A02_Drawing_files___127523___ARCH.pdf

PDF 832 KB Posted

Attached to
Repair building #400, Cp Casey
Solicitation number
W91QVN-17-R-0096
Issued by

About this file

Drawing ARCH

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-1

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

SCALE:

MANUFACTURES INDICATED.

PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE

COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.

ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE (COR).

CAUSED BY THIS PROJECT AND SHALL REPAIR THE DAMAGES TO MATCH UP TO

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO EXISTING AREAS

FOR APPROVAL.

CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITION AND SUBMITED TO COR

CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE PREPARED AT THE SITE BY THE

SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE WITH THE FIELD

8.

FOR APPROVAL.

CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP DRAWINGS TO COR

OFFICE, DPW. PER DIRECTION FROM THE INSPECTOR IN CHARGE OR COR

SALVAGE OR SERVICEABLE MATERIALS SHALL BE RETURNED TO SUPPLY OR STORAGE

2.

3.

4.

5.

6.

7.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER

IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT. THE GENERAL

AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION

OF THE LOAD BEARING WALLS TO PREVENT COLLAPSE OF THE STRUCTURE

APPROPRIATE TEMPORARY SUPPORTS SHOULD BE CONSTRUCTED PRIOR TO DEMOLITION

9.

10.

11.

12.

13.

14.

NUMBERS ARE FROM TM-5-807-7 AND FEDERAL STANDARD NO. 595b, COLORS.

COLOR OF MATERIALS & PAINTS SHALL BE SELECTED BY USING AGENCY AND COLOR

COMMENCEMENT OF FLOOR TILE WORK.

ALL CONCRETE FLOOR SURFACES SHALL BE LEVELED AND SMOOTHED PRIOR TO

DETAILS AND GET APPROVAL FROM COR. BEFORE FABRICATION AND INSTALLATION.

CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DOOR/WINDOW

ADDITIONAL COST TO THE GOVERNMENT.

EQUIPMENT, ETC), ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM WITHOUT

THE INSTALLATION AND/OR REPLACEMENT OF MECHANICAL (PLUMBING, HEATING,

ITEMS, CUT, PATCH AND RESTORE WALLS, FLOORS AND CEILING WHERE REQUIRED FOR

THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVE/REINSTALL ANY OBSTRUCTED

GENERAL NOTES

REPAIR BUILDING S-400

CAMP CASEYYI, SC

127523

WALL : 2.00 SM. DEG K/W

ROOF : 3.35 SM. DEG K/W

R-VALUE FOR INSULATION:

10,973 10,973

3,1731,2003,1001,2002,300

,6

,7

,4

,6

,7

,4

4,8776,096

10,973

4,8776,096

10,973

EXST/REMOVAL FLOOR PLAN

SCALE:

NEW FLOOR PLAN REMOVAL EXISTING WALL

REMOVE EXISTING DOOR

LEGEND

REMOVE EXISTING CONC SLAB

& DOOR FRAME

WINDOW &

WINDOW FRAME

DOOR & DOOR

FRAME

50 MET STUD WALL

STORAGE ROOM-2

STORAGE ROOM-1

1/50 1/50

FEC

D1

D2

W1 W1

W1

W1

W1 W1

200 THK CONC WALL

AND GENERAL NOTES

EXST/REMOVAL & NEW FLOOR PLAN

SHALL BE AS A PART OF THE CONTRACT DOCUMENT OF THIS PROJECT.

STANDARD DETAIL DRAWINGS FOR O&MA PROJECT, KOREA, DATED OCTOBER 1, 2003

15.

LOAD ANALYSIS TO COR FOR APPROVAL.

CONTRACTOR SHALL SUBMIT STRUCTURAL SHOP DRAWINGS INCLUDING BUILDING

A-2

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

1.

2.

3.

4.

6.

7.

8.

9.

5.

SCOPE OF WORKS (ARCHITECTURAL WORKS)

REPAIR / MAINTENANCE (K) WORKS

10.

11.

12.

13.

14.

15.

SCOPE OF WORKS (ARCHITECTURAL WORKS)

NEW CONSTRUCTION (L) WORKS

1.

REPLACE DETERIORATED EXISTING WINDOW HORIZONTAL MINI BLINDS WITH NEWS.

