TE 2- Checklist for Quarterly Preventive Maintenance.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- W91QVN22R0028
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN22R0028-0004-Final.pdf | ||
| Attachment 1_Instruction of SAM Registraion.pptx | PPTX presentation | |
| W91QVN-22-R-0028-0003.pdf | ||
| W91QVN22R0028-0002_Final.pdf | ||
| TE 1 -List of Desiccant Dehumidifiers.xls | XLS spreadsheet | |
| W91QVN22R0028-0001.pdf | ||
| W91QVN-22-R-0028.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ML
Technical Exhibit 2-1 - Checklist for Quarterly Preventive Maintenance
| Inspection and Maintenance to be performed for Dehumidifier (ML Type) | |||
| Model: | Date: | ||
| Location: | Building No. | ||
| Activities | Initials | Remarks | |
| 1. Check power supply voltage and operation status of the circuit breaker. | |||
| 2. Check operation status of the toggle switch. | |||
| 3. Check direction of rotation of the reactivation fan, process fan and rotor. | |||
| 4. Check the rotation speed of the rotor (8-12/ Hour) | |||
| 5. Check the tention of the rotor belt. | |||
| 6. Check temperature of the reactivation heater (90℃-130℃) | |||
| 7. Check all of the electric parts by visual examination. | |||
| 8. Check electric current value for process fan / reactivation fan. | |||
| 9. Check electric current value for drive motor. | |||
| 10. Check electric current value for reactivation heater step 1. | |||
| 11. Check electric current value for reactivation heater step 2. | |||
| 12. Check contamination status of the filter. | |||
| 13. Check the condition of the outer casing by visual examination. | |||
| 14. Check the overheating prevention device of the reactivation heater. | |||
| 15. Conduct dehumidification performance. |
a. Recommendation for Preventive Maintenance, Minor Repair Work Description, Major Repair Items
| Inspector Name: | Signature: | Date: |
| Bldg Manager Name: | Signature: | Date: |
| Gvmnt Rep. Name: | Signature: | Date: |
DryCool
| Technical Exhibit 2-2 - Checklist for Quarterly Preventive Maintenance | |
| Solicitation No. W91QVN-22-R-0028 |
| Inspection and Maintenance to be performed for Dehumidifier (DryCool Type) | |||
| Model: | Date: | ||
| Location: | Building No. | ||
| Activities | Initials | Remarks | |
| 1. Check power supply voltage and operation status of the circuit breaker. | |||
| 2. Check operation status of the toggle switch. | |||
| 3. Check direction of rotation of the reactivation fan, process fan and rotor. | |||
| 4. Check the rotation speed of the rotor (8-12/ Hour) | |||
| 5. Check the tention of the rotor belt. | |||
| 6. Check all of the electric parts by visual examination. | |||
| 7. Check electric current value for process fan. | |||
| 8. Check electric current value for reactivation fan. | |||
| 9. Check electric current value for drive motor. | |||
| 10. Check electric current value for condenser fan. | |||
| 11. Check electric current value for compressor 1. | |||
| 12. Check electric current value for compressor 2. | |||
| 13. Check electric current value for compressor 3. | |||
| 14. Check electric current value for compressor 4. | |||
| 15. Check the tention of the process fan belt. | |||
| 16. Check contamination status of the filter. | |||
| 17. Check if the refrigerant is leaking. | |||
| 18. Check the condition of the outer casing by visual examination. | |||
| 19. Conduct dehumidification performance. |
a. Recommendation for Preventive Maintenance, Minor Repair Work Description, Major Repair Items
| Inspector Name: | Signature: | Date: |
| Bldg Manager Name: | Signature: | Date: |
| Gvmnt Rep. Name: | Signature: | Date: |