Drawing CIVIL

View the file

Other files

File Type Posted
A02_Drawing_files___127523___Title.pdf PDF
A02_Drawing_files___127523___MECH.pdf PDF
A02_Drawing_files___127523___ELEC.pdf PDF
Solicitation_for_W91QVN-17-R-0096.docx DOCX document
A02_Submittal_Register___127523.xls XLS spreadsheet
A02_Drawing_files___127523___ARCH.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

- 1 100 0 100 200 300M

SCALE IN METERS

THIS PROJECT

N

CAMP CASEY

CIVIL

C-1

GENERAL NOTES :

1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND

DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO

SUBMISSION OF CONTRACT PROPOSAL.

2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY

UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS

INDICATED BY THE COR AND SHALL BE APPROVED BY THE COR

PRIOR TO COMMENCING WORK ON THE PROJECT.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/RESTORATION

TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY

DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTOR’S

EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.

6. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL

DRAWINGS, FOR OM&A PROJECTS, KOREA, OCTOBER 2003, DEPARTMENT

OF THE REPLACEATION MANAGEMENT AGENCY, KOREA REGION OFFICE"

FORM ARE A PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED

TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO ADDITIONAL COST

TO THE PROJECT CONTRACT.

LOCATION PLAN

7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY

FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO

CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE

EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO

ADDITIONAL COST.

8. THE CONTRACTOR SHALL KEEP THE REPLACEION AREA CLEAN AT

ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS

MATERIALS, EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN

A CLEAN CONDITION ACCEPTABLE TO THE OWNER OR OWNER’S

REPRESENTATIVE.

5. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED AND

CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS

UNDER GROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER

ITEMS WHICH WILL INTERFERE WITH THE REPLACEION OPERATIONS.

7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY

FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO

CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE

EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO

ADDITIONAL COST.

LOCATION PLAN AND GENERAL NOTES

CHOE, S M.

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR’G DIV

FORCE PROTECTION

CHK’D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

UNIT #15707, APO AP 96258-5707

AS SHOWN

65-A

12 CM

ST

STREAM

S T

ST

P

V C

227.5

J-4

ST

36 CM

.5

.9

W A

L L

W A

L L

W A

L L

WALL

W A

L L

WALL

228.4

ST

GAL275

MATCH LINE ’C’

00-49341

3-48PN

00-49341

4-200PN

00-49341

4-200PN

01-49550

00-49341

LAUNDRY

KSC

PEST

647667

UTIL

B&G

WH-1

WH-2

DPW HQ

A

B

629 685

651A

833T

808 811

746 715 726

A B

00-49341

A

B

1149 1151

10291144

A

B

1918 1879

A

B

A

B

A

B

2372A

2373T

A C

2451 2400

A

B

A

B

2648 2605

2609T

2514 2540

8008T

2540T

26462645

1991 1963

A B

18331832

1962 1812

456A

CCTT

CCTT

SIMNET

463Z

SSSC

TSAK MILES 2000

549 546

8114T

560G

A B

86M

48T

A

B

39 55

134 133

186 192

202A

208 215 214

213 212

259 245

FOOT BR

VEH BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

VEH BR 1821

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

FOOT BR

FOOT BR

VEH BR

VEH BR

VEH BR

VEH BR

FOOT BR

1158A

1158B

RAILHEAD

.8

.5

ST

R

C

6 PV

C

ST

SS

T

/2

C

M

S T

268.6

STREAM

DISCHARGE TO

65-A

12 CM

ST

STREAM

MATCH LINE ’C’

447A

F

F

497A

497B

458Z

2372?

