About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21_W91QVN-18-R-0049-0001.pdf | ||
| A2_Drawing_files_-_Elec.pdf | ||
| A2_Drawing_files___109374___MECH.PDF | ||
| A2_Drawing_files-Title.pdf | ||
| A22_Submittal_Register.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011137568
a. This is Non-Work Plan Task Order for the follow ing MATOC Contractors only. Contract No# W91QVN-14-D-0031,0032, 0033, 0035, 0036, 0037, 0038, 0039, 0040, 0041, 0044, 0045, 0046, 0047,0048,0049, and 0050.
b. If the Contractor is unable to submit the proposal in response to this RFP, the Contractor shall submit the "No-Offer Letter" by date and time specif ied in this solicitation.
MR. SON, U KAP 02-7914-3354
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
31-Jan-2018
(RFP)
(IFB)
X
CALL:
Repair CBRN Protection System
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________120 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCC YONGSAN, UNIT #15289
APO AP 96205-5289
UNITED STATES OF AMERICA (THE)
W91QVN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
109374
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W91QVN18R0049 22
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W91QVN18R0049
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Repair CBRN Protection System, CRC
FFP
Work Class: K FOB: Destination
PURCHASE REQUEST NUMBER: 0011137568
PSC CD: Z2AZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Estimated Cost for War Hazzard
FFP
is Zero (0).
FOB: Destination
NET AMT
Section C - Descriptions and Specifications
STATEMENT OF WORK
PROJECT NO TITLE LOCATION
109374 Repair CBRN protection system in various buildings Camp Red Cloud
1. DESCRIPTION: The work to be performed to repair CBRN protection system in various buildings is described below and executed by one or more of the groups.
1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.
1.2. Work by In-House Labor: Not applicable to this project.
1.3. Work by Troop Labor: Not applicable to this project.
2. PRINCIPAL FEATURES: This project includes the following principal features:
2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.
2.1.1. Mechanical Work
2.1.1.1. Building No. 294
2.1.1.1.1. Replace existing Nuclear, Biological, and Chemical (NBC) fans (2sets) including Variable Frequency Driver (VFD), control, and associated duct with new. (Drawing No. M-2, M-3, M-16, M-17)
2.1.1.1.2. Replace existing main control panel including accessories and wiring with new. (Drawing No. M-2, M-10, M-11, M-12, M-13, M-14)
2.1.1.1.3. Replace existing 16" diameter soft flex duct with rigid duct. (Drawing No. M-2, M-6)
2.1.1.1.4. Replace existing 12" diameter soft flex duct with rigid duct. (Drawing No. M-2, M-6)
2.1.1.1.5. Replace existing shock isolators for Fan and Filter Assembly (FFA, 2sets), and associated ductwork with new. (Drawing No. M-2, M-3, M-5)
2.1.1.1.6. Replace existing shock isolators for NBC fans (2sets), duct, and associated ductwork with new. (Drawing No. M-2, M-3, M-16, M-17)
2.1.1.1.7. Replace existing shock isolators for filter housing, duct, and associated ductwork with new.
(Drawing No. M-2, M-3, M-16, M-17)
2.1.1.1.8. Replace existing blast valves (56sets) with new. (Exhaust side) (Drawing No. M-2, M-3, M- 15)
2.1.1.1.9. Replace and clean existing blast valves (56sets) internal parts with new. (Intake side) (Drawing No. M-2, M-3, M-15)
2.1.1.1.10. Replace seal and accessories for blast doors and gas tight doors with new. (Drawing No.
M-2, M-4)
2.1.1.1.11. Replace existing Electrically Operated two position Dampers (EOD, gas tight dampers) with new. (Drawing No. M-2, M-12, M-15, M-16, M-17)
2.1.1.1.12. Replace existing Air Flow Monitoring Station (AFMS) and controller with new. (Drawing No. M-2, M-15, M-16)
2.1.1.1.13. Replace existing Difference Pressure (DP) gauges, re-tighten pressure line fittings, and associated accessories with new. (Drawing No. M-2, M-12)
