Project No: SMYU 12-1032 Title: REPAIR 51 OG OPERATIONS, B1114, Osan Air Base (AB)

a. This is non- Work Plan Task Order for the follow ing MATOC Contractors only. NON-Work Plan Task Order requests for proposal under the MATOC #W91QVN-18-D-0053, 0054, 0055, 0056, 0057, 0058, 0059, 0060, 0061, 0062, 0063, 0064, 0065, 0066, 0067, 0068, 0069, 0070, 0071, 0073, 0074, 0075, 0076, 0077, 0078, 0079, 0093, 0094 and 0163.

b. Site Visit: All MATOC offerors w ho intend to propose on this solicitation are strongly recommended to attend the site visit. See site visit clauses in Section L for Schedule.

c. If the Contractor is unable to submit the proposal in response to this RFP, the Contractor shall submit the 'No-Offer Letter' by date and time

MS. KIM, NAM SUN 02-7914-3339

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

15-May-2018

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________270 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________05 Jun 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCC YONGSAN, UNIT #15289

APO AP 96205-5289

UNITED STATES OF AMERICA (THE)

W91QVN

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: 755-0638 TEL: FAX:

W91QVN18R0127 27

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W91QVN18R0127

Section A - Solicitation/Contract Form

SUBJECT TO AVAILABLITY OF FUND

“Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.”

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

REPAIR 51 OG OPERATIONS, B1114

FFP

Project No: SMYU 12-1032 Title: REPAIR 51 OG OPERATIONS, B1114, Osan Air Base (AB) (see detailed statement of work and attached drawings)

Contractor shall provide all personnel, labor, tools, equipment materials, supervision, and transportation.

FOB: Destination

PURCHASE REQUEST NUMBER: F3J3CE8109AW04

PSC CD: Z2AA

NET AMT

Section C - Descriptions and Specifications

SOW

PROJECT NO. TITLE LOCATION

SMYU 12-1032 REPAIR 51 OG OPERATIONS, B1114 Osan AB

TABLE OF CONTENTS

1. Technical Provisions - I: Statement of Work

2. Technical Provisions - II: Technical Detail Specifications

3. Technical Provisions - III: Special Conditions

4. Appendix “A” - List of Applicable Contract Drawings

5. Appendix “B” - Osan AB Architectural Compatibility Plan

6. Appendix “C” - Asbestos Survey Report

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

1.0 DESCRIPTION: The work to be performed for completion of this project shall be in general as described below, and executed by one or more of the groups.

1.1 Work by Contractor:

1.1.1 The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.

1.1.2 The contractor shall repair 51 OG Operations building, B1114, Osan AB in accordance with the specifications and drawings.

1.2 Work by In-House Forces: Not applicable to this project.

1.3 Work by Troop Labor: Not applicable to this project.

*CONTRACT TYPE: This is an individual Non-Work Plan Task Order of Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) issued by 411th CSB, Korea.

2.0 PRINCIPAL FEATURES: This project includes, but will not be limited to the following principal features:

3.0 SCOPE OF WORK (SOW): All works shall be in accordance with the attached specifications and drawings.

3.1 CIVIL WORKS

3.1.1 REPAIR BY REPLACING EXISTING AC (ASPHALTIC CONCRETE) PAVEMENT.

3.1.2 REPAIR BY REPLACING EXISTING CONCRETE SIDEWALK.

3.1.3 REPAIR BY REPLACING EXISTING CONCRETE CURB.

3.1.4 REPAIR BY REPLACING EXISTING CONCRETE PADS.

3.1.5 REPAIR BY REPLACING DOMESTIC WATER, FIRE LINES, WITH GATE VALVE, POST

INDICATOR VALVE, AND FITTINGS.

