A21_Solicitation_W91QVN18R0033_Frequency_Converters.pdf

PDF 625 KB Posted

Attached to
Frequency Converters with Installation and Shelter Construction
Solicitation number
W91QVN-18-R-0033
Issued by

About this file

Solicitation W91QVN-18-R-0033 Frequency Converters with Installation and Shelter Construction

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W91QVN-18-R-0033 06-Apr-2018

b. TELEPHONE NUMBER

(02) 7914-3357

8. OFFER DUE DATE/LOCAL TIME

01:00 PM 21 May 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W91QVN9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MS. GASKINS, JESSICA D.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W582MZ70800078

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCC YONGSAN, UNIT #15289

APO AP 96205-5289

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W808G4 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

X SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

CHO, HAN SU

UNIT#15783 3AG

APO AP 96266-5757

TEL: FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

335312

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF96

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W91QVN-18-R-0033

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Installation Patriot Characteristic

FFP

Installation Patriot Characteristic Power Equipment Location: Suwon Air Base in accordance with Statement of Work section 4.

PURCHASE REQUEST NUMBER: W582MZ70800078

NET AMT

0001AA 3 Each Frequency Converter, 150kW

FFP

Frequency Converter, 150kW in accordance with Statement of Work section 4.1(A).

FOB: Destination

PSC CD: 6130

0001AB 3 Each Power Distribution Unit, 521A

FFP

Power Distribution Unit, 521A in accordance with Statement of Work section 4.1(B).

0001AC 5 Each Frequency Converter, 60kW

FFP

Frequency Converter, 60kW in accordance with Statement of Work section 4.1(C).

0001AD 5 Each Power Distribution Unit, 210A

FFP

Power Distribution Unit, 210A in accordance with Statement of Work section 4.1(D).

0001AE 2 Each Manual Transfer Switch (MTS)

FFP

Manual Transfer Switch (MTS)

0001AF 18 Each Junction Box

FFP

Junction Box in accordance with Statement of Work section 4.1(E).

Patriot Characteristic Cable, Connector

FFP

Patriot Characteristic Cable, Connector and Contruction in accordance with Statement of Work section 4.2.

Location: Suwon Air Base

0002AA 1 Job Fire Control Area Cable/Connector/Wire

FFP

Fire Control Area Cable/Connector/Wire Routing

0002AB 1 Job Launcher Area Cable/Connector/Wire

FFP

Launcher Area Cable/Connector/Wire Routing

0002AC 1 Job ICC Cable/Connector/Wire

FFP

ICC Cable/Connector/Wire Routing

Subsidiary Item

FFP

Subsidiary Item in accordance with Statement of Work section 4.

0003AA 1 Job Civil Engineering Works

FFP

Civil Engineering Works in accordance with Statement of Work section 4.

0003AB 1 Job Installation PVC Pipe, Cable Tray

FFP

Installation PVC Pipe, Cable Tray in accordance with Statement of Work section 4.

Shelter

FFP

0004AA 4 Job Battery FC Shelter

FFP

Battery FC Shelter in accordance with Statement of Work section 4.3.

0004AB 1 Job ICC FC Shelter

FFP

ICC FC Shelter in accordance with Statement of Work section 4.3.

Commercial Power

FFP

Commercial Power in accordance with Statement of Work section 4.

0005AA 4 Each Battery

FFP

Battery in accordance with Statement of Work section 4.

0005AB 1 Each

ICC

FFP

ICC in accordance with Statement of Work section 4.

0006 1 Each Training

FFP

Training in accordance with Statement of Work section 7.

Location: Suwon Air Base

0007 1 Lot Manual

FFP

Manuals in accordance with Statement of Work section 8.

Location: Suwon Air Base

0008 1 Lot Warranty

FFP

Contractor shall provide commercial warranty for a minimum of two (2) years for any items, installation, and construction. Warranty period shall begin from the date of final acceptance of the item(s), installation, or construction. If (within 2 years full coverage warranty period) any fails, the contractor shall be require by the Government, at no increase in contract price, to take corrective action in accordance with the Statement of Work section 6.

Location: Suwon Air Base

OPTION Installation Patriot Characteristic

FFP

Installation Patriot Characteristic Power Equipment Location: Kunsan Air Base in accordance with Statement of Work Section 4.

1001AA 1 Each OPTION Frequency Converter, 150kW

FFP

Frequeuncy Converter, 150kW in accordance with Statement of Work section 4.1(A).

1001AB 1 Each OPTION Power Distribution Unit, 521A

FFP

Power Distribution Unit, 521A in accordance with Statement of Work section 4.1(B).

1001AC 2 Each OPTION Frequency Converter, 60kW

FFP

Frequency Converter, 60kW in accordance with Statement of Work section 4.1(C).

1001AD 2 Each OPTION Power Distribution Unit, 210A

FFP

Power Distribution Unit, 210A in accordance with Statement of Work section 4.1(D).

1001AE 1 Each OPTION Manual Transfer Switch (MTS)

FFP

Manual Transfer Switch (MTS)

1001AF 8 Each OPTION Junction Box

FFP

Junction Box in accordance with Statement of Work section 4.1(E).

OPTION Patriot Characteristic Cable, Connector

FFP

Patriot Characteristic Cable, Connector and Construction in accordance with Statement of Work section 4.2.

Location: Kunsan Air Base

1002AA 1 Job OPTION Fire Control Area Cable/Connector/Wire

FFP

Fire Control Area Cable/Connector/Wire Routing

1002AB 1 Job OPTION Launcher Area Cable/Connector/Wire

FFP

Launcher Area Cable/Connector/Wire Routing

OPTION Subsidiary Item

FFP

Subsidiary Item in accordance with Statement of Work section 4.

