21-R-0039 Amendment 0003.pdf

PDF 444 KB Posted

Attached to
USFK Contractor Security Guard Service
Solicitation number
W91QVN-21-R-0039
Issued by

About this file

This amendment to a solicitation provides a master post schedule for contractor security guard services at various United States installations in the Republic of Korea. The schedule lists 193 guard posts across multiple installations, including Camp Humphreys, Yongsan, Camp Casey, Camp Mobile, Camp Castle North, Camp Hovey, Warrior Base, Camp Stanley, and others. It also includes details on post locations, types such as gate or random inspection team, and hours of operation. Supervisor posts are similarly defined for each installation. The solicitation is for non-personal security guard services under a non-personal services contract to control installation access according to Office of the Provost Marshal General guidance and USFK regulations during periods of armistice and contingencies.

View the file

Other files

File Type Posted
Amendment 5.pdf PDF
21-R-0039 Amendment 004.pdf PDF
W91QVN-21-R-0039 Amendment 002.pdf PDF
AMD 01 W91QVN-21-R-0039.pdf PDF
21-R-0039 Attachment 1- OfferBreakdown Format.xlsx XLSX spreadsheet
RFP W912QVN-21-R-0039 09 Apr 21.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to publish the Master Post Schedule (MPS).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-May-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN21R0039

X 9B. DATED (SEE ITEM 11)

09-Apr-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-May-2021

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

SERVICES DIV, UNIT #15289

APO AP 96271

UNITED STATES

W91QVN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

Dennis M, Fuentes, Contracting Officer DSN 315-755-3347 dennis.m.fuentes.civ@mail.mil

W91QVN21R0039

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

MASTER POST SCHEDULE

POST # POST

LOCATION

POST TYPE POST

HOURS

SOG

HOURS

ER

HOURS

NER

HOURS

Total

Guard Posts

Camp Casey

1 Gate 1 Gate (O/W) 24 8,760 8,760

1A Gate 1 Gate (Veh) 24 8,760 8,760

1B Gate 1 Gate (Veh) 24 8,760 8,760

3 Ped gate Gate (Ped) 15 (0500-2000) 5,475 5,475

3A Ped gate Gate (Ped) 24 8,760 8,760

3B Ped gate Gate (Ped) 24 8,760 8,760

3C Ped gate Visitor Control 20 (0500-0100)

7,300 7,300

3D Ped gate Visitor Control 20 (0500-0100)

7,300 7,300

4 Gate 4 Gate (Veh) 24 8,760 8,760

5 Commercial Gate

Gate (Ped/Veh)

24 8,760 8,760

5A Commercial Gate

Gate (Ped/Veh)

24 8,760 8,760

5B Commercial Gate

Gate (Ped/Veh)

11 (Mon-Sat 0700-1800) 3,443 3,443

5C Commercial Gate

Gate (Ped/Veh)

11 (Mon-Sat 0700-1800) 3,443 3,443

6 RIT RIT 16 5,840 5,840

6A RIT RIT 16 5,840 5,840

Camp Mobile

1 Gate 1 Gate (Veh) 24 8,760 8,760

1A Gate 1 Gate (Veh) 24 8,760 8,760

Camp Castle North

1 Gate 1 Gate (Veh) 12 (Mon-Fri 0700-1900) 3,132 3,132

1A Gate 1 Gate (O/W) 12 (Mon-Fri 0700-1900) 3,132 3,132

Camp Hovey

3 Gate 3 Gate (Ped) 24 8,760 8,760

3A Gate 3 Gate (Veh) 24 8,760 8,760

Warrior Base

1 Gate 1 Gate (Veh) 24 8,760 8,760

1A Gate 1 Gate (O/W) 24 8,760 8,760

Camp Stanley

1 Gate 1 (Aviation)

Gate (Veh) 24 8,760 8,760

1A Gate 1 (Aviation)