QA00894-0J

QA00893-0J

QA00892-0J

ADMIN

EXER W/LAT

EXER W/LAT

QA00138-9J

QA01300-8J

00-54151 BUP 020122

00-54152 BUP 020122

00-54132 BUP 010801

00-54127 BUP 040430

00-54158 BUP 030104

00-54129 BUP 011109

00-54157 BUP AFTER 2026

00-54156 BUP 031030

00-54130 BUP 020330

00-54131 BUP 020929

00-54155 BUP 030506

03-57200 REPAIR 041007

99-47353

4-200PN

01-QA00604 BUP

XX-QA00606 BUP 0310XX

95-44142

4-184PN

95-44066

4-184PN

96-QA00466 BUP

95-44066

4-184PN

95-44066

4-184PN

95-44066

4-184PN

01-55893 BUP

99-QA00603 BUP

XX-QA00602 BUP 0310XX

99-47353

4-200PN

96-43269

4-184PN

97-44592

4-200PN

XX-QA00287 BUP

01-55894 BUP

99-51682

4-200PN

99-51820

3-48PN

97-44592

4-200PN

99-51682

4-200PN

99-51682

4-200PN

01-55882 BUP

A

B

A B

2022(?)

VEH BR

VEH BR

472?

455?

1839T

1840T

BARRIER

1564 1566

635A

2002B

A B

48A

A

B

A B

A B

A

B

A

B

A

B

174 Z

GRAVES

GRAVES

x x x x x x x x

B A

S K

E T

B A

L L

C

O U

R T

T E

N N

IS

C

O U

R T

706(707A)

(2298)

1071?

A B

1760?

VEH BR?

VEH BR?

4. ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL BE

COVERED WITH TOP SOIL AND SOLID SODDED.

127523

SCALE = 1 : 3,000

REPAIR BLDG S-400

CIVIL

C-2

AS SHOWN

CHOE, S M.

- 2

CAMP CASEY

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR’G DIV

FORCE PROTECTION

CHK’D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

UNIT #15707, APO AP 96258-5707

QTYNO. ITEM

REMOVAL PLAN

REMOVAL PLAN

1:200

0 20M15105

REMARK

REMOVAL SCHEDULE

* LEGEND

SCALE: 1 / 200

TURF AREA

C H

A

IN

L

IN

K F

E N

C E

C H

A

IN

L

IN

K F

E N

C E

N

C O

N

TA

IN

ER

C O

N T A

IN

E R

CASEY CREEK

CHAIN LINK FENCE

C H

A

IN

L

IN

K F

E N

C E

TREE 3 EA 5.0M H

P C

C A

R E

A

EP

REPAIR BLDG S-400

127523

CASEY LANDFARM

AC AREA

CIVIL

C-3

AS SHOWN

CHOE, S M.

- 3 CAMP CASEY

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR’G DIV

FORCE PROTECTION

CHK’D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

UNIT #15707, APO AP 96258-5707

SCALE: 1 / 200

N

1:200

0 20M15105

SCOPE OF WORK

- 4

SCHEDULE #1 (CONSTRUCT/ALTERATION)

1. CONSTRUCT AC PAVEMENT.

SITE LAYOUT PLAN

SITE LAYOUT PLAN AND SCOPE OF WORK

C H

A

IN

L

IN

K F

E N

C E

C H

A

IN

L

IN

K F

E N

C E

C O

N

TA

IN

ER

C O

N T A

IN

E R

CASEY CREEK

CHAIN LINK FENCE

C H

A

IN

L

IN

K F

E N

C E

P C

C A

R E

A

EP

CONSTRUCT AC PAVEMENT,

APPROX. 1,320.0 SM. SEE

REPAIR BLDG S-400

127523

CASEY LANDFARM

AC AREA

AC PAVEMENT JOINT

SUBGRADE

NEW PAVEMENT,

SEE DETAIL

MIN

EXST AC PAVEMENT

TACK COAT

SAWCUT & BITUMINOUS

PRIME COAT

NEW AC PAVEMENT

EXISTING

PAVEMENT

300MM THK BASE COURSE

150MM THK SUBBASE COURSE

- 4

SCALE: NONE

TYPICAL AC PAVEMENT SECTION

AC PAVEMENT JOINT (NEW TO EXST)

1A

1B

AC PAVEMENT

1A

PRIME COAT

SUB GRADE

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR’G DIV

FORCE PROTECTION

CHK’D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

UNIT #15707, APO AP 96258-5707

75MM THK ASPHALTIC CONCRETE

CIVIL

C-4

AS SHOWN

CHOE, S M. CAMP CASEY

REPAIR BLDG S-400

127523

AC PAVEMENT DETAIL

127523-1
127523-2
127523-3
127523-4

File details come from the government source that posted it. Updated .