amendment_W91QVN20R0008-1.pdf
PDF 2 MB Posted
- Attached to
- Christmas Decoration and Installation
- Solicitation number
- W91QVN20R0008
About this file
amendment1
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91QVN20R0008
411TH CSB, KOREA - CONST & SUPPLY TEAM
POC: CHO, UN CHONG
TEL: 755-3391
UNCHONG.CHO4.LN@MAIL.MIL
APO AP 96271-5228
UNITED STATES
0011402246-0001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
a. The purpose of this amendment are as follow s;
1. Provide response from one of the potential contractors’ question. The quesiton and response are on the next page.
2. Add SOW for the direction of bow s installation.
b. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Oct-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN20R0008
X 9B. DATED (SEE ITEM 11)
21-Oct-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Oct-2019
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
CONSTRUCTION & SUPPLY DIV, UNIT #15289
APO AP 96271
UNITED STATES
W91QVN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W91QVN
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
QUESTION AND RESPONSE
1. Question and response are as the following:
-Vendor Question: Will you clarify the quantity of ornaments for Item no. 0005 Artificial Christmas Tree?
-Government response: The below number of ornaments in item no 0005 is per tree.
Length : 3M
• Material: Plastic
• Sturdy Metal Stand for support for tree
• Ornaments (Per a tree)
- Plastic Ball (Diameter 10Cm) – 9EA (Per a tree)
- Plastic Ball (Diameter 12Cm) – 8EA (Per a tree)
- Plastic Ball (Diameter 14 & 15Cm) – 6EA(Per a tree)
- Ribbon (18Cm)– 12 EA (Per a tree)
- Christmas Logo (40Cm) – 1EA (Per a tree)
- Snowflake (10Cm & 12.5Cm)– 10EA (Per a tree)
- Star Christmas Tree Topper(40Cm) – 1EA (Per a tree)
- Others (Over 18Cm)– 30EA (Per a tree)
2. Add SOW for the direction of bows installation.
Bows shall be hanged with consistent (same) direction along with the street and drive ways so oncoming traffic can see them directly. The opposite side of the street shall have the bows facing the other direction so oncoming traffic can see those bows directly as well.
The following have been modified:
ITEMS SPECIFICATION
CLIN Description Unit Quantity Unit Price Amount 0001 50M Outdoor Multicolored String lights) ea 100
Power: AC 220V, 27mA, 5-6W (Per 10M) 100 LEDs within 10M transparent solid casing, solid casing, bulb spacing 10.0CM, bright enough for holiday decoration.
Can be connected to as long as 100M.
Waterproof End to end expandable Features & details Length: 50m
Can be connected to as long as 100 Feet, tube diameter: 4-6mm Bulb pacing 10.0CM, more bulbs, bright enough for holiday decorating Power: AC 220V, 27mA, 5-6W (Per 10M) Multi-colored
Note: All lights must be reusable and not single-use lights.
Lights will be tested after removal.
Warm White LED Icicle Lights (150 LEDs, 3M) ea 910
Power: AC 220V, 45mA, 10W 150 warm white icicle lights on transparent wire, 11Cm lead, 3M total length Waterproof End to end expandable Light Count: 150 Wire Color: Warm White Light Color: Warm White Bulb String Length: 4.8M, Spacing Between Drops: 11Cm Drop Count: 20 Max Sets Connected: 10 Lead Length: 3M in Drop Length: 30.5Cm – 39Cm – 47.5Cm – 56Cm Tail Length: 11Cm Voltage: AC 220V Usage: Indoor / Outdoor Bulb Type: LED Wattage: 10W
Lights will be tested after removal
0003 Multi Color LED Flexible Christmas Tree Lights ea 30
Power: AC 220V, 45mA, 100W (2W per Meter) LED lights inside transparent tube with diameter 1.3Cm, 50M total length Light Count: 1,800 EA Light Color: Warm White, Green, Red String Length: 50M, Spacing Between LED Light: 2.8Cm Drop Count: 20 Max Sets Connected: 10 Voltage: AC 220V Usage: Indoor / Outdoor Bulb Type: LED Wattage: 10W