METAL DOOR

THERMAL INSULATED

AL SLIDING WINDOW W/

EIFS

CONCRETE RAMP (TYP)

SCALE:

ELEVATION-1

SCALE:

ELEVATION-2

SCALE:

ELEVATION-4

SCALE:

ELEVATION-3

S-400S-400

RAMP (TYP)

CONCRETE

STOOP (TYP)

CONCRETE

1/100 1/100

1/1001/100

PROTECTED

PROTECTED

PROTECTED

METAL ROOFING

W/ INSUL ON VR

(TYP)

METAL ROOFING

W/ INSUL ON VR

(TYP)

PROTECTED

METAL GUTTER

(TYP)

PROTECTED

METAL

DOWNSPOUT

(TYP)

BUILDING

IDENTIFICATION

(TYP)

THERMAL INSULATED

INSECT SCREEN (TYP)

PROTECTED

METAL FASCIA

W/ INSUL ON VR

(TYP)

PROTECTED

METAL FASCIA

W/ INSUL ON VR

(TYP)

PROTECTED

METAL FASCIA

W/ INSUL ON VR

(TYP)

METAL ROOFING

W/ INSUL ON VR

(TYP)

PROTECTED

METAL GUTTER

(TYP)

CONC SPLASH

BLOCK (TYP)

REPAIR BUILDING S-400

CAMP CASEYYI, SC

127523

& SCOPE OF WORKS

ELEVATIONS

CEILING SUSPENSION SYSTEM AS SHOWN ON FLOOR PLANS AND FINISH SCHEDULE.

REPLACE DETERIORATED EXISTING CEILING WITH NEW GYPSUM WALL BOARD (GWB, NORMAL) CEILING INCL.

APPLY EPOXY COATING WITH NON SLIP GRITS ON FLOORS AS SHOWN ON INTERIOR FINISH SCHEDULE.

INSTALL NEW TALL BUILT IN COATED METAL SHELVING AS SHOWN ON FLOOR PLANS, SECTIONS AND NOTES.

SPACE + 6 THK TINTED LOW-E TEMPERED GLASS AS SHOWN ON FLOOR PLANS AND WINDOW SCHEDULE.

TYPE WINDOWS INCLUDING INSULATING GLASS WITH 8.75 THK CLEAR LAMINATED GLASS + 12 THK AIR

REPLACE DETERIORATED EXISTING WINDOWS INCL INSECT SCREEN WITH NEW ALUMINUM THERMAL BREAKER

FINISH SCHEDULE.

APPLY SCP(SKIM COAT PLASTER) ON CONCRETE WALLS AS SHOWN ON FLOOR PLANS, SECTIONS & INTERIOR

CWB AS SHOWN ON FLOOR PLANS AND SECTIONS.

REPLACE DETERIORATED EXISTING CONCRETE SLAB WITH NEW INCLUDING WWF, VAPOR BARRIER AND

FOUNDATIONS, REINFORCEMENT BARS AND EIFS AS SHOWN ON FLOOR PLANS, ELEVATIONS AND SECTIONS.

REPLACE DETERIORATED EXISTING EXTERIOR WALLS WITH NEW CONCRETE INCLUDING CONCRETE

FLOOR PLANS, ELEVATIONS & SECTIONS.

INSULATIONS, PROTECTED METAL FASCIA, SOFFIT AND PROTECTED METAL ROOF LINER AS SHOWN ON

REPLACE DETERIORATED EXISTING ROOF WITH NEW PROTECTED METAL ROOF INCLUDING METAL FRAMES, ELEVATIONS & SECTIONS.

GUTTERS AND DOWNSPOUTS INCLUDING CONCRETE SPLASH BLOCKS AS SHOWN ON FLOOR PLAN,

REPLACE DETERIORATED EXISTING RAIN GUTTERS AND DOWNSPOUTS WITH NEW PROTECTED METAL RAIN

REPLACE EXTERIOR BUILDING IDENTIFICATIONS WITH NEW AS SHOWN ON ELEVATIONS AND DETAIL.

FLOOR PLANS AND DETAIL DRAWING.

REPLACE DETERIORATED EXISTING FIRE EXTINGUISHER CABINET(FEC) WITH NEW AS SHOWN ON NEW

AS SHOWN ON NEW FLOOR PLANS AND DOOR SCHEDULE.

REPLACE DETERIORATED EXISTING DOORS AND DOOR FRAMES WITH NEW INCLUDING HARDWARE SETS

SECTIONS (NATURAL COLOR, OAK).

REPLACE DETERIORATED EXISTING WOODEN HEAD & SILL FOR ALL WINDOWS WITH NEW AS SHOWN ON

& SECTIONS.

PAINT ON ALL INTERIOR SURFACES INCLUDING CEILING & WALL AS SHOWN ON INTERIOR FINISH SCHEDULE

AND ELEVATIONS.

