W91QVN-16-R-0201

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

Repair Building #753, Camp Casey

FFP

Work Class: K FOB: Destination

PURCHASE REQUEST NUMBER: 0010848029-0001

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

Repair Building #753, Camp Casey

Work Class: L

PURCHASE REQUEST NUMBER: 0010848029-0001

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Estimated Cost for Work Hazard is Zero(0)

NET AMT

Section C - Descriptions and Specifications

TECHNICAL PROVISIONS - I

STATEMENT OF WORK

PROJECT NO TITLE LOCATION

58484 Repair building No. 753 Camp Casey

1. DESCRIPTION: The work to be performed to repair building No. 753 is described below and executed by one or more of the groups.

1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.

1.2. Work by In-House Labor: Not applicable to this project..

1.3. Work by Troop Labor: Not applicable to this project.

2. PRINCIPAL FEATURES: This project includes the following principal features:

2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.

2.1.1. Civil Work

2.1.1.1. Replace Asphalt Concrete (AC) surface course.

2.1.1.2. Replace sidewalk.

2.1.1.3. Replace granite curb.

2.1.1.4. Paint parking line with 150mm width reflective.

2.1.1.5. Restore solid sodding with top soil.

2.1.2. Architectural Work

2.1.2.1. Replace existing floor tile with new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) as shown on new floor plan and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall have been corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval.

2.1.2.2. Replace existing ceiling with new acoustical ceiling tile and metal suspension systems as shown on interior finish schedule.

2.1.2.3. Replace existing ceiling with new gypsum wall board (GWB, normal, water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plans and finish schedule.

2.1.2.4. Replace gravel bed and concrete curb with new 100mm deep gravel bed and granite curb (minimum 450mm height, 20mm diameter weep hole) around building as shown on floor plans and detail drawing.

2.1.2.5. Replace existing Floor Tile (FT) and Glazed Ceramic Wall Tile (GCWT) with new including accessories, metal lath, mortar bed, and waterproofing in bathroom and shower room as shown on floor plans and detail drawings.

2.1.2.6. Replace existing concrete slab as need to replace mechanical piping works.

2.1.2.7. Replace interior and exterior signages with new for all rooms as shown on elevations and signage schedule.

2.1.2.8. Paint all existing exterior exposed Concrete Masonry Unit (CMU), metal, woods, concrete surfaces, fascia, soffit and other components (trash bins, guard walls) of exterior surface of the building as shown on floor plan and detail drawings.

2.1.2.9. Replace existing vanity cabinets including wall hung cabinet with new in all toilet as shown on new floor plans and detail drawing.

2.1.2.10. Paint existing steel handrails and guardrails including sanding and primer in all stairs.

2.1.2.11. Replace existing pipe chases and pipe cover with new CMU, waterproof or ‘X’ type of GWB, cement boards pipe chases and metal cover including access door in each rooms for new mechanical piping system and duct as per floor plans, sections and detail drawings.

2.1.2.12. Replace existing fire extinguisher cabinets (FEC) with new as shown on new floor plans and detail drawing.

2.1.2.13. Replace existing all doors and door frames with new including new hardware sets as shown on new floor plans and door schedule.

2.1.2.14. Replace existing wooden sill for all windows with new as shown on door and window schedule. (Natural color, oak).

2.1.2.15. Replace existing window horizontal mini blinds with news, fireproof type.

2.1.2.16. Replace existing windows including insect screen and protected metal flashing with new aluminum thermal breaker type blast windows including insulating glass with 8.75mm thick clear laminated glass + 12mm thick air space + 6mm thick tinted low-e tempered glass as shown on floor plans and window schedule..

2.1.2.17. Replace existing metal shelf with mop rack with new in janitor room.

2.1.2.18. Replace existing wooden hanging rails and chair rails with new in each bed room and day rooms as shown on floor plans.

2.1.2.19. Replace rubber tiles with new including tread, riser and stair base in stair-1 and 2 as shown on floor plans and interior finish schedule.

2.1.2.20. Replace existing aluminum louvers with new as shown on floor plans and detail drawings.

2.1.2.21. Replace existing all access doors on wall and ceiling with new.

2.1.2.22. Apply epoxy coating with nonslip grits on existing floors as shown on interior finish schedule.

2.1.2.23. Replace wooden shelf, Stainless Steel (SST) rod with new in each closet as shown on floor plan and details.

2.1.2.24. Paint on all interior surfaces including ceiling and wall as shown on interior finish schedule & elevations.

2.1.2.25. Replace plexi-info holder with new as shown on detail drawings.

2.1.2.26. Replace existing quarry tile including quarry tile base with new as shown on floor plans and interior finish schedule.