3.1.6 REPAIR BY REPLACING SEWER LINE.

3.1.7 REPAIR BY REPLACING 0.45M CONCRETE DITCH WITH STEEL GRATINGS.

3.1.8 PROVIDE SOLID SOD.

3.2 STRUCTURAL WORKS

3.2.1 REPLACE EXISTING MECH ROOM WITH NEW (CONCRETE WALL, STEEL ROOF).

3.2.2 REPLACE EXISTING CONCRETE SLAB WITH NEW 180MM THICKNESS CONCRETE SLAB.

3.2.3 REPLACE EXISTING CONCRETE APRON.

3.2.4 REPLACE CONCRETE STOOP.

3.2.5 REMOVE EXISTING STEEL COLUMN & BEAM.

3.2.6 BLOCK UP EXISTING OPENING WITH CMU (CEMENT MASONRY UNIT).

3.2.7 REPLACE EXISTING METAL ROOFING WITH FORM DECK.

3.2.8 REPLACE EXISTING OUTSIDE CONCRETE PAD TO STEEL FRAME PLATFORM.

3.3 ARCHITECTURAL WORKS

3.3.1. FLOOR AND BASE

3.3.1.1 REPLACE EXISTING FLOOR FINISH PER FINISH SCHEDULE.

3.3.1.2 REPLACE EXISTING CONCRETE SLAB (SEE EXISTING/ REMOVAL FLOOR PLAN)

3.3.1.3 REPLACE EXISTING BASE PER FINISH SCHEDULE.

3.3.1.4 INFILL CEMENT MORTAR BED AFTER REMOVE EXISTING FLOOR TILE WITH

CEMENT MORTAR BED.

3.3.2. WALL

3.3.2.1 REPLACE EXISTING WALL WITH FINISH PER FINISH SCHEDULE.

3.3.2.2 REPLACE EXISTING WALL LINER WITH GWB (GYPSUM WALL BOARD) LINING

WITH FINISH.

3.3.2.3 REMOVE EXISTING WALL.

3.3.2.4 REPLACE EXISTING WALL FINISH PER FINISH SCHEDULE.

3.3.2.5 SAW-CUT EXISTING WALL.

3.3.2.6 REPLACE EXISTING EXTERIOR METAL SIDING WITH EIFS (INTERIOR INSULATION

& FINISH SYSTEM).

3.3.2.7 INFILL EXISTING WALL OPENING.

3.3.2.8 ADD EXISTING EIFS ON EXISTING CMU (CONCRETE MASONTY UNIT) WALL.

3.3.2.9 REPLACE EXISTING WALL WITH EIFS.

3.3.3. CEILING

3.3.3.1 REPLACE EXISTING CEILING PER FINISH SCHEDULE.

3.3.4. ROOF

3.3.4.1 REPLACE EXISTING ROOF WITH STANDING SEAM METAL ROOFING WITH RIGID

INSULATION ON SELF ADHESIVE VAPOR/ AIR BARRIER ON ROOF DECK.

