A09_W91QVN-19-R-0205-0001.pdf

PDF 286 KB Posted

Attached to
Maintenance and Repair Tracked Vehicle and Engineer Equipment
Solicitation number
W91QVN-19-R-0205
Issued by

About this file

Amendment (Question and Answer)

View the file

Other files

File Type Posted
A09_W91QVN-19-R-0205-0003.pdf PDF
A09_W91QVN-19-R-0205-0002.pdf PDF
Attchment_5,_ELIN.xlsx XLSX spreadsheet
A09_W91QVN-19-R-0205.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W582MZ91410101

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Next Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Oct-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN19R0205

X 9B. DATED (SEE ITEM 11)

16-Sep-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Oct-2019

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

NAME: JUVON ALLGOOD

PHONE #: 315 730-4209

APO AP 96271

W91QVN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91QVN19R0205

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

1. The purpose of this amendment is

a. To answer the questions from offerors:

Q1. Under the PWS 1.6.1.3 Contractor License: The Contractor shall possess license of “General Automotive

Vehicle Maintenance and Repair Business (자동차종합정비업)” issued by ROK Government IAW Article 53 of

Registration of Automotive Vehicle Maintenance and Repair Business (자동차관리사업의 등록) of Automotive

Vehicle Management Law (자동차관리법).

But based on the PWS, most of equipment are classified as heavy equipment such as Tracked Vehicles and Engineer Equipment. We therefore believe that prime contractor who possess a license of construction equipment(건설기계정비업) issued by ROK Government and Approval of a manufactory(공장 등록증명서) is qualified as well. Therefore we are asking if this requirement can be added to enhance the range of competitive bids that may be submitted.

A1. Permit of Maintenance and Repair of Construction Equipment (건설기계정비업) and Certificate of Factory

Registration (공장 등록증명서) are not required because performance of the contract shall be done at facilities provided by U.S. government located in the U.S. military bases. However, offerors shall show they have an experience with maintenance and repair of not only Tracked Wheel Vehicle but also Construction Equipment in their proposals.

Q2. Do you have any plans for site visits?

A2. No, Site visit is not required because models and estimated amount of vehicle and equipment, estimated labor hours for each model, and locations of work sites are stated in the PWS.

2. All other terms and conditions of RFP W91QVN-19-R-0205 remain unchanged.

(End of Summary of Changes)

W91QVN19R0205

File details come from the government source that posted it.