2.1.1.1.14. Replace existing platform steel guard rail including painting in Mech room with new.
(Drawing No. M-2, M-15)
2.1.1.1.15. Replace existing galvanized steel grating cover including frame including welding with new. (Drawing No. M-2, M-15)
2.1.1.1.16. Replace existing ductwork associated accessories for decontamination station with new.
(Drawing No. M-2, M-6, M-7)
2.1.1.1.17. Replace existing decontamination station's accessories with new. (Drawing No. M-2, M-8)
2.1.1.1.18. Replace existing 2,000mm x 2,000mm stainless steel drain pan including 1/2" drain line with new. (Drawing No. M-2, M-9)
2.1.1.1.19. Replace existing solenoid valves (3sets), water level gauge, and wiring with new.
(Drawing No. M-2, M-9)
2.1.1.2. Building No. 292
2.1.1.2.1. Replace existing NBC fans (2sets) with VFD, control associated duct with new. (Drawing No. M-2, M-3, M-24, M-26)
2.1.1.2.2. Replace existing main control panel including accessories and wiring with new. (Drawing No. M-2, M-19, M-20, M-21, M-22, M-23)
2.1.1.2.3. Replace existing shock isolators for NBC fans (2sets), duct, and associated ductwork with new. (Drawing No. M-2, M-3, M-24, M-26)
2.1.1.2.4. Replace existing shock isolators for filter housing, duct, and associated ductwork with new.
(Drawing No. M-2, M-3, M-25)
2.1.1.2.5. Replace existing seal and accessories for blast doors and gas tight doors with new.
(Drawing No. M-2, M-3, M-18)
2.1.1.2.6. Replace existing blast valves (22sets) for CBRN filter intake and exhaust side with new.
(Drawing No. M-2, M-3, M-24)
2.1.1.2.7. Replace existing Electrically Operated two position Dampers (EOD, gas tight damper) with new. (Drawing No. M-2, M-21, M-24, M-26)
2.1.1.2.8. Replace existing AFMS and controller with new. (Drawing No. M-2, M-21, M-24)
2.1.1.3. Building No. 50
2.1.1.3.1. Replace existing air handling unit including FFA (Government Furnished Contractor Installed (GFCI)) and associated duct with new. (Drawing No. M-2, M-27)
2.1.1.3.2. Replace existing Collective Protection System (CPS) main panel and control with new.
(Drawing No. M-2, M-27, M-28, M-29, M-30)
2.1.1.4. Air leakage test
2.1.1.4.1. Perform air leakage test for building No. 294, 292, and 50.
2.1.2. Electrical Work
2.1.2.1. Replace existing door limit switches and associated wiring and conduit with new for building No. 292, 294, 50. (Drawing No. E-1, E-3, E-7, E-10)
2.1.2.2. Replace existing intercom system with new for building No. 294, 50. (Drawing No. E-1, E-2, E-10)
2.1.2.3. Replace power and control system, circuit breakers, combination type motor starters for mechanical equipment with new including main control panel (CPS panel), NBC fans, FFA units, VFDs, air measuring devices, air flow controllers, EOD for building No. 292, 294. (Drawing No. E-1, E-4, E-5, E-6, E-8, E-9)
2.1.2.4. Replace combination type motor starter, magnetic motor starter, power and control system for mechanical equipment with new including main control panel (CPS panel), FFA, roof ventilator for building No. 50. (Drawing No. E-1, E-10)
2.1.2.5. Replace existing electrical component in motor control center with new for building No. 292,
294. (Drawing No. E-1, E-5, E-9)
2.1.2.6. Block up cable riser duct openings, any unsealed conduit between toxic free area and non toxic free area with gas tight sealing for building No. 292, 294, 50.
2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.
None
TECHNICAL PROVISIONS - II
TECHNICAL DETAIL SPECIFICATIONS
GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION- 1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.
Changes to the Standard Technical Detail Specifications: None
TECHNICAL PROVISIONS - III
SPECIAL CONDITIONS
1. Environmental Requirements in Contract
The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.
In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.
All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.
Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.
The responsibilities of all contractor personnel include:
(1) Comply with all applicable environmental laws, regulations and installation environmental policies.
(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention Plan.
(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.
(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.
(6) Open burning is prohibited on the Government premises IAW installation environmental policy.
