LIST OF APPLICABLE CONTRACT DRAWINGS
1. GENERAL: The work shall conform to the drawings, all of which form a part of the specifications. The drawings are from the “Standard Detail Drawings for OMA Projects, Korea (OMA STD DETAIL DWG, 2014)” issued by the Department of the Army, Installation Management Agency, Korea Region Office which can be downloaded from the website http://www.usfk.mil/Resources/ContractingwithUSFK.aspx. and the Contract Design Drawings (100%) prepared by AMKOR A&E Inc. attached on this solicitation. The below ate list of drawings for reference.
DRAWING
| ELEVATIONS |
| AE201 |
| 30 NOV 17 |
| CROSS SECTIONS |
| AE301 |
| 30 NOV 17 |
| ENLARGED PARTIAL FLOOR PLAN & INTERIOR ELEVATIONS |
| AE401 |
| 30 NOV 17 |
| EXTERIOR WALL SECTIONS-1 |
| AE402 |
| 30 NOV 17 |
| EXTERIOR WALL SECTIONS-2 |
| AE403 |
| 30 NOV 17 |
| EXTERIOR WALL SECTIONS-3 |
| AE404 |
| 30 NOV 17 |
| INTERIOR WALL SECTIONS |
| AE405 |
| 30 NOV 17 |
| INTERIOR WALL PARTITION TYPE PLAN & DETAILS-1 |
| AE406 |
| 30 NOV 17 |
| INTERIOR WALL PARTITION TYPE DETAILS-2 |
| AE407 |
| 30 NOV 17 |
| CEILING DETAILS |
| AE501 |
| 30 NOV 17 |
| ROOF DETAILS-1 |
| AE502 |
| 30 NOV 17 |
| ROOF DETAILS-2 |
| AE503 |
| 30 NOV 17 |
| MISC DETAILS-1 |
| AE504 |
| 30 NOV 17 |
| MISC DETAILS-2 |
| AE505 |
| 30 NOV 17 |
| MISC DETAILS-3 |
| AE506 |
| 30 NOV 17 |
| EXT/ INTERIOR FINISH SCHEDULE |
| AE601 |
| 30 NOV 17 |
| MATERIAL COLOR SCHEDULE |
| AE602 |
| 30 NOV 17 |
| SIGNAGE NUMBERING FLOOR PLAN |
| AE603 |
| 30 NOV 17 |
| SIGNAGE TYPES & DETAIL |
| AE604 |
| 30 NOV 17 |
| DOOR/WINDOW & LOUVER NUMBERING FLOOR PLAN |
| AE605 |
| 30 NOV 17 |
| DOOR SCHEDULE, TYPES & DOOR HARDWARE SCHEDULE |
| AE606 |
| 30 NOV 17 |
| DOOR DETAILS |
| AE607 |
| 30 NOV 17 |
| WINDOW/LOUVER SCHEDULE, TYPE & DETAILS |
| AE608 |
| 30 NOV 17 |
STRUCTURAL
| GENERAL NOTES, DESIGN DATA & TYPICAL DETAILS |
| SF001 |
| 30 NOV 17 |
| EXISTING/REMOVAL GROUND FLOOR PLAN |
| SF101 |
| 30 NOV 17 |
| NEW GROUND FLOOR PLAN |
| SF102 |
| 30 NOV 17 |
| NEW ROOF FRAMING PLAN |
| SF103 |
| 30 NOV 17 |
| WALL SECTION |
| SF401 |
| 30 NOV 17 |
| PLATFORM SECTIONS |
| SF402 |
| 30 NOV 17 |
| MISC. DETAILS-1 |
| SF501 |
| 30 NOV 17 |
| MISC. DETAILS-2 |
| SF502 |
| 30 NOV 17 |
MECHANICAL
| LEGEND & ABBREVIATIONS |
| MH001 |
| 30 NOV 17 |
| GENERAL NOTES & SCOPE OF WORK |
| MH002 |
| 30 NOV 17 |
| EXIST/REMOVAL HVAC FLOOR PLAN |
| MD101 |
| 30 NOV 17 |
| NEW HVAC DUCT FLOOR PLAN |
| MH101 |
| 30 NOV 17 |
| NEW HVAC PIPING FLOOR PLAN |
| MH102 |
| 30 NOV 17 |
| HVAC SECTIONS-1 |
| MH301 |
| 30 NOV 17 |
| HVAC SECTIONS-2 |
| MH302 |
| 30 NOV 17 |
| NEW MECH ROOM HVAC PARTIAL FLOOR PLAN |
| MH401 |
| 30 NOV 17 |
| HVAC MISC. DETAILS-1 |
| MH501 |
| 30 NOV 17 |