1003AA 1 Job OPTION Civil Engineering Works

FFP

Civil Engineering Works in accordance with Statement of Work section 4.

1003AB 1 Job OPTION Installation PVC Pipe, Cable Tray

FFP

Installation PVC Pipe, Cable Tray in accordance with Statement of Work section 4.

OPTION Shelter

FFP

Shelter in accordance with Statement of Work section 4.3.

1004AA 1 Job OPTION Battery FC Shelter

FFP

Battery FC Shelter in accordance with Statement of Work section 4.3.

OPTION Commercial Power

FFP

Commercial Power in accordance with Statement of Work section 4.

1005AA 1 Each OPTION Battery

FFP

Battery in accordance with Statement of Work section 4.

1006 1 Each OPTION Training

FFP

Training in accordance with Statement of Work section 7.

Location: Kunsan Air Base

1007 1 Lot OPTION Manual

FFP

Manuals in accordance with Statement of Work section 8.

Location: Kunsan Air Base

1008 1 Lot OPTION Warranty

FFP

Contractor shall provide commercial warranty for a minimum of two (2) years for any items, installation, and construction. Warranty period shall begin from the date of final acceptance of the item(s), installation, or construction. If (within 2 years full coverage warranty period) any fails, the contractor shall be require by the Government, at no increase in contract price, to take corrective action in accordance with the Statement of Work section 6.

Location: Kunsan Air Base

OPTION Installation Patriot Characteristic

FFP

Location: Camp Carroll in accordance with Statement of Work Section 4.

2001AA 3 Each OPTION Frequency Converter, 150kW

FFP

Frequency Converter, 150kW in accordance with Statement of Work section 4.1(A).

2001AB 3 Each OPTION Power Distribution Unit, 521A

FFP

Power Distribution Unit, 521A in accordance with Statement of Work section 4.1(B).

2001AC 7 Each OPTION Frequency Converter, 60kW

FFP

Frequency Converter, 60kW in accordance with Statement of Work section 4.1(C).

2001AD 7 Each OPTION Power Distribution Unit, 210A

FFP

Powe Distribution Unit, 210A in accordance with Statement of Work section 4.1(D).

2001AE 3 Each OPTION Manual Transfer Switch (MTS)

FFP

Manual Transfer Switch (MTS)

2001AF 24 Each OPTION Junction Box

FFP

Junction Box in accordance with Statement of Work section 4.1(E).

OPTION Patriot Characteristic Cable, Connector

FFP

Patriot Characteristic Cable, Connector and Construction in accordance with

Location: Camp Carroll

2002AA 3 Job OPTION Fire Control Area Cable/Connector/Wire

FFP

Fire Control Area Cable/Connector/Wire Routing

2002AB 3 Job OPTION Launcher Area Cable/Connector/Wire

FFP

Launcher Area Cable/Connector/Wire Routing

2002AC 1 Job OPTION ICC Cable/Connector/Wire

FFP

ICC Cable/Connector/Wire Routing

OPTION Subsidiary Item

FFP

2003AA 1 Job OPTION Civil Engineering Works

FFP

Civil Engineering Works in accordance with Statement of Work section 4.

2003AB 1 Job OPTION Installation PVC Pipe, Cable Tray

FFP

Installation PVC Pipe, Cable Tray in accordance with Statement of Work section 4.

OPTION Shelter

FFP

2004AA 3 Job OPTION Battery FC Shelter

FFP

Battery FC Shelter in accordance with Statement of Work section 4.3.

2004AB 1 Job OPTION ICC FC Shelter

FFP

ICc DC Shelter in accordance with Statement of Work section 4.3.

OPTION Commercial Power

FFP

2005AA 3 Each OPTION Battery

FFP

Battery in accordance with Statement of Work section 4.

2005AB 1 Each

OPTION ICC

FFP

ICC in accordance with Statement of Work section 4.

2006 1 Each OPTION Training

FFP

in accordance with Statement of Work section 7.

Location: Camp Carroll

2007 1 Lot OPTION Manual

FFP

Manuals in accordance with Statement of Work section 8.

Location: Camp Carroll

2008 1 Lot OPTION Warranty

FFP

Contractor shall provide commercial warranty for a minimum of two (2) years for any items, installation, and construction. Warranty period shall begin from the date of final acceptance of the item(s), installation, or construction. If (within 2 years full coverage warranty period) any fails, the contractor shall be require by the Government, at no increase in contract price, to take corrective action in accordance with the Statement of Work section 6.

Location: Camp Carroll

OPTION Installation Patriot Characteristic

FFP

Location: Osan Air Base in accordance with Statement of Work Section 4.

3001AA 2 Each OPTION Frequeuncy Converter, 150kW

FFP

Frequency Converter, 150kW in accordance with Statement of Work section 4.1(A).

3001AB 2 Each OPTION Power Distribution Unit, 521A

FFP

Power Distribution Unit, 521A in accordance with Statement of Work section 4.1(B).

3001AE 1 Each OPTION Manual Transfer Switch (MTS)

FFP

Manual Transfer Switch (MTS)

OPTION Patriot Characteristic Cable, Connector

FFP

Patriot Characteristic Cable, Connector and Construction in accordance with

Location: Osan Air Base

3002AA 2 Job OPTION Fire Control Area Cable/Connector/Wire

FFP

Fire Control Area Cable/Connector/Wire Routing

Subsidiary Item

FFP

3003AA 2 Job OPTION Civil Engineering Works

FFP

Civil Engineering Works in accordance with Statement of Work section 4.

3003AB 2 Job OPTION Installation PVC Pipe, Cable Tray

FFP

Installation PVC Pipe, Cable Tray in accordance with Statement of Work section 4.

