A02_Drawing_files___127523___CIVIL.pdf
PDF 2 MB Posted
- Attached to
- Repair building #400, Cp Casey
- Solicitation number
- W91QVN-17-R-0096
About this file
Drawing CIVIL
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A02_Drawing_files___127523___Title.pdf | ||
| A02_Drawing_files___127523___MECH.pdf | ||
| A02_Drawing_files___127523___ELEC.pdf | ||
| Solicitation_for_W91QVN-17-R-0096.docx | DOCX document | |
| A02_Submittal_Register___127523.xls | XLS spreadsheet | |
| A02_Drawing_files___127523___ARCH.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 100 0 100 200 300M
SCALE IN METERS
THIS PROJECT
N
CAMP CASEY
CIVIL
C-1
GENERAL NOTES :
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND
DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO
SUBMISSION OF CONTRACT PROPOSAL.
2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY
UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS
INDICATED BY THE COR AND SHALL BE APPROVED BY THE COR
PRIOR TO COMMENCING WORK ON THE PROJECT.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/RESTORATION
TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY
DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTOR’S
EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
6. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL
DRAWINGS, FOR OM&A PROJECTS, KOREA, OCTOBER 2003, DEPARTMENT
OF THE REPLACEATION MANAGEMENT AGENCY, KOREA REGION OFFICE"
FORM ARE A PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED
TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO ADDITIONAL COST
TO THE PROJECT CONTRACT.
LOCATION PLAN
7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY
FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO
CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE
EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO
ADDITIONAL COST.
8. THE CONTRACTOR SHALL KEEP THE REPLACEION AREA CLEAN AT
ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS
MATERIALS, EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN
A CLEAN CONDITION ACCEPTABLE TO THE OWNER OR OWNER’S
REPRESENTATIVE.
5. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED AND
CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS
UNDER GROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER
ITEMS WHICH WILL INTERFERE WITH THE REPLACEION OPERATIONS.
7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY
FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO
CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE
EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO
ADDITIONAL COST.
LOCATION PLAN AND GENERAL NOTES
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
AS SHOWN
65-A
12 CM
ST
STREAM
S T
ST
P
V C
227.5
J-4
ST
36 CM
.5
.9
W A
L L
W A
L L
W A
L L
WALL
W A
L L
WALL
228.4
ST
GAL275
MATCH LINE ’C’
00-49341
3-48PN
00-49341
4-200PN
00-49341
4-200PN
01-49550
00-49341
LAUNDRY
KSC
PEST
647667
UTIL
B&G
WH-1
WH-2
DPW HQ
A
B
629 685
651A
833T
808 811
746 715 726
A B
00-49341
A
B
1149 1151
10291144
A
B
1918 1879
A
B
A
B
A
B
2372A
2373T
A C
2451 2400
A
B
A
B
2648 2605
2609T
2514 2540
8008T
2540T
26462645
1991 1963
A B
18331832
1962 1812
456A
CCTT
CCTT
SIMNET
463Z
SSSC
TSAK MILES 2000
549 546
8114T
560G
A B
86M
48T
A
B
39 55
134 133
186 192
202A
208 215 214
213 212
259 245
FOOT BR
VEH BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR 1821
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
1158A
1158B
RAILHEAD
.8
.5
ST
R
C
6 PV
C
ST
SS
T
/2
C
M
S T
268.6
STREAM
DISCHARGE TO
65-A
12 CM
ST
STREAM
MATCH LINE ’C’
447A
F
F
497A
497B
458Z
2372?
