A02_Drawing_files___58484___CIVIL.pdf
PDF 2 MB Posted
- Attached to
- Repair Bldg# 753
- Solicitation number
- W91QVN16R0201
About this file
Drawing files _ 58484 -2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A21_Submittal_Register___58484.xls | XLS spreadsheet | |
| A02_Drawing_files___58484_ELEC.pdf | ||
| A21_W91QVN-16-R-0201.docx | DOCX document | |
| A02_Drawing_files___58484___ARCH.pdf | ||
| A02_Drawing_files___58484___MECH.pdf | ||
| A02_Drawing_files___58484___ELEC.pdf | ||
| A02_Drawing_files___58484___TITLE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
- 1 100 0 100 200 300M
SCALE IN METERS
SCALE = 1 : 3,000
THIS PROJECT
N
CAMP CASEY
CIVIL
C-1
GENERAL NOTES :
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND
DIMENSIONS AT THE PROJECT SITE ORIENTATION PRIOR TO
SUBMISSION OF CONTRACT PROPOSAL.
2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ANY
UNDETAILED PORTION OF THE JOB INCLUDING OTHER AREAS
INDICATED BY THE COR AND SHALL BE APPROVED BY THE COR
PRIOR TO COMMENCING WORK ON THE PROJECT.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR/RESTORATION
TO THEIR ORIGINAL CONDITIONS OF THE ITEMS DAMAGED BY
DISMANTLING, DEMOLISHING, OR REMOVING AT THE CONTRACTOR’S
EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
6. THE CIVIL STANDARD DRAWINGS SHOWN IN THE "STANDARD DETAIL
DRAWINGS, FOR OM&A PROJECTS, KOREA, OCTOBER 2003, DEPARTMENT
OF THE REPLACEATION MANAGEMENT AGENCY, KOREA REGION OFFICE"
FORM ARE A PART OF THIS PROJECT. THE DETAILS WILL BE UTILIZED
TO ACCOMPLISH THE CIVIL SCOPE OF WORK AT NO ADDITIONAL COST
TO THE PROJECT CONTRACT.
LOCATION PLAN
5. THE SITE INDICATED ON THE DRAWINGS SHALL BE GRADED AND
CLEARED/REROUTED OF ALL NATURAL OBSTRUCTIONS, SUCH AS
UNDER GROUND ROCK BASE, EXISTING UTILITY LINES, AND OTHER
ITEMS WHICH WILL INTERFERE WITH THE REPLACEION OPERATIONS.
7. THE CONTRACTOR SHALL PERFORM TOPOGRAPHIC SURVEY TO VERIFY
FOR GOOD SURFACE RUN-OFF DISCHARGE CONDITIONS AND ALSO
CHECK THE OTHER REPLACEION REQUIREMENTS IN MEETING THE
EXISTING SITE CONDITIONS PRIOR TO START OF WORK AT NO
ADDITIONAL COST.
LOCATION PLAN AND GENERAL NOTES
CHOE, S M.
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
AS SHOWN
12 CM
ST
S T
ST
P
V C
.5
.9
W A
L L
GAL
6 PV
C
ST
12 CM
ST
GRAVES
GRAVES
x x x x x x x x
4. ALL UNPAVED AREAS WITHIN THE GRADING LIMIT LINES SHALL BE
COVERED WITH TOP SOIL AND SOLID SODDED.
8. THE CONTRACTOR SHALL KEEP THE CONSTRUCTION AREA CLEAN AT
ALL TIMES AND AT COMPLETION OF WORK, REMOVE ALL SURPLUS
MATERIALS, EQUIPMENT AND DEBRIS AND LEAVE THE PREMISES IN
A CLEAN CONDITION ACCEPTABLE TO THE OWNER OR OWNER’S
REPRESENTATIVE.
65-A
STREAM
227.5
J-4
ST
36 CM
W A
L L
W A
L L
WALL
W A
L L
WALL
228.4
ST
MATCH LINE ’C’
00-49341
3-48PN
00-49341
4-200PN
00-49341
4-200PN
01-49550
00-49341
LAUNDRY
KSC
PEST
647667
UTIL
B&G
WH-1
WH-2
DPW HQ
A
B
629 685
651A
833T
808 811
746 715 726
A B
00-49341
A
B
1149 1151
10291144
A
B
1918 1879
A
B
A
B
A
B
2372A
2373T
A C
2451 2400
A
B
A
B
2648 2605
2609T
2514 2540
8008T
2540T
26462645
1991 1963
A B
18331832
1962 1812
456A
CCTT
CCTT
SIMNET
463Z
SSSC
TSAK MILES 2000
549 546
8114T
560G
A B
86M
48T
A
B
39 55
134 133
186 192
202A
208 215 214
213 212
259 245
FOOT BR
VEH BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
VEH BR 1821
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
FOOT BR
FOOT BR
VEH BR
VEH BR
VEH BR
VEH BR
FOOT BR
1158A
1158B
RAILHEAD
.8
.5
ST
R
C
SS
T
/2
C
M
S T
268.6
STREAM
DISCHARGE TO
65-A
STREAM
MATCH LINE ’C’
447A
F
F
497A
497B
458Z
2372?
