W91QVN18R0067_0002_final.pdf

PDF 469 KB Posted

Attached to
Master BPA for various furniture
Solicitation number
W91QVN18R0067
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
W91QVN18R0067-0004_Final.pdf PDF
Schematics_A4_Office_Reorg_for_amendment_0004.pdf PDF
W91QVN18R0067_0003_final.pdf PDF
W91QVN18R0067_0001_final.pdf PDF
A2_Schematics_A4_Office_Reorg_Furniture.pptx PPTX presentation
W91QVN18R0067_final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

411TH CSB, KOREA - CONST & SUPPLY TEAM

POC: MRS. YUN, SU-OK

TEL: 02-7914-3200

SUOK.YUN.LN@MAIL.MIL

APO AP 96205-5289

UNITED STATES OF AMERICA (THE)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a. The purpose of this amendment is to change site visit schedule from 1000hrs, 4 May 2018 to 1000hrs, 9 May 2018.

b. The closing date & time is extended from 1500hrs, KST, 9 May 2018 to 1500hrs, KST, 11 May 2018.

c. All other terms and conditions remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN18R0067

X 9B. DATED (SEE ITEM 11)

27-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-May-2018

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCC YONGSAN, UNIT #15289

APO AP 96205-5289

W91QVN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W91QVN

FACILITY CODECODE

EMAIL:TEL:

W91QVN18R0067

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 09-May-2018 03:00 PM to 11-May-2018 03:00 PM.

The following have been modified:

SUPPLY SERVICE AND PRICE

BPA Master Dollar Limit: $1,000,000

BPA Call Limit: $150,000

Period of Performance: 15-Jun-2018 or the date of agreement, whichever is later, thru 14-Jun-2021

FSC Code:

7105 Household Furniture 7110 Office Furniture 7125 Cabinets, Lockers, Bins and Shelving 7195 Miscellaneous Furniture and Fixtures

BLANKET PURCHASE AGREEMENT

NOTICE TO OFFEROR: THIS IS MULTIPLE BLANKET PURCHASE AGREEMENTS (BPA) FOR

VARIOUS FURNITURE. THE PRICES OFFERED WILL BE USED FOR NOT ONLY AWARDING THE

ORDER BUT ESTABLISHING BPAs.

A. PERIOD OF PERFORMANCE : 15-Jun-2018 or the date of agreement, whichever is later, thru 14-Jun-2021

B. ITEM DESCRIPTION (FSC Code and Description: 7105/7110/7125/7195 – Furniture)

1. CLIN 0001: See Pricing Schedule with Performance Work Statement (PWS) as attached.

2. CLIN 0002: None listed items–This CLIN may be used for items that are within the scope of the FSC Code(7105/7110/7125/7195).

C. PRICE SCHEDULE AND DELIVERY & INSTALLATION INFORMATION: Individual call will be specified with price schedule and delivery and installation information.

D. DELIVERY & INSTALLATION INFORMATION: Delivery and installation shall be FOB destination or as specified on each call to be accomplished by the supplier. Individual call will be specified with delivery and installation information.

E. GENERAL TERMS AND CONDITIONS:

1. Description of Agreement: The purpose of this solicitation is to enter into Multiple Blanket Purchase Agreement (BPAs) to provide the necessary and required various furniture under listed Federal Supply Class (FSC) Code in Korea Wide specified hrerein. Specific location, requirement will be identified and issued with BPA call as needed.

2. Extent of Obligation: The Government is obligated only to the extent of authorized purchases actually made under the BPA.

3. Purchase limitation: Individual purchases under this BPA SHALL NOT EXCEED $1,000,000 (Per Year).

Authorized individual(s) whose organizational component is 411th CSB shall not exceed $150,000.

4. Call Officer

4.1. The Contracting Officer of 411th CSB will be Call Officer.

4.2. Calls placed by unauthorized individuals and accepted by the supplier will not be approved for payment.

5. Invoices: The invoice shall be submitted electronically through Wide Area Work Flow – Receipt and Acceptance (WAWF) at the web site https://wawf.eb.mil.