3.3.5. MISC.

3.3.5.1 REPLACE EXISTING DOOR & DOOR FRAME PER DOOR SCHEDULE.

3.3.5.2 REMOVE EXISTING DOOR & DOOR FRAME.

3.3.5.3 REPLACE EXISTING WINDOW & WINDOW FRAME PER WINDOW SCHEDULE.

3.3.5.4 REMOVE EXISTING WINDOW & WINDOW FRAME.

3.3.5.5 REMOVE EXISTING REGISTER.

3.3.5.6 REPLACE EXISTING CONCRETE APRON.

3.3.5.7 REMOVE EXISTING CONCRETE STOOP.

3.3.5.8 ADD CONCRETE APRON.

3.3.5.9 DEMOLISH EXISTING CONTAINER.

3.3.5.10 REMOVE EXISTING BOLLARD.

3.3.5.11 REMOVE EXISTING STL COLUMN & BEAM (SEE STRUCTURAL DRAWINGS)

3.3.5.12 REPLACE EXISTING SLIDING DOOR WITH OVERHEAD COILING DOOR.

3.3.5.13 REMOVE EXISTING CABINET & SINK.

3.3.5.14 REPLACE EXISTING TOILET & JANITOR ACCESSORIES & PLUMBING FIXTURES.

3.3.5.15 REPLACE EXISTING GUTTER & DOWNSPOUT WITH CONCRETE SPLASH BLOCK.

3.3.5.16 ADD BOLLARD.

3.3.5.17 REPLACE EXISTING ELECTRIC WATER CLOLER (SEE MECHANICAL DRAWINGS).

3.3.5.18 REPLACE EXISTING FEC (FIRE EXTINGUISHER CABINET).

3.3.5.19 REPLACE EXISTING SIGNAGE PER SIGNAGE SCHEDULE.

3.3.5.20 REPLACE EXISTING METAL FASCIA (SEE ELEVATION DRAWING).

3.3.5.21 ADD PROTECTED METAL CANOPY WITH SUPPORT FRAME.

3.3.5.22 DEMOLISH EXISTING EXTERIOR STORAGE SHED WITH DOOR.

3.3.5.23 REMOVE EXISTING FUEL OIL SUMP PIT.

3.3.5.24 ADD CONCRETE STOOP.

3.3.5.25 ADD DOOR & DOOR FRAME PER DOOR SCHEDULE.

3.3.5.26 ADD LOUVER.

3.3.6 ASBESTOS REMOVAL

3.3.6.1 REMOVE ASBESTOS CONTAINING MATERIALS (SEE APPENDIX “C” ASBESTOS

SURVEY REPORT)

3.4. MECHANICAL WORKS

3.4.1. HVAC-REMOVAL WORK

3.4.1.1. REMOVE EXISTING HEATING BOILER, ASSOCIATED CIRCULATING PUMP, AND

PIPING DISTRIBUTION SYSTEM.

3.4.1.2. REMOVE EXISTING OUTDOOR PACKAGED AIR CONDITIONING UNIT SYSTEM

WITH ASSOCIATED DUCTWORK AND CONTROLS.

3.4.1.3. REMOVE EXISTING AIR COOLED CONDENSING UNIT, AIR HANDLING UNIT, AND

ASSOCIATED DUCTWORK AND PIPING DISTRIBUTION SYSTEM.

3.4.1.4. REMOVE EXISTING UNIT HEATERS, FIN-TUBE RADIATORS, AND ASSOCIATED

HOT WATER PIPING.

3.4.1.5. REMOVE EXISTING EXHAUST AIR FAN.

3.4.1.6. RELOATE EXISTING FUEL OIL STORAGE TANK AND REMOVE ASSOCIATED

UNDERGROUND FUEL OIL PIPING AND SUMPS (2EA).

3.4.1.7. REMOVE EXISTING SUPPLY DIFFUSERS, RETURN REGISTER AND EXHAUST

GRILLES.

3.4.2. HVAC-REPLACEMENT WORK

3.4.2.1. PROVIDE AND INSTALL NEW HEATING HOT WATER BOILER SYSTEM TO INCLUDE

NEW BOILER, NEW PUMP, NEW PIPING DISTRIBUTION, EXPANSION TANK, AIR

SEPARATOR, AND NEW DDC (DIGITAL DIRECT CONTROL) SYSTEM.

3.4.2.2. PROVIDE AND INSTALL NEW PACKAGED ENERGY RECOVERY UNIT TO INCLUDE

NEW DUCT DISTRIBUTION SYSTEM, PIPING SYSTEM AND DDC SYSTEM.

3.4.2.3. PROVIDE AND INSTALL PACKAGED AIR CONDITIONING UNIT TO INCLUDE NEW

DUCT DISTRIBUTION SYSTEM, PIPING SYSTEM AND DDC SYSTEM.

3.4.2.4. PROVIDE AND INSTALL NEW HEAT PUMP PACKAGED UNITS TO INCLUDE

REFRIGERANT PIPING AND CONTROLS.

3.4.2.5. PROVIDE AND INSTALL NEW HEAT PUMP PACKAGED UNIT FOR COMM ROOM TO

INCLUDE REFRIGERANT PIPING AND CONTROLS.

3.4.2.6. PROVIDE AND INSTALL NEW EXHAUST FANS AND ASSOCIATED DUCTWORK.

3.4.2.7. RELOCATE EXISTING PACKAGED DOUBLE WALL FUEL OIL STORAGE TANK WITH

BUILT-IN PIPING SYSTEM.

