W91QVN-16-R-0030_Solicitation_Amendment_1.docx.pdf
PDF 58 KB Posted
- Solicitation number
- W91QVN16R0030
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN-16-R-0030_Amendment_2.pdf | ||
| Exhibit_2_Quality_and_Standards_of_Work-20JULY14.docx | DOCX document | |
| Exhibit_6_Historical_Data_on_Supplies_and_Services-1JUNE14.xlsx | XLSX spreadsheet | |
| Exhibit_8_Daily_Contract_Inspection_Report-1JUNE14.doc | DOC document | |
| W91QVN-16-R-0030_Army_Family_Housing.docx.pdf | ||
| Exhibit_4_COP_Check_List-1JUNE14.docx | DOCX document | |
| Exhibit_11_USAG_Yongsan_PDF_Map.pdf | ||
| Exhibit_9_NCIR-1JUNE14.doc | DOC document | |
| Attachment_1_-_ELIN_List.xlsx | XLSX spreadsheet | |
| Exhibit_3_COC_Check_List-1JUNE14.xlsx | XLSX spreadsheet | |
| Exhibit_5_COM_Checklist-1JUNE14.docx | DOCX document | |
| Exhibit_1_Schedule_of_Services-1JUNE14.doc | DOC document | |
| Attachment_2_-_Past_Performance_Questionnair.docx | DOCX document | |
| Exhibit_7_Historical_Vacate_Qtrs_Data-1JUNE14.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE NEXT PAGE.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jan-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91QVN-16-R-0030
X 9B. DATED (SEE ITEM 11)
23-Dec-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jan-2016
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCC YONGSAN, UNIT #15289
APO AP 96205-5289
UNITED STATES (THE)
W91QVN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91QVN-16-R-0030
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT
1. The purpose of this amendment is to provide answers to the potential offeror’s questions.
2. The closing date and time, 26 January, 2016, 01:00 P.M. has not changed.
3. All other terms and conditions remain unchanged.
Q# Reference
(PWS/RFP)
Questions Answers
Performance Work Statement, Para 1.2.2. Prior Experience and Addendum to 52.212-1, Para 6, Subfactor 1:
Contractor’s Qualification (2).
Prior Experience
According to this solicitation, one of the key qualification for the contractor is more than two years’ experience in R&M.
Our question is;
1. Our company is licensed for the contract but not qualified for the experience. But our partner has qualified records for it. Is it possible to join this contract as a consortium?
2. If possible, is there any required documents for this?
In accordance with the Factor A, Subfactor 1;
Contractor’s Qualification of the 52.212-2
EVALUATION--COMMERCIAL ITEMS
(OCT 2014) in the solicitation, The offeror shall provide all three (3) below identified requirements. For the ii) & iii) requirement, subcontractor’s registration and permission is allowable. In case of subcontractor(s) use, the offeror shall submit copies of the subcontract agreement with official companies who possess the registration and permission.
Additionally, the offeror shall submit copies of the subcontractor’s specific registration and permission issued by ROK.
i) Prime Contractor’s a valid Construction Business Registration for the business item category of “Building/Facilities Maintenance” in accordance with the Article 9 of ROK Law "Framework Act on Construction Industry.”
Is this a follow-on requirement? If so, could you please provide the incumbent contract number for this opportunity?
If not, is this a new requirement?
The current contract is W91QVN-15-D-0023.
W91QVN-16-R-0030
FBO Posting I have received presolicitation (Changed) of W91QVN-16-R-0030 issued on Dec. 23, 2015.
I have reviewed this presolicitation for bidding.
I think it is not enough to formal proposal.
Would you please let me know when formal original solicitation will be issued and expected bid date.
Solicitation and all pertinent documents were released via Fedbizopps on 23 December, 2015.
Performance Work Statement, Para 1.2.3.1.
Contract Manager (CM) and 1.2.3.5.2.
Customer Service Representative
(CSR).
Addendum to 52.212-1, Para 6, Subfactor 2: Key Personnel Qualification, (1) Contract Manager (CM), (2)Customer Service Representative
This entity has a most experienced and competent prospective contract manager as a key personnel.
He is very fluent in English as a key personnel for Family Housing R/M service business.
However, he has never taken English Proficiency Test like TOEIC.
In this case, does he mandatorily have to have a score of English Proficiency Test?
Yes. TOEIC score certificate requirement is tied to personnel qualification as specified in the Factor A, Subfactor 2; Key Personnel Qualification of the 52.212-2
EVALUATION--COMMERCIAL ITEMS
(OCT 2014).
Exhibit 7, Exhibit 11 and Performance Work Statement Para 2.1.1.
Appliances and Installed Equipment
Please let me have the more specified Building list that a contractor shall serve, precise figures of ground areas that a contractor shall clean and maintain, and appliances and installed equipment List that a contractor shall maintain (i.e. How many AHUs are there). If applicable, let us have detailed drawings for individual buildings and grounds.
Exhibit 7 specifies the number of units based by location. Additional details of units were provided during the site visit on the 07 January, 2015. Exhibit 11 provides a detailed map with a scale to allow the contractor to estimate exact ground areas.
In Para 2.1.1. it states "Appliances and Installed Equipment: For this contract, only the dishwasher, built-in convection ovens (GFOQ's only), gas fire place systems (GFOQ's only) to include hearth and glass doors, range hoods, both fire suppression and non-fire suppression systems, all HVAC systems shall be considered Appliances and Installed Equipment."
(End of Summary of Changes)
File details come from the government source that posted it. Updated .