6. Administrative Responsibilities:

6.1. The supplier is responsible for;

6.1.1. Submission of an invoice electronically through Wide Area Work Flow (WAWF) at the web site https://wawf.eb.mil no later than 7 days after the end of the billing period (25th through 24th of the following month).

6.2. The Receiving Officer is responsible for;

6.2.1. Process the invoice through Wide Area Work Flow (WAWF)

6.2.2. The Receiving Officer will be specified at individual call.

7. SPECIFICATIONS: All suppliers to be furnished under this BPA shall be of the best commercial quality which meet specification stated in individual call.

CLIN 0001 PRICING SCHEDULE

Description Qty Unit of Issue Unit Price Amount

1 4 ft round team table 4 Each

2 Carrel 23 Each

3 Coffee Table 3 Each

4 Desk Chair 96 Each

5 L-shaped Desk 6 Each

6 Sofa 7 Each

7 Team Table Chairs 48 Each

8 Under-the-desk Filing Cabinet 80 Each

SALIENT CHARACTERISTICS

**All items are brand name, or equal

T-1 10 ft x 4 ft Conference Table

Item Description Example Image Manufacturer

Type

Size

Features

Warranty

Bush Industries, Inc., or equal

Engineered wood conference table

10’L x 4’W

• Scratch Resistant

• Stain Resistant

• Cable Management

• Edge Banding

• 120 inch L x 48 inch W (+/- 6 in)

• 1.5 inch thick table top (+/- 1 in)

• 28 inch high (+/- 2 in)

• Boat Top Conference Table

• Dark wood laminate finish (match other tables)

• Stain/Scratch resistant

• Adjustable glides to level the desk on uneven surfaces

5+ years

T-2 4 ft Round Team Table

Item Description Example Image Manufacturer

Type

ICEBERG Enterprises, or equal

Engineered wood round pedestal table with metal base

9 10 ft x 4 ft Conference Table 1 Each

10 6 ft Long Desk 58 Each

11 4 ft Long Desk 6 Each

12 Green CAT 6 Cables (varying length) 197 Each

13 Purple CAT 6 Cables (varying length) 188 Each

14 Red CAT 6 Cables (varying length) 39 Each

15 Storage Container 1 Lot

16 Removal and Storage of existing furniture 1 Job

17 Delivery and installation of new furniture 1 Job

Total Amount:

48”Dia

• Scratch Resistant

• Stain Resistant

• Cable Management

• Edge Banding

• 48 inch round (+/- 6 in)

• 1.5 inch thick table top (+/- 1 in)

• 28 inch high (+/- 2 in)

• Round top meeting table

• Dark wood laminate finish (match other tables)

• Stain/Scratch resistant

• Adjustable glides to level the desk on uneven

T-4 Coffee Table

Manufacturer

Type

HON, or equal

Engineered wood laminate coffee table

48"W x 18"H x 20"D

• Scratch Resistant

• Stain Resistant

• Cable Management

• Edge Banding

• 48 inch L x 20 inch W (+/- 6 in)

• 1.5 inch thick table top (+/- 1 in)

• 18 inch high (+/- 2 in)

• Square top coffee table

• Dark wood laminate finish (match sofa legs)

• Stain/Scratch resistant

• Adjustable glides to level the desk on uneven

CH-1 Desk Chair

Manufacturer

Type

Basyx, or equal

Executive desk chair

24"W x 48"H x 18"D Seat (+/- 2 inches)

• Scratch Resistant

• Stain Resistant

• Metal pedestal style base

• 5 caster wheels

• Adjustable height

• Adjustable lumbar support

• Adjustable arm rests

• Adjustable tilt

• Faux leather or vinyl cushion seat

• Fabric mesh back

• Black, dark gray, or graphite finish base

• Black, dark gray, or graphite fabrics

5+ Years

CH-4 Team Table Chair

Manufacturer

Type

Office Star, or equal

Rolling task chair

24"W x 36"H x 18"D Seat (+/- 2 inches)