| HVAC MISC. DETAILS-2 |
| MH502 |
| 30 NOV 17 |
| HVAC MISC. DETAILS-3 |
| MH503 |
| 30 NOV 17 |
| HVAC MISC. DETAILS-4 |
| MH504 |
| 30 NOV 17 |
| HVAC MISC. DETAILS-5 |
| MH505 |
| 30 NOV 17 |
| HVAC MISC. DETAILS-6 |
| MH506 |
| 30 NOV 17 |
| FUEL OIL TANK DETAILS |
| MH507 |
| 30 NOV 17 |
| PACKAGE OUTDOOR TYPE HRU-1 INSTALLATION LATOUT |
| MH508 |
| 30 NOV 17 |
| PACKAGE OUTDOOR TYPE PACU-1 INSTALLATION LATOUT |
| MH510 |
| 30 NOV 17 |
| MECHANICAL EQUIPMENT SCHEDULE-1 |
| MH601 |
| 30 NOV 17 |
| MECHANICAL EQUIPMENT SCHEDULE-2 |
| MH602 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-1 |
| MH603 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-2 |
| MH604 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-3 |
| MH605 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-4 |
| MH606 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-5 |
| MH607 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-6 |
| MH608 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-7 |
| MH609 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-8 |
| MH610 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-9 |
| MH611 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-10 |
| MH612 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-11 |
| MH613 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-12 |
| MH614 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-13 |
| MH615 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-14 |
| MH616 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-15 |
| MH617 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-16 |
| MH618 |
| 30 NOV 17 |
| SYSTEM CONTROL DIAGRAM-17 |
| MH619 |
| 30 NOV 17 |
| NEW MECH ROOM HVAC PIPING ISOMETRIC DIAGRAM |
| MH901 |
| 30 NOV 17 |
| EXIST/REMOVAL PLUMBING PIPING FLOOR PLAN |
| PD101 |
| 30 NOV 17 |
| NEW PLUMBING PIPING FLOOR PLAN |
| PP101 |
| 30 NOV 17 |
| NEW MECH ROOM & TOILET PLUMBING PIPING FLOOR PLANS |
| PP401 |
| 30 NOV 17 |
| PLUMBING MISC. DETAILS-1 |
| PP501 |
| 30 NOV 17 |
| PLUMBING MISC. DETAILS-2 |
| PP502 |
| 30 NOV 17 |
| PLUMBING EQUIPMENT SCHEDULE |
| PP601 |
| 30 NOV 17 |
| PLUMBING SYSTEM CONTROL DIAGRAM-1 |
| PP602 |
| 30 NOV 17 |
| PLUMBING SYSTEM CONTROL DIAGRAM-2 |
| PP603 |
| 30 NOV 17 |
| NEW MECH ROOM & TOILET PLUMBING PIPING ISOMETRIC DIAGRAM |
| PP901 |
| 30 NOV 17 |
ELECTRICAL
| LEGEND AND ABBREVIATIONS |
| E-001 |
| 30 NOV 17 |
| GENERAL NOTES-1 |
| E-002 |
| 30 NOV 17 |
| GENERAL NOTES-2 AND SCOPE OF WORK |
| E-003 |
| 30 NOV 17 |
| REMOVAL/EXIST EXTERIOR ELECTRICAL/CATV DISTRIBUTION PLAN |
| ES101 |
| 30 NOV 17 |
| NEW/EXIST EXTERIOR ELECTRICAL/CATV DISTRIBUTION PLAN |
| ES102 |
| 30 NOV 17 |
| DETAILS-1 |
| ES501 |
| 30 NOV 17 |
| DETAILS-2 |
| ES502 |
| 30 NOV 17 |
