This document contains questions and answers regarding solicitation number W91QVN-21-R-0039 for contract security guard services at United States Army and other Department of Defense installations in the Republic of Korea. The services required include providing personnel at installation access control points and for random inspection teams to control installation access according to Office of the Provost Marshal General guidance and USFK regulations. Questions were asked regarding TOEIC score requirements, vehicle and fuel provisions, personnel duties, training schedules, and proposal submission procedures. The responses clarified evaluation criteria, contractor responsibilities for costs and personnel, and directed offerors to review amendment number 0003 for additional details such as the master post schedule.

View the file

Other files

File Type Posted
Amendment 5.pdf PDF
21-R-0039 Amendment 0003.pdf PDF
W91QVN-21-R-0039 Amendment 002.pdf PDF
AMD 01 W91QVN-21-R-0039.pdf PDF
21-R-0039 Attachment 1- OfferBreakdown Format.xlsx XLSX spreadsheet
RFP W912QVN-21-R-0039 09 Apr 21.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendement is to publish the questions and answ ers received by prospective offerors.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN21R0039

X 9B. DATED (SEE ITEM 11)

09-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-May-2021

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

SERVICES DIV, UNIT #15289

APO AP 96271

UNITED STATES

W91QVN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

Dennis M. Fuentes, Contracting Officer DSN315-755-3347 dennis.m.fuentes.civ@mail.mil

W91QVN21R0039

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

OFFERORS QUESTION AND ANSWERS

No. Question Response Change in

RFP

1 Could it possible for the incumbent ER qualified CSGs with a minimum TOEIC score of 250 on the listening part and 300 on the reading part of the exam to be succeeded from the previous contractor

W91QVN-21-R-0039 evaluation factors will be used to evaluate proposals. No other criteria will be considered including the criteria from any previous solicitation/contract.

No.

2 Do they have to meet the newly established TOEIC scores shown in 5.6.2 without any exception?

W91QVN-21-R-0039 evaluation factors will be used to evaluate proposals. No other criteria will be considered. There is no exception

No.

3 Pls advise when this term would be effective from.

W91QVN-21-R-0039 evaluation factors will be used to evaluate proposals. No other criteria will be considered. TOEIC scores are expected to be achieved during the award/start of the new contract.

No.

4 Representative and Certification shall offeror, who has already completed annual representations and certifications in SAM; submit the R&C paragraph (b) only completed FAR 52.204-8 with the proposal?

Representative and Certification shall be submitted with your proposal IAW the instructions in the solicitation W91QVN-21-R- 0039. Page 76 of the RFP will change FAR 52.204-8 to FAR 52.212-3.

Yes

5 When shall the offeror submit the FEP and Financial Resource, either on the time of the proposal or later when selected?

If the offeror is selected for award. No.

6 The offerors shall submit the certified financial records and documents to include a minimum of three years as of the closing date. If it has not been more than 3 years since an entity was established, is it available for the entity to submit the relevant documents from the establishment date although the covered period would not be more than 3 years?

Yes No.

7 The offerors shall submit the ROK Certificate of

Business Registrations (사업자등록증) that represents "Special Security Guard Services

Please submit as part of the proposal. No.

(특수경비업무). If available, please confirm officially whether the offerors shall submit the Certificate of Business Registrations as part of the proposal.

8 Please provide us with more detailed work descriptions of personnel including Contract Manager, Area Guard Commanders, ER Guard Supervisors, ER Security Guards, and NER Security Guards. It would be a great help for us to assign a work force and make an accurate price schedule.

Duties and responsibilities for the Contract Guards are outlined within Part-2 and Part-5 of the PWS and the stated references (Part-6).

No.

9 In the last bid (W91QVN-19-R-0062), MPS was pre-distributed for each Area and base, so we were able to calculate the exact labor cost. When will the MPS for this bidding be distributed?

The Master Post Schedule was published on 10 May 21 in amendment number 0003 to solicitation number W91QVN-21-R-0039

No.

10 Is there a minimum required vehicle quantity? Contractor shall determine the number and type of vehicles required to meet the PWS requirements i.e. personnel movement and RIT Teams.

No.

11 Does the contractor shall be provide Gas for vehicles?

Contractor is responsible for all associated cost to operate and maintain contractor provided vehicles

No.

12 You told us on the site visit that we shall not alter the Attachment 1. Offer breakdown.

However, there is no cell to input the above elements such as Monthly Basic Wage, etc.

Apart from the Attachment 1. Offer breakdown, shall an offeror submit its own additional offer breakdown that can include the elements?

Offerors may submit additional offer breakdown if needed.

No.

13 There is no attachment with guard force work schedule provided by the US government.

Could you please upload guard force work schedule onto beta.sam.gov?

US government cannot share current contractors work schedules/information. Direct your attention to amendment number 0003 to W91QVN21R0039 posted on 10 May 21.

No.

14 Could you please tell us what is the lead-time of training, how often will you provide the class, and how many people allow to attend each class?

DBIDs training is an annual requirement for the Guard Force. Initial DBIDs training will be coordinated through the COR during the Phase-In period. With the COVID environment, training maybe limited to 15-20 personnel at a given time.

No.

15 There is no FAR 52.204- 8 Offeror Representations and Certifications in this solicitation.

Page 76 para 1.3 will change from FAR 52.204-8 to FAR 52.212-3.

Yes.

16 In my experience, speaking 120 is impossible-to-achieve goal for security guards.

Speaking of English can't be improved in half a year. I would like to recommend you to lower the speaking score at least 100 if possible.

If you stick to the score above, I think that only 10% of current security guard may pass score 120.

Speaking and Listening are the most important factors in the performance of duties. Through a review of current files, obtaining a score of 120 is attainable. The government will not entertain the lowering of the TOEIC requirements.

No.

17 Proposals shall be submitted via beta.SAM.gov. However, to the best of our knowledge, there is no function that makes proposal submission available in beta.SAM.gov.

Please confirm if there is a function for offerors to submit the proposal in beta.SAM.gov.

- If it is unavailable to submit proposal via beta.SAM.gov, proposals still shall be submitted via email by 1700 the day before the solicitation closes?

Please see Addendum to FAR 52.212-1 Instruction to Offeror.

18 Is it available to have the information about current work schedule of the security guard services including post locations, work hours, number of guards, etc?

US government cannot share current contractors work schedules/information. Direct your attention to amendment number 0003 to W91QVN21R0039 posted on 10 May 21.

No.

19 Are there any significant differences in work duties between English Required Security Guards and Non-English Req. Security Guards?

One example is Non-English personnel cannot work at a Visitor Center and should not be on a traffic lane without an English Required personnel. Other differences may be note upon review of the Master Post Schedule.

No.

20 Is it available to have the information about the shift working currently being operated on each post location? We would like to know how many guards need to rotate on each post location within 24 hours.

US government cannot share current contractors work schedules/information. Direct your attention to amendment number 0003 to W91QVN21R0039 posted on 10 May 21.

No.

21 It is assumed the rest of CLINs from 0008 ~ 0014 shall be filled in to Complete the format. Please confirm.

Question 21 is not understood. No.

22 Is someone who does not have Korean nationality eligible to work as a security guard if he Or she meets the conditions of language proficiency regarding Korean and English?

Contractor personnel shall not be from a designated Country as outlined on the USFK Designated Country List. Contractor personnel shall meet all requirements stipulated by the ROK government for Third Country Personnel living and working within the ROK. The contractor is ultimately responsible for all personnel that perform on this contract.

No.

(End of Summary of Changes)