• Scratch Resistant

• Stain Resistant

• Metal pedestal style base

• 5 caster wheels

• Adjustable height

• Fabric or vinyl cushion seat

• Fabric mesh lumbar support back

• Black, dark gray, or graphite finish base

• Black, dark gray, or graphite fabric

5+ Years

D-1 L-Shaped Desk (Left Corner Credenza)

Manufacture r

Type

Lorell, or equal

Laminate credenza with left return

30"D x 69"W x 30"H w/48”D return

• Scratch Resistant

• Stain Resistant

• Cable Management

• Edge Banding

• 69 inch L (+/- 6 in)

• 48 inch D return (+/- 6 in)

• 30 inch D desk (+/- 6 in)

• 1.5 inch thick table top (+/- 1 in)

• 30 inch high (+/- 2 in)

• Dark wood laminate finish (match coffee tables)

• Adjustable glides to level the desk on uneven

D-3 6’ Long Desk

HON, or equal

Engineered wood laminate desk with metal legs

72"W x 30"H x 30"D

• Scratch Resistant

• Stain Resistant

• Cable Management

• Edge Banding

• 72 inch L x 30 inch W (+/- 6 in)

• 1.5 inch thick table top (+/- 1 in)

• 30 inch high (+/- 2 in)

• Light gray laminate finish

• Stain/Scratch resistant

• Adjustable glides to level the desk on uneven surfaces

• Metal legs

D-4 Carrel

Manufacture r

Type

Moore Co. , or equal

Engineered wood laminate carrel desk

36”W x 30”D x 30” Desk H

• Scratch Resistant

• Stain Resistant

• Cable Management

• Edge Banding

• 36 inch L x 30 inch W (+/- 6 in)

• 1 .5 inch thick table top (+/- 1 in)

• 30 inch high (+/- 2 in)

• Light wood laminate finish

• Stain/Scratch resistant

• Adjustable glides to level the desk on uneven surfaces

• Integrated 24 inch privacy walls on 3 sides

5+ year

D-5 4 ft Long Desk

Academia Computer Desk Div, or equal

Engineered wood laminate console with metal legs

48”W x 30”D

• Scratch Resistant

• Stain Resistant

• Cable Management

• Edge Banding

• 48 inch L x 30 inch W (+/- 6 in)

• 1.5 inch thick table top (+/- 1 in)

• 30 inch high (+/- 2 in)

• Light wood laminate finish

• Stain/Scratch resistant

• Adjustable glides to level the desk on uneven surfaces

• Metal legs

LF-1 Under-the-desk Filing Cabinet

Bush Industries Inc. , or equal

3 Drawer under desk filing cabinet

16”W x 20”D x 28”H (+/- 2 inches)

• Two box drawers hold small office supplies

• File drawer opens on full-extension, ball-bearing slides

• One lock secures bottom two drawers

• File drawer holds letter- or legal-size files

• Casters for easy mobility when loaded

• Must fit under 6’ desks (D-3)

• Finish to match/be darker in shade than light laminate desks

SF-1 Sofa

Manufacturer

Type

Rodco Brandt, or equal

2 person sofa

32”L x 48”W x 36”H (+/- 6 inches)

• Scratch Resistant

• Stain Resistant

• Edge Banding

• Dark wood laminate finish legs (match coffee tables)

• Vynil, faux leather, or other wipe-clean fabric

• Brown or blue fabric

• Adjustable glides to level the desk on uneven surfaces

FURNITURE DELIVERY REQUIREMENT

The contractor shall provide copies of the test reports and certifications based upon the most recent edition of the ANSI/BIFMA when furniture is delivered. If the contractor(s) is/are local vendor(s), it shall provide the following in place of ANSI/BIFMA reports & certificates with the furniture and/or chair:

i) Eco-friendly Material Class E0 Test Result (Korean: 친환경자재등급기준 E0 시험성적서)

ii) Certificate of Direct Production issued by ROK Small Business Corporation (Korean:중소기업중앙회장이