2.1.2.27. Replace existing concrete stoops with new as shown on floor plans.

2.1.2.28. Block up door opening with CMU and re-bar as shown on floor plan.

2.1.2.29. Replace existing counter table with new including Solid Surface Material (SSM) counter in admin office as shown on floor plan.

2.1.3. Mechanical Work

2.1.3.1. HVAC system

2.1.3.1.1. Replace existing hot and chilled water circulation pump, expansion tank, air separator, 3-way mixing valve, carbon monoxide detector, detection controller, alarm gong, and associated piping with new.

2.1.3.1.2. Replace existing drain and hot and chilled water piping throughout the building with new.

2.1.3.1.3. Replace existing chiller, associated accessories and piping with new.

2.1.3.1.4. Replace existing air handling units and associated ductwork in laundry room with new.

2.1.3.1.5. Replace existing fan coil units, outside air intake boxes, controls, and associated piping with new.

2.1.3.1.6. Replace existing exhaust fans and associated duct in the mechanical room, laundry room, and toilet with new.

2.1.3.1.7. Replace existing bathroom exhaust fans and ducts with new.

2.1.3.1.8. Replace existing ceiling mounted electric heater, thermostat, and energy recovery ventilation with new.

2.1.3.1.9. Replace existing fin-tube radiator, split air conditioning unit, and associated piping with new.

2.1.3.1.10. Replace existing unit heater, range hood, fire extinguisher, and 100mm dryer connect to dryer with new.

2.1.3.1.11. All mechanical systems shall be tested, adjusted, and balanced by the contractor in strict accordance with applicable sections of division 15 - mechanical O&MA standard technical specifications for miscellaneous projects, Korea. The HVAC Testing, Adjusting, and Balancing (TAB) report shall be submitted to the project COR for government review and approval.

2.1.3.2. Plumbing work

2.1.3.2.1. Replace existing domestic hot water storage tank, domestic hot water circulation pump, domestic hot water re-circulation pump, expansion tank, thermostatic mixing valve, and associated accessories with new.

2.1.3.2.2. Replace existing all domestic hot and cold water piping with new.

2.1.3.2.3. Replace existing all sewer, vent, floor drain, and cleanout piping with new.

2.1.3.2.4. Replace existing bathroom plumbing fixtures and associated piping with new.

2.1.3.2.5. Replace existing electric water cooler, sink, dryer vent, and valve box in the laundry room with new.

2.1.3.2.6. Replace existing Back Flow Preventer (BFP) and Pressure Reducing Valve (PRV) assembly including pipe supports and hose bibb with new.

2.1.3.3. Sprinkler work

2.1.3.3.1. Replace existing fire protection system with new wet type sprinkler system and associated piping.

2.1.4. Electrical Work

2.1.4.1. Replace existing lighting fixtures, exit lights, exterior lights, toggle switches, 3-way switches, photocell, lighting contactor, wires and conduits with new.

2.1.4.2. Replace existing panelboards, panelboard front covers, receptacles and cover plates, circuit breaker, and associated wiring and conduit with new.

2.1.4.3. Replace existing safety switches, master control panel, combination motor starters, magnetic motor starters, manual motor starters, junction boxes, control system, wires and conduits for HVAC system with new.

2.1.4.4. Replace fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, building transmitter, antenna, visual signal strobes (15 or 75 candela), microphone, speaker device, local operating console and associated wiring and conduit.

2.1.4.5. Replace existing telephone terminal board, equipment rack and accessories, outlets including cover plates, and associated wiring and conduit with new.

2.1.4.6. Replace existing CATV cabinets and pull boxes, outlets including cover plates and associated wiring and conduit with new.

2.1.4.7. Replace existing exterior underground telecommunication system including communication manhole and accessories with new.

2.1.4.8. Remove and reinstall existing CCTV cameras, monitoring system, and associated accessories.

2.1.4.9. Remove existing public address system including speakers.

2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.

2.2.1. Civil Work

2.2.1.1. Install 150mm diameter PVC water line including Post Indicator Valve (PIV).

2.2.2. Architectural Work

2.2.2.1. Install kitchenette and counter top in each day room as shown on floor plans and details drawings.

2.2.2.2. Install new gypsum wall board (GWB, normal) ceiling including ceiling suspension system in each bed room as shown on floor plans, sections and finish schedule.