OPTION Shelter

FFP

3004AA 2 Job OPTION Battery FC Shelter

FFP

Battery FC Shelter in accordance with Statement of Work section 4.3.

OPTION Commercial Power

FFP

3005AA 1 Each OPTION Battery

FFP

Battery in accordance with Statement of Work section 4.

3006 1 Each OPTION Training

FFP

Training in accordance with Statement of Work section 7.

Location: Osan Air Base

3007 1 Lot OPTION Manual

FFP

Manuals in accordance with Statement of Work section 8.

Location: Osan Air Base

3008 1 Lot OPTION Warranty

FFP

Contractor shall provide commercial warranty for a minimum of two (2) years for any items, installation, and construction. Warranty period shall begin from the date of final acceptance of the item(s), installation, or construction. If (within 2 years full coverage warranty period) any fails, the contractor shall be require by the Government, at no increase in contract price, to take corrective action in accordance with the Statement of Work section 6.

Location: Osan Air Base

Section C - Descriptions and Specifications

LCS NOTICE

LOGISTICS COST SHARING (LCS) PROJECT NOTICE:

This solicitation is conducted under the LCS program and will result in a contract between the Government of the Republic of Korea (ROK) and the contractor. ROK will directly pay the contractor. No appropriated funds of the United States (US) shall be obligated for payment due under this contract.

In accordance with the International Agreement between the US and ROK, titled “Amendment to the Implementing Agreement between the United States Forces Korea and the Republic of Korea Ministry of National Defense Concerning Logistics Cost Sharing” (hereinafter “International Agreement”), signed by the parties on 14 October 2015:

"The parties hereby agree that all LCS work must be accomplished in the ROK or its territorial waters and that all equipment and supplies that are to be acquired with ROK Government funds shall be manufactured in the ROK, and all LCS service work shall be carried out by Korean contractor(s), the Korea Railroad Corporation, or the ROK military. The term ‘Korean contractor(s)’ is defined as an entity, that, including its parent, is a domestic corporation under the Korean Tax Act and whose domestic status is recorded in the Certified Copy of Register or its successor document. A parent is defined as an entity that holds more than 50/100 of the total issued and outstanding shares in another company, as reflected in the Stock Change Certificate.”

See Section L, Instructions to Offerors, for submission requirements related to LCS solicitations.

(End of Notice)

STATEMENT OF WORK

TECHNICAL PROVISIONS- I

STATEMENT OF WORK

TITLE : Installation of Frequency Converters three (3) 150KW/400HZ and five (5) 60KW/400HZ for the PATRIOT

Missile System, Suwon Air Base (Funded with calendar year 2018 funds). (Option purchases at areas:

Kunsan Air Base one (1) 150KW/400HZ and two (2) 60KW/400HZ (Funded with calendar year 2019 funds); Camp Carroll-three (3) 150KW/400HZ and seven (7) 60KW/400HZ (Funded with calendar year 2020 funds): Osan Air Base . two (2) 150KW/400HZ (Funded with calendar year 2021 funds).

1. The contractor shall provide all necessary resources to install power distribution panels, cabling, and digital converters, 150KW/400Hz and 60KW/400Hz. If contractor has to remove any items or damaged any property for execution of this project, contractor should reinstall and restore them as original. If contractor damaged the Patriot Missile System during initial operational/functional test, contractor should repair or replace damaged components and restore Patriot Missile System as original condition without extra cost to government. This contract is considered a turn-key procurement which includes the acquisition and installation of frequency converter associated system hardware and software, support equipment, infrastructures, operations and maintenance (O&M) training, and manuals needed to integrate the subsystems into an operationally safe, suitable and effective Frequency Converters System as determined by the government. No government or Army assets will be used.

1.1 Work by Contractor:

A. The contractor shall provide all labor, materials, tools, equipment, supplies and any other resources necessary to accomplish the scope of work in accordance with specifications and UNIFIED FACILITIES GUIDE SPECIFICATIONS UFGS-26 35 43 (May 2011) Change 1 - 05/13. See the attachment 01 for

UFGS.

B. The contractor shall verify the locations and dimensions at the job site.

1.2 Work by In-House labor: Not applicable to this project.

1.3 Work by Troop Labor: Not applicable to this project.

2. Applicable Documents: MIL-STD-461D, Requirements for the Control of Electromagnetic Interference Emissions and Susceptibility.

MIL-STD-810F, Environmental Engineering Considerations and Laboratory Tests.

MIL-STD-882E, Department of Defense Standard Practice System Safety.

MIL-STD-1472, Human Engineering.

MIL-HDBK-454, General Guidelines for Electronic Equipment.

3. CONTRACT COMPLETION DATE (CCD): The contractor must complete this project within 210 days after NTP issued. This contract may be terminated if not completed within 210 days after NTP issued date.

4. PRINCIPAL FEATURES: This project includes, but will not be limited to the following principal features:

Schedule #I, Converter. See the attached UFGS (Unified Facilities Guide Specifications).

4.1. Hardware Specifications: Contractor shall provide hardware which meets the following minimum salient characteristics.