Lights will be tested after removal
0004 Christmas Present Box ea 2 Customized Christmas present box with openable cover.
Dimensions: 4’ X 4’ X 4’ Material : Wood (Outer : Decorated with water-proof wrapping paper and Ribbon) illuminated like in the picture in SOW using the cascading icicle LED lights
See SOW for example
Artificial Christmas Tree ea 2
Length : 3M Material: Plastic Sturdy Metal Stand for support for tree Ornaments (Per a tree)
- Plastic Ball (Diameter 10Cm) – 9EA (per a tree)
- Plastic Ball (Diameter 12Cm) – 8EA (per a tree)
- Plastic Ball (Diameter 14 & 15Cm) – 6EA (per a tree)
- Ribbon (18Cm)– 12 EA (per a tree)
- Christmas Logo (40Cm) – 1EA (per a tree)
- Snowflake (10Cm & 12.5Cm)– 10EA (per a tree)
- Star Christmas Tree Topper(40Cm) – 1EA (per a tree)
- Others (Over 18Cm)– 30EA (per a tree)
0006 36” diameter holiday decorative wreaths ea 14
Dimensions: 36 inch outer diameter; with no less than 20 decorative and no less than 7 poinsettia and pine cone garlands.
See SOW.
0007 Pine Garland ea 30 Length : 270Cm Color : Green Material : Plastic
0008 Miscellaneous items lot 1
- Adhesive Light Mounting Bracket Clip (Sticky)
- Zip Ties
- Surge Protectors
- 220V plug
- Electrical wire
- Floor cord cover cable protector.
- Electrical Tapes
- Electrical Controller with Push Button.
- Waterproof Receptacle with cover
0009 Labor Cost for Installation and testing job 1 Phase 1
Installation: From 01 NOV 2019 to
29 NOV 2019
Installation of holiday ribbons on light poles on the USAG Humphreys installation is required no later than 29 NOV 2019:
Phase 2
Installation: From 01 NOV 2019 to
29 NOV 2019
Purchase (of new) and installation of (new and current U.S.
Government) holiday lights and decorations in the following areas:
1) New Downtown Plaza area (including Holiday Tree)
2) Main (Anjeong-ri) gate area,
3) Sentry Village (Transformation Park) area
Note: The installation of holiday lights in New Downtown Plaza areas except holiday tree shall be completed by 28 NOV 19 for Black Friday lighting.
Phase 3
Installation: From 30 NOV 2019 to
05 JAN 2020
Maintain, Replace, and Repair damaged holiday lights and decoration:
1) New Downtown Plaza area (including Holiday Tree),
2) Main (Anjeong-ri) gate area,
3) Sentry Village (Transformation Park) area,
4) Light poles as specified in the Site Map 4, Area D of this
SOW
0010 Removal, Inventorying, and Storage of all decorations job 1
Removal, Inventorying, and Storage: From 06 JAN 2020 to 17 JAN 2020
Location of Performance: USAG Humphreys, Pyongtaek, South Korea
Specifically:
(1) New Downtown Plaza and surrounding areas,
(2) USAG Humphreys Main Gate (Anjeong-Ri),
(3) Sentry Village area
Light poles as specified in the Site Map 4, Area D of this SOW.
Total
For Site Map 01 New Downtown Plaza area, Site Map 02 Main Gate area, Site Map 3 Transformation Park & Site Map 4 Christmas Bow.
Must meet or exceed the above specifications
SOW
STATEMENT OF WORK
PROJECT NO: VA-90351
TITLE: 2019 Holiday Decoration Project
LOCATION: USAG Humphreys
DESCRIPTION: The work to be performed for completion of this project shall be as described below and executed by the contractor.
a. Work by Contractor:
The contractor shall provide all labor, tools, specified materials, supplies, and any other resources necessary to accomplish the scope of work contained herein and as indicated in the technical specifications and Appendix A (graphics) listed within this Statement of Work
(SOW).
b. Work by In-House Forces: Not applicable to this project.
c. Work by Troop Labor: Not applicable to this project.
