TE05_Checklist_for_AST_and_Dike.pdf

PDF 47 KB Posted

Attached to
W91QVN-19-R-0065-0002
Solicitation number
W91QVN-19-R-0065
Issued by

About this file

Technical Exhibit 05 Checklist for AST and Dike

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment-10, Inspection Checklist, 1 of 1

Worksheet for AST and Dike Tank No:

Work Description Yes No Remark /Take Action

1. Inspeciton & Clean-up

a. Does the tank have any visible leaks or sign of leak?

b. Is the dike drain free of debris drained?

c. Does the dike have a drain valve?

d. Is the dike drain valve closed?

e. Is the tank grounded?

f. Are there "No Smoking" signs on the tank?

g. Does the tank have visible corrosion damaged?

h. Does the container dike have visible damaged?

i. Does the tank required re-painting?

j. Contractor should maintain cleanliness in the dike

k. Contractor must close the drain valve after work.

- Diagram

2. Please, describe below any abnormalities found under inspection and required corrections.

3. If there is any leaking in tank and dike, contractor have to report to COR wihtout delay.

Date :

Inspector/Signature :

Worksheet

File details come from the government source that posted it.