A. FREQUENCY CONVERTERS, 150kW

- 400HZ Power Supply for Radar Station (RS) and Engagement Control Station (ECS)

- 3Phase 4Wire 208V ±1%

- 400HZ ±0.25%

- Over Load: 150% Output 5 Minute

- Emergency Shutdown

- Battle - Short

- Included Un-interruptible Function

B. Power Distribution Unit, 521A

- Power Distribution to RS, ECS

- 3Phase 4Wire 208V

- Input Voltage Range: ±15%

- Rate Current: 521A

- Max In Rush Current: 2500A

- Output Overload Protection: 120%

- Emergency Shutdown

- Manual Transfer Switch (150kW Frequency Converter (FC), Electrical Power Plan (EPP))

C. FREQUENCY CONVERTERS, 60kW

- 400HZ Power Supply for Launcher Station (LS) (4)

- 3Phase 4Wire 208V ±1%

- 400HZ ±0.25%

- Over Load: 125% Output 25Minute

- Emergency Shutdown

- Included Un-interruptible Function

D. Power Distribution Unit, 210A

- Power Distribution to 4 Launchers

- 3Phase 4Wire 208V

- Input Voltage Range: +15% ~ -10%

- Rate Current: 210A

- Max In Rush Current: 2000A

- Output Overload Protection: 120%

- Emergency Shutdown

E. JUNCTION BOX

- Cable Interface and Power On/Off Function for Launcher

- Power: 16kW

- 3Phase 208VAC, 400HZ

- Input Voltage Range: +15% ~ -10%

- Current: 55.5A (PF. 0.8)

- Voltage Drop: 150mV

Schedule #II, Construction and Installation: All work shall be done IAW the attached specifications.

4.2. Suwon AB: Contractor shall provide drawings and shelter specifications that shall accommodate the hardware solution provided in accordance with Statement of Work 4.1. Contractor shall submit shelter configuration that meets the minimum salient characteristics in accordance with Statement of Work 4.3.

A. Fire Control

i. Remove and repair all existing Frequency Converter (FC) shelter.

ii. Remove all existing FC and Power Distribution Unit (PDU) by 35th ADA Brigade.

iii. Remove all existing cables and related electricity materials.

iv. Construct FC Shelter as shown on drawing.

v. Install cable trays as shown on drawing.

vi. Install new power cables

vii. Install new control cables

viii. Install Connectors, PDU

ix. Install Connectors, PDU to RS

x. Install FC150kW, PDU and new cables with connectors.

xi. Install input switch

xii. System Integration Check Out

B. Launcher Station

i. Remove all existing cables and related electricity materials.

ii. Install transportable container type shelter not greater than 3.5m(w) x 7m(L) x 3m(h)

iii. Install cable trays as shown on drawing.

iv. Install new power cables

v. Install new control cables

vi. Install Connectors, Launcher Power Joi Box (LPJB)

vii. Install FC 60kW, PDU, LPJB and new cables with connectors.

viii. Install Input Distribution Panels with the appropriate load capacity circuit breakers

ix. System Integration Check Out

C. ICC Area, Suwon AB:

i. Remove and repair all existing FC shelter.

ii. Remove all existing FC and LPJB by 35th ADA Brigade.

iii. Remove all existing cables and related electricity materials.

iv. Construct FC shelters as shown on drawing.

v. Install cable trays as shown on drawing.

vi. Install new power cables

vii. Install new control cables

viii. Install Connectors, LPJB

ix. Install FC60kW, PDU, LPJB and new cables with connectors.

x. System Integration Check Out.

4.2.1. Option Purchase Areas:

4.2.1.1. Kunsan Air Base (CY 2019)

ii. Remove all existing FC and PDU by 35th BDE.

iii. Remove all existing cables and related electricity materials.

iv. Construct FC Shelter as shown on drawing.

v. Install cable trays as shown on drawing.

vi. Install new power cables

vii. Install new control cables

viii. Install Connectors, PDU

ix. Install Connectors, PDU to RS

x. Install FC150kW, PDU and new cables with connectors.

ii. Install transportable container type shelter not greater than 3.5m(w)x7m(L)x3m(h)

iii. Install cable trays as shown on drawing.

iv. Install new power cables

v. Install new control cables

vi. Install Connectors, LPJB

vii. Install FC 60kW, PDU, LPJB and new cables with connectors.

viii. Install Input Distribution Panels with the appropriate load capacity circuit breakers

ix. System Integration Check Out

4.2.1.2. Camp Carroll (CY 2020)

iii. Remove all existing cables and related electricity materials.

iv. Construct FC Shelter as shown on drawing.

v. Install cable trays as shown on drawing.

vi. Install new power cables

vii. Install new control cables

viii. Install Connectors, PDU

ix. Install Connectors, PDU to RS

x. Install FC150kW, PDU and new cables with connectors.

ii. Install transportable container type shelter not greater than 3.5 meters (width) x 7 meters

(length) x 3 meters (height)

iii. Install cable trays as shown on drawing.

iv. Install new power cables

v. Install new control cables

vi. Install Connectors, LPJB

vii. Install FC 60kW, PDU, LPJB and new cables with connectors.

viii. Install Input Distribution Panels with the appropriate load capacity circuit breakers

ix. System Integration Check Out

C. ICC Area, Camp Carroll:

ii. Remove all existing FC and LPJB by 35th BDE.

iii. Remove all existing cables and related electricity materials.

iv. Construct FC shelters as shown on drawing.

v. Install cable trays as shown on drawing.

vi. Install new power cables

vii. Install new control cables

viii. Install Connectors, LPJB

ix. Install FC60kW, PDU, LPJB and new cables with connectors.

x. System Integration Check Out

4.2.1.3. Osan (CY 2021)

iii. Remove all existing cables and related electricity materials.

iv. Construct FC Shelter as shown on drawing.

v. Install cable trays as shown on drawing.

vi. Install new power cables

vii. Install new control cables

viii. Install Connectors, PDU

ix. Install Connectors, PDU to RS

x. Install FC150kW, PDU and new cables with connectors.