PRINCIPAL FEATURES: This project includes, but will not be limited to the following principal features:
1. Purchase of specified, holiday lights (outdoor, weather-proof, alternating multi-color and cascading soft white icicle light emitting diode (LED), Christmas trees with decoration, wreaths, decorations, exhibits, and accoutrements.
2. Installation/set-up, disassembly/removal of decorations of 33 feet (10.1 meter) tall holiday tree, ribbons/bows, holiday lights, ornaments, exhibits, etc. in the designated areas and in and on the designated structures and infrastructure on the installation.
3. Installation of currently U.S. Government owned holiday decorations. Contractor shall utilize existing U.S. Government holiday decorations to the maximum extent possible in the execution of this project.
4. Removal, Inventorying, and Storage of all holiday decorations and equipment at the completion of the project.
TECHNICAL DETAIL SPECIFICATIONS
GENERAL: The requirements delineated in this Statement of Work (SOW) are from U.S.
Government’s Requiring Activity (RA), US Army Garrison Humphreys, Directorate of Public Works (DPW). The purpose of this project is to procure equipment, install/remove, inventory, and prepare for storage all holiday lighting, décor, and other accoutrements to decorate and support the Annual Tree Lighting event in the New Downtown Plaza area and other specified areas around the installation, to include: light poles along the specified sections of roadways and buildings on the installation; and specified areas in Sentry village and Main gate. Please see attached graphics in Appendix A.
Decorations will include, icicle holiday lights for the buildings in and near the New Downtown Plaza area in the vicinity of the Holiday tree, multi-color LED lights for the Holiday tree exhibit, light poles, and bushes, cascading icicle holiday lights for the walk-over bridge, canopies, arch, and light poles leading up to and surrounding the Holiday tree exhibit, decorations for the main (Anjeong-ri) gate area along with the chain link fence near playground, lights for the Sentry Village (Transformation park) area, and holiday exhibits for the targeted areas.
A. Contractor shall purchase holiday lights, decorations, and supplies for the holiday tree and buildings in the new downtown plaza. The main gate and Sentry Village (Transformation Park) areas shall utilize existing decorations and others as appropriate. New holiday decorations are to include, but are not limited to, holiday tree lighting (multi-colored LED lights for adorning the holiday tree, cascading, soft white, icicle lights for the roof of buildings, the bridge and archway in the new downtown plaza area), holiday exhibit decorations (see examples in Appendix A), holiday displays (see examples in Appendix A), ribbons/bows, and other western holiday decorations. All decorations must be sized according to the location so that they may be seen by the community in the given area. Additional decoration details will be provided in Appendix A of this document.
B. All decorations, exhibits, lights, etc. purchased under this contract shall be turned over to the Requiring Activity (RA)-Directorate of Public Works as the RA is the owner of this material, post receipt.
C. Contractor shall provide all supervision, labor, materials, supplies, tools, transportation, and equipment necessary to perform purchasing, delivery, installation, and removal of decorations and supplies.
D. Contractor shall be responsible for complete disposal of any debris created during the performance of work. Contractor shall perform daily clean-up of all debris on the work site. Disposal of debris and other waste products shall be in keeping with current USFK regulations and ROK Laws and Regulations.
E. Contractor shall waterproof all surge protectors, electrical devices to prevent from any accident and take corrective action in accordance with government safety office’s guidance.
F. Contractor shall coordinate any deviation or necessary changes with RA and
Contracting Officer in advance.
G. The contractor shall be responsible for the installation, decoration, and erection of the US Government supplied holiday tree at the event site (New Downtown Plaza area).
The tree shall be decorated by contractor at the targeted location. Dismantling and transportation of the tree after the display period of the event shall be the responsibility of the contractor.