QA00894-0J
QA00893-0J
QA00892-0J
ADMIN
EXER W/LAT
EXER W/LAT
QA00138-9J
QA01300-8J
00-54151 BUP 020122
00-54152 BUP 020122
00-54132 BUP 010801
00-54127 BUP 040430
00-54158 BUP 030104
00-54129 BUP 011109
00-54157 BUP AFTER 2026
00-54156 BUP 031030
00-54130 BUP 020330
00-54131 BUP 020929
00-54155 BUP 030506
03-57200 REPAIR 041007
99-47353
4-200PN
01-QA00604 BUP
XX-QA00606 BUP 0310XX
95-44142
4-184PN
95-44066
4-184PN
96-QA00466 BUP
95-44066
4-184PN
95-44066
4-184PN
95-44066
4-184PN
01-55893 BUP
99-QA00603 BUP
XX-QA00602 BUP 0310XX
99-47353
4-200PN
96-43269
4-184PN
97-44592
4-200PN
XX-QA00287 BUP
01-55894 BUP
99-51682
4-200PN
99-51820
3-48PN
97-44592
4-200PN
99-51682
4-200PN
99-51682
4-200PN
01-55882 BUP
A
B
A B
2022(?)
VEH BR
VEH BR
472?
455?
1839T
1840T
BARRIER
1564 1566
635A
2002B
A B
48A
A
B
A B
A B
A
B
A
B
A
B
174 Z
B A
S K
E T
B A
L L
C
O U
R T
T E
N N
IS
C
O U
R T
706(707A)
(2298)
1071?
A B
1760?
VEH BR?
VEH BR?
REPAIR BUILDING NO. S-753
58484
CIVIL
C-2
AS SHOWN
CHOE, S M. CAMP CASEY
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
- 2
SCALE: 1 / 250
SITE LAYOUT PLAN
1:250
0 20M15105
SITE LAYOUT PLAN AND SCOPE OF WORK
REPAIR BUILDING NO. S-753
58484
- 3
AC ROAD
N
G
A L
T R
A S
H
A /G
CP
#181FHY
AC PAVED ROAD
CP
8" PV
C
S 8"
PV
CS
SM
H
6" PVC
W
4" DIA
S-756
8" DIA
S
W
H
T C
L
T C
L
HH
H
CONTAIN
ER B
OX
D.AFREEZER
ACU
TR
C
CBCBCB
D200 PVC
CB
CP
CP
LP
LP
E
SSSSDDDD
65.5
W
BOX
BLDG #753
T R
A S H
B
IN
CHILLAR
T /F
CONTAINER
CBCBCB
S
A C
P A
V E
M E
N T
L
IM
IT
L
IN
E
A C
P A
V E
M E
N T
L
IM
IT
L
IN
E
W
150M M
AC ROAD
CON’C RETAINING WLL
J
E
- 3
- 3
INSTALL 150mm DIA PVC WATER LINE W/ PIV, APPROX. 130.0 LM
SEE CIVIL STD DWG. C-0404~0415 &
- 3
PAINT PARKING LINE W/ 150MM W
REFLECTIVE WHITE, APPROX. 6.0 SM
2.7
.5
- 3
REPLACE 1.5M W SIDEWALK,
APPROX. 130.0 SM. SEE
REPLACE GRANITE CURB,
APPROX. 120.0 LM. SEE
RESTORE SOLID SODDING
W/ TOP SOIL, APPROX. 850.0 SM.
SEE
SCOPE OF WORK
SCHEDULE #1 (REPAIR/MAINTENANCE)
SCHEDULE #2 (CONSTRUCT/ALTERATION)
2. RESTORE/REPLACE SIDEWALK.
5. RESTORE SOLID SODDING W/ TOP SOIL.
1. INSTALL 150mm DIA PVC WATER LINE W/ PIV.
3. RESTORE/REPLACE GRANITE CURB.
- 3
RESTORE SIDEWALK,
APPROX. 5.0 SM. SEE
- 3
REPLACE GRANITE CURB,
APPROX. 3.0 LM. SEE
REPLACE AC SURFACE COURSE,
APPROX. 1,310.0 SM. SEE
1. REPLACE AC SURFACE COURSE.
4. PAINT PARKING LINE W/ 150MM W REFLECTIVE
WHITE.