REPLACE DETERIORATED EXISTING CONCRETE RAMP AND STOOP WITH NEW AS SHOWN ON FLOOR PLANS

16.

SCHEDULE.

REPLACE DETERIORATED EXISTING VCB WITH NEW AS SHOWN ON FLOOR PLAN AND INTERIOR FINISH

A-3

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

V A

R

C L

G

H

T

HD16 @200 O.C.

4-HD16

HD13 @400 O.C.

VERT BARS

HD13 @300 O.C.

HORIZ BARS

L A

P

FL

SCALE: 1/50

CROSS SECTION-1

SCALE: 1/50

CROSS SECTION-2

WORKING

POINT

FL

L A

P

HD16 @200 O.C.

4-HD16 3

C L

H

T

HD13 @400 O.C.

VERT BARS

HD13 @300 O.C.

HORIZ BARS

VAPOR BARRIER

150THK CWB

EXST CONC

100THK SLAB ON GRADE

W/ MW10(#8)-150x150 WWF

VAPOR BARRIER

150THK CWB

EXST CONC

1.

METAL SHELVING NOTES

2.

FABRICATION AND INSTALLATION

COORDINATE WITH USING AGENCY FOR INSTALLATION BEFORE

AND USING AGENCY FOR APPROVALAS. AND CONTRACTOR SHALL

FOR TALL BUILT IN COATED METAL SHELVING TO ENGINEERING DIV

THE CONTRACTOR SHALL PREPARE AND SUBMIT SHOP DRAWINGS

METAL SHELVING

ON FLOOR WITH ANCHOR BOLTS.

OR ABOVE WITH COATED METAL SHELVING AND FIXED

TALL BUILT IN METAL SHELVING MUST CARRYING 300KG

PROTECTED

PROTECTED

PROTECTED METAL

ON 50 MET STUD

WOODEN HEAD

& SILL (OAK)

PAINT SCP

ON CONC

METAL ROOFING

W/ INSUL ON VR

(TYP)

ROOF LINER

FINISH PER

SCHEDULE

METAL ROOFING

W/ INSUL ON VR

(TYP)

15 THK GWB

@ 400 OC(MAX)

ON CONC WALL

BACKFILL W/

SATISFACTORY MATERIAL

BACKFILL W/

SATISFACTORY MATERIAL

REPAIR BUILDING S-400

CAMP CASEYYI, SC

127523

METAL SHELVING NOTES

CROSS SECTIONS AND

A-4

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

IN

S

ID

E

B O

X

D

IM

PULL (TYP)

SIDE)-TYP

METAL DOOR

6 DIA METAL

SCREW (3-PER

SCHEDULE

FLAT TRIM

FINISH PER

(ALL AROUND)

WOOD SHIM

V

E R

IF

Y

3C SECTIONELEVATION3B

(OUTSIDE TRIM DIM)

(INSIDE BOX DIM) W/ METAL LATH

FLAT TRIM

CONC FILL

IN

S

WOOD SHIM

(ALL AROUND)

DOOR PULL

CASING BEAD

(ROUGH OPENING)

PLAN3A

3C 3B

(TYP)

METAL

DOOR PULL

TEMPERED SAFETY

METAL TRIM

T

F F

L

F I R E

E X T I N G U I S H E R

GLASS

W/ METAL LATH

CONC FILL

(INSIDE BOX DIM)

30 30

45300

(INSIDE BOX DIM)

IN

S

(OUTSIDE TRIM DIM)

O

U T S

T R

3 THK X 50 W

SST STRAP

@ 900 OC

(TYP)

9 DIA EXP BOLT

75 W X 150 H X 5 THK

SST PLATE (TYP)

EXT INSUL &

FNSH SYSTEM

PROTECTED

METAL DS

(150 x 100) 6 DIAx80 RUST

PROOF CAP

SCREW & NUT

W/WASHER (TYP) 1.5 THK X 50 W

PROTECTED METAL

DS STRAP HANGER

@ 900 OC (MAX)

NUMBER & SIZE

NUMBER

NOTE

3. LOCATION FOR SEE ELEVATION.

BUILDING

2. NUMBER ARE TWO PLACES PER EACH

WITH THE BASE CIVIL ENGINEER.