3.4.2.8. PROVIDE AND INSTALL NEW FUEL OIL PIPING FROM THE RELOCATED FUEL OIL

STORAGE TANK TO THE NEW BOILER ROOM AND CONNECT TO THE BOILER.

3.4.2.9. PROVIDE AND INSTALL NEW UNIT HEATERS, FIN-TUBE RADIATORS, AND

ASSOCIATED PIPING.

3.4.2.10. PROVIDE AND INSTALL NEW SUPPLY DIFFUSERS, RETURN REGISTERS,

TRANSFER GRILLERS, AND EXHAUST GRILLES.

3.4.3. PLUMBING-REMOVAL WORK

3.4.3.1 REMOVAL EXISTING ELECTRIC DOMESTIC HOT WATER HEATER AND

ASSOCIATED PIPING.

3.4.3.2 REMOVE EXISTING DOMESTIC HOT AND COLD WATER PIPING.

3.4.3.3 REMOVE EXISTING WATER CLOSET ASSOCIATED PIPING.

3.4.3.4 REMOVE EXISTING LAVATORY AND ASSOCIATED PIPING.

3.4.3.5 REMOVE EXISTING DOMESTIC COLD SUPPLY PIPING.

3.4.3.6 REMOVE EXISTING ELECTRIC WATER COOLER ASSOCIATED PIPING.

3.4.3.7 REMOVE EXIST FLOOR DRAIN, SEWER AND VENT PIPING.

3.4.3.8 REMOVE EXISTING KITCHEN SINK ASSOCIATED PIPING.

3.4.4. PLUMBING-REPLACEMENT WORK

3.4.4.1 PROVIDE NEW ELECTRIC DOMESTIC HOT WATER HEATER, RECIRCULATION

PUMP, EXPANSION TANK, ASSOCIATED PIPING, AND CONTROLS.

3.4.4.2 PROVIDE NEW DOMESTIC HOT AND COLD WATER PIPING.

3.4.4.3 PROVIDE NEW SEWER AND VENT PIPING.

3.4.4.4 PROVIDE NEW WATER CLOSET AND ASSOCIATED PIPING.

3.4.4.5 PROVIDE NEW LAVATORY AND ASSOCIATED PIPING.

3.4.4.6 PROVIDE NEW SINK AND ASSOCIATED PIPING.

3.4.4.7 PROVIDE NEW ELECTRIC WATER COOLER AND ASSOCIATED PIPING.

3.5. ELECTRICAL WORKS

3.5.1 LIGHTING SYSTEM

3.5.1.1 REPLACE EXISTING LIGHT FIXTURES WITH NEW.

3.5.1.2 REPLACE EXISTING EMERGENCY LIGHT FIXTURES WITH NEW.

3.5.1.3 REPLACE EXISTING LIGHT SWITCHES WITH NEW.

3.5.2 POWER SYSTEM

3.5.2.1 REPLACE EXISTING RECEPTACLE WITH NEW.

3.5.2.2 REPLACE EXISTING POWER CONNECTION WIRES, SAFETY SWITCH AND MOTOR

STARTER FOR MECHANICAL EQUIPMENT WITH NEW.

3.5.2.3 REPLACE EXISTING PANELBOARD WITH NEW.

3.5.2.4 REPLACE EXISTING POWER SERVICE SYSTEM WITH NEW CURRENT

TRANSFORMER'S BOX, WATTHOUR METER, MAIN PANELBOARD, WIRES AND CONDUIT.

3.5.3 TELEPHONE SYSTEM

3.5.3.1 REPLACE EXISTING TELEPHONE SYSTEM WITH NEW TELEPHONE TERMINAL

BOARD, TERMINAL BLOCKS, EQUIPMENT RACKS, PATCH PANELS, TELEPHONE

OUTLETS, WIRES AND CONDUIT, BUT EXISTING TELEPHONE TERMINAL CABINET AND

COMMUNICATION PATCH PANEL TO REMAIN.

3.5.4 CABLE TELEVISION (CATV) SYSTEM

3.5.4.1 REPLACE EXISTING CATV SYSTEM WITH NEW CATV DISTRIBUTION CABINET,

PULL BOXES, SPLITTERS, TAP-OFFS, CATV OUTLET, WIRES AND CONDUIT.