Gate (Veh) 24 8,760 8,760

DETACHMENT - L

1 Gate (Main) Gate (Veh/Ped)

24 8,760 8,760

Supervisor Posts

Camp Casey

Supervisor Mobile All Gates 24 8,760 8,760

Camp Hovey & Camp Casey Gate #4

Warrior Base

Camp Stanley

Guard Posts

Yongsan

5 Gate 5 Gate (Ped) 20 (0500-0100) 7,300 7,300

6 Gate 6 Gate (Veh) 24 8,760 8,760

6A Gate 6 Gate (Veh) 24 8,760 8,760

6B Gate 6 Gate (Ped) 24 8,760 8,760

7 Gate 7 (TMP) Gate (Ped/Veh)

12 (M-F 0630-1830) 3,132 3,132

7A Gate 7 (TMP) Gate (O/W) 12 (M-F 0630-1830) 3,132 3,132

13 Gate 13 Gate (Veh) 19 (0500-2400) 6,935 6,935

13A Gate 13 Gate (Veh) 19 (0500-2400) 6,935 6,935

13B Gate 13 Gate (Veh) 19 (0500-2400) 6,935 6,935

13C Gate 13 Inspection 24 8,760 8,760

13D Gate 13 Inspection 24 8,760 8,760

13E Gate 13 Inspection 12 (M-F 0600-1800) 3,132 3,132

13F Gate 13 Inspection 12 (M-F 0600-1800) 3,132 3,132

14 Gate 14 Gate (Ped) 20 (0500-0100) 7,300 7,300

264 WH-264 Gate 24 8,760 8,760

TANGO

1 Gate 1 (Off Ramp)

Gate (Veh) 24 8,760 8,760

1A Gate 1 (Off Ramp)

Gate (Veh) 24 8,760 8,760

2 Gate 2 (Main Gate)

Gate (Ped/Veh)

24 8,760 8,760

2A Gate 2 (Main Gate)

Gate (O/W) 24 8,760 8,760

3 Gate 3 (Back Gate) (Reynolds Range )

Gate (Ped/Veh)

4 Gate 4 (On Ramp)

Gate

K-16

1 Gate 1 Main Gate (Ped/Veh)

24 8,760 8,760

1A Gate 1 Main Gate (Ped/Veh)

1B Gate 1 Main Gate (O/W) 24 8,760 8,760

Incheon Airport JMMT

1 Gate 1 Gate

Yongin

1 Gate 1 Main Gate (Veh) 24 8,760 8,760

1A Gate 1 Main Gate (O/W) 24 8,760 8,760

Camp Market

2 Gate 2 Main Gate (Ped/Veh)

2A Gate 2 Main Gate (O/W) 24 8,760 8,760

DETACHMENT - J

1 Gate (Main) Gate (Veh/Ped)

Yongsan

Supervisor Mobile All Gates 12 (M-F) (0600-1800)

3,132 3,132

Incheon Airport JMMT (MEVA)

Supervsior Mobile All Gates 24 8,760 8,760

Yongin

Camp Market

Supervsior Mobile All Gates 12 ( M-F) (0500-1700)

3,132 3,132

K-16/Tango

Guard Posts

Camp Humphreys

PEDESTRIAN GATE (24/7)

1 Pedestrian

Gate

BLDG. S1442

Check Incoming IDs

24 8,760 8,760

2 Pedestrian Gate

BLDG. S1442

Check Incoming IDs

24 8,760 8,760

3 Pedestrian Gate

BLDG. S1442

Check Incoming IDs/Overwatc h

24 8,760 8,760

4 Pedestrian Gate

BLDG. S1442

Check Incoming IDs (Mon-Fri) (0130-0930)

8 2,080 2,088

MAIN GATE (Millett Gate) 17/5 (Mon-Fri)(0500-2200)

5 Main Gate Bldg. S411

Access Control 1

17 4,437 4,437

6 Main Gate Bldg. S411

Access Control 2

17 4,437 4,437

7 Main Gate Bldg. S411

Access Control 3

9 (0500-1400) 2,349 2,349

8 Main Gate Bldg. S411

Access Control 4

9 (0500-1400) 2,349 2,349

9 Main Gate Bldg. S411

Overwatch 17 4,437 4,437

ALPHA Random Inspection Team (16/7) 10 Mobile Random

Inspection 16 5,840 5,840

11 Mobile Random Inspection

16 5,840 5,840

BRAVO Random Inspection Team (16/5)(Mon-Fri)