; CONTRACTOR SHALL VERIFY

1. BUILDING IDENTIFICATION

V E

R

IF

Y B

Y

NUMBER

BUILDING

IDENTIFICATION

S-400

SCALE: N/A

DOWNSPOUT DETAIL

SCALE: N/A

BUILDING IDENTIFICATION

SCALE: N/A

FIRE EXTINGUISHER CABINET DETAILS

PAINT SCP

PAINT SCP

PAINT SCP

EXT FIELD

IS TO MATCH

LETTER COLOR

WALL COLOR

MATCH

COLOR IS TO

BACKGROUND

ROOF COLOR

7070 760

S-400

REPAIR BUILDING S-400

CAMP CASEYYI, SC

127523

DETAILS

FL

A-5

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

INTERIOR FINISH SCHEDULE

FLOOR BASE WALLS CEILING

REMARKS

FINISH COLOR FINISH COLOR FINISH COLOR FINISH COLOR HEIGHT

PAINT VAR

MATERIAL & COLOR SCHEDULE

MAT'L

EXST

MAT'L

NEW

MAT'L

EXST

MAT'L

NEW

MAT'L

EXST

MAT'L

NEW

MAT'L

NEW

MAT'L

EXST

1.

2.

MANUFACTURERS STANDARD MUST APPROACH.

TO INDICATE THE COLOR WHICH THE

IS NOT REQUIRED. THE SELECTIONS SERVE ONLY

AN EXACT MATCH OF THE MANUFACTURERS COLOR

INTENDED TO LIMIT SELECTIONS OF PRODUCTS.

IDENTIFICATION PURPOSES ONLY AND ARE NOT

MANUFACTURERS' COLORS LISTED ARE FOR

3.

FLOOR MATERIAL/COLOR

PT-1

FINISH SCHEDULE NOTES

ROOM NAMESROOM NOS

CONC GWB101 EPOXY EP-1 GWB

COLORS SHALL BE APPROVED BY USING AGENCY.

SELECTION OF INTERIOR PAINT AND FACTORY APPLIED

APPROVED BY THE COR OR USING AGENCY.

THE RLFC AREA. EXTERIOR COLOR SCHEME AS

APPLIED COLORS SHALL BE IN ACCORDANCE WITH

SELECTION OF EXTERIOR PAINT AND FACTORY

REMARKS

DOOR DIMENSION

WIDTH

MATERIAL

D1

DOOR

TYPE

DOOR

NOS.

ROUGH OPENING

WIDTH HEIGHT

HDW

SET

THICKHEIGHT NO (HR)

RATED

FIRE

LOUVERGLAZING

CUT

UNDER

FRAME

D2

DOOR

DOOR / WINDOW / LOUVER SCHEDULE

A -21501930 2250 1830 44.5 1 - -

B - -2 - -1016 2250

METAL METAL

METALMETAL

(2 EA)

P L A N

DOOR S E C T I O N

STEEL TUBE

WELDED TO

STEEL PLATE

50 x 50 x 6THK

FOUNDATION

STEEL PLATE

STEEL TUBE

CONCRETE

170 x 170 x 6THK

WELDED TO

EYEBOLT

HOOK &

DOOR

HOOK & EYEBOLT

STEEL TUBE

CONC)

GALV STEEL

80x80x3.2 THK

50 x 50 x 6 THK STEEL

80x80x3.2 THK

WALL TYPE BUMPER L02101

GALV STEEL TUBE

(FILLED W/CONC)

PLATE WELDED TO

WALL TYPE BUMPER L02101

YELLOW STRIPS

BLACK BACKGROUND

TUBE (FILLED W/

250X250

SURFACE

ROOFING

FLASHING

FASCIA

SOFFIT

DOOR & FRAME

HANDRAIL

MATERIAL

ROOF LINER

STEEL

STEEL PIPE

COLOR

CHOCOLATE

COLOR NO.

20095

CHOCOLATE

CHOCOLATE

CHOCOLATE

CHOCOLATE

CHOCOLATE

20095

20095

20095

20095

20095

REMARKS

WALL EIFS

WALL CMU

BEAM/COL CONC

STAIR CONC

SAND-STONE

SAND-STONE

SAND-STONE

SAND-STONE

23617

23617

23617

23617

PROTECTED METAL

PROTECTED METAL

PROTECTED METAL

EXTERIOR COLOR SCHEDULE-1

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

ELEVATION

SCALE: N/A

DOOR STOP & HOLDER DETAILS

EP-1

OR APPROVED EQUAL

ABRASIVE GRAIN FINISH

WITH NONSLIP GRIT

TOP: DHDC-6500T

MID: DHDC-6500M

PRIMER: DHDC-6500P

NOROO EPOXY

EPOXY PAINT

10001200ALC - -------AL

DOOR/WINDOW SCHEDULE & DETAILS

INTERIOR FINISH SCHEDULE,

10mmTHK PEJ

W/SEALANT (TYP)

