A07-W91RUS-18-R-DA71-0005.pdf

PDF 500 KB Posted

Attached to
Fiber Optic Cable Install Federal contract opportunity
Solicitation number
W91RUS-18-R-DA71
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

Answers to Questions

View the file

Other files for this federal contract opportunity

Other files attached to Fiber Optic Cable Install, newest first.
File Type Posted
A07-Conformed_Copy-W91RUS-18-R-DA71.pdf PDF
A07-W91RUS-18-R-DA71-0004.pdf PDF
A07-Conformed_Copy-W91RUS-18-R-DA71.pdf PDF
Drawing_.pdf PDF
A07-W91RUS-18-R-DA71-0003.pdf PDF
A07-Conformed_Copy-W91RUS-18-R-DA71.pdf PDF
A07-Conformed_Copy-W91RUS-18-R-DA71.pdf PDF
A07-W91RUS-18-R-DA71-0002.pdf PDF
A07-Conformed_Copy-W91RUS-18-R-DA71.pdf PDF
A07-W91RUS-18-R-DA71-0001.pdf PDF
A07-Solicitation-W91RUS-18-R-DA71.pdf PDF
A01-Statement_of_Work.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACC-APG

RHONDA GILL

BLDG 61801 RM 3410

PN: 520-533-5269 FAX: 520-538-6400

FORT HUACHUCA AZ 85613

0011182667

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of amendment 0005 is to:

1. Post questions and answ ers, see Questions and Answ ers Part 2.

2. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W91RUS18RDA71

X 9B. DATED (SEE ITEM 11)

02-May-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-May-2018

CODE

ACC-APG

2133 CUSHING ST.

BLDG 61801 RM 3212

FORT HUACHUCA AZ 85613

W91RUS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W91RUS

FACILITY CODECODE

EMAIL:TEL:

W91RUS18RDA71

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

QUESTION AND ANSWERS PART 2

Questions and Answers Part 2

Question 1: Manholes are full of water, Is the contractor responsible for the removal of the water and if so what is the process for disposal?

Answer 1: Contractor is responsible for the removal of the water, in this case it approximate 2 ft or less, and it can be disposal in the grain system.

Questions 2: Per Contractor Requirements 2.L FOC is to be grounded. There are no grounding busbars in any of the Telcom rooms please advise?

Answer 2: Where they are no grounded busbars in the Telecommunication rooms please provide and install new busbar.

Question 3: According to (SOW) 3.1 "Riser strand Armor and metallic strength cable rated" Fiber Optic Cable is to be used. My assumption is that we are to use OSP corrugated armored and not Interlocking Armored Indoor/Outdoor Fiber Optic Cable. What type of armored FOC is to be used for the underground portion of the work?

Answer 3: OSP corrugated Armored cable is correct (underground).

Question 4: Per FOC Infrastructure 3.4 "Provide and install as needed FOC Fabric-mesh Innerduct , 1x3-cell" All manhole pathways contain multipliable Single wall 1" Corrugated Innerducts, Is the contractor to provide and install 1x3cell Fabric-mesh Innerduct for the entire length of the Fiber run or match existing Corrugated Innterducts ?

Answer 4: FOC-mesh Innerduct, will be fabric Mesh 9x.

Answer 4.1: All manhole pathways we want to put in the fabric Mesh 9x for the entire length. If we run into a place or where we cannot than we use best practice or use existing fabric innterducts.

Reference SOO 1.0 All Fiber will be install with the proper service loop twenty (20%) service loop etc.

Question 5: Should this state “20 foot” service loop, instead of “20%”?Is the 20% service loop to be in each manhole/hand hole or only at the demark location?

Answer 5: 20 foot service loop.

Question 6: Reference: SOO 3.1 Install new 24 strand Underground SM FOC Riser Strand fiber armor and metallic strength cable rated from building 53302 to building 80706 approximate 3000 feet’s. The govt is providing 10 calendar days to complete this project, with up to 5 of those days involving project plan submittal (prior to work start). However, this project involves working in manholes and plenum spaces, which is time-consuming. Please confirm the requirement for work completion is 10 calendar days.(?)

Answer 6: Should state at least 20 days.

Question 7: Reference: SOO 3.4 Provide and install as needed FOC Fabric-mesh inner duct, 1 X 3-Cell. Does the requirement for maxcell pertain Only to OSP fiber runs? Is plenum rated inner duct required for the ISP fiber runs as well?