| REMOVAL/EXIST LIGHTING PLAN |
| ED101 |
| 30 NOV 17 |
| REMOVAL/EXIST POWER/AUXILIARY SYSTEM PLAN |
| ED102 |
| 30 NOV 17 |
| NEW BUILDING GROUNDING SYSTEM PLAN |
| EG101 |
| 30 NOV 17 |
| NEW LIGHTING PLAN |
| EL101 |
| 30 NOV 17 |
| NON-STANDARD LIGHT FIXTURE DETAILS |
| EL501 |
| 30 NOV 17 |
| LIGHT FIXTURE SCHEDULE |
| EL601 |
| 30 NOV 17 |
| NEW POWER PLAN |
| EP101 |
| 30 NOV 17 |
| NEW MECH POWER PLAN |
| EP102 |
| 30 NOV 17 |
| POWER ONE-LINE DIAGRAM |
| EP601 |
| 30 NOV 17 |
| LOAD SCHEDULES-1 |
| EP602 |
| 30 NOV 17 |
| LOAD SCHEDULES-2 |
| EP603 |
| 30 NOV 17 |
| LOAD SCHEDULES-3 |
| EP604 |
| 30 NOV 17 |
| NEW TEL/DATA/CATV SYSTEM PLAN |
| TT101 |
| 30 NOV 17 |
| TEL/DATA SYSTEM DIAGRAMS |
| TT601 |
| 30 NOV 17 |
| CATV SYSTEM DIAGRAMS |
| TT602 |
| 30 NOV 17 |
FIRE PROTECTION
| FIRE PROTECTION NOTES AND LEGEND |
| F-101 |
| 30 NOV 17 |
| LIFE SAFETY PLAN |
| F-101 |
| 30 NOV 17 |
| FIRE ALARM DEMOLITION PLAN |
| FD101 |
| 30 NOV 17 |
| FIRE SPRINKER HAZARD PLAN |
| FX101 |
| 30 NOV 17 |
| FIRE SPRINKLER PLAN |
| FX102 |
| 30 NOV 17 |
| FIRE SPRINKLER DETAILS |
| FX501 |
| 30 NOV 17 |
| FIRE ALARM/ MASS NOTIFICATION PLAN |
| FA101 |
| 30 NOV 17 |
| FIRE ALARM/ MASS NOTIFICATION DETAILS |
| FA501 |
| 30 NOV 17 |
| FIRE ALARM/MASS NOTIFICATION SEQUENCE OF OPERATIONS |
| FA601 |
| 30 NOV 17 |
| FIRE ALARM/MASS NOTIFICATION RISER DIAGRAM |
| FA602 |
| 30 NOV 17 |
GENERAL�
TITLE SHEET, SCHEDULE OF DRAWINGS & CROSS REFERENCING CONVENTIONS-1�
G-001�
30 NOV 17�
TITLE SHEET, SCHEDULE OF DRAWINGS & CROSS REFERENCING CONVENTIONS-2�
G-002�
30 NOV 17�
PROJECT LOCATION PLAN�
G-003�
30 NOV 17�
CIVIL�
CIVIL ABBREVIATIONS, NOTES, LEGEND & SCOPE OF WORK�
C-001�
30 NOV 17�
REMOVAL PLAN�
CD101�
30 NOV 17�
SITE LAYOUT PLAN�
CS102�
30 NOV 17�
GRADING & DRAINAGE PLAN�
CG103�
30 NOV 17�
UTILITY PLAN�
CU104�
30 NOV 17�
COMBINED UTILITY PLAN�
CU105�
30 NOV 17�
GRADING SECTIONS - 1�
CG301�
30 NOV 17�
GRADING SECTIONS - 2�
CG302�
30 NOV 17�
DRAIN LINE PROFILES - 1�
CG303�
30 NOV 17�
DRAIN LINE PROFILES - 2�
CG304�
30 NOV 17�
WATER LINE PROFILES�
CU305�
30 NOV 17�
SEWER LINE PROFILE�
CU306�
30 NOV 17�
PAVEMENT DETAILS�
CS501�
30 NOV 17�
DRAINAGE DETAILS�
CG502�
30 NOV 17�
WATER DETAILS - 1�
CU503�
30 NOV 17�
WATER DETAILS - 2�
CU504�
30 NOV 17�
WATER DETAILS - 3�
CU505�
30 NOV 17�
WATER DETAILS - 4�
CU506�
30 NOV 17�
SEWER DETAILS�
CU507�
ARCHITECTURAL�
ABBREVIATION, MATERIAL INDICATIONS & SYMBOLS�
AE001�
30 NOV 17�
GENERAL NOTES & SCOPE OF WORK�
AE002�
30 NOV 17�
EXISTING/REMOVAL FLOOR PLAN�
AE101�
30 NOV 17�
EXISTING/REMOVAL ROOF PLAN�
AE102�
30 NOV 17�
NEW FLOOR PLAN�
AE103�
30 NOV 17�
ROOF PLAN�
AE104�
30 NOV 17�
REFLECTED CEILING PLAN (LOWER)�
AE105�
30 NOV 17�
REFLECTED CEILING PLAN (UPPER)�
AE106