(7) Participate in installation’s recycling program.
(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office.
Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.
(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.
(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.
(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.
2. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW
COVER SHEET
After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.
A. AT Level I Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 20 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.
B. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area.
Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
C. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award.
D. Requirement for OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
OPSEC training is available at the following website: http://cdsetrain.dtic.mil/opsec/
Section F - Deliveries or Performance
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days after notice to proceed (NTP) is issued. The time stated for completion shall include final cleanup of the premises.
(End of clause)
Section J - List of Documents, Exhibits and Other Attachments
SUBMITTAL REGISTER
Note 1. See the uploaded document in FBO.
Note 2. The Submittal Register in Section J, identifies the documentation that will be made available for approval and review by the Government in the performance of this task order. It is the contractor's responsibility that this data is in compliance with the corresponding OMA specification that is referenced.
LIST OF APPLICABLE CONTRACT DRAWINGS
GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS- FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.
Ring No. Sheet No. Description Date
1 T-1 TITLE SHEET 24 JAN 18
2 L-1 PROJECT LOCATION PLAN 24 JAN 18
MECHANICAL
3 M-1 MECHANICAL MATERIAL INDICATIONS & SYMBOLS
AND ABBREVIATIONS
24 JAN 18
4 M-2 SCOPE OF WORK AND GENERAL NOTES 24 JAN 18
5 M-3 MECHANICAL EQUIPMENT SCHEDULE 24 JAN 18
6 M-4 BLAST DOORS FLOOR PLAN(UPPER BUNKERS, -294)
AND SPECIFIC NOTES
24 JAN 18
7 M-5 UPPER BUNKER PARTIAL & SECTION PLAN (BLDG S-
294) AND SPECIFIC NOTES
24 JAN 18
8 M-6 DECON STATION FLOOR PLAN( UPPER BUNKER, S-
294)
24 JAN 18
9 M-7 DECON STATION PARTIAL PLAN-1 & 2(UPPER
BUNKER, S-294), WALL DUCT PENETRATION WITH
NON-METALLIC CONNECTOR AND NOTES
24 JAN 18
10 M-8 DECON STATION PARTIAL PLAN-3 AND NOTES 24 JAN 18
11 M-9 DOMESTIC WATER TANK SYSTEM FLOOR AND
SECTION PLAN AND NOTES
24 JAN 18
12 M-10 UPPER BUNKER NBC MAIN CONTROL PANEL-1 24 JAN 18
13 M-11 UPPER BUNKER NBC MAIN CONTROL PANEL-2 24 JAN 18
14 M-12 CPS AIR FLOW SYSTEM DIAGRAM(UPPER
BUNKER),EXHAUST FAN SYSTEMS AND AIRLOCK
AREA SYSTEM
24 JAN 18
15 M-13 LADDER DIAGRAM-1(NBC MAIN CONTROLPANEL-1),
UPPER BUNKER
24 JAN 18
16 M-14 LADDER DIAGRAM-2(NBC MAIN CONTROLPANEL-2),
UPPER BUNKER
24 JAN 18
17 M-15 EXISTING MECHANICAL ROOM FLOOR PLAN (UPPER
BUNKER, S-294), SPECIFIC NOTES AND BLAST
VALVES
24 JAN 18
18 M-16 EXISTING NBC FAN SECTION-1(UPPER BUNKER, S-
294)
24 JAN 18
19 M-17 EXISTING NBC FAN SECTION-2(UPPER BUNKER, S-
294)
24 JAN 18
20 M-18 BLAST DOORS FLOOR PLAN(LOWER BUNKER, S-
292), LOW LEVEL FLOOR PLAN AND SPECIFIC
NOTES
24 JAN 18
21 M-19 LOWER BUNKER NBC MAIN CONTROL PANEL-1 24 JAN 18
22 M-20 LOWER BUNKER NBC MAIN CONTROL PANEL-2 24 JAN 18
23 M-21 CPS AIR FLOW SYSTEM DIAGRAM(LOWER BUNKER)
AND EXHAUST FAN SYSTEM
24 JAN 18
24 M-22 LADDER DIAGRAM-1(NBC MAIN CONTROLPANEL-1),