H. Contractor shall remove all decorations with the intent and purpose of reuse of all decorative items.
I. RA/DPW is responsible for Contractor’s base access throughout execution of this contract.
J. Installation and removal schedule will be coordinated with the RA/DPW and KO.
K. All materials utilized shall be required to meet US and USFK Safety standards.
L. Items shall be same and/or similar to the item descriptions shown in this document and contractor’s quote.
RESPONSIBILITY FOR SUPPLIES:
A. Title to supplies/equipment furnished under this contract shall pass to the RA upon formal acceptance, unless the contract specifically provides for earlier passage of title.
B. Unless the contract specifically provides otherwise, risk of loss or damage to supplies shall remain with the Contractor and shall pass to the RA/COR upon acceptance by the COR or delivery of the supplies to the COR at the destination specified in the contract, whichever is later.
C. This section shall not apply to supplies that fail to conform to contract requirements as to give a right of rejection. The risk of loss of or damage to such nonconforming supplies remains with the Contractor until cure or acceptance. After cure or acceptance, paragraph
(B) of this section shall apply.
D. Under paragraph (B) of this section, the Contractor shall not be liable for loss of or damage to supplies caused by the negligence of officers, agents, or employees of the RA/COR acting within the scope of their employment.
E. Malfunctions or damage to existing U.S. Government equipment and supplies, prior to
Contractor transportation, and/or installation are not the responsibility of the Contractor and the Contractor shall not be liable for the damage/malfunction of equipment currently in the possession of the U.S. Government, prior to inspection/installation.
PERFORMANCE:
A. Period of Performance: Completion of installation and commissioning shall be executed in phases:
Phase 1: Installation of holiday ribbons on light poles on the USAG Humphreys installation is required no later than 29 NOV 2019:
Installation: From 01 NOV 2019 to 29 NOV 2019
Phase 2: Purchase (of new) and installation of (new and current U.S. Government) holiday lights and decorations in the following areas:
(1) New Downtown Plaza area (including Holiday Tree)
(2) Main (Anjeong-ri) gate area,
(3) Sentry Village (Transformation Park) area
Installation: From 01 NOV 2019 to 29 NOV 2019.
Note: The installation of holiday lights in New Downtown Plaza areas except holiday tree shall be completed by 28 NOV 19 for Black Friday lighting.
Phase 3: Maintain, Replace, and Repair damaged holiday lights and decoration:
(1) New Downtown Plaza area (including Holiday Tree),
(2) Main (Anjeong-ri) gate area,
(3) Sentry Village (Transformation Park) area
(4) Light poles as specified in the Site Map 4, Area D of this SOW
Installation: From 30 NOV 2019 to 05 JAN 2020
Phase 4: Removal, Inventorying, and Storage:
Removal, Inventorying, and Storage: From 06 JAN 2020 to 17 JAN 2020
B. Location of Performance: USAG Humphrey, Pyongtaek, South Korea, Specifically:
(1) New Downtown Plaza and surrounding areas,
(2) USAG Humphreys Main Gate (Anjeong-Ri)
(3) Sentry Village area
(4) Light poles as specified in the Site Map 4, Area D of this
SOW. See graphical references as included in this document in Appendix A.
INSPECTION AND ACCEPTANCE:
1. The contractor shall make certain all materials purchased and installed meet the requirements of the contract and proof thereof upon request of the Requring Activity (RA). Materials not meeting the requirements of the contract shall not be brought to the job site, unless the materials are previously purchased US Government property.
2. The final inspection and acceptance will be performed by the Requiring Activity (RA) or their representative at the performance site.
3. The Contractor shall provide and maintain an inspection system acceptable to the RA covering the provisions of this contract.
4. The RA has the right to inspect and test all services called for by the contract, to the extent practicable, at any time and place during the term of the contract. The RA shall perform inspections and tests in a manner that will not unduly delay the work.
5. If any of the services do not conform to contract requirements, the Contracting Officer
(KO) may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount.
6. When the defects in services cannot be corrected by appropriate means, the KO may:
(a) require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
(b) reduce the contract price to reflect the reduced value of the services performed.
7. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the KO may:
(a) by contract or otherwise, perform the services and charge to the Contractor any cost incurred by the RA that is directly related to the performance of such service; or
(b) terminate the contract for default.
INSTALLATION AND REMOVAL OF DECORATIONS:
1. Installation and removal schedule shall be coordinated with the RA and shall fall within the ranges as previously stipulated in the SOW.
2. Contractor shall provide the necessary equipment to perform the installation of this contract in the time specified. This entails, at the very least, lift trucks (bucket trucks) with operators and two traffic controller per a lift trucks. The contractor and each subcontractor shall provide and be responsible for all cranes, lifts, etc., necessary for the proper and efficient movement, installation, erection/set-up, decoration, and removal of materials in the targeted areas in this statement of work (SOW). The equipment shall be provided with proper bracing, safety devices, etc.
3. Contractor shall be responsible for providing vehicle(s) in serviceable and safe condition, to include any oil, gas, or other items that are required for the operation of the vehicle listed.
4. Contractor shall be responsible to obtain vehicle insurance, as required by USAG Humphrey Vehicle Registration requirements.
5. Contractor shall be responsible for safe operation of vehicle on the installation, and maintain security of the equipment. On requirements that require overhead lifting, the Contractor shall provide appropriate safety protocols to mitigate the need for personnel entering the installation buildings.
6. All contractor equipment shall be subject to functional and safety inspection by the RA and/or USAG Humphreys Safety group. Equipment not completely safe or functional shall be repaired before work is started.
7. Winterization: The contractor shall be required to perform weather sensitive work during the winter season, which may cause additional costs to be incurred for the contractor.
These additional costs are the contractor’s responsibility.
CONTRACT ADMINISTRATION DATA:
A. RECEIVING OFFICER
(1) The receiving officer or his/her designee is the receiving officer for the receipt of items.
(2) The Receiving Officer is responsible for inspection and acceptance of item and services, and preparation of receiving report (DD Form 250). The Receiving Officer is required to make distribution of the receiving reports with the completion of performance to the following personnel:
Contracting Officer (KO), Contracting Specialist, and Contracting Officer’s Representative
(COR): TBD
SPECIAL CONDITIONS
TITLE: 2019 Holiday Decoration Project
1. GENERAL: In addition to the requirements specified under "GENERAL PROVISIONS" for this Fixed Price Purchase and Installation/Removal/Inventorying Holiday Decorations project, the Contractor shall comply with the following "SPECIAL CONDITIONS" which form a part of this contract.
2. WORK HOURS: The work will be accomplished from 0600 hours through 2400 hours, from 01 November through 29 November 2019 (Installation), 30 December 2019 through 05 January 2020 (Maintain and Repair), 06 January 2020 through 17 January 2020 (Removal, Inventorying, Storage). Any proposed change in working hours should be approved by the Contracting Officer (KO) and RA.
3. NOTIFICATION OF INSPECTION SECTION: Prior to starting work, the contractor shall notify the RA of the actual date he intends to start work. The contractor shall also give the project inspector/RA daily updates on the progress of the installation due to the tight time line of execution of this project.
4. INSTALLATION ACCESS AND CONTROL
4.1 Installation Access: RA/DPW is responsible for Contractor’s base access throughout execution of this contract.
4.2 Designations: All contractors’ employees shall be easily recognized by wearing uniform and/or name tag during the performance of work under this contract. All cargo vehicles also shall be identified as performers by displaying company name during working hours.
4.3 Search and Control: All Contractor’s employees will be subject to installation’s security protocols including searching of vehicles and persons.
5. SUBMITTALS: The contractor shall provide contract progress updates daily.
6. COORDINATION: The contractor shall coordinate his work with all others (subcontractor and government agencies) involved in this project and shall cooperate with all other contractors and government agencies so as to facilitate the general progress of the work. The contractor shall be provided a list of others to coordinate with at the pre-construction conference. Each contractor shall afford all other contractors reasonable opportunity to work or store materials. Before proceeding with any work, the contractor and/or subcontractor shall consult applicable drawings and specifications for each trade involved.