발행한직접생산확인증명서 )

iii) Test Result for Metal Coating and Hinge of Furniture (Korean: 내식성/내구성 시험성적서)

iv) Test Result for Quality, Strength and Coating of Chair (Korean: 품질, 강도, 도막 시험성적서)

v) Production Quality Mark in each item and Quality Assurance Certification for all items (Korean: 품질표시표 &

품질보증서)

If the contractor fails to provide the above items, the payment will not be made until provided.

Performance Work Statement For CLIN 0001 Office Furniture for Bldg 933, 1st Floor, Basement, & Sub-Basement, and

Office Furniture Rearrangement for Bldg 1601 Osan Air Base, South Korea

PERIOD OF PERFORMANCE:

Period of Performance is fifty-two (52) calendar days after receipt of contract. All phases consist of approximately ten (10) calendar days encompassing two full weekends. Weekend work is preferred and technical contact will provide weekend oversight and/or escort.

RECEIVING OFFICER (RO):

1st Lt Andrew P. Bossert, andrew.bossert.1@us.af.mil, DSN: 315-784-8760, Commercial: 011-82-505-784-8760, 607, 607th Air Support Operations Group (US Air Force)

TECHNICAL CONTACT:

Capt John H. Nussbaum, john.nussbaum.1@us.af.mil, DSN: 315-784-6963, Comm: 011-82-505-784-6963, 7th Air Force (US Air Force)

MSgt Julius J. Jackson, julius.jackson.1@us.af.mil, DSN : 315-784-6276, Comm: 011-82-505-784-6276, 7th Air Force (US Air Force)

THREE (3) PHASES: Initiate Phase 1 within 7 days of receipt of the BPA Call. The contractor shall begin Phase 2 no earlier than 5 working days after completion of Phase 1. Receiving officer contract the contractor to begin Phase 2 sooner than the 5 working day waiting period. Additionally, the Receiving officer shall grant the contractor access to portions of Phase 3 in advance of the completion of Phase 1 or 2. Otherwise, the contractor shall begin Phase 3 no sooner than 5 days after completion of Phase 2.

TEMPORARY STORAGE REQUIREMENT: All phases require storage container(s) provided and placed by the contractor in the parking lots adjacent to Bldg 1601 and Bldg 1384. These containers shall be placed in such a manner as to minimize the impact to parking spaces and maintain access to heating oil tanks and facilities. The government may remove furniture from the storage container(s) for use in other office spaces. Upon completion of Phase 3, the contractor shall remove these storage containers and all remaining furniture and may dispose, recycle, or resell the furniture as desired. Any damage to the parking lots or surrounding facilities shall be repaired by the contractor at the contractor’s expense.

Phase 1 – Bldg 933, Ground Floor and Basement Floor. Desired Period of Performance, 10 days including 2 weekends. Initiate Phase 1 within 3 days of receipt of the BPA call. Contractor shall leave no less than 3 days between the removal of furniture and the installation of new furniture in each room. All phases require storage mailto:andrew.bossert.1@us.af.mil mailto:john.nussbaum.1@us.af.mil mailto:julius.jackson.1@us.af.mil container(s) provided and placed by the contractor in the parking lot adjacent to Bldg 1601 and Bldg 1384. These containers shall be placed in such a manner as to minimize the impact to parking spaces and maintain access to heating oil tanks and facilities.