3.5.5 EXTERIOR ELECTRICAL DISTRIBUTION SYSTEM

3.5.5.1 REPLACE EXISTING POWER DISTRIBUTION SYSTEM WITH NEW UNDERGROUND

PRIMARY LINE, PAD MOUNTED TRANSFORMER AND UNDERGROUND SECONDARY LINE.

3.5.6 EXTERIOR TELECOMM DISTRIBUTION SYSTEM

3.5.6.1 RELOCATE EXISTING OVERHEAD CATV LINE.

3.6. FIRE PROTECTION WORKS

3.6.1 DEMOLISH EXISTING FIRE ALARM SYSTEM COMPONENTS IN THEIR ENTIRETY

INCLUDING WIRING AND EXPOSED CONDUIT.

3.6.2 PROVIDE AND INSTALL WET PIPE FIRE SPRINKLER PROTECTION SYSTEM IN

ACCORDANCE WITH AUTOMATIC SPRINKLER SYSTEM NOTES ON DRAWING SHEET F-

001.

3.6.3 PROVIDE AND INSTALL FIRE ALARM / MASS NOTIFICATION SYSTEM.

4.0 CONTRACT PERFORMANCE PERIOD: 270 calendar days after NTP (Notice to Proceed) including off-shore materials procurement.

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

1. GENERAL: This project shall comply with Division 01 of the “Standard Technical Specifications for O&MA Projects, Korea (2014 OMA SPECS & SPEC REVISION 1)” the latest version issued by the Department of the Army, Installation Management Command and it can be downloaded from the website http://www.usfk.mil/Resources/ContractingwithUSFK.aspx.

2. OTHER APPLICABLE PARTICULAR SPECIFICATIONS & GUIDES: This project shall comply with Appendix “B”, Osan AB Architectural Compatibility Plan dated 01 January 2009 by the 51st Civil Engineer Squadron (51CES), and the “Specifications Contract Submittal (100%)” prepared by AMKOR A&E Inc.

attached on this solicitation. The below are project table of contents of the particular specification for reference.

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

See Standard Technical Specifications for O&MA Projects, Korea

(2014 OMA SPECS & SPEC REVISION 1)

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 82 13.00 10 ASBESTOS ABATEMENT

DIVISION 03 - CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

07 27 00 AIR BARRIER MEMBRANES

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 41 14 PROTECTED METAL

07 42 13 METAL WALL PANELS

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 33 23 OVERHEAD COILING DOORS

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 VISUAL DISPLAY UNITS

10 14 00.10 EXTERIOR SIGNAGE

10 14 00.20 INTERIOR SIGNAGE

10 28 13 TOILET ACCESSORIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

12 48 13 ENTRANCE FLOOR MATS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING CONTROL

SYSTEMS

23 23 00 REFRIGERANT PIPING

23 52 00 HEATING BOILERS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

23 83 00.00 20 ELECTRIC SPACE HEATING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 51 00 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 16 SUBBASES FOR FLEXIBLE PAVING

32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 13 CONCRETE SIDEWALKS, CURBS, GUTTERS AND DITCHES

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 11 00 WATER DISTRIBUTION

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 56 10 ABOVEGROUND FUEL OIL PIPING SYSTEM

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

1.0 CONTRACT PERFORMANCE PERIOD: 270 calendar days after NTP (Notice to Proceed) including off-shore materials procurement.

2.0 CONSTRUCTION SITE ACCESS: The entire project site is located inside the flight line area and construction works will be 100% escorted by military personnel therefore, contractor’s actual daily work hours might be less than normal work hours. Also, the construction activity could be limited by aircraft operations. Contractor shall consider these uncertainties on their price proposal.

3.0 SECURITY REQUIREMENTS:

3.1 Contractor’s personnel or any representative of the contractor entering installation/base shall abide by all security regulations imposed by Installation Commander or Base Commander at all times and shall be subject to security checks. Contractor’s personnel and property shall be subject to search and seizure upon entering the confines of the installation/base.