Answer 7: Maxcell for the OSP fiber run change to fiber-mesh 9x. Plenum rated inner duct for the ISP.

Question 8: Reference: SOO 4.3 Furnish Fiber Optic Patch cables. The contractor shall furnishTwelve (4) 5 ft. long and (12) 3 ft. long, duplex, multi-mode FOC patch cable with SC connectors as specified for the project. Is the quantity for the 5-ft patch cable 12 or 4?

Answer 8: 5-ft patch cable 12.

Question 9: All other FOC requirements involve SM, not MM (“as specified for the project”). Please confirm whether the patch cables need to be MM or SM.

Answer 9: this project is for SM fiber.

Question: 10: Reference: SOO 4.3 Testing shall demonstrate the acceptability and performance characteristics of the fiber optic cable installed / and orreused under this task order. Also, during the site visit the govt expressed requirement for the contractor to re-use existing innerduct (as much as possible). Adding fiber cabling to existing innerduct that is already occupied by fiber is difficult, which could take additional time or result in negative test results. Will the contractor have discretion to install new innerduct where there is innerduct existing, when inspection of the existing innerduct warrants not re-using the existing innerduct? Is the government able/willing to provide detailed butterfly drawings of the existing conditions of each manhole/hand hole?

Answer 10: They should be a open pathway for all fiber. Where location we want to install new fiber innerduct if space permit. Man-power will not permit at this time for the Government personnel to get all condition of each manhole, but if you would like to survey each manhole we will we will get a detail person to assist you.

Question 11: Reference: 4.3 Deliverables: “Deliverables may be provided electronically.”…”Provide one (1) soft copy and one (1) hard copy of as-built drawings.” The requirement that all submittals may be provided electronically, and the requirement for the as-builts to also be submitted in hard copy are contradictory. Please clarify.

Answer 11: All submittals may be provided electronically.

Question 12: Reference: 4.3 Deliverables: The duration of this project will not exceed10 business days from the date of award. Award +5: Project plans will be submitted in Microsoft Project (converted to PDF) five (5) daysprior to the start of work. 10 days of onsite work, start to finish, with 5 days obligated to the project plan submittal, leaves only 5 days of work time on site. Is it the government’s intention that the contractor will have 5 days to perform work?

Answer 12: 20 days for start to finish.

Question 13: Reference: 4.3 iWATCH Training. The Contractor will ensure that all Contractor employees and sub-contractor employees performing services under this contract have been briefed on the iWATCH Program, or equivalent for their supporting DoD Agency, within 30 days of employment under the contract. Will the government provide iWATCH training within 5 days after contract award, in order for the contractor to be able to complete the work within 10 days of award, and given that work cannot start i=until the project plan is submitted (within 5 days of contract award)?

Answer 13: 20 days from start to finish.

The following have been modified:

QUESTIONS AND ANSWERS

1. Are preconstruction BICSI certified RCDD Stamped Design Documents required in the Project Plan as described underDeliverables within the SOW?

Answer: A Certified RCDD Stamped Design Documents required and personnel.

2. The SOW call for Furnish and Install of all materials, supporting materials and incidentals: is paragraph k.

Joint Inventory/Bulk Materials applicable to this solicitation?

Answer: yes, If the project require 100 feet of cable and you purchase a 1000 feet, than 900 feet's will go back to the Government

3. The Request Delivery Date is 14 May 2018. Is the intent for job to be complete by this date or substantially started? If preconstruction design is a requirement this date appears infeasible. Has any preconstruction design taken place prior to RFQ issuance?

Answer: No, This was a date the customer would like this project to be completed, but this date given will be change to 45 days after project awarded.

4. The RFQ and SOW refer to site layout to be provided. We request that any site layouts/drawings, as-builts from previous work, etc. be made available for reference as part of this solicitation.

Answer: Yes, Path Drawing will be provided.

5. Will there be a pre-Bid site visit for this solicitation? If not, will contractors be able to gain access to assess existing conditions prior to bidding?

Answer: see the document titled A07-Revised Site Visit Information

6. I did not see and drawing posted for this solicitation. Are there any? Drawings are referenced in the SOW, sect 2.b.

Answer: see item #4

(End of Summary of Changes)