Amendment_for_W91QVN-16-T-0061-0008.docx
DOCX document 36 KB Posted
- Attached to
- Paints
- Solicitation number
- W91QVN-16-T-0061
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91QVN-16-T-0061
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 21-Oct-2016 03:00 PM to 07-Nov-2016 10:00 AM.
The following have been modified:
OFFER INFORMATION
ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO THE OFFEROR(S)
1. Offers shall be submitted to Federal Business Opportunities (FBO) website (https://www.fbo.gov/) . Offer submitted other than FBO will not be considered for award. The technical proposal shall include the company name. All questions should be emailed to chusong.yi2.ln@mail.mil within 10 days after the solicitation is issued. The electronic offer shall be submitted by the closing date and time of solicitation. Partial quotation is not acceptable.
2. The offer(s) shall include the following requirements IAW Para 1 above.
a. Technical Proposal:
i) Technical proposal shall contain description/specification of each listed item including manufacturer name and model/part number. The technical proposal, specification and data shall be in English.
ii) The offeror must propose the exact “NSN item for ELINs 01thru 05’ listed in Attachment A. Even if the exact "NSN item" is submitted, the offeror shall submit the respective specifications, manufacture name, and model/part number with their quotation.
iii) The proposed “equal product” for ELINs 06 thru 32 must meet, or exceed, the salient physical, functional, or performance characteristics specified in the solicitation. Technical proposal shall contain description/specification of each listed item including manufacturer name and model/part number. For equal product, without supporting information, only copy and paste of salient characteristics as listed in the solicitation with each item in the quotation is not acceptable, and will not be considered for an award.
b. Past Performance: Furnish information indicated below for most recent government and commercial contracts offeror has performed during the past three (3) years of the same scope as that contained in the solicitation. If the contract is awarded based on the false information, the contract will be terminated for cause of the contractor
1. Contract Number
1. Contract Date
1. Contract Amount
1. Contracting Agency
1. Project Officer: Email & Phone #
1. Project Description
Each offeror shall submit any known adverse past performance information including all relevant supporting details with their proposal. Each offeror shall provide a copy of any cure notices or show cause letters received on each contract listed and a description of any corrective action by the offeror. The offeror shall also provide the information listed above on any contract that has been terminated, in whole or in part, for default during the past three (3) years, or any contracts which are currently in the process of such termination. This information is required for any contract, whether similar or not to the proposed effort.
The Government reserves right to conduct investigation of the offeror’s past performances, not limited to the listed past performances on the Past Performance proposal. If the contract is awarded based on the false information, the contract will be terminated for cause of the contractor.
c. Price Schedule. See Attachment A.
d. Offeror’s status as a Korean contractor:
1) The offeror's most recent Stock Change Certificate (주식등변동 상황명세서), as certified and submitted to the ROK Local Tax Office (국세청),
2) The offeror's Certified Copy of Register [등기부 등본 (유효사항)], as certified and submitted to the ROK Supreme Court (대법원), and
3) If the offeror has a Parent (as Parent is defined in the International Agreement), the Parent's Certified Copy of Register [등기부등본 (유효사항)], as certified and submitted to the ROK Supreme Court (대법원).
Note: Failure to submit the above requirements may be grounds for determining the proposal to be non-compliant and not eligible to be considered for award.
3. Clauses 52.203-2 and 52.209-5, and Local clause 5152.204-4032 shall be submitted upon request from the Government.
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it. Updated .