TECHNICAL PROVISIONS - II

TECHNICAL DETAIL SPECIFICATIONS

PROJECT NO TITLE LOCATION

58484 Repair building No. 753 Camp Casey

GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION-1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.

Changes to the Standard Technical Detail Specifications: None

TECHNICAL PROVISIONS - III

SPECIAL CONDITIONS

PROJECT NO TITLE LOCATION

58484 Repair building No. 753 Camp Casey

1. The contractor shall have personnel on site for the sprinkler work and the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificates in Korea are the followings which are issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have two personnel that one is certified for (1) and the other for (2) below.

(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)

(2) Engineer Fire Fighting Facilities - Mechanical (소방설비기사 -기계)

2. Environmental Requirements in Contract

The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.

In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.

All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.

Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.

The responsibilities of all contractor personnel include:

(1) Comply with all applicable environmental laws, regulations and installation environmental policies.

(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention Plan.

(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.

(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.

(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.

(6) Open burning is prohibited on the Government premises IAW installation environmental policy.

(7) Participate in installation’s recycling program.

(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office. Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.

(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.

(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.

(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.

(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.

3. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW COVER SHEET

After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.

A. AT Level I Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 20 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.

B. Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

C. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 10 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award.

D. Requirement for OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

OPSEC training is available at the following website: http://cdsetrain.dtic.mil/opsec/

Section F - Deliveries or Performance

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 210 calendar days after notice to proceed (NTP) is issued. The time stated for completion shall include final cleanup of the premises.

(End of clause)

Section J - List of Documents, Exhibits and Other Attachments

LIST OF APPLICABLE CONTRACT DRAWINGS

PROJECT NO TITLE LOCATION

58484 Repair building No. 753 Camp Casey

GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS-FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.

Ring No.
Sheet No.
Description
Date
1
T-1
TITLE SHEET
18 Mar 16

CIVIL

2
C-1
LOCATION PLAN AND GENERAL NOTES
18 Mar 16
3
C-2
SITE LAYOUT PLAN AND SCOPE OF WORK
18 Mar 16
4
C-3
MISC. DETAILS
18 Mar 16

ARCHITECTURAL

5
A-1
1ST FLOOR PLAN & GENERAL NOTES
18 Mar 16
6
A-2
2ND-4TH FLOOR PLAN & SCOPE OF WORKS
18 Mar 16
7
A-3
EXT / INTERIOR WALL SECTIONS AND DETAILS
18 Mar 16
8
A-4
TYPICAL & PARTIAL PLANS AND ELEVATIONS
18 Mar 16
9
A-5
CABINET DETAILS AND NOTES
18 Mar 16
10
A-6
INTERIOR, EXTERIOR FINISH SCHEDULE AND MATERIAL & COLOR SCHEDULE
18 Mar 16
11
A-7
DOOR / WINDOW SCHEDULE, ELEVATIONS AND NOTES
18 Mar 16
12
A-8
HARDWARE SCHEDULE AND DETAILS
18 Mar 16
13
A-9
SIGNAGES SCHEDULE
18 Mar 16