4.3. Shelter:

Contractor should provide shelter drawings and construction sites layouts to be approved by the government prior to the start of construction work. Below are the required tasks.

i. Remove and repair all existing FC shelter.

ii. Remove all existing FC and PDU by 35th BDE.

iii. Remove all existing cables and related electricity materials.

iv. Construct FC Shelter with approved drawing.

v. Install cable trays with approved drawing.

vi. Install new power cables

vii. Install new control cables

viii. Install Connectors, PDU

ix. Install Connectors, PDU to RS

x. Install FC150kW, PDU and new cables with connectors.

5. Special Requirements

5.1 Frequency Converter must operate with the PATRIOT System. Contractors shall submit evidence of at least one (1) years’ experience within the last ten (10) years performance in manufacturing frequency converter having inter-operability with the PATRIOT Missile System. Such evidence includes Government Contract performance ratings or copies of contracts showing purchase of the frequency converter for the PATRIOT Missile System. The frequency converter must have proven capability of operating under harsh conditions which include intended use such as operating continuously for 120 hours, highly variable Kw and Hz, and rough handling.

5.2 Safety Requirements & Plan

The contractor shall ensure that all of the works performed under this contract are accomplished in accordance with Engineering Manual (EM) 385-1-1 General Safety Requirements, National Fire Protection Association (NFPA), The National Institute for Occupational Safety and Health (NIOSH) and other applicable documents.

The contractor shall develop and maintain a safety plan that describes all of the safety requirements for every phase of activities under this contract. The complete analysis for unforeseen safety hazards and unfavorable working condition shall be made. The safety plan shall develop and/or comply by referring to the EM 385-1-1, General Safety Requirement, National Institute for Occupational Safety and Health (NIOSH), National Fire Protection Code and other applicable documents.

The safety plan shall be submitted to the Contracting Officer Representative (COR) for review prior to start of the work. The contractor shall not be authorized to perform any portion of this contract without review of the Safety plan by COR.

All contractor equipment shall be equipped with proper safety devices and shall be in a safe operating condition at all times. All contractor equipment shall be subject to safety inspection at any time by the COR.

5.3 Transportation

The contractor provided transportation shall comply with US Military Base Safety requirements, DoD Safety and security policies as well as ROK Government laws and regulations for the transportation of wastes and materials under this contract.

The COR or other government representative has the right to request any identification and/or occupational endorsements from the driver beyond what is identified in additional specific clauses in this contract and refuse commencement and/or completion of pickups if any unusual or suspicious actions occur. Potential demurrage associated with the driver verification process and/or the unexpected halt or commencement of pickups will not be grounds for any claims against the US Government.

5.4 Spill Responsibility

In addition to the requirements listed in the KEGS (Korea Environmental Governing Standard) the contractor shall arrive at the pick-up site with all required spill prevention and containment equipment and supplies, including salvage (over-pack) drums, absorbent material, non-sparking tools, spark-free shovel, and the appropriate personal protective equipment.

During the performance of Waste Management Services, the contractor shall ensure he has the spill containment supplies readily available.

During the performance of this contract, the contractor is solely responsible for containment, clean-up and disposal for all spills, leaks, spill residue, and/or debris that occur as a result of, or is contributed to by the actions of its agents, employees, or subcontractors. Contractor responsibility also includes appropriate container packaging and labeling, and documentation for shipment. The contractor agrees to clean up such spills in accordance with applicable local laws and regulations at no cost the U.S. Government.

The contractor shall report all spills or leaks, regardless of their quantity to the COR and Contracting Officer (KO) immediately upon discovery. A written follow-up report shall be submitted to the COR and KO no later than 24 hours after the initial telephonic report. Upon completion of the spill clean-up, the Contractor shall submit a summary report to the COR and KO within ten (10) calendar days of the clean-up. The written report shall be in narrative form including following:

- Description of item spilled (including identity, quantity, manifest no., etc.)

- Exact date, time and location (physical address) of spill including a description of the area involved

- Persons contacted or present at the time of the spill

- Initial containment procedures initiated

- Personal injury involved (if any)

- Required assistance (if any)

- Description of clean-up procedures employed at the site

- Anticipated future clean-up procedures

- Name officially and location to dispose of spill residue

- A copy of the manifest used to remove the spill residue

- A narrative summarizing any communications with U.S. Government or Korean officials

Upon disposal of the spill residue, the contractor shall submit a summary report of the spill incident to the COR and KO. The report shall include any follow-up or additional information regarding: clean-up and disposal procedures taken, outside assistance required (if any), personal injury follow-up, and the names and telephone numbers of all national, regional, or local officials contacted during and after the spill incident as well as a copy of the manifest signed by the disposal facility and a certificate of disposal. This report and accompanying documents must be received not later than thirty (30) calendar days from the incident.

6. WARRANTY PROVISIONS:

Contractor shall provide commercial warranty for a minimum of two (2) years for any items, installation, and construction. Warranty period shall begin from the date of final acceptance of the item(s), installation, or construction. If (within 2 years full coverage warranty period) any fails, the contractor shall be require by the Government, at no increase in contract price, to take corrective action IAW the following.

Installed Converters covered under these warranty provisions are required to be repaired, pursuant to this clause. The Contractor may repair the item(s) on site at which the Installation Converters is located. In the event it is not feasible to repair on site, the Contractor shall bear transportation cost to the Contractor's plant or designated place for repair and return.

Warranty provisions do not apply to defects and failures from the following:

- Improper or negligent storage, operation, maintenance modification or repair by the Government.

- Combat damage.

- Acts of God.

- Faulty Government- furnished property.

- Failure by the Government to perform prescribed maintenance.

- Misuse or abuse of equipment by the Government.

7. Training: The Contractor shall provide a one (1) day operation and maintenance training after installation of converter system. Training shall be held at the same post/facility/installation as the installed converter systems.

Training shall be held for no more than 30 students. Contractor shall provide the training materials; government will provide facility and necessary video equipment. Training materials must be approved by the COR at least two weeks prior to the training.

