A2_Drawing_files-Title.pdf
PDF 1010 KB Posted
- Attached to
- Repair CBRN Protection System
- Solicitation number
- W91QVN18R0049
About this file
Drawing-title
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21_W91QVN-18-R-0049-0001.pdf | ||
| A2_Drawing_files_-_Elec.pdf | ||
| A21_W91QVN-18-R-0049.pdf | ||
| A2_Drawing_files___109374___MECH.PDF | ||
| A22_Submittal_Register.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF DRAWINGS
RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.
T - 1
RING NO. DESCRIPTION OF DRAWINGS
TITLE SHEET
DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS
TITLE SHEET
T-1
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
E - 1
E - 2
ELECTRICAL
L - 1 PROJECT LOCATION PLAN2
E - 3
E - 4
REPAIR CBRN PROTECTION SYSTEM
IN VARIOUS BUILDINGS, CRC
CAMP RED CLOUDCHONG, ST
109374
REPAIR CBRN PROTECTION SYSTEM IN VARIOUS BUILDINGS
FEWR NO. 109374, CAMP RED CLOUD
MECHANICAL
M - 1
BLDG S-294, S-292 & S-50, CRC
M - 2
M - 3
M - 4
M - 5
M - 6
M - 7
M - 8
M - 9
M - 10
M - 11
M - 12
M - 13
M - 14
M - 15
M - 16
M - 17
M - 18
M - 19
M - 20
M - 21
M - 22
M - 23
M - 24
M - 25
M - 26
M - 27
M - 28
M - 29
M - 30
M - 31
MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBREVIATIONS
SCOPE OF WORK AND GENERAL NOTES
MECHANICAL EQUIPMENT SCHEDULE
BLAST DOORS FLOOR PLAN(UPPER BUNKER, S-294) AND SPECIFIC NOTES
(BLDG S-294) AND SPECIFIC NOTES
DECON STATION FLOOR PLAN (UPPER BUNKER, S-294)
DECON STATION PARTIAL PLAN-1 & 2(UPPER
PENETRATION WITH NON-METALLIC CONNECTOR AND NOTES
BUNKER, S-294), WALL DUCT
DECON STATION PARTIAL PLAN-3 AND NOTES
DOMESTIC WATER TANK SYSTEM FLOOR AND SECTION PLAN AND NOTES
UPPER BUNKER NBC MAIN CONTROL PANEL-1
UPPER BUNKER NBC MAIN CONTROL PANEL-2
CPS AIR FLOW SYSTEM DIAGRAM (UPPER BUNKER),EXHAUST FAN SYSTEMS
AND AIRLOCK AREA SYSTEM
LADDER DIAGRAM-1(NBC MAIN CONTROLPANEL-1), UPPER BUNKER
LADDER DIAGRAM-2(NBC MAIN CONTROLPANEL-2), UPPER BUNKER
EXISTING MECHANICAL ROOM FLOOR PLAN
NOTES AND BLAST VALVES
(UPPER BUNKER, S-294), SPECIFIC
EXISTING NBC FAN SECTION-1(UPPER BUNKER, S-294)
EXISTING NBC FAN SECTION-2(UPPER BUNKER, S-294)
BLAST DOORS FLOOR PLAN(LOWER BUNKER,
AND SPECIFIC NOTES
S-292), LOW LEVEL FLOOR PLAN
LOWER BUNKER NBC MAIN CONTROL PANEL-1
LOWER BUNKER NBC MAIN CONTROL PANEL-2
CPS AIR FLOW SYSTEM DIAGRAM(LOWER BUNKER) AND EXHAUST FAN
SYSTEM
LADDER DIAGRAM-1(NBC MAIN CONTROLPANEL-1), LOWER BUNKER
LADDER DIAGRAM-2(NBC MAIN CONTROLPANEL-2), LOWER BUNKER
EXISTING MECH RM CEILING LEVEL PLAN
PLAN (LOWER BUNKER, S-292) AND SPECIFIC NOTES
, EXISTING BLAST VALVES UPPER LEVEL
EXISTING MECH RM MCRF FILTER LEVEL
SPECIFIC NOTES
PLAN(LOWER BUNKER, S-292) AND
EXISTING NBC FAN SECTION(LOWER BUNKER, S-292)
EXISTING FLOOR PLAN(BLDG S-50)AND SPECIFIC NOTES
BUNKER(S-50) NBC MAIN CONTROL PANEL
LADDER DIAGRAM-1(NBC MAIN CONTROLPANEL-1), S-50 BUNKER
LADDER DIAGRAM-2(NBC MAIN CONTROLPANEL-2), S-50 BUNKER
BUNKER(S-294,S-292 & S-50) AIR LEAKAGE TEST FLOW CHART
E - 5
E - 6
E - 7
E - 8
E - 9
E - 10