MECHANICAL

14
M-1
MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBREVIATIONS
18 Mar 16
15
M-2
GENERAL NOTES AND SCOPE OF WORK
18 Mar 16
16
M-3
MECHANICAL EQUIPMENT SCHEDULE-1
18 Mar 16
17
M-4
MECHANICAL EQUIPMENT SCHEDULE-2
18 Mar 16
18
M-5
1ST FL HVAC PLAN AND AIR DEVICE SCHEDULE
18 Mar 16
19
M-6
2ND FL HVAC PLAN
18 Mar 16
20
M-7
3RD FL HVAC PLAN
18 Mar 16
21
M-8
4TH FL HVAC PLAN
18 Mar 16
22
M-9
MECH RM HVAC PARTIAL PLAN AND EXHAUST DUCT ISOMETRIC DIAGRAM (TYP)
18 Mar 16
23
M-10
LAUNDRY RM HVAC PARTIAL PLAN(TYP), TYP MODULE HVAC PARTIAL PLAN (1ST THRU 4TH FL) AND ISOMETRIC DIAGRAM
18 Mar 16
24
M-11
CONTROLS AND CHILLED/HOT WATER PIPING SYSTEM DIAGRAM
18 Mar 16
25
M-12
OUTSIDE AIR SUPPLY UNIT SINGLE ZONE & FCU CONTROL DIAGRAM
18 Mar 16
26
M-13
VENT SYS CONTROL DIA, DOMESTIC HOT WATER SYSTEM CONTROL DIAGRAM, EF-4 AND EF-1 CONTROL CIRCUIT(TYP FOR EF-5) AND CO DETECTION SYSTEM
18 Mar 16
27
M-14
1ST & 2ND FL PLUMBING PIPING PLAN, SPECIFIC NOTES AND NOTES
18 Mar 16
28
M-15
3RD & 4TH FL P,UMBING PIPING PLAN, SPECIFIC NOTES AND NOTES
18 Mar 16
29
M-16
MECH ROOM PLUMBING PARTIAL PLAN AND NOTES
18 Mar 16
30
M-17
TYP MODULE PLUMBING PARTIAL PLANS-1 AND 2 AND NOTES
18 Mar 16
31
M-18
LAUNDRY PLUMBING PARTIAL PLANS AND NOTES
18 Mar 16
32
M-19
TOILET PLUMBING PARTIAL PLANS, WATER CONSERVATION, PLUMBING FIXTURE SCHEDULE AND NOTES
18 Mar 16
33
M-20
FIRE PROTECTION LEGEND & ABBREVIATION SPRINKLER Q'TY LIST AND GENERAL NOTES
18 Mar 16
34
M-21
1ST FLOOR FIRE PROTECTION PIPING PLAN
18 Mar 16
35
M-22
2ND FLOOR FIRE PROTECTION PIPING PLAN
18 Mar 16
36
M-23
3RD FLOOR FIRE PROTECTION PIPING PLAN
18 Mar 16
37
M-24
4TH FLOOR FIRE PROTECTION PIPING PLAN
18 Mar 16
38
M-25
MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN AND TYP UNIT FIRE PROTECTION PIPING PARTIAL PLAN
18 Mar 16
39
M-26
DETAILS-1
18 Mar 16
40
M-27
DETAILS-2
18 Mar 16
41
M-28
DETAILS-3
18 Mar 16
42
M-29
DETAILS-4
18 Mar 16
43
M-30
DETAILS-5
18 Mar 16
44
M-31
DETAILS-6
18 Mar 16
45
M-32
DETAILS-7
18 Mar 16
46
M-33
DETAILS-8
18 Mar 16
47
M-34
DETAILS-9
18 Mar 16

ELECTRICAL

48
E-1
LEGEND, NOTES AND SCOPE OF WORK
18 Mar 16
49
E-2
EXIST/NEW EXTERIOR TELECOMM DISTRIBUTION PLAN
18 Mar 16
50
E-3
1ST, 2ND, 3RD AND 4TH FLOOR LIGHTING PLAN
18 Mar 16
51
E-4
LIGHTING FIXTURE DETAILS
18 Mar 16
52
E-5
LIGHTING FIXTURE SCHEDULE
18 Mar 16
53
E-6
1ST, 2ND, 3RD & 4TH FLOOR POWER PLAN
18 Mar 16
54
E-7
PANELBOARD "P" & LOAD CENTER "L1","L2","L3 &"L4" LOAD SCHEDULE
18 Mar 16
55
E-8
TYPICAL BEDROOM ELECTRICAL MODULE PLAN & MECH. RM PARTIAL POWER PLAN
18 Mar 16
56
E-9
1ST, 2ND, 3RD & 4TH FLOOR LAN/TEL PLAN
18 Mar 16
57
E-10
TELECOMMUNICATION SYSTEM DIAGRAM
18 Mar 16
58
E-11
1ST, 2ND, 3RD AND 4TH FLOOR CATV PLAN
18 Mar 16
59
E-12
CATV SYSTEM DIAGRAM
18 Mar 16
60
E-13
1ST, 2ND, 3RD & 4TH FLOOR FIRE ALARM AND MASS NOTIFICATION SYSTEM PLAN
18 Mar 16
61
E-14
FIRE ALARM / MASS NOTIFICATION SYSTEM DIAGRAM
18 Mar 16

Section K - Representations, Certifications and Other Statements of Offerors

52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

(a) The offeror certifies that --

(1) The prices in this offer have been arrived at independently, without, for the purpose of restricting competition, any consultation, communication, or agreement with any other offeror or competitor relating to –

(i) Those prices,

(ii) The intention to submit an offer, or

(iii) The methods of factors used to calculate the prices offered:

(2) The prices in this offer have not been and will not be knowingly disclosed by the offeror, directly or indirectly, to any other offeror or competitor before bid opening (in the case of a sealed bid solicitation) or contract award (in the case of a negotiated solicitation) unless otherwise required by law; and

(3) No attempt has been made or will be made by the offeror to induce any other concern to submit or not to submit an offer for the purpose of restricting competition.