Room 107, A4 Command Suite. Disassemble and remove existing furniture, desks, cabinets, chairs, and communication cables. Vacuum and clean room. Store disassembled existing office furniture in portable storage container at Bldg 1601. Install new office furniture, desks, tables, cabinets, and chairs as shown on drawing. Install Cat-6 cable (with extra 1-meter slack) from nearest wall port to each workstation as shown on drawing. Quantities:

(3) L-shaped desks, (2) 4’ round table, (17) team table chairs, (9) carrels, (6) desk chairs, (3) sofas, (1) coffee table,

(3) under-the-desk filing cabinets, (15) Cat-6 cables.

Room 112, A4 Workstation Office. Disassemble and remove existing furniture, desks, cabinets, chairs, and communication cables. Vacuum and clean offices. Store disassembled existing office furniture in portable storage container at Bldg 1601. Install new office furniture, desks, tables, cabinets, and chairs as shown on drawing. Install Cat-6 cable (with extra 1-meter slack) from nearest wall port to each workstation as shown on drawing. Quantities:

(3) L-shaped desks, (3) under-the-desk filing cabinets, (3) desk chairs, (3) Cat-6 cables

Room B-101, GEOBASE Office. Disassemble and remove existing furniture, desks, cabinets, chairs, and communication cables. Vacuum and clean room. Store disassembled existing office furniture in portable storage container at Bldg 1601. Install new office furniture, desks, tables, cabinets, and chairs as shown on drawing. Install Cat-6 cable (with extra 1-meter slack) from nearest wall port to each workstation as shown on drawing. Quantities:

(6) 6’ desks, (6) desk chairs, (6) under-the-desk filing cabinets, (18) Cat-6 cables

Room B-103, Conference Room. Disassemble and remove existing furniture, desks, cabinets, chairs, and communication cables. Vacuum and clean room. Store disassembled existing office furniture in portable storage container at Bldg 1601. Install new office furniture, desks, tables, cabinets, and chairs as shown on drawing. Install Cat-6 cable (with extra 1-meter slack) from nearest wall port to each workstation as shown on drawing. Quantities:

(1) 10’x4’ table, (2) 4’ desks, (10) rolling conference room chairs, (9) team table chairs, (3) Cat-6 cables

Room B-130, SIPR Café, and Room B-129, A4M/W Office. Disassemble and remove existing furniture, desks, cabinets, chairs, and communication cables. Vacuum and clean room. Store disassembled existing office furniture in portable storage container at Bldg 1601. Install new office furniture, desks, tables, cabinets, and chairs as shown on drawing. Install Cat-6 cable (with extra 1-meter slack) from nearest wall port to each workstation as shown on drawing. Quantities: (7) carrels, (7) team table chairs, (11) under-the-desk filing cabinets, (4) 6’ desks, (4) desk chairs, (15) Cat-6 cables

Room B-128, CALC Floor. Disassemble and remove existing furniture, desks, cabinets, chairs, and communication cables. Vacuum and clean room. Store disassembled existing office furniture in portable storage container at Bldg 1601. Install new office furniture, desks, tables, cabinets, and chairs as shown on drawing. Install Cat-6 cable (with extra 1-meter slack) from nearest wall port to each workstation as shown on drawing. Quantities: (18) 6’ desks, (18) desk chairs, (18) filing cabinets, (1) 4’ desk, (38) Cat-6 cables

Phase 2 – Bldg 933 Basement. Period of Performance, 10 days including 2 weekends. The contractor shall begin Phase 2 no earlier than 5 working days after completion of Phase 1. Receiving Officer coordinate the contractor to begin Phase 2 sooner than the 5 working day waiting period. Contractor shall leave no less than 3 days between the removal of furniture and the installation of new furniture in each room. All phases require storage container(s) provided and placed by the contractor in the parking lot adjacent to Bldg 1601 and Bldg 1384. These containers shall be placed in such a manner as to minimize the impact to parking spaces and maintain access to heating oil tanks and facilities.