8. Manuals: The Contractor shall submit the manuals for operation, maintenance and supplies before training.

See Attachment No.1, UFGS, paragraph 1.5.1. Manuals must be approved at least two weeks prior to the training.

9. New Equipment Start Up: The Startup Inspection and testing must be done by a qualified Technician from the Manufacturer. The Inspection will determine if the Equipment has been installed correctly, that the safety devices are set correctly and tested prior to commissioning. To properly test the safety devices a Load Bank Test will be conducted and operated no less than 8 hours. The Government will make available to the contractor a load bank for testing. The contractor must thoroughly test each Frequency Converters on the load bank before connecting to the Patriot Missile System. The contractor must contact the COR to schedule the use of the load banks at least one week prior to testing.

10. Commissioning: The Frequency Converters will be operated with the entire system connected and the Radar at full radiate for a 72 hours period with no failures; within this testing period there will be 6 control shut downs to verify that there are no failures within frequency converters. Should the system fail as a result of problems with the new equipment be it component failure or adjustments, The Test period will reset upon adjustment or repair.

11. Security:

10.1. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13). Applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

TITLE: Installation of Frequency Converters three (3) 150KW/400HZ and five (5) 60KW/400HZ for the PATRIOT

Missile System, Suwon Air Base.

The Power Distribution Unit (PDU) distributes power from Manual Transfer Switch (MTS) to Radar Station (RS), Engagement Control Station (ECS) (Fire control area) and Launcher Power Joi Box (LPJB) (Launcher area). All the units shall be designed IAW MIL-STD-461D. All provided items (Converter, PDU, Electrical Power Plant Joi Box (EEP JB), MTS, RS, ECS etc) shall be integrated and be compatible with each other.

DIVISION 01 GENERAL REQUIREMENTS

01320 Project Schedule 01330 Submittal Procedures 01351 Safety, Health and Emergency Response (HTRW/UST) 01451 Contractor Quality Control 01500 Temporary Construction Facilities 01780 Closeout Submittals

DIVISION 02 SITE CONSTRUCTION

02050 Demolition 02210 Grading 02221 Excavation, Filling and Backfilling for Buildings 02222 Excavation, Trenching, and Backfilling for Utilities System 02515 Concrete Pavement for Roads and Airfields

DIVISION 03 CONCRETE

03100 Structural Concrete Formwork 03150 Expansion Joints, Contraction Joints, and Water stops 03200 Concrete Reinforcement 03300 Cast-In-Place Structural Concrete

DIVISION 04 MASONRY

04200 Masonry

DIVISION 05 METALS

05090 Welding, Structural 05120 Structural Steel 05500 Miscellaneous Metal

DIVISION 07 THERMAL & MOISTURE PROTECTION

07413 Metal Siding 07600 Flashing and Sheet Metal

DIVISION 08 DOORS & WINDOWS

08110 Steel Doors and Frames 08520 Aluminum and Environmental Control Aluminum Windows 08700 Door Hardware 08810 Glass and Glazing

DIVISION 09 FINISHES

09900 Paints and Coatings

DIVISION 15 MECHANICAL

15895 Air Supply, Distribution, Ventilation, and Exhaust System

DIVISION 16 ELECTRICAL

16050 Basic Electrical Materials and Methods 16370 Electrical Distribution System Aerial 16375 Electrical Distribution System, Underground 16410 Automatic Transfer Switch and By-Pass/Isolation Switch 16415 Electrical Work Interior

(End of Statement of Work)

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A N/A 0001AA Destination Government Destination Government 0001AB Destination Government Destination Government 0001AC Destination Government Destination Government 0001AD Destination Government Destination Government 0001AE Destination Government Destination Government 0001AF Destination Government Destination Government 0002 N/A N/A N/A N/A 0002AA Destination Government Destination Government 0002AB Destination Government Destination Government 0002AC Destination Government Destination Government 0003 N/A N/A N/A N/A 0003AA Destination Government Destination Government 0003AB Destination Government Destination Government 0004 N/A N/A N/A N/A 0004AA Destination Government Destination Government 0004AB Destination Government Destination Government 0005 N/A N/A N/A N/A 0005AA Destination Government Destination Government 0005AB Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 1001 N/A N/A N/A N/A 1001AA Destination Government Destination Government 1001AB Destination Government Destination Government 1001AC Destination Government Destination Government 1001AD Destination Government Destination Government 1001AE Destination Government Destination Government 1001AF Destination Government Destination Government 1002 N/A N/A N/A N/A 1002AA Destination Government Destination Government 1002AB Destination Government Destination Government 1003 N/A N/A N/A N/A 1003AA Destination Government Destination Government 1003AB Destination Government Destination Government 1004 N/A N/A N/A N/A 1004AA Destination Government Destination Government 1005 N/A N/A N/A N/A 1005AA Destination Government Destination Government 1006 Destination Government Destination Government 1007 Destination Government Destination Government 1008 Destination Government Destination Government 2001 N/A N/A N/A N/A