(b) Each signature on the offer is considered to be a certification by the signatory that the signatory --

(1) Is the person in the offeror's organization responsible for determining the prices offered in this bid or proposal, and that the signatory has not participated and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision; or

(2) (i) Has been authorized, in writing, to act as agent for the following principals in certifying that those principals have not participated, and will not participate in any action contrary to subparagraphs (a)(1) through (a)(3) of this provison ______________________________________________________ (insert full name of person(s) in the offeror's organization responsible for determining the prices offered in this bid or proposal, and the title of his or her position in the offeror's organization);

(ii) As an authorized agent, does certify that the principals named in subdivision (b)(2)(i) above have not participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) above; and

(iii) As an agent, has not personally participated, and will not participate, in any action contrary to subparagraphs (a)(1) through (a)(3) of this provision.

(c) If the offeror deletes or modifies subparagraph (a)(2) of this provision, the offeror must furnish with its offer a signed statement setting forth in detail the circumstances of the disclosure.

(End of Provision)

252.209-7999 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (DEVIATION 2012-O0004) (JAN 2012)

(a) In accordance with sections 8124 and 8125 of Division A of the Consolidated Appropriations Act, 2012,(Pub. L. 112-74) none of the funds made available by that Act may be used to enter into a contract with any corporation that—

(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless the agency has considered suspension or debarment of the corporation and made a determination that this further action is not necessary to protect the interests of the Government.

(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless the agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.

(b) The Offeror represents that—

(1) It is [ ___ ] is not [ ___ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability,

(2) It is [ ___ ] is not [ ___ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.

(End of provision)

5152.204-4032 REPRESENTATIONS AND CERTIFICATIONS

(a) SUBCONTRACTING:

If the offeror contemplates subcontracting, it must obtain prior written approval of subcontractor from the PCO or ACO, and list below: (1) the names and addresses of the subcontractor(s), (2) the type of subcontracting, and (3) the estimated price for each subcontract.

(b) AFFILIATED OFFERORS:

(1) Business concerns are affiliates of each other when, either directly or indirectly, one concern controls or has the power to control the other, or a third party controls or has the power to control both.

(2) Each offeror shall furnish, below, the following information:

(i) Whether the offeror has any affiliates;

(ii) The names and addresses of all affiliates of the offeror; and

(iii) The names and addresses of all persons and concerns exercising control or ownership of the offeror and any or all of its affiliates, and whether they are common officers, directors, stockholders holding controlling interest, or otherwise.

AFFILIATED CONCERNS. : (Name, location and, in detail, controlling interest in each)

(c) PRINCIPAL OWNER(S) OR STOCKHOLDER(S):

Each offeror shall list below the name(s) and address(es) of the principal owner(s) or stockholder(s) of the company and percentage of ownership. If a major portion is publicly traded and/or otherwise widely distributed, state that, with the percentage so affected.

(d) STANDARDS OF CONDUCT CERTIFICATION:

This is to certify that, to the best of my knowledge and belief, except as described below, no representative of this firm who deals with US Government employees on any aspect of this procurement is a former US Government employee, to include former US military personnel. I understand that this certification is continuing in nature and places a duty on me and my firm to notify the Contracting Officer of any additional individual(s) who fit the above description prior to the individual's assuming duties.

(i) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(ii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

(iii) Name ______________________________________________ Former rank/grade ____________________________________ Last US Government position ___________________________

Firm ____________________________________________________ Name _____________________________________________________ Signature __________________________________________________

Title _____________________________________________________ Date of Execution ____________________________________________

(e) TAXES:

(1) References:

(i) Contract clause entitled "FAR 52.229-06 Taxes—Foreign Fixed-Price Contracts (Jan 1991)."

(ii) US-ROK Status of Forces Agreement (SOFA), Articles IX and XVI.

(iii) ROK Customs Law, Law No. 1976, promulgated on 29 November 1967, as amended.

(iv) ROK Value Added Tax Law, Law No. 2934, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(v) ROK Special Excise Tax Law, Law No. 2935, promulgated on 22 December 1976 (effective date 1 July 1977), as amended.

(2) Contractor shall state the types and estimated amount of taxes that would normally apply to such transactions but are excluded from this proposal.