Room B-108 CA7 Cell. Re-arrange existing furniture, including L-shaped desks, square desks, and partition walls, as shown on drawing. Vacuum and clean offices. Install new chairs and under-the-desk filing cabinets as shown on drawing. Install Cat-6 cable (with extra 1-meter slack) from nearest wall port to each workstation as shown on drawing. Quantities: (24) desk chairs, (16) under-the-desk filing cabinets, (32) Cat-6 cables

Rooms B-106/107, CFPC Offices. Disassemble and remove existing furniture, desks, cabinets, chairs, and communication cables. Vacuum and clean offices. Store disassembled existing office furniture in portable storage container at Bldg 1601. Install new office furniture, desks, tables, cabinets, and chairs as shown on drawing. Install Cat-6 cable (with extra 1-meter slack) from nearest wall port to each workstation as shown on drawing. Quantities:

(12) 6’ desks, (12) desk chairs, (12) under-the-desk filing cabinets, (24) Cat-6 cables

Room B-124/125/126/127 CALC Overwatch and Back Rooms. Disassemble and remove existing furniture, desks, cabinets, chairs, and communication cables. Vacuum and clean room. Store disassembled existing office furniture in portable storage container at Bldg 1601. Install new office furniture, desks, tables, cabinets, and chairs as shown on drawing. Install Cat-6 cable (with extra 1-meter slack) from nearest wall port to each workstation as shown on drawing. Quantities: (7) carrels, (10) 6’ desks, (10) desk chairs, (7) team table chairs, (27) Cat-6 cables.

Contingency Furniture Storage. Procure, assemble, and move into storage in Bldg 933 as directed (5) 6’ desks.

Select (50) desk chairs which were either previously removed from Bldg 933 or are currently in Bldg 1601 that are in good condition. Good condition is defined as all wheels are operational, arms and back in good condition, fabric is untorn and not discolored. Move these chairs into storage spaces as directed by the Receiving Officer.

Phase 3 – Bldg 933 Subbasement and Bldg 1601. Period of Performance, 10 days including 2 weekends. The receiving officer may grant the contractor access to portions of Phase 3 in advance of the completion of Phase 1 or

2. Otherwise, the contractor shall begin Phase 3 no sooner than 5 days after completion of Phase 2.

Bldg 933, Rooms SB-201 Collaboration Room, SB-203 A4W Office, and SB-204 A4X Office. Disassemble and remove existing furniture, desks, cabinets, chairs, and communication cables. Vacuum and clean room. Store disassembled existing office furniture in portable storage container at Bldg 1601. Install new office furniture, desks, tables, cabinets, and chairs as shown on drawing. Install Cat-6 cable (with extra 1-meter slack) from nearest wall port to each workstation as shown on drawing. Room SB-201 Quantities: (2) 4’ round table, (2) coffee tables, (3) 4’ desks, (4) sofas, (8) team table chairs, (3) Cat-6 cables. Room SB-203 Quantities: (4) 6’ desks, (4) desk chairs,

(12) Cat-6 cables, (4) under-the-desk filing cabinets. Room SB-204 Quantities: (4) 6’ desks, (4) desk chairs, (12) Cat-6 cables, (4) under-the-desk filing cabinets.

Bldg 1601, all rooms. All furniture removed from Bldg 933 may be used to meet the requirements in Bldg 1601, no new furniture shall be purchased for Bldg 1601. Activities in Bldg 1601 shall be completed without delays between removing and installing furniture. The contractor shall ensure all furniture installed provides usable desk space, defined as no less than 3’ x 2’ clear desk space and 3’ by 5’ of clear floor space directly in front of the desk space with no furniture stacked or unusable. See attached schematics for a diagram. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 1. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 5 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 2. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 6 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm A1. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 6 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) red Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm A2. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 6 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) red Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 3. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 2 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 4. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 2 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 5. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 8 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 6. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 2 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 7. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 6 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 8. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 2 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 9. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 4 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 10. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 6 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 12. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 8 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 13. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 8 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 15. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 6 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 16. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 8 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm. 17. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 2 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 20. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 25 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 21. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 2 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

Bldg 1601, Rm 22. Contractor shall move all existing furniture within Bldg 1601 and add any furniture removed from Bldg 933. Contractor shall remove any furniture currently in this room. Contractor shall provide no less than 2 work stations in this room between the existing furniture in the room, within Bldg 1601, or the furniture in storage that was removed from Bldg 933. Install one (1) green and one (1) purple Cat-6 cable (with extra 1-meter slack) from nearest wall port to each work station. If no port is available on the wall, the contractor shall provide 8 meters of cable per work station.

ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO THE OFFEROR(S)

QUOTATION INFORMATION & REQUIREMENT

1. Quotations shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to suok.yun.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to ONLY FBO server problem not individual failure/problem. All questions should be emailed to suok.yun.ln@mail.mil within five (5) days after the solicitation is issued. The electronic bid shall be submitted by the closing date and time of the solicitation. Partial quotation will not be acceptable.

2. The offeror(s) shall submit the following requirements IAW Para 1 above.

a. Technical Proposal: The contractor shall submit the detailed specification with drawing for the proposed items along with the quotation, even if the quoter proposed the same item. Quoters who fail to submit all of the specified information will not be considered for award. Note: Copy and paste of salient characteristics of RFQ with each item in the quotation is not acceptable and will not be considered for an award.

b. Price Schedule. The price schedule in the item list shall be used to evaluate price for establishing BPAs.

3. Failure to submit the paragraph 2 above requirements shall be grounds for determining the offer technically unacceptable, and ineligible for contract award.

4. The terms “Quotation” and “Quoter” shall be substituted for “Offer” and “Offeror” in this solicitation.

5. In accordance with FAR 25.1002, solicitations for contracts to be entered into and performed in Korea, to ensure a fair evaluation of offers, the Government will use the US Government current fiscal year conversion rate of W1,156.12 per US $1.00.

6. Quoters are urged and expected to inspect the site where the work will be performed.

The site visit will take place at:

i) Location: Meet at Doolittle Gate, Osan Air Base.

ii) Date: 9 May 2018

iii) Time: 1000 hrs

iv) Point of Contact: Capt John Nussbaum, email: john.nussbaum.1@ua.af.mil, Work Phone: 050-5784-

Note: If the contractor need to escort on post, please provide the attendance list (Name, Phone number, Company name) to me via email, by COB, 8 May 2018. The contractor shall bring KN ID card (주민등록증) for escort.

mailto:suok.yun.ln@mail.mil mailto:suok.yun.ln@mail.mil mailto:john.nussbaum.1@ua.af.mil

7. PRE-AWARD SURVEY: A pre-award survey may be conducted on any offerors. The pre-award survey is to determine the prospective contractor’s responsibility in accordance with FAR Part 9.104-1. Information may be requested as required by the Contracting Officer and the information shall be submitted within three (3) working days of the request.

(End of Summary of Changes)

BASIS OF AWARD

The Government will establish BPAs with three (3) ~ five (5) vendors, or more resulting from this solicitation to the responsible quoter having submitted the lowest-priced quotation that satisfies all terms and conditions of this solicitation. The following items and quantities shall be used to evaluate quotations. The proposed unit prices shall be used to establish BPAs. The following factors shall be used to evaluate quotations.

►Factor A. Technical

►Factor B. Past Performance (See DFARS 252.213-7000 Notice to Prospective Suppliers on Use of Past Performance Information Retrieval System--Statistical Reporting in Past Performance Evaluations)

►Factor C. Price

Note 1: To be determined responsible, a prospective contractor must meet FAR 9.104-1 General standards.

Note 2: To be determined technically acceptable, the submitted specification must meet salient characteristics stated in this solicitation.

(End of clause)

The following have been deleted:

52.236-27 Alt I Site Visit (Construction) (Feb 1995) - Alternate I FEB 1995

(End of Summary of Changes)

File details come from the government source that posted it.