2001AA Destination Government Destination Government 2001AB Destination Government Destination Government 2001AC Destination Government Destination Government 2001AD Destination Government Destination Government 2001AE Destination Government Destination Government 2001AF Destination Government Destination Government 2002 N/A N/A N/A N/A 2002AA Destination Government Destination Government 2002AB Destination Government Destination Government 2002AC Destination Government Destination Government 2003 N/A N/A N/A N/A 2003AA Destination Government Destination Government 2003AB Destination Government Destination Government 2004 N/A N/A N/A N/A 2004AA Destination Government Destination Government 2004AB Destination Government Destination Government 2005 N/A N/A N/A N/A 2005AA Destination Government Destination Government 2005AB Destination Government Destination Government 2006 Destination Government Destination Government 2007 Destination Government Destination Government 2008 Destination Government Destination Government 3001 N/A N/A N/A N/A 3001AA Destination Government Destination Government 3001AB Destination Government Destination Government 3001AE Destination Government Destination Government 3002 N/A N/A N/A N/A 3002AA Destination Government Destination Government 3003 N/A N/A N/A N/A 3003AA Destination Government Destination Government 3003AB Destination Government Destination Government 3004 N/A N/A N/A N/A 3004AA Destination Government Destination Government 3005 N/A N/A N/A N/A 3005AA Destination Government Destination Government 3006 Destination Government Destination Government 3007 Destination Government Destination Government 3008 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0001AA 210 dys. ADC 3 CHO, HAN SU

UNIT#15783 3AG

APO AP 96266-5757

W808G4

0001AB 210 dys. ADC 3 (SAME AS PREVIOUS LOCATION)

0001AC 210 dys. ADC 5 (SAME AS PREVIOUS LOCATION)

0001AD 210 dys. ADC 5 (SAME AS PREVIOUS LOCATION)

0001AE 210 dys. ADC 2 (SAME AS PREVIOUS LOCATION)

0001AF 210 dys. ADC 18 (SAME AS PREVIOUS LOCATION)

0002 N/A N/A N/A N/A

0002AA 210 dys. ADC 1 CHO, HAN SU

UNIT#15783 3AG

APO AP 96266-5757

0002AB 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0002AC 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0003 N/A N/A N/A N/A

0003AA 210 dys. ADC 1 CHO, HAN SU

UNIT#15783 3AG

APO AP 96266-5757

0003AB 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0004 N/A N/A N/A N/A

0004AA 210 dys. ADC 4 CHO, HAN SU

UNIT#15783 3AG

APO AP 96266-5757

0004AB 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0005 N/A N/A N/A N/A

0005AA 210 dys. ADC 4 CHO, HAN SU

UNIT#15783 3AG

APO AP 96266-5757

0005AB 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0006 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0007 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

0008 210 dys. ADC 1 (SAME AS PREVIOUS LOCATION)

1001 N/A N/A N/A N/A

1001AA N/A N/A N/A N/A

1001AB N/A N/A N/A N/A

1001AC N/A N/A N/A N/A

1001AD N/A N/A N/A N/A

1001AE N/A N/A N/A N/A

1001AF N/A N/A N/A N/A

1002 N/A N/A N/A N/A

1002AA N/A N/A N/A N/A

1002AB N/A N/A N/A N/A

1003 N/A N/A N/A N/A

1003AA N/A N/A N/A N/A

1003AB N/A N/A N/A N/A

1004 N/A N/A N/A N/A

1004AA N/A N/A N/A N/A

1005 N/A N/A N/A N/A

1005AA N/A N/A N/A N/A

1006 N/A N/A N/A N/A

1007 N/A N/A N/A N/A

1008 N/A N/A N/A N/A

2001 N/A N/A N/A N/A

2001AA N/A N/A N/A N/A

2001AB N/A N/A N/A N/A

2001AC N/A N/A N/A N/A

2001AD N/A N/A N/A N/A

2001AE N/A N/A N/A N/A

2001AF N/A N/A N/A N/A

2002 N/A N/A N/A N/A

2002AA N/A N/A N/A N/A

2002AB N/A N/A N/A N/A

2002AC N/A N/A N/A N/A

2003 N/A N/A N/A N/A

2003AA N/A N/A N/A N/A

2003AB N/A N/A N/A N/A

2004 N/A N/A N/A N/A

2004AA N/A N/A N/A N/A

2004AB N/A N/A N/A N/A

2005 N/A N/A N/A N/A

2005AA N/A N/A N/A N/A

2005AB N/A N/A N/A N/A

2006 N/A N/A N/A N/A

2007 N/A N/A N/A N/A

2008 N/A N/A N/A N/A

3001 N/A N/A N/A N/A

3001AA N/A N/A N/A N/A

3001AB N/A N/A N/A N/A

3001AE N/A N/A N/A N/A

3002 N/A N/A N/A N/A

3002AA N/A N/A N/A N/A

3003 N/A N/A N/A N/A

3003AA N/A N/A N/A N/A

3003AB N/A N/A N/A N/A

3004 N/A N/A N/A N/A

3004AA N/A N/A N/A N/A

3005 N/A N/A N/A N/A

3005AA N/A N/A N/A N/A

3006 N/A N/A N/A N/A

3007 N/A N/A N/A N/A

3008 N/A N/A N/A N/A

ADDENDUM TO FAR 52.212-4

ADDENDUM TO FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS

1. SHIPPING INSTRUCTIONS:

a. SHIP / DELIVERY TO:

The Contractor shall contact below point of contact (POC) at least five (5) working days prior to delivery to coordinate the delivery and installation schedule.

b. Delivery Location and Installation Location

6/52 ADA BN , Suwon Air Base, CW2 Donnelly, 784-1399 (DSN)/0505-784-1399(Commercial) OR SFC Bouchat Dave, 788-5949 (DSN)/0505-788-5949(Commercial)

b. RECEIVING OFFICER:

35th ADA BDE, Korea, Unit #2075, APO AP 96278-2075 ATTN: CW5 Smith Isaac, 784-1399 (DSN)/0505-784-1399(Commercial)

c. COMPLETION OF DELIVERY AND INSTALLATION: No later than 210 days after receipt of order or Modification. Partial delivery are not authorized. Installation shall be started upon delivery of the supplies ordered under this Purchase order.