(i) Customs Tax (except for ROK MND-funded contracts or delivery orders):

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

This item will be imported specifically for this contract? Yes _____ No _____

(ii) Special Excise Tax:

Name Number Cost/Unit of Item of Units w/o Tax % of Tax Tax/Unit Tax Total

Name of item manufacturer

(iii) Value Added Tax (VAT):

Input VAT on materials purchased for this contract. 10% _____ Input VAT on transportation leased/rented for this contract.10% _____ Input VAT on equipment leased/rented for this contract. 10% _____ Input VAT on services purchased for this contract. 10% _____ Output VAT on total contract amount. 10% _____

(iv) Special Excise (Petroleum) Tax:

No. of U/P Liters w/o Tax Tax/Unit Total Tax Amount Regular Gasoline ________ (L) ________ w________ w_____________ Premium Gasoline ________ (L) ________ w________ w_____________ Diesel ________ (L) ________ w________ w_____________ Other ________ (L) ________ w________ w_____________

(v) Education Tax.

(3) Name of the oil company from which POL products will be purchased:

Oil Company: _________________________________________ (Name only)

(4) I certify by this submission that all supplies and services to be purchased for this contract have been proposed exclusive of Value Added Tax, applicable Customs Tax (except ROK MND-funded contracts and delivery orders), Special Excise Tax, and Education Tax.

Signed (Chop)

(f) CERTIFICATIONS AND REPRESENTATIONS

By submitting an offer, each offeror agrees to be bound by all certifications and representations in this solicitation. The Government reserves the right to require any and all certifications and representations to be completed and signed in hard copy by the successful offeror prior to contract award. Failure of an offeror to complete the certifications and representations within the time directed by the Contracting Officer may result in a determination that the contractor is not a responsible offeror for this acquisition.

Section L - Instructions, Conditions and Notices to Bidders

INSTRUCTION TO OFFEROR

1. GENERAL INSTRUCTIONS FOR PREPARATION OF PROPOSAL:

a. The Government intends to award without discussion, but reserves the right to conduct discussions if deemed necessary and to establish a competitive range for efficiency in accordance with FAR 52.215-1(f)(4).

b. Offeror(s) may, at the discretion of the Government, be asked to provide more information and clarification regarding their proposals. The Government may make a final determination as to whether an offer is acceptable or unacceptable solely based on the proposals as submitted, without requesting any further information. However, if it is deemed necessary the Government may, at its sole discretion, request additional information clarifying but not substantially changing any proposal as submitted.

2. SUBMISSION OF PROPOSAL:

a. Offers shall be submitted to the Federal Business Opportunities (FBO) website (https://www.fbo.gov/), or if FBO is not available, email to ukap.son1.ln@mail.mil with the evidence document such as screen shot. The FBO unavailability is limited to ONLY FBO server problem not individual failure/problem. All questions should be emailed to ukap.son1.ln@mail.mil within five (5) days after the solicitation is issued. The electronic offer shall be submitted by 1300 hrs on the closing date of RFP.

b. The PRICING PROPOSAL with the detailed cost breakdown shall be submitted by 1300 hours on the closing date of RFP through https://www.fbo.gov/. The cost breakdown should clearly identify all the significant costs associated with the level of effort prescribed in the statement of work. Any omission of such data may result in the offeror not being considered for award.

c. Section K : Offerors must complete all portions of Section K and submit it through https://www.fbo.gov/ by 1300 hours on the closing date of RFP. The offeror shall review all expenses to ensure that all applicable taxes are excluded from the overall price. In addition, any proposed exemption of a specific ROK tax shall be legitimate, attributable to the contract, and authorized by the applicable stated references.

Failure to submit the above requirements may be grounds for determining the proposal to be non compliant and not eligible to be considered for award.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

a. Date & Time: 07 July 2016 at 0900 hours

b. POC: So, Ki Chong, DSN:730-3713, Cell: 010-2718-7476

c. Location: Bldg#617, Cp Casey.

(End of provision)

5152.236-4011 CONSTRUCTION PRICE RANGE

Pursuant to FAR 36.204 the estimated price range is between $1,000,000 and $5,000,000.

Section M - Evaluation Factors for Award

BASIS OF AWARD

Award shall be made to the responsible offeror submitting the lowest priced, technically acceptable offer and completed Section K that satisfies all terms and conditions of this solicitation. The Government reserves the right to make a technical acceptability determination without any discussion with the offeror. The tax exemptions stated in Section K will be reviewed by the contracting officer for reasonableness and necessity to complete the Task Order. The contracting officer may reject a proposal if the offeror appears to improperly overstate any proposed tax exemptions.

image1.wmf image2.wmf