3.2 Escort Privileges: The contractor shall be responsible for adhering to the escorting privileges on base passes for the Program Manager, Contract Manager (CM), CQC System Manager, SSHO with a limitation of three (3) persons and one (1) vehicle access per base pass. It is the contractor’s responsibility to ensure that the escorting official has full control over all escorted individuals at all times. Any individual found on the installations unescorted will be removed from the installation or base and the escort officials escorting privileges will be immediately withdrawn.

Any individual removed from these installations/bases will not be authorized further access to these installations/bases and may further be subject to other Government actions.

3.3 Return Post/Base Passes: On the contract completion date, the contractor shall turn-in all passes to the sponsor that were issued for the contract and final payment will not be made until such items are returned.

4.0 REMARKS: Taking part in the site orientation is strongly recommended to survey actual location condition and getting accurate dimensions to prepare cost proposal. Also any modification requests by contractor due to different site conditions during construction period are never allowed.

APPENDIX “A”

LIST OF APPLICABLE CONTRACT DRAWINGS

1. GENERAL: The work shall conform to the drawings, all of which form a part of the specifications. The drawings are from the “Standard Detail Drawings for OMA Projects, Korea (OMA STD DETAIL DWG, 2014)” issued by the Department of the Army, Installation Management Agency, Korea Region Office which can be downloaded from the website http://www.usfk.mil/Resources/ContractingwithUSFK.aspx.

and the Contract Design Drawings (100%) prepared by AMKOR A&E Inc. attached on this solicitation.

The below ate list of drawings for reference.

See the uploaded as Appendix “A” in FBO

APPENDIX “B”

Osan AB Architectural Compatibility Plan

See the uploaded as Appendix “B” in FBO

APPENDIX “C”

Asbestos Survey Report

See the uploaded as Appendix “C” in FBO

CONTRACT SUBMITTAL REQUIREMENT

MATERIAL APPROVAL SUBMITTALS: Contractor shall have an approved AF Form 3000 for all material which are on the lists in provided “SUBMITTAL REGISTER” that is to be used on this contract.

ATOPSEC

1. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 20 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

2. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area.

Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

2a. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

2b. For contractors that do not require CAC, but require access to a DoD facility or installation.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

3. AT Awareness Training for Contractor Personnel Traveling Overseas. This standard language required US based contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13. Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact.

4. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award.

7. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter. OPSEC training is available at the following website: http://cdsetrain.dtic.mil/opsec/

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 270 calendar days after Notice of Proceed (NTP). The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section G - Contract Administration Data

Section K - Representations, Certifications and Other Statements of Offerors

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

(a) The offeror certifies that --

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –

(i) Those prices,

(ii) The intention to submit an offer, or

(iii) The methods of factors used to calculate the prices offered:

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --

(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or

(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS

(a) SUBCONTRACTING:

If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.

(b) AFFILIATED OFFERORS:

(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.

(2) Each offeror shall furnish, below, the following information:

(i) Whether the offeror has any affiliates;

(ii) The names and addresses of all affiliates of the offeror; and

(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.

AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)

(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):

Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.

(d) STANDARDS OF CONDUCT CERTIFICATION:

This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.

(i) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(ii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(iii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

Firm ____________________________________________________ Name _____________________________________________________ Signature __________________________________________________

Title _____________________________________________________ Date of Execution ____________________________________________

(e) TAXES:

(1) References:

(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."

(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.

(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.

(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.

(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

This item will be imported specifically for this contract? Yes _____ No _____

(ii) Special Excise Tax:

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

Name of item manufacturer

(iii) Value Added Tax (VAT):

Input VAT on materials purchased for this contract. 10% _____ Input VAT on transportation leased/rented for this contract.10% _____ Input VAT on equipment leased/rented for this contract. 10% _____ Input VAT on services purchased for this contract. 10% _____ Output VAT on total contract amount. 10% _____

(iv) Special Excise (Petroleum) Tax:

No. of U/P

Liters w/o Tax Tax/Unit Total Tax Amount Regular Gasoline ________ (L) ________ w________ w_____________ Premium Gasoline ________ (L) ________ w________ w_____________ Diesel ________ (L) ________ w________ w_____________ Other ________ (L) ________ w________ w_____________

(v) Education Tax.

