 1

Subcontractor 2

Subcontracts provenciot-iw: rlr:

Subcontractor shall provide separate worksheets in accordance with section L, para V.B.

Phase In Labor Costs

Phase In CLIN 0001Labor CategoryPrime/SubNo. of PersonnelNumber of HoursCost
CLIN 0001AA Kuwait
CLIN TOTALS00$0.00
CLIN 0001AB Qatar
CLIN TOTALS000

Phase In DBA

Phase In DBA
Defense Base Act InsuranceNo. of PersonnelTotal Direct Labor HoursTotal Direct LaborG & A ___%Fixed Fee @ _0.0__%Total

Kuwait - CLIN 0003AA

Total $0.00

Qatar - CLIN 0003AB

Total $0.00

Grand Total

Phase In Materials

Phase In MaterialsItem DescriptionNumber of UnitsUnit PriceTotal Price of Item
CLIN 0004AA

Kuwait

CLIN TOTAL0
CLIN 0004AB

Qatar

CLIN TOTAL 0

Base Summary

CLINCLIN Description
No. of PersonnelNumber of HoursCost
Summary CLIN 1100-1400No. of PersonnelNumber of HoursCost
1100Base Period Kuwait
1101Base Labor
1101AABase Labor

1102 Base Call Out/Overtime Kuwait

1102AA CPFF Kuwait $40,000.00

1103 Base DBA Insurance Kuwait

1103AA Cost Kuwait

1104 Base ODCs Materials Kuwait

1104AA Cost Kuwait

1105 Base ODCs Non-Materials Kuwait

1105AA Cost Kuwait $147,000.00

1106 Base Travel, Housing, Vehicles Kuwait

1106AA Cost Kuwait $592,735.83

1200Base Period Qatar
1201Base Labor
1201AABase Labor

1202 Base Call Out/Overtime Qatar

1202AA CPFF Qatar $8,333.34

1203 Base DBA Insurance Qatar

1203AA Cost Qatar

1204 Base ODCs Materials Qatar

1204AA Cost Qatar

1205 Base ODCs Non-Materials Qatar

1205AA Cost Qatar $49,000.00

1206 Base Travel, Housing, Vehicles Qatar

1206AA Cost Qatar $31,250.00

1300 CostBase Service Contract Reporting
1400 CostBase Contract Reporting – Other

Base Labor Rates Base Labor Rates

Straight Time Hourly Direct Labor RateDanger Pay Allowance ___%Post Differential Allowance ___%Total of Straight Time Labor, Danger Pay and Post Diff AllowancesDefense Base Act Ins___%Fringe ___%Lab OH ___%G & A ___%Fixed Fee @ ___%Total
Prime200
Contractor to insert labor categories by site in
this column and total all labor at bottom of
worksheet. Insert rows as necessary. This
applies to all CLIN worksheets for base and
option periods.

Subcontractor 1

Subcontractor 2

Subcontracts

Base Labor Costs

Base CLIN 1101 & 1200Labor CategoryPrime/SubNo. of PersonnelNumber of HoursCost
CLIN 1101AA Kuwait
CLIN TOTALS00$0.00
CLIN 1200AA Qatar
CLIN TOTALS000

Base DBA

Base DBA
Defense Base Act InsuranceNo. of PersonnelTotal Direct Labor HoursTotal Direct LaborG & A ___%Fixed Fee @ _0.0__%Total

Kuwait - CLIN 1103AA

Total $0.00

Qatar - CLIN 1203AA

Total $0.00

Grand Total

Base Materials

Base MaterialsItem DescriptionNumber of UnitsUnit PriceTotal Price of Item
CLIN 1104AA

Kuwait

CLIN TOTAL0
CLIN 1204AA

CLIN TOTAL 0

Option 1 Summary

CLINCLIN Description
No. of PersonnelNumber of HoursCost
Summary CLIN 2100-2400No. of PersonnelNumber of HoursCost
2100Option 1 Period Kuwait
2101OP 1 Labor
2101AAOP1 Labor