APPENDIX "A"
MATERIAL and GRAPHICAL SPECIFICATIONS
TITLE: 2019 Holiday Decoration Project
GENERAL: The purchase and installation/removal work shall conform to the information in this section and throughout the rest of this SOW. All materials that are newly purchased are to be manufactured and installed to withstand the winter environment in the immediate area this includes strong winds, below freezing temperatures, precipitation, and any and all winter weather conditions. Current U.S. Government owned equipment shall only be utilized as stated in this SOW or to the maximum extent possible for decorative purposes.
Utilization of Current US Government property:
The garland, wreaths, and ornaments shall be utilized, to the maximum extent possible, in the new downtown plaza area, the Transformation Park (Sentry Village) area, or the Main Gate area. Any additional materials required for decorating the new downtown plaza area shall be purchased and supplied by the contractor. All materials purchased by the contractor shall become property of the U.S. Government after inspection and receipt by the COR or designate.
Work Scope Graphical Specifications:
Site Map 1: New Downtown Plaza area:
Work to be executed:
Contractor shall erect, decorate, and deconstruct the 33 foot (10.1 meter) holiday tree (U.S.
Government property) at the location delineated with the picture of a holiday tree on the graphic.
Contractor shall install outdoor, weather-proof, soft white, cascading, icicle LED lighting along the buildings’ outer edges highlighted in “blue” color on the graphic. The linear footage required is 1490 meter.
Contractor shall install outdoor, weather-proof, soft white, cascading, icicle LED lighting along the sections highlighted in “red” color on the graphic. This includes the walk-over bridge, arch, canopies at the entrance to the new Plaza area, lamp posts running from the entrance of the plaza area to the holiday tree area, the lamp posts surrounding the Holiday tree area, and the interstitial spaces between the lamp posts. The linear footage required is 1240 meter.
Contractor shall install outdoor, weather-proof, flexible LED lighting to light poles (44EA) from the entrance of the plaza areas to the holiday tree. Three (3) lines of each color (“Red”, “Soft white”, and “Green) shall be installed together without space and the space of lines of combined three lines shall be less than 5 centimeters.
(Example)
Contractor shall install assorted holiday light displays and exhibits (i.e. Santa, Snowman, candy canes, North Pole, etc.) at the locations marked with an “X” on the graphic.
Contractor shall install “Nut Cracker Toy Soldiers” type of lighted exhibits at the locations marked with a “T” on the graphic.
Contractor shall provide and install two (2) holiday Christmas present wooden boxes (Dimension : 4’ X 4’ X 4’, outer : water proof wrapping paper) at the locations marked with a “B” on the graphic
Contractor shall decorate the second row of light poles with holiday wreaths of the same or similar type in current U.S. Government inventory.
Deconstruct, inventory, and prepare for storage all of the decorations utilized in this area.
Current US Government holiday equipment shall be utilized to the maximum extent possible
Materials to be purchased:
Sitemap 1 Area A: New Downtown Plaza area
A. Lights for holiday tree will be decorated with no less than 3000 new multi-colored holiday LED lights, no less than 400 new weather proofed ornaments, and topped with a large lit star (blue/white) to the tree; The large lit star shall be provided as Government Furnished Material which was used Christmas decorations in the year of 2018. And will be secured to endure inclement weather (to include high winds) until removal. For the decoration of the 33 foot (10.1 meter) tall holiday tree:
1. Space between lines is less than 2”, Multi-Color (red, amber, blue, green, and gold) LED lights
Please see photos below for illustrative examples of multi-colored light holiday tree and star:
B. Flexible outdoor LED holiday decoration lights (Color: Red, Green, Yellow) for light poles (22EA) in the new Downtown Plaza.
See below for illustrative examples of multi-colored LED string/strip/tube lights:
C. Soft white, cascading icicle LED lights on the buildings’ outer edges, the bridge, arch, canopies, light posts, and intra-light posts heading to and surrounding the main holiday tree area. (2700 meter).
See illustrative examples below:
File details come from the government source that posted it.