Installation POC: SFC Bouchat Dave, 788-5949 (DSN)/0505-788-5949(Commercial)

2. INSPECTION AND ACCEPTANCE: Inspection for condition, quality, quantity count and final acceptance after installation of the supplies delivered under this Purchase Order shall be conducted by Receiving Officer or his authorized representative at the final destination point in Korea. The test for final acceptance will be conducted per the attached ACCEPTANCE TEST PROCEDURES.

3. NOTICE TO RECEIVING OFFICER (KOREA): Upon receipt and acceptance of supplies, the Receiving Officer is responsible for preparing a receiving report on DD Form 250. The Receiving Officer is required to complete the entire DD 250 and distribute to the Contract Specialist: Ms. Jessica D. Gaskins, 411th CSB, Korea, Unit 15289, APO AP 96205, TEL: 724-3357 (DSN), or e-mail: jessica.d.gaskins.civ@mail.mil.

4. RECEIVING OFFICER’S NOTIFICATION TO PURCHASING ACTIVITY OF NON-RECEIPT,

DAMAGE OR NON-CONFORMANCE: The Receiving Officer shall notify the Purchasing Office promptly after date of delivery specified in the purchase order, of supplies not received, damaged in transit, or not conforming to specifications of the purchase order. Only under extenuating circumstances should such notification be made later than 15 days after specified dated of delivery.

4. PAYMENT OFFICE FOR LCS PROJECT: Requests for payment, invoicing and payment status will be referred to the USFK-J4 (LCS funded).

Payment Office for LCS Funded Project:

Payment Office POC:

ROK Ministry of National Defense Defense Logistics Agency (DLA) Phone: 02-748-5752

USFK-J4-IP

PSC 303 BOX 29, APO AP 96205

TEL: 723-6295 (DSN)

pacom.yongsan.usfk.mbx.j4-lcs@mail.mil

(End of Addendum to FAR 52.212-4)

Section G - Contract Administration Data

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.203-2 Certificate Of Independent Price Determination APR 1985 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

OCT 2016

52.209-5 Certification Regarding Responsibility Matters OCT 2015 52.209-9 Updates of Publicly Available Information Regarding

Responsibility Matters

JUL 2013

52.212-1 Instructions to Offerors--Commercial Items JAN 2017 52.212-4 Contract Terms and Conditions--Commercial Items JAN 2017 52.212-5 (Dev) Contract Terms and Conditions Required to Implement

Statutes or Executive Orders--Commercial Items (Deviation 2013-O0019)

NOV 2017

52.217-5 Evaluation Of Options JUL 1990 52.217-7 Option For Increased Quantity-Separately Priced Line Item MAR 1989 52.225-14 Inconsistency Between English Version And Translation Of

Contract

FEB 2000

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

DEC 2013

52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And

Vegetation

APR 1984

52.243-1 Changes--Fixed Price AUG 1987 52.247-34 F.O.B. Destination NOV 1991 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

OCT 2016

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.211-7003 Item Unique Identification and Valuation MAR 2016 252.211-7008 Use of Government-Assigned Serial Numbers SEP 2010 252.225-7012 Preference For Certain Domestic Commodities DEC 2016 252.225-7041 Correspondence in English JUN 1997 252.225-7042 Authorization to Perform APR 2003 252.225-7993 (Dev) Prohibition on Providing Funds to the Enemy (Deviation

2015-O0016)

SEP 2015

252.243-7001 Pricing Of Contract Modifications DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015) ALTERNATE I (MAR 2015)

(a) Definitions. As used in this clause—

“Agent” means any individual, including a director, an officer, an employee, or an independent contractor, authorized to act on behalf of the organization.

“Coercion” means—

(1) Threats of serious harm to or physical restraint against any person;

(2) Any scheme, plan, or pattern intended to cause a person to believe that failure to perform an act would result in serious harm to or physical restraint against any person; or

(3) The abuse or threatened abuse of the legal process.

“Commercial sex act” means any sex act on account of which anything of value is given to or received by any person.

“Commercially available off-the-shelf (COTS) item” means--

(1) Any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Debt bondage” means the status or condition of a debtor arising from a pledge by the debtor of his or her personal services or of those of a person under his or her control as a security for debt, if the value of those services as reasonably assessed is not applied toward the liquidation of the debt or the length and nature of those services are not respectively limited and defined.

“Employee” means an employee of the Contractor directly engaged in the performance of work under the contract who has other than a minimal impact or involvement in contract performance.

“Forced labor” means knowingly providing or obtaining the labor or services of a person—

(1) By threats of serious harm to, or physical restraint against, that person or another person;

(2) By means of any scheme, plan, or pattern intended to cause the person to believe that, if the person did not perform such labor or services, that person or another person would suffer serious harm or physical restraint; or

(3) By means of the abuse or threatened abuse of law or the legal process.

“Involuntary servitude” includes a condition of servitude induced by means of—

(1) Any scheme, plan, or pattern intended to cause a person to believe that, if the person did not enter into or continue in such conditions, that person or another person would suffer serious harm or physical restraint; or

(2) The abuse or threatened abuse of the legal process.

“Severe forms of trafficking in persons” means—

(1) Sex trafficking in which a commercial sex act is induced by force, fraud, or coercion, or in which the person induced to perform such act has not attained 18 years of age; or

(2) The recruitment, harboring, transportation, provision, or obtaining of a person for labor or services, through the use of force, fraud, or coercion for the purpose of subjection to involuntary servitude, peonage, debt bondage, or slavery.

“Sex trafficking” means the recruitment, harboring, transportation, provision, or obtaining of a person for the purpose of a commercial sex act.

“Subcontract” means any contract entered into by a subcontractor to furnish supplies or services for performance of a prime contract or a subcontract.

“Subcontractor” means any supplier,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.