2102 OP1 Call Out/Overtime Kuwait

2102AA CPFF Kuwait $48,000.00

2103 OP1 DBA Insurance Kuwait

2103AA Cost Kuwait

2104 OP 1 ODCs Materials Kuwait

2104AA Cost Kuwait

2105 OP 1 ODCs Non-Materials Kuwait

2105AA Cost Kuwait $176,400.00

2106 OP 1 Travel, Housing, Vehicles Kuwait

2106AA Cost Kuwait $711,283.00

2200Option 1 Period Qatar
2201OP 1 Labor
2201AAOP 1 Labor

2202 OP 1Call Out/Overtime Qatar

2202AA CPFF Qatar $10,000.00

2203 OP 1 DBA Insurance Qatar

2203AA Cost Qatar

2204 OP 1ODCs Materials Qatar

2204AA Cost Qatar

2205 OP 1 ODCs Non-Materials Qatar

2205AA Cost Qatar $58,800.00

2206 OP1 Travel, Housing, Vehicles Qatar

2206AA Cost Qatar $37,500.00

2300 Cost NSPOP1 Service Contract Reporting
2400 Cost NSPOP 1 Contract Reporting – Other

OP 1 Labor Rates OP 1 Labor Rates

Straight Time Hourly Direct Labor RateDanger Pay Allowance ___%Post Differential Allowance ___%Total of Straight Time Labor, Danger Pay and Post Diff AllowancesDefense Base Act Ins___%Fringe ___%Lab OH ___%G & A ___%Fixed Fee @ ___%Total
Prime200
Contractor to insert labor categories by site in
this column and total all labor at bottom of
worksheet. Insert rows as necessary. This
applies to all CLIN worksheets for base and
option periods.

Subcontractor 1

Subcontractor 2

Subcontracts

OP 1 Labor Costs

OP 1 CLIN 2101 & 2200Labor CategoryPrime/SubNo. of PersonnelNumber of HoursCost
CLIN 2101AA Kuwait
CLIN TOTALS00$0.00
CLIN 2200AA Qatar
CLIN TOTALS000

OP 1 DBA

OP 1 DBA
Defense Base Act InsuranceNo. of PersonnelTotal Direct Labor HoursTotal Direct LaborG & A ___%Fixed Fee @ _0.0__%Total

Kuwait - CLIN 2103AA

Total $0.00

Qatar - CLIN 2203AA

Total $0.00

Grand Total

OP 1 Materials

OP 1 MaterialsItem DescriptionNumber of UnitsUnit PriceTotal Price of Item
CLIN 2104AA

Kuwait

CLIN TOTAL0
CLIN 2204AA

CLIN TOTAL 0

OP 2 Summary

CLINCLIN Description
No. of PersonnelNumber of HoursCost
Summary CLIN 3100-3400No. of PersonnelNumber of HoursCost
3100Option 2 Period Kuwait
3101OP 2 Labor
3101AAOP2 Labor