QA00894-0J
QA00893-0J
QA00892-0J
ADMIN
EXER W/LAT
EXER W/LAT
QA00138-9J
QA01300-8J
00-54151 BUP 020122
00-54152 BUP 020122
00-54132 BUP 010801
00-54127 BUP 040430
00-54158 BUP 030104
00-54129 BUP 011109
00-54157 BUP AFTER 2026
00-54156 BUP 031030
00-54130 BUP 020330
00-54131 BUP 020929
00-54155 BUP 030506
03-57200 REPAIR 041007
99-47353
4-200PN
01-QA00604 BUP
XX-QA00606 BUP 0310XX
95-44142
4-184PN
95-44066
4-184PN
96-QA00466 BUP
95-44066
4-184PN
95-44066
4-184PN
95-44066
4-184PN
01-55893 BUP
99-QA00603 BUP
XX-QA00602 BUP 0310XX
99-47353
4-200PN
96-43269
4-184PN
97-44592
4-200PN
XX-QA00287 BUP
01-55894 BUP
99-51682
4-200PN
99-51820
3-48PN
97-44592
4-200PN
99-51682
4-200PN
99-51682
4-200PN
01-55882 BUP
A
B
A B
2022(?)
VEH BR
VEH BR
472?
455?
1839T
1840T
BARRIER
1564 1566
635A
2002B
A B
48A
A
B
A B
A B
A
B
A
B
A
B
174 Z
GRAVES
GRAVES
x x x x x x x x
B A
S K
E T
B A
L L
C
O U
R T
T E
N N
IS
C
O U
R T
706(707A)
(2298)
1071?
A B
1760?
VEH BR?
VEH BR?
4. ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL BE
COVERED WITH TOP SOIL AND SOLID SODDED.
127523
SCALE = 1 : 3,000
REPAIR BLDG S-400
CIVIL
C-2
AS SHOWN
CHOE, S M.
- 2
CAMP CASEY
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
QTYNO. ITEM
REMOVAL PLAN
REMOVAL PLAN
1:200
0 20M15105
REMARK
REMOVAL SCHEDULE
* LEGEND
SCALE: 1 / 200
TURF AREA
C H
A
IN
L
IN
K F
E N
C E
C H
A
IN
L
IN
K F
E N
C E
N
C O
N
TA
IN
ER
C O
N T A
IN
E R
CASEY CREEK
CHAIN LINK FENCE
C H
A
IN
L
IN
K F
E N
C E
TREE 3 EA 5.0M H
P C
C A
R E
A
EP
REPAIR BLDG S-400
127523
CASEY LANDFARM
AC AREA
CIVIL
C-3
AS SHOWN
CHOE, S M.
- 3 CAMP CASEY
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
SCALE: 1 / 200
N
1:200
0 20M15105
SCOPE OF WORK
- 4
SCHEDULE #1 (CONSTRUCT/ALTERATION)
1. CONSTRUCT AC PAVEMENT.
SITE LAYOUT PLAN
SITE LAYOUT PLAN AND SCOPE OF WORK
C H
A
IN
L
IN
K F
E N
C E
C H
A
IN
L
IN
K F
E N
C E
C O
N
TA
IN
ER
C O
N T A
IN
E R
CASEY CREEK
CHAIN LINK FENCE
C H
A
IN
L
IN
K F
E N
C E
P C
C A
R E
A
EP
CONSTRUCT AC PAVEMENT,
APPROX. 1,320.0 SM. SEE
REPAIR BLDG S-400
127523
CASEY LANDFARM
AC AREA
AC PAVEMENT JOINT
SUBGRADE
NEW PAVEMENT,
SEE DETAIL
MIN
EXST AC PAVEMENT
TACK COAT
SAWCUT & BITUMINOUS
PRIME COAT
NEW AC PAVEMENT
EXISTING
PAVEMENT
300MM THK BASE COURSE
150MM THK SUBBASE COURSE
- 4
SCALE: NONE
TYPICAL AC PAVEMENT SECTION
AC PAVEMENT JOINT (NEW TO EXST)
1A
1B
AC PAVEMENT
1A
PRIME COAT
SUB GRADE
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
75MM THK ASPHALTIC CONCRETE
CIVIL
C-4
AS SHOWN
CHOE, S M. CAMP CASEY
REPAIR BLDG S-400
127523
AC PAVEMENT DETAIL
| 127523-1 |
| 127523-2 |
| 127523-3 |
| 127523-4 |
File details come from the government source that posted it. Updated .