A21_Attachment_1-Deliverable.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- Inspection, Test and Maintenance of Natural Gas Line and Equipment in Camp Casey and K-16
- Solicitation number
- W91QVN19R0318
About this file
ATTACHMENT 1-DELIVERABLE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN19R0318-0002.docx | DOCX document | |
| W91QVN19R0318-0001_(Q&A).docx | DOCX document | |
| W91QVN19R0318-0001_(Attachment).pdf | ||
| A21_Attachment_3-2-List_of_Gas_Using_Facilities_in_K-16.xlsx | XLSX spreadsheet | |
| A21_Attachment_3-1-List_of_Gas_Using_Facilities_in_Camp_Casey.xlsx | XLSX spreadsheet | |
| A21_Attachment_2-1-Natural_Gas_Utility_Map_for_Camp_Casey.pdf | ||
| A21_Attachment_2-2-Natural_Gas_Utility_Map_for_K-16.pdf | ||
| SOLICITATION_W91QVN19R0318.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment 1 |
| DELIVERABLES |
| DELIVERABLE | FREQUENCY | # OF COPIES | MEDIUM/FORMAT | DISTRIBUTION |
| #1. |
PWS, Para 1.3.6.1.
Accident Requiring Emergency Medical Treatment
| Immediate. Not later than two (2) hours after the incident | N/A | Email or Telephone | COR |
| #2. |
PWS, Para 1.4.4.
Quality Control Plan Initial: within 14 calendar days of contract award
Updates: 5 calendar days prior to implementation 2 Electronic Copies One MS Word
| One pdf with CM's signature | COR | |
| #3. |
PWS, Para 1.11.3.
| Contractor Vehicle Registration | Seven (7) working days of work commencement | 1 Electronic Copy | Fillable pdf | COR |
| #4. |
PWS, Para 1.12.1
| AT Level I Training | Within fourteen (14) calendar days of contract award | 1 Electronic Copy | pdf with CM's signature | COR |
| #5 |
PWS, Para 1.12.3.
| iWATCH Training | Not later than thirty (30) calendar days of contract award | 1 Electronic Copy | pdf with CM's signature | COR |
| #6 |
PWS Para 1.13.1.
Safety Plan Initial: within ten (10) calendar days of contract award
Updates: five (5) calendar days prior to effective days of change 1 Electronic Copy One MS Word
| One pdf with CM's signature | COR | |
| #7 |
PWS, Para 1.21.
| Contractor Manpower Reporting Application (CMRA) | Annually NLT October 31, or IAW requirements at cmra.army.mil | Online Entry | Via website IAW requirements at cmra.army.mil | COR |
| #8 |
PWS, Para 5.1.2.
Inspection and Test Schedule Ten (10) calendar days advance of commencement of work 1 Electronic Copy One MS Word
| One pdf with CM's signature | COR | |
| #9 |
PWS, Para 5.1.3.
Semi-annual inspection report Within fifteen (15) calendar days of periodic inspection completion 1 Electronic Copy One MS Word
One pdf with CM's signature COR
File details come from the government source that posted it.