3102 OP 2 Call Out/Overtime Kuwait

3102AA CPFF Kuwait $48,000.00

3103 OP 2 DBA Insurance Kuwait

3103AA Cost Kuwait

3104 OP 2 ODCs Materials Kuwait

3104AA Cost Kuwait

3105 OP 2 ODCs Non-Materials Kuwait

3105AA Cost Kuwait $176,400.00

3106 OP 2 Travel, Housing, Vehicles Kuwait

3106AA Cost Kuwait $711,283.00

3200Option 2 Period Qatar
3201OP 2 Labor
3201AAOP 2 Labor

3202 OP 2Call Out/Overtime Qatar

3202AA CPFF Qatar $10,000.00

3203 OP 2 DBA Insurance Qatar

3203AA Cost Qatar

3204 OP 2 ODCs Materials Qatar

3204AA Cost Qatar

3205 OP 2 ODCs Non-Materials Qatar

3205AA Cost Qatar $58,800.00

3206 OP 2 Travel, Housing, Vehicles Qatar

3206AA Cost Qatar $37,500.00

3300 Cost NSPOP2 Service Contract Reporting
3400 Cost NSPOP 2 Contract Reporting – Other

OP 2 Labor Rates OP 2 Labor Rates

Straight Time Hourly Direct Labor RateDanger Pay Allowance ___%Post Differential Allowance ___%Total of Straight Time Labor, Danger Pay and Post Diff AllowancesDefense Base Act Ins___%Fringe ___%Lab OH ___%G & A ___%Fixed Fee @ ___%Total
Prime200
Contractor to insert labor categories by site in
this column and total all labor at bottom of
worksheet. Insert rows as necessary. This
applies to all CLIN worksheets for base and
option periods.

Subcontractor 1

Subcontractor 2

Subcontracts

OP 2 Labor Costs

OP 2 CLIN 3101 & 3200Labor CategoryPrime/SubNo. of PersonnelNumber of HoursCost
CLIN 3101AA Kuwait
CLIN TOTALS00$0.00
CLIN 3200AA Qatar
CLIN TOTALS000

OP 2 DBA

OP 2 DBA
Defense Base Act InsuranceNo. of PersonnelTotal Direct Labor HoursTotal Direct LaborG & A ___%Fixed Fee @ _0.0__%Total

Kuwait - CLIN 3103AA

Total $0.00

Qatar - CLIN 3203AA

Total $0.00

Grand Total

OP 2 Materials

OP 2 MaterialsItem DescriptionNumber of UnitsUnit PriceTotal Price of Item
CLIN 3104AA

Kuwait

CLIN TOTAL0
CLIN 3204AA

CLIN TOTAL 0

OP 3 Summary

CLINCLIN Description
No. of PersonnelNumber of HoursCost
Summary CLIN 4100-4400No. of PersonnelNumber of HoursCost
4100Option 3 Period Kuwait
4101OP 3 Labor
4101AAOP 3 Labor

4102 OP 3 Call Out/Overtime Kuwait

4102AA CPFF Kuwait $48,000.00

4103 OP 3 DBA Insurance Kuwait

4103AA Cost Kuwait

4104 OP 3 ODCs Materials Kuwait

4104AA Cost Kuwait

4105 OP 3 ODCs Non-Materials Kuwait

4105AA Cost Kuwait $176,400.00

4106 OP 3 Travel, Housing, Vehicles Kuwait

4106AA Cost Kuwait $711,283.00

4200Option 3 Period Qatar
4201OP 3 Labor
4201AAOP 3 Labor

4202 OP 3 Call Out/Overtime Qatar

4202AA CPFF Qatar $10,000.00

3203 OP 3 DBA Insurance Qatar

3203AA Cost Qatar

4204 OP 3 ODCs Materials Qatar

4204AA Cost Qatar

4205 OP 3 ODCs Non-Materials Qatar

4205AA Cost Qatar $58,800.00

4206 OP 3 Travel, Housing, Vehicles Qatar

4206AA Cost Qatar $37,500.00

4300 Cost NSPOP 3 Service Contract Reporting
4400 Cost NSPOP 3 Contract Reporting – Other

OP 3 Labor Rates OP 3 Labor Rates

Straight Time Hourly Direct Labor RateDanger Pay Allowance ___%Post Differential Allowance ___%Total of Straight Time Labor, Danger Pay and Post Diff AllowancesDefense Base Act Ins___%Fringe ___%Lab OH ___%G & A ___%Fixed Fee @ ___%Total
Prime200
Contractor to insert labor categories by site in
this column and total all labor at bottom of
worksheet. Insert rows as necessary. This
applies to all CLIN worksheets for base and
option periods.