12 Mobile Random Inspection

16 4,176 4,176

13 Mobile Random Inspection

16 4,176 4,176

Hamjeong-Ri (Charlton Gate) (14/5)(Mon-Fri)

14 Hamjeon-ri Gate

Pedestrian Gate

14 3,654 3,654

15 Hamjeon-ri Gate

Pedestrian Gate

14 3,654 3,654

16 Hamjeon-ri Gate

Access Control 3

14 3,654 3,654

17 Hamjeon-ri Gate

Access Control 4

14 3,654 3,654

18 Hamjeon-ri Gate

Access Control 5

4 1,044 1,044

19 Hamjeon-ri Gate

Overwatch 14 3,654 3,654

DODU-RI (Adams Gate) (24/7) 20 Dodu-ri Gate Ped 24 8760 8,760

21 Dodu-ri Gate Ped 24 8760 8,760

22 Dodu-ri Gate VCC 24 8760 8,760

23 Dodu-ri Gate VCC 24 8760 8,760

24 Dodu-ri Gate Commercial 24 8760 8,760

25 Dodu-ri Gate POV Lane 24 8,760 8,760

26 Dodu-ri Gate Access Control 7

16 5,840 5,840

27 Dodu-ri Gate Access Control 8

16 5,840 5,840

28 Dodu-ri Gate Access Control 9

12 4,380 4,380

29 Dodu-ri Gate Access Control 10

12 4,380 4,380

30 Dodu-ri Gate Access Control 11

12 4,380 4,380

31 Dodu-ri Gate Access Control 12

12 4,380 4,380

32 Dodu-ri Gate Access Control 13

6 2,190 2,190

33 Dodu-ri Gate Access Control 14

6 2,190 2,190

34 Dodu-ri Gate ACP Overwatch

24 8,760 8,760

DONGCHAN-RI (Yoon Gate) (24/7) 35 Dongchan-ri

Gate Ped 24 8,760 8,760

36 Dongchan-ri Gate

Ped 24 8,760 8,760

37 Dongchan-ri Gate

VCC 24 8,760 8,760

38 Dongchan-ri Gate

VCC 24 8,760 8,760

39 Dongchan-ri Gate

Commercial 24 8,760 8,760

40 Dongchan-ri Gate

POV Lane 24 8,760 8,760

41 Dongchan-ri Gate

POV Lane 24 8,760 8,760

42 Dongchan-ri Gate

Access control 8

12 4,380 4,380

43 Dongchan-ri Gate

Access control 9

12 4,380 4,380

44 Dongchan-ri Gate

Access control 10

8 2,920 2,920

45 Dongchan-ri Gate

Access control 11

8 2,920 2,920

46 Dongchan-ri Gate

Access control 12

24 8,760 8,760

47 Dongchan-ri Gate

Access control 13 (Mon- Fri)(0130- 0930)

8 2,088 2,088

48 Dongchan-ri Gate

Access control 14 (Mon-Fri) (0130-0930)

8 2,088 2,088

49 Dongchan-ri Gate

ACP

Overwatch

Suwon

1 Main Gate Access Control (0600-2100)

15 Not Armed 5,475 5,475

2 Main Gate Access Control

24 Not Armed 8,760 8,760

3 Main Gate Access Control

24 Not Armed 8,760 8,760

Supervisor Camp Humphreys

Supervisor Camp Humphreys

Supervisor (Mon-Fri)

24 6,264 6,264

Supervisor Camp Humphreys

Supervisor 24 8,760 8,760

Supervisor Camp Humphreys

Supervisor 24 8,760 8,760

Supervisor Camp Humphreys

Supervisor (Mon-Fri)

24 6,264 6,264

Guard Posts

Camp Carroll

1 Gate 1 Gate (Veh) 24 8,760 8,760

1A Gate 1 Gate (Veh) 24 8,760 8,760

1B Gate 1 Gate (Veh/Ped)

12 (0530-1730) 4,380 4,380

1C Gate 1 Gate (OW) 24 8,760 8,760

2 Gate 2 Gate (Ped/Veh)

12 (0530-1730) (M-F) 3,132 3,132

2A Gate 2 Gate (Ped/Veh)

12 (0530-1730) (M-F) 3,132 3,132

2B Gate 2 Gate (Bag Check)