PAINT 2450PAINT PT-1PT-1CONC GWB102 EPOXY EP-1 GWB

STORAGE ROOM-1

STORAGE ROOM-2

CONC

CONC

SCP ON

CONC

GWB ON

METAL LINER

PROTECTED

GWB

F.F 20095

W1 MET DOOR

THERMAL INSULATED

A B

MET DOOR

THERMAL INSULATED

(ANODIZED DARK BRONZE)

(THERMAL BREAK TYPE)

W/ INSECT SCREEN

C

FIX

SLIDING AL WINDOW

930 2150 44.5

ASTRAGAL

HDW-1

HINGES 8111 114X114, NRP

1 LOCKSET 1000-1 F07

FLUSH BOLT LO40812

DOOR STOP & HOLDER

HDW-2

1 THRESHOLD J32100

CLOSER CO2011

KICK PLATE J102, SST1

LOCKSET 1000-1 F081

WEATHER STRIP & SEAL1

HINGES 8111 114X114, NRP

DOOR STOP & HOLDER

WEATHER STRIP & SEAL1

3.

APPROVAL

AND WINDOW SCHEDULE AND DETAIL DRAWING TO COR FOR

CONTRACTOR SHOULD SUBMIT SHOP DRAWING FOR ALL DOOR

CONNECTED TO STRUCTURE WITH ANCHOR BOLT AND WELDING.

ALL EXTERIOR DOOR FRAME AND WINDOW FRAME SHOULD BE

AND UFC 4-010-01, PAG B-9 & 10, PARA B-3.1 THRU B-3.1.4

ALL EXTERIOR DOOR, GLAZED WINDOW: SEE SEPC SECTION 08391;

5.

6.

4.

HEAT GAIN AND FIRERATED.

WHITE OR LIGHT BEIGE TO MAXIMIZE REFLECTANCE AND MINIMIZE

BE EQUIPPED WITH HORIZONTAL MINI BLINDS. COLOR SHALL BE

WINDOWS IN ALL AREAS WHERE FUNCTIONALLY WARRANTED SHALL

1.

2.

FABRICATION AND INSTALLATION

SHALL BE APPROVED BY THE CONTRACTING OFFICER BEFORE

DOORS AND ALUMINUM WINDOWS AS ACTUAL SIZE, AND DRAWINGS

THE CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL

DOOR & WINDOW NOTES

WINDOW BLIND SHOULD BE EQUIPPED TO ALL EXTERIOR WINDOWS.

( SHGC : MAX 0.4 )

+ 6 THK TINTED LOW-E TEMPERED GLASS

+ 12 THK AIR SPACE

: 8.75 THK CLEAR LAMINATED GLASS

TYPICAL INSULATED/LAMINATED GLASS FOR WINDOWS

DOOR / WINDOW / HARDWARE SCHEDULE / NOTES

COR.

INSTALL HIGH QUALITY AND GRADE PRODUCTS WITH APPROVAL TO

COLOR, & QUALITY ARE NOT REQUIRED. BUT CONTRACTOR SHOULD

AN EXACT MATCH OF THE MANUFACTURERS FUNCTION, GRADE,

AND ARE NOT INTENDED TO LIMIT SELECTIONS OF PRODUCTS.

MANUFACTURERS LISTED ARE FOR IDENTIFICATION PURPOSES ONLY

REPAIR BUILDING S-400

CAMP CASEYYI, SC

127523

BASE MATERIAL/COLOR

OR APPROVED EQUAL

P110, BROWN

ROPPE

VINYL COVE BASEVCB-1

WALL MATERIAL/COLOR

PT-1

OR APPROVED EQUAL

LATEX/SEMIGLOSS

NOROO NR7066

PAINT COLOR

CEILING MATERIAL/COLOR

PT-1

OR APPROVED EQUAL

LATEX/SEMIGLOSS

NOROO NR7066

PAINT COLOR

VCB VCB F.F VCB-1

VCB VCB F.F VCB-1CONC

OR RAMP

CONC STOOP

127523-Repair Bldg S-400, Cp Casey-A-1
127523-Repair Bldg S-400, Cp Casey-A-2
127523-Repair Bldg S-400, Cp Casey-A-3
127523-Repair Bldg S-400, Cp Casey-A-4
127523-Repair Bldg S-400, Cp Casey-A-5

File details come from the government source that posted it. Updated .