A07-W91RUS-18-R-DA71-0001.pdf
PDF 503 KB Posted
- Attached to
- Fiber Optic Cable Install Federal contract opportunity
- Solicitation number
- W91RUS-18-R-DA71
About this file
The purpose of Amendment 0001 is to: 1. Add the requested site visit information and to provide a question and answer sheet. 2. All remaining terms and conditions still apply.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A07-Conformed_Copy-W91RUS-18-R-DA71.pdf | ||
| A07-W91RUS-18-R-DA71-0005.pdf | ||
| A07-W91RUS-18-R-DA71-0004.pdf | ||
| A07-Conformed_Copy-W91RUS-18-R-DA71.pdf | ||
| Drawing_.pdf | ||
| A07-W91RUS-18-R-DA71-0003.pdf | ||
| A07-Conformed_Copy-W91RUS-18-R-DA71.pdf | ||
| A07-W91RUS-18-R-DA71-0002.pdf | ||
| A07-Conformed_Copy-W91RUS-18-R-DA71.pdf | ||
| A07-Conformed_Copy-W91RUS-18-R-DA71.pdf | ||
| A07-Solicitation-W91RUS-18-R-DA71.pdf | ||
| A01-Statement_of_Work.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACC-APG
RHONDA GILL
BLDG 61801 RM 3410
PN: 520-533-5269 FAX: 520-538-6400
FORT HUACHUCA AZ 85613
0011182667
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0001 is to:
1. Add the requested site visit information and to provide a question and answ er sheet.
2. All remaining terms and conditions still apply.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W91RUS18RDA71
X 9B. DATED (SEE ITEM 11)
02-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-May-2018
CODE
ACC-APG
2133 CUSHING ST.
BLDG 61801 RM 3212
FORT HUACHUCA AZ 85613
W91RUS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W91RUS
FACILITY CODECODE
EMAIL:TEL:
W91RUS18RDA71
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
QUESTIONS AND ANSWERS
1. Are preconstruction BICSI certified RCDD Stamped Design Documents required in the Project Plan as described underDeliverables within the SOW?
Answer: A Certified RCDD Stamped Design Documents required and personnel.
2. The SOW call for Furnish and Install of all materials, supporting materials and incidentals: is paragraph k.
Joint Inventory/Bulk Materials applicable to this solicitation?
Answer: yes, If the project require 100 feet of cable and you purchase a 1000 feet, than 900 feet's will go back to the Government
3. The Request Delivery Date is 14 May 2018. Is the intent for job to be complete by this date or substantially started? If preconstruction design is a requirement this date appears infeasible. Has any preconstruction design taken place prior to RFQ issuance?
Answer: No, This was a date the customer would like this project to be completed, but this date given will be change to 45 days after project awarded.
4. The RFQ and SOW refer to site layout to be provided. We request that any site layouts/drawings, as-builts from previous work, etc. be made available for reference as part of this solicitation.
Answer: Yes, Path Drawing will be provided.
5. Will there be a pre-Bid site visit for this solicitation? If not, will contractors be able to gain access to assess existing conditions prior to bidding?
Answer: see the document titled A07-Revised Site Visit Information
6. I did not see and drawing posted for this solicitation. Are there any? Drawings are referenced in the SOW, sect 2.b.
Answer: see item #4
SITE VISIT INFORMATION
Attachment V – Installation Information Infrastructure Architecture (I3A) Fort Huachuca AZ
The Government will hold a site visit on 11 May 2018 at 0900 A.M. Arizona Time.
W91RUS18RDA71
Instructions to Access Post: You must allow time (30 to 45 minutes) for sign in for a visitor pass as the entry gate.
If arriving at (TUS) Tucson International Airport
Get on I-10 E from E Corona Rd or S Alvernon Way Follow I-10 E to AZ-90 S – Benson Take Exit 302 Follow AZ-90 S to N. Buffalo Soldier Trail Turn Right on Hatfield Street, Proceed to Visitor Center (Van Daman) Gate Once through gate go to fourth (4th) traffic light and turn right (Arizona Street) Proceed through the 4 Way Stop, building 53302 is on the left side of the street.
a) The contractors will meet with Contracting Officer (KO), Contracting Officer Representative (COR), Network Enterprise Center Program Manager (NEC PM) at Building 53302 (Cement 1) on Arizona Street.
b) Emails must be directed to all of the following: rosa.l.rascon.civ@mail.mil, rhonda.k.gill.civ@mail.mil
c) The site visit will be conducted over a time period of 2 hours of 0900-1100.
The starting location is building 53302 (Cement 1) and then walking approximately 3000 feet to building 80706 (Hayes Hall).
d) Lunch will not be provided, nor will the Government reimburse contractors who attend the site visit.
e) As of this date contractors are to provide their own transportation.
f) All visitors must have proper photo identification and must be US Citizens. All names (limited to 2 per vendor) must be provided by 10 May 2018 for security purposes. Absolutely no roster changes will be allowed on the date of the site visit.
g) NO QUESTIONS will be answered during the site visit. All questions shall be submitted in writing by the cut-off date and time listed on the solicitation. Answers to all questions received, will be provided to all contractors receiving the solicitation via modification.
(End of Summary of Changes)