3,4
50 THK MIN
SOLID SOD
BLANKET
100 THK MIN
TOP SOIL
SCARIFIED AND
COMPACTED SUBGRADE
- 3
SCALE: NONE
SOLID SODDING
NOTE:
BELL HOLES SHALL BE EXCAVATED TO THE
NECESSARY SIZE AT EACH JOINT OR
COUPLING TO ELIMINATE POINT BEARING.
SATISFACTORY
BACKFILL
INITIAL
BACKFILL
BEDDING-SELECT
GRANULAR MATERIAL
SHALL BE FREE OF
ROCK 13 OR LARGER
UNYIELDING
MATERIAL
FIRM UNDISTURBED
EARTH (SEE NOTE)
UNYIELDING MATERIAL
TRENCH BOTTOM
EARTH TRENCH BOTTOM
TURFED OR MISC AREAS
PLASTIC
MARKING TAPE
(300 DEEP MAX)1
1.5
TRENCH WALLS CUT
TO 1.5:1 MAX
WITHOUT SHORING
150 MIN
M
IN
OD + 600
TYPICAL TRENCH SECTION4
- 3
SCALE: NONE
SUBGRADE
NEW PAVEMENT,
SEE DETAIL
MIN
EXST AC PAVEMENT
TACK COAT
SAWCUT & BITUMINOUS
PRIME COAT
NEW AC PAVEMENT
- 3
SCALE: NONE
SIDEWALK
- 3
SCALE: NONE
CIVIL
C-3
AS SHOWN
CHOE, S M. CAMP CASEY
A
B C D
E F G H
SYMBOL BY
DESIGNED BY
ENERGY MANAGER
SUBMITTED BY
USING AGENCY
APPROVED BY
PROJECT NO. DRAWING NO. REF NO.
SCALE :
ZONE DATE APVD.
UTILITIES
SHEET OF
REVIEWED BY
DESCRIPTION
BLDGS & GROUNDS
CHIEF, ENGR’G DIV
FORCE PROTECTION
CHK’D
REVISIONS
IMCOM
FIRE & EMERGENCY SVC
SAFETY
ENVIRONMENT
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD
ENGINEERING DIVISON, DPW, USAG-RED CLOUD
UNIT #15707, APO AP 96258-5707
300MM THK BASE COURSE
150MM THK SUBBASE COURSE
- 3
SCALE: NONE
TYPICAL AC PAVEMENT SECTION
AC PAVEMENT JOINT (NEW TO EXST)
1A
1B
AC PAVEMENT
1A
PRIME COAT
SUB GRADE
OPEN
V A
R
IE
S
S E
E P
L A
N
SLEEVE
COUPLING
PADLOCK
CAP
INDICATOR POST
HANDLE
CONCRETE BASE
FINISH GRADE
LINE
EXTENSION
ROD
VALVE
380 SQ.
CONC. COLLAR
150 0 FIRE WATER
SUPPLY LINE (DUCTILE
OR CAST IRON PIPE)
(SQ.)
2-D10 REBAR
- 3
SCALE: NONE
POST INDICATOR VALVE
EXISTING
PAVEMENT
SUBGRADE
17525
P A
V E
M E
N T
S E
C T
IO
N
A C
O R
P C
C
GRANITE CURB
CONCRETE 25-18-8
GRANITE CURB
75MM THK ASPHALTIC CONCRETE
REPAIR BUILDING NO. S-753
58484
JOINT
SEALER
JOINT
FILLER
R=3
TYP
R=3
TYP
TRANSVERSE CONTRACTION JOINTS
SHALL BE SPACED SO THAT RATIO
OF SLAB LENGTH TO WIDTH WILL
NOT EXCEED 1.25. THE DEPTH OF
THE CONTRACTION JOINT WILL BE
AT LEAST ONE-FOURTH OF THE
SIDEWALK SLAB THICKNESS,BUT NOT
LESS THAN THE MAXIMUM NOMINAL
SIZE OF THE AGGREGATE USED.
PROVIDE EXP JOINTS AT MAX 9.0 M
INTERVALS FOR STRAIGHT SECTIONS,
AT ALL RETURNS OF WALKS,
AND WHERE WALKS ABUT OTHER
CONCRETE STRUCTURES.
BROOM
FINISH FIN GRADE
2A S E C T I O N
2B
EXPANSION JOINT
2C
CONTRACTION JOINT
COMPACTED
NON-FROST-SUSCEPTIBLE
MATERIAL BASE
0.06
#8-150X150 WWF
2D
SIDEWALK ON DITCH
D13 @200 O.C
CON’C DITCH
FNSH GRADE
BIKE PATH &
WALKING TRAIL
MISC. DETAILS
| 58484-C1 |
| 58484-C2 |
| 58484-C3 |
File details come from the government source that posted it. Updated .