Subcontractor 1

Subcontractor 2

Subcontracts

OP 3 Labor Costs

OP 3 CLIN 4101 & 4200Labor CategoryPrime/SubNo. of PersonnelNumber of HoursCost
CLIN 4101AA Kuwait
CLIN TOTALS00$0.00
CLIN 4200AA Qatar
CLIN TOTALS000

OP 3 DBA

OP 3 DBA
Defense Base Act InsuranceNo. of PersonnelTotal Direct Labor HoursTotal Direct LaborG & A ___%Fixed Fee @ _0.0__%Total

Kuwait - CLIN 4103AA

Total $0.00

Qatar - CLIN 4203AA

Total $0.00

Grand Total

OP 3 Materials

OP 3 MaterialsItem DescriptionNumber of UnitsUnit PriceTotal Price of Item
CLIN 4104AA

Kuwait

CLIN TOTAL0
CLIN 4204AA

CLIN TOTAL 0

OP 4 Summary

CLINCLIN Description
No. of PersonnelNumber of HoursCost
Summary CLIN 5100-5400No. of PersonnelNumber of HoursCost
5100Option 4 Period Kuwait
5101OP 4 Labor
5101AAOP 4 Labor

5102 OP 4 Call Out/Overtime Kuwait

5102AA CPFF Kuwait $48,000.00

5103 OP 4 DBA Insurance Kuwait

5103AA Cost Kuwait

5104 OP 4 ODCs Materials Kuwait

5104AA Cost Kuwait

5105 OP 4 ODCs Non-Materials Kuwait

5105AA Cost Kuwait $176,400.00

5106 OP 4 Travel, Housing, Vehicles Kuwait

5106AA Cost Kuwait $711,283.00

5200Option 4 Period Qatar
5201OP 4 Labor
5201AAOP 4 Labor

5202 OP 4 Call Out/Overtime Qatar

5202AA CPFF Qatar $10,000.00

5203 OP 4 DBA Insurance Qatar

5203AA Cost Qatar

5204 OP 4 ODCs Materials Qatar

5204AA Cost Qatar

5205 OP 4 ODCs Non-Materials Qatar

5205AA Cost Qatar $58,800.00

5206 OP4 Travel, Housing, Vehicles Qatar

5206AA Cost Qatar $37,500.00

5300 Cost NSPOP 4 Service Contract Reporting
5400 Cost NSPOP 4 Contract Reporting – Other

OP 4 Labor Rates OP 4 Labor Rates

Straight Time Hourly Direct Labor RateDanger Pay Allowance ___%Post Differential Allowance ___%Total of Straight Time Labor, Danger Pay and Post Diff AllowancesDefense Base Act Ins___%Fringe ___%Lab OH ___%G & A ___%Fixed Fee @ ___%Total
Prime200
Contractor to insert labor categories by site in
this column and total all labor at bottom of
worksheet. Insert rows as necessary. This
applies to all CLIN worksheets for base and
option periods.

Subcontractor 1

Subcontractor 2

Subcontracts

OP 4 Labor Costs

OP 4 CLIN 5101 & 5200Labor CategoryPrime/SubNo. of PersonnelNumber of HoursCost
CLIN 5101AA Kuwait
CLIN TOTALS00$0.00
CLIN 5200AA Qatar
CLIN TOTALS000

OP 4 DBA

OP 4 DBA
Defense Base Act InsuranceNo. of PersonnelTotal Direct Labor HoursTotal Direct LaborG & A ___%Fixed Fee @ _0.0__%Total

Kuwait - CLIN 5103AA

Total $0.00

Qatar - CLIN 5203AA

Total $0.00

Grand Total

OP 4 Materials

OP 4 MaterialsItem DescriptionNumber of UnitsUnit PriceTotal Price of Item
CLIN 5104AA

Kuwait

CLIN TOTAL0
CLIN 5204AA

CLIN TOTAL 0

File details come from the government source that posted it. Updated .