LOWER BUNKER
24 JAN 18
25 M-23 LADDER DIAGRAM-2(NBC MAIN CONTROLPANEL-2),
LOWER BUNKER
24 JAN 18
26 M-24 EXISTING MECH RM CEILING LEVEL PLAN , EXISTING
BLAST VALVES UPPER LEVEL PLAN (LOWER
BUNKER, S-292) AND SPECIFIC NOTES
24 JAN 18
27 M-25 EXISTING MECH RM MCRF FILTER LEVEL
PLAN(LOWER BUNKER, S-292) AND SPECIFIC NOTES
24 JAN 18
28 M-26 EXISTING NBC FAN SECTION(LOWER BUNKER, S-
292)
24 JAN 18
29 M-27 EXISTING FLOOR PLAN(BLDG S-50)AND SPECIFIC
NOTES
24 JAN 18
30 M-28 BUNKER(S-50) NBC MAIN CONTROL PANEL 24 JAN 18
31 M-29 LADDER DIAGRAM-1(NBC MAIN CONTROLPANEL-1),
S-50 BUNKER
24 JAN 18
32 M-30 LADDER DIAGRAM-2(NBC MAIN CONTROLPANEL-2),
S-50 BUNKER
24 JAN 18
33 M-31 BUNKER(S-294,S-292 & S-50) AIR LEAKAGE TEST
FLOW CHART
ELECTRICAL
34 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORKS 24 JAN 18
35 E-2 EXIST/NEW AIRLOCK SYSTEM CONTROL AND
AUXILIARY PLAN, INTERCOM SYSTEM DIAGRAM(
UPPER BUNKER, S-294 )
36 E-3 EXIST/NEW ELECTRICAL DOOR CONTROL SYSTEM
PLAN( UPPER BUNKER, S-294 )
24 JAN 18
37 E-4 EXIST/NEW ELECTRICAL ROOM PARTIAL POWER
PLAN HIGH LEVEL( UPPER BUNKER, S-294 )
24 JAN 18
38 E-5 MCC DETAILS & DIAGRAMS, EXIST MCC ( UPPER
BUNKER, S-294 )
24 JAN 18
39 E-6 EXIST/NEW FAN & FILTER ASSEMBLY UNIT POWER &
CONTROL PLAN (S-294 )
40 E-7 EXIST/NEW ELECTRICAL DOOR CONTOL SYSTEM 24 JAN 18
PLAN ( LOWER BUNKER, S-292 )
41 E-8 EXIST/NEW MECHANICAL ROOM PARTIAL POWER
PLAN (HIGH LEVEL) ( LOWER BUNKER, S-292 )
24 JAN 18
42 E-9 MCC DETAILS & DIAGRAMS/EXIST NMCC1 ( LOWER
BUNKER, S-292 )
24 JAN 18
43 E-10 EXISTING ELECTRICAL PLAN(BLDG S-50), INTERCOM
SYSTEM DIAGRAM
LIST OF GOVERNMENT FURNISHED MATERIALS (GFM)
Item No. 1
Description Fan and Filter Assembly (FFA)
Quantity 2
Specifications
Rated air flow 1000 cfm
Air flow resistance 6.0 in H2O
System pressure performance 10.5 IWG
Physical characteristics
Length 83" (2.11m)
Height 35.36" (89.81cm)
Width 27.56" (70cm)
Weight 330lbs (149.69Kg)
Housing material Aluminum
Filter M98, Gas and Particulate, Filter Set, 200-cfm part No. 5-19-6722-N, NSN 4240-01-369-6533 or HF200S Power Requirements
Section K - Representations, Certifications and Other Statements of Offerors
52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)
(a) The offeror certifies that --
(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –
(i) Those prices,
(ii) The intention to submit an offer, or
(iii) The methods of factors used to calculate the prices offered:
(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and
(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.
(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --
(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or
(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);
(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and
(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.
(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.
(End of Provision)
252.209-7999 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law
REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILTIY
OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION 2012-00004) (JAN 2012)
(a) In accordance with sections 8124 and 8125 of Division A of the Consolidated Appropriations Act, 2012, (Pub. L. 112-74) none of the funds made available by that Act may be used to enter into a contract with any corporation that-
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless the agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government.