12 (0530-1730) (M-F) 3,132 3,132

2C Gate 2 Gate (Ped/Veh)

12 (0530-1730) (M-F) 3,132 3,132

4 Gate 4 Gate (VCC) 24 8,760 8,760

4A Gate 4 Gate (Ped/Veh)

24 8,760 8,760

4B Gate 4 Gate (Ped/Veh)

24 8,760 8,760

4C Gate-4 Gate (Ped/Veh)

8 (0530-1330) (M-F) 2,088 2,088

7 Farmer's Road Gate

Gate

12 (0700-1900) 4,380 4,380

Camp Walker

4 Gate 4 Gate

4A Gate 4 Gate

24 8,760 8,760

4B Gate 4 Gate (Ped/Veh)

24 8,760 8,760

4C Gate 4 Gate (Ped/Veh)

12 (0600‐1800) (M‐F) 3,132 3,132

6 Gate 6 Gate (VCC) 16 (0500-2100) 5,840 5,840

6A Gate 6 Gate (Ped/Veh)

16 (0500-2100) 5,840 5,840

6B Gate 6 Gate (Veh) 16 (0500-2100) 5,840 5,840

6C Gate 6 Gate (Ped/Veh)

12 (0600-1800) (M-F) 3,132 3,132

6D Gate 6 Gate (Ped/Veh)

12 (0600-1800) 4,380 4,380

50 Gate 4 (Starting Point)

RIT 16 (0600-2200) 5,840 5,840

50A Gate 4 (Starting Point)

RIT 16 (0600-2200) 5,840 5,840

Camp Henry

(Ped/Veh)

12 (0600-1800) (M-F) 3,132 3,132

1A Gate 1 Gate (Ped/Veh)

12 (0600-1800) (M-F) 3,132 3,132

1B Gate 1 Gate (Ped/Veh)

12 (0600-1800) (M-F) 3,132 3,132

1C Gate 1 Gate (Ped/Veh)

8 (0600-1400) (M-F) 2,088 2,088

2 Gate 2 Gate (Ped/Veh)

24 8,760 8,760

2A Gate 2 Gate (Ped/Veh)

24 8,760 8,760

2B Gate 2 Gate (Veh) 24 8,760 8,760

2C Gate 2 Gate (Veh) 12 (0600-1800) (M-F) 3,132 3,132

Camp George

3 Gate 3 Gate

13 (0600-1900) (M-F) 3,393 3,393

3A Gate 3 Gate

13 (0600-1900) (M-F) 3,393 3,393

3B Gate 3 Gate

13 (0600-1900) (M-F) 3,393 3,393

Daegu Storage (SP-47)

5 Gate 5 Gate (Ped/Veh)

12 (0600-1800) (M-F) 3,132 3,132

5A Gate 5 Overwatch 12 (0600-1800) (M-F) 3,132 3,132

Busan Storage

1 Gate 1 Gate (Ped) 24 8,760 8,760

1A Gate 1 Gate (Ped) 24 8,760 8,760

1B Gate 1 Gate (Ped/Veh)

12 (M-F 0700-1900) 3,132 3,132

1C Gate 1 Gate

12 (M-F 0700-1900) 3,132 3,132

DRMO APO

(Ped/Veh)

24 8,760 8,760

1A Gate 1 Gate

9 (0700-1600) (Mon-Fri) 3,285 3,285

Pier 8

1 Gate 1 VCC 24 8,760 8,760

1A Gate 1 Gate (Ped/Veh) 8 (0700‐1500) (M‐F) 2,088 2,088

1B Gate 1 Gate (Veh) 24 8,760 8,760

Kunsan POL

1 Main Gate Gate (Veh) 24 8,760 8,760

1A Main Gate Overwatch 24 8,760 8,760

Camp Carroll

Camp Walker / Daegu Storage SP-47

Camp Henry / George

Busan Storage

DRMO APO

Pier 8

Kunsan POL

TOTAL 193,992 582,094 417,206 1,193,300

(End of Summary of Changes)

2021-05-10T15:38:34+0900
FUENTES.DENNIS.MICHAEL.1205586284

File details come from the government source that posted it. Updated .