LEGEND, GENERAL NOTES AND SCOPE OF WORKS
INTERCOM SYSTEM DIAGRAM( UPPER BUNKER, S-294 )
EXIST/NEW AIRLOCK SYSTEM CONTROL AND AUXILIARY PLAN,
SYSTEM PLAN( UPPER BUNKER, S-294 )
EXIST/NEW ELECTRICAL DOOR CONTROL
MCC DETAILS & DIAGRAMS, EXIST MCC ( UPPER BUNKER, S-294 )
POWER & CONTROL PLAN (S-294 )
EXIST/NEW FAN & FILTER ASSEMBLY UNIT
SYSTEM PLAN ( LOWER BUNKER, S-292 )
EXIST/NEW ELECTRICAL DOOR CONTOL
( LOWER BUNKER, S-292 )
EXIST/NEW MECHANICAL ROOM PARTIAL POWER PLAN (HIGH LEVEL)
( LOWER BUNKER, S-292 )
MCC DETAILS & DIAGRAMS/EXIST NMCC1
INTERCOM SYSTEM DIAGRAM
EXISTING ELECTRICAL PLAN(BLDG S-50),
HIGH LEVEL( UPPER BUNKER, S-294 )
EXIST/NEW ELECTRICAL ROOM PARTIAL POWER PLAN
UPPER BUNKER PARTIAL & SECTION PLAN
L-1
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR'G DIV
DES
CHK'D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
UNIT #15707, APO AP 96258-5707
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
US ARMY INSTALLATION MANAGEMENT COMMAND
DEPARTMENT OF THE ARMY
CIVIL
PROJECT LOCATION PLAN
N
GREEN
SAND
S A
N D
FNSH. EL. EL. 68.20
OUT
DOOR
DE
CK
BIK
E R
ACK
FL
EL:
67.0
N
POHANG
UIJONGBU
MAIN GATE
FIRE STATION
GATE #2
NOT TO SCALE
L O C A T I O N M A P
CAMP RED CLOUD
WONJU
MOKPO
TONGYOUNG
SEOUL
TONGDUCHON
CHUNCHON
OSAN
TAEJON
E A S T S E A
BUSAN
WAEGWAN
CHINHAE
TAEGU
MUNSAN
W E S T
S E A
INCHON
KWANGJU
KUNSAN
PYONGTAEK
SCALE:
PROJECT LOCATION PLAN
N/A
S-294
S-50
REPAIR CBRN PROTECTION SYSTEM
IN VARIOUS BUILDINGS, CRC
CAMP RED CLOUDCHONG, ST
109374
S-292
CP RED CLOUD, KOREA
REPAIR CBRN PROTECTION SYSTEM IN VARIOUS BUILDINGS,
FEWR NO. 109374,
THIS PROJECT
| Bunker(S-294S-292)-Fina(revised)_L1 |
| Bunker(S-294S-292)-Fina(revised)_L2 |
| Bunker(S-294S-292)-Fina(revised)_M1 |
| Bunker(S-294S-292)-Fina(revised)_M2 |
| Bunker(S-294S-292)-Fina(revised)_M3 |
| Bunker(S-294S-292)-Fina(revised)_M4 |
| Bunker(S-294S-292)-Fina(revised)_M5 |
| Bunker(S-294S-292)-Fina(revised)_M6 |
| Bunker(S-294S-292)-Fina(revised)_M7 |
| Bunker(S-294S-292)-Fina(revised)_M8 |
| Bunker(S-294S-292)-Fina(revised)_M9 |
| Bunker(S-294S-292)-Fina(revised)_M10 |
| Bunker(S-294S-292)-Fina(revised)_M11 |
| Bunker(S-294S-292)-Fina(revised)_M12 |
| Bunker(S-294S-292)-Fina(revised)_M13 |
| Bunker(S-294S-292)-Fina(revised)_M14 |
| Bunker(S-294S-292)-Fina(revised)_M15 |
| Bunker(S-294S-292)-Fina(revised)_M16 |
| Bunker(S-294S-292)-Fina(revised)_M17 |
| Bunker(S-294S-292)-Fina(revised)_M18 |
| Bunker(S-294S-292)-Fina(revised)_M19 |
| Bunker(S-294S-292)-Fina(revised)_M20 |
| Bunker(S-294S-292)-Fina(revised)_M21 |
| Bunker(S-294S-292)-Fina(revised)_M22 |
| Bunker(S-294S-292)-Fina(revised)_M23 |
| Bunker(S-294S-292)-Fina(revised)_M24 |
| Bunker(S-294S-292)-Fina(revised)_M25 |
| Bunker(S-294S-292)-Fina(revised)_M26 |
| Bunker(S-294S-292)-Fina(revised)_M27 |
| Bunker(S-294S-292)-Fina(revised)_M28 |
| Bunker(S-294S-292)-Fina(revised)_M29 |
| Bunker(S-294S-292)-Fina(revised)_M30 |
| Bunker(S-294S-292)-Fina(revised)_M31 |
File details come from the government source that posted it.