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless the agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that –
(1) It is ( ) is not ( ) a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with authority responsible for collecting the tax liability,
(2) It is ( ) is not ( ) a corporation that was convicted of a felony criminal violation under a federal law within the preceding 24 months.
(End of provision)
5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS
(a) SUBCONTRACTING:
If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.
(b) AFFILIATED OFFERORS:
(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.
(2) Each offeror shall furnish, below, the following information:
(i) Whether the offeror has any affiliates;
(ii) The names and addresses of all affiliates of the offeror; and
(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.
AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)
(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):
Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.
(d) STANDARDS OF CONDUCT CERTIFICATION:
This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.
(i) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________
(ii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________
(iii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________
Firm ____________________________________________________ Name _____________________________________________________ Signature __________________________________________________
Title _____________________________________________________ Date of Execution ____________________________________________
(e) TAXES:
(1) References:
(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."
(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.
(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.
(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.
(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.
(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.
(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):
Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total
This item will be imported specifically for this contract? Yes _____ No _____
(ii) Special Excise Tax:
Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total
Name of item manufacturer
(iii) Value Added Tax (VAT):
Input VAT on materials purchased for this contract. 10% _____ Input VAT on transportation leased/rented for this contract.10% _____ Input VAT on equipment leased/rented for this contract. 10% _____ Input VAT on services purchased for this contract. 10% _____ Output VAT on total contract amount. 10% _____
(iv) Special Excise (Petroleum) Tax:
No. of U/P Liters w/o Tax Tax/Unit Total Tax Amount Regular Gasoline ________ (L) ________ w________ w_____________ Premium Gasoline ________ (L) ________ w________ w_____________ Diesel ________ (L) ________ w________ w_____________ Other ________ (L) ________ w________ w_____________
(v) Education Tax.
(3) Name of the oil company from which POL products will be purchased:
Oil Company: _________________________________________ (Name only)
(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.
Signed (Chop)
(f) CERTIFICATIONS AND REPRESENTATIONS
By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation.
The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.
Section L - Instructions, Conditions and Notices to Bidders
INSTRUCTION TO OFFEROR
1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL:
a. The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215- 1(f)(4).
b. Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.
2. SUBMISSION OF PROPOSAL:
a. Offers shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to ukap.son1.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to ONLY FBO server problem not individual failure/problem. All questions should be emailed to ukap.son1.ln@mail.mil within five (5) days after the solicitation is issued. The electronic offer shall be submitted by 1500 hrs on the closing date of RFP.
b. The PRICING PROPOSAL with the detailed cost breakdown shall be submitted by 1500 hours on the closing date of RFP through https://www.fbo.gov/. The cost breakdown should clearly identify all the significant costs associated with the level of effort prescribed in the statement of work. Any omission of such data may result in the offeror not being considered for award.
c. Section K : Offerors must complete all portions of Section K and submit it through https://www.fbo.gov/ by 1500 hours on the closing date of RFP. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, any proposed exemption of a specific ROK tax shall be legitimate, attributable to the contract, and authorized by the applicable stated references.
Failure to submit the above requirements may be grounds for determining the proposal to be non compliant and not eligible to be considered for award.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
Date and Time : 2 Feb 2018, 14:30 hours
POC : So, Ki Chong, DSN: 730‐3713, Cell: 010‐2718‐7476 Location : Gate #2 (Near Uijongbu Sports Complex), Camp Red Cloud
(End of provision)
5152.236-4011 CONSTRUCTION PRICE RANGE
Pursuant to FAR 36.204 the estimated price range is between $ 1,000,000 and $5,000,000.
Section M - Evaluation Factors for Award
BASIS OF AWARD
Award shall be made to the responsible offeror submitting the lowest priced, technically acceptable offer and completed Section K that satisfies all terms and conditions of this solicitation. The Government reserves the right to make a technical acceptability determination without any discussion with the offeror.
The tax exemptions stated in Section K will be reviewed by the contracting officer for reasonableness and necessity to complete the Task Order. The contracting officer may reject a proposal if the offeror appears to improperly overstate any proposed tax exemptions.