(3) Name of the oil company from which POL products will be purchased:

Oil Company: _________________________________________ (Name only)

(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.

Signed (Chop)

(f) CERTIFICATIONS AND REPRESENTATIONS

By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation.

The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.

Section L - Instructions, Conditions and Notices to Bidders

INSTRUCTION TO OFFEROR

1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL:

The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-1(f)(4).

Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.

2. SUBMISSION DOCUMENT: The following shall be submitted by 13:00 hours (Korean Standard Time) on the closing date of RFP through Federal Business Opportunities (https://fbo.gov), or if FBO is not available, email to namsun.kim3.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to only FBO server problem not individual failure/problem. All questions should be emailed to namsun.kim3.ln@mail.mil within five (5) days after the solicitation is issued.

a. Pricing Proposal: The pricing proposal must clearly indicate prices for each Contract Line Item Number in Section B - Supplies or Services and Prices.

b. Detailed Offer breakdown: The detailed offer breakdown must clearly identify all costs that can materially impact the statement of work (SOW).

c. Section K- Representations, Certifications and Other Statements of Offerors

Section K-TAXES: Offerors must complete all tax portions of Section K. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, any proposed exemption of a specific ROK tax shall be legitimate, attributable to the contract, and authorized by the applicable stated references.

Section K-OTHER: Offerors must complete all Non-Tax related portions of SECTION K.

Compliance with Solicitation: Failure to submit the above requirements under Section L may be grounds for determining the proposal to be non-compliant. For example, if a detailed offer breakdown is not submitted, the contracting officer will be unable to find the offeror's pricing proposal acceptable and the offeror's proposal will be ineligible for award. Non-compliance will only be cured if the government holds discussions as detailed in

SECTION L.

3. No-Offer Letter: If MATOC Contractor is unable to submit the proposal in response to this RFP, the Contractor shall submit a 'No-Offer Letter' by date and time specified in this solicitation.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Date/Time: 29 May 2018/0930 hours Place: Doolittle Gate, Osan AFB Point of Contact: Mr. Kim, Tok Kwan, Construction Inspector, DSN: 784-5227, e-mail:

tok_kwan.kim.kr@us.af.mil

Escort : Any MATOC contractor who needs escort shall be at front of "Doolittle Gate, Osan AFB" on 29 May 2018 by 0920 hrs with Korea identification card, passport or driver license (주민등록증, 여권 혹은 운전면허증).

Note: Any MATOC contractor who needs escort shall contact with Mr. Kim, Tok Kwan, Construction Inspector.

(End of provision)

5152.236-4011 CONSTRUCTION PRICE RANGE

Pursuant to FAR 36.204 the estimated price range is between $1,000,000.00 and $5,000,000

Section M - Evaluation Factors for Award

BASIS OF AWARD

1. Award shall be made to the responsible offeror submitting the lowest priced offer that is evaluated as aceptable for all evaluation criteria.

2. Evaluation Criteria

The pricing proposal shall be evaluated to determine whether it is complete and reasonable. A complete and reasonable pricing proposal will be deemed acceptable.

The detailed offer breakdown will be used by the contracting officer to determine whether proposed prices are complete and reasonable. A detailed offer breakdown may be used by the contracting officer to determine whether an offeror is able to complete the requirements under the contract, and/or whether discussions will be conducted pursuant to instructions to the offerors.

Section K-TAXES:will be evaluated to determine whether it is complete. In addition, propose exemptions of specific ROK taxes will be evaluated to determine whether they are legitimate, attributable to the contract, authorized, and reasonable. A complete SECTION-K that only proposes exemptions of specific ROK taxes that are legitimate, attributable to the contract, necessary to complete the Task Order, do not improperly overstate any proposed tax exemption, authorized, and reasonable will be deemed acceptable.

Section K-OTHERS: will be evaluated to determine whether it is complete. A complete SECTION K-OTHER will be deemed acceptable.