W91QVN-16-R-0030_Army_Family_Housing.docx.pdf
PDF 843 KB Posted
- Solicitation number
- W91QVN16R0030
About this file
W91QVN-16-R-0030 Army Family Housing (AFH) USAG Yongsan
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W91QVN-16-R-0030_Amendment_2.pdf | ||
| W91QVN-16-R-0030_Solicitation_Amendment_1.docx.pdf | ||
| Exhibit_2_Quality_and_Standards_of_Work-20JULY14.docx | DOCX document | |
| Exhibit_6_Historical_Data_on_Supplies_and_Services-1JUNE14.xlsx | XLSX spreadsheet | |
| Exhibit_8_Daily_Contract_Inspection_Report-1JUNE14.doc | DOC document | |
| Exhibit_4_COP_Check_List-1JUNE14.docx | DOCX document | |
| Exhibit_11_USAG_Yongsan_PDF_Map.pdf | ||
| Exhibit_9_NCIR-1JUNE14.doc | DOC document | |
| Attachment_1_-_ELIN_List.xlsx | XLSX spreadsheet | |
| Exhibit_3_COC_Check_List-1JUNE14.xlsx | XLSX spreadsheet | |
| Exhibit_5_COM_Checklist-1JUNE14.docx | DOCX document | |
| Exhibit_1_Schedule_of_Services-1JUNE14.doc | DOC document | |
| Attachment_2_-_Past_Performance_Questionnair.docx | DOCX document | |
| Exhibit_7_Historical_Vacate_Qtrs_Data-1JUNE14.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W91QVN-16-R-0030 23-Dec-2015
b. TELEPHONE NUMBER
(02) 7914-6452
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 26 Jan 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QVN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MR. ALEXIS, LEVI B.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCC YONGSAN, UNIT #15289
APO AP 96205-5289
UNITED STATES (THE)
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W6B0AA 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
USAG-Y, DPW, HOUSING DIVISION
DONALD R. BIZEK
BLDG 4106-212
APO AP 96205
UNITED STATES (THE)
TEL: 738-3996 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$18,000,000
NAICS:
561720
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF181
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W91QVN-16-R-0030
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 11 Months Cleaning Services
FFP
The contractor shall perform the services in accordance with Para. 6.2. of the PWS.
FOB: Destination
NET AMT
0002 11 Months Police Call Services
FFP
Policing of Common Areas and Ground Maintenance Services. The contractor shall perform the services in accordance with Para. 6.3 of the PWS.
0003 11 Months Demand Maintenance Order
FFP
The contractor shall perform the services in accordance with Para. 7.1. of the PWS.
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
Change of Occupancy Cleaning (COC)
FFP
(Requirements Portion) The contractor shall perform the services in accordance with Para. 7.6.16.1. of the PWS.
ESTIMATED
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AA 17 Each Change of Occupancy Cleaning (COC)
FFP
Two (2) Bedroom Type
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AB 103 Each Change of Occupancy Cleaning (COC)
FFP
Three (3) Bedroom Type
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AC 25 Each Change of Occupancy Cleaning (COC)
FFP
Four (4) Bedroom Type
UNIT UNIT PRICE ESTIMATED AMOUNT
0004AD 6 Each Change of Occupancy Cleaning (COC)
FFP
Five (5) Bedroom Type
UNIT UNIT PRICE ESTIMATED AMOUNT
Change of Occupancy Maintenance (COM)
FFP
(Requirements Portion) The contractor shall perform the services in accordance with Para. 7.6.17.1. of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AA 17 Each Change of Occupancy Maintenance (COM)
FFP
Two (2) Bed Room Type
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AB 103 Each Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AC 25 Each Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AD 6 Each Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
Change of Occupancy Painting (COP)
FFP
(Requirements Portion) The contractor shall perform the services in accordance with Para. 7.3.18.1. of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AA 17
Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AB 103 Each Change of Occupancy Painting (COP)
FFP
Two (3) Bedroom Type
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AC 25 Each Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
0006AD 6 Each Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
Project Works
FFP
The contractor shall perform the services in accordance with Para. 7.7 of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AA 5,000 Square Foot
Interior and Exterior Painting
FFP
Two (2) Coats. The contractor shall perform the services in accordance with Para.
7.7.2. or Para. 7.7.3. of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AB 30,000 Square
Interior Painting (Latex)
Two (2) Coats. The contractor shall perform the services in accordance with Para.
7.7.2.
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AC 5,000 Square
Painting Enamel
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AD 5,000 Square
Floor Repair or Replacement
Vinyl Composition Tile 12"x12"x1/8"thk. The contractor shall perform the services in accordance with Para. 7.7.4. of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AE 1,000 Square
Repair Wooden Floring 1/4" Thick. The contractor shall perform the services in accordance with Para. 7.7.4. of the PWS
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AF 5,000 Square
Repair Sheet Vinyl or Vinyl Deco Floor covering. The contractor shall perform the services in accordance with Para. 7.7.4. of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AG 2,000 Square
Ceramic Mosaic Floor Tile
(And similar applications) Installation or Replacement or Repair. The contractor shall perform the services in accordance with Para. 7.7.4.2. of the PWS.
UNIT UNIT PRICE ESTIMATED AMOUNT
0007AH 2,000 Square
Quarry Floor Tile
(And similar applications) Installation or Replacement or Repair. The contractor
UNIT UNIT PRICE ESTIMATED AMOUNT
Major Replacements/Repair Service
FFP
(Requirements Portion). Any replacement/repair works that require labor, materials and equipment costing between $500.00 and $2,000.00. The contractor shall perform the major replacement/repair service works upon receipt of delivery orders as needed basis in accordance with Para. 7.8. of the PWS. The contractor shall provide the prices for the listed items in Attachment 1 with the price proposal.
0009 1 Months Phase-In Period (1 Mar 16 - 31 Mar 16)
FFP
(Firm Fixed Price Portion). The contractor shall provide all phase-in personnel, management, resources, transportation and other services for transition from existing contract to new contract in accordance with the paragraph 1.3.7. of PWS.
0010 1 Job Accounting for Contract Services
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 12. of PWS for CMR requirement herein. NOTE:
Not to exceed 20 Man hours for data collection and report.
Estimated Cost for War Hazard Losses is
FFP
Zero (0).
1001 12 Months OPTION Cleaning Services
FFP
1002 12 Months OPTION Police Call Services
FFP
Policing of Common Areas and Ground Maintenance Services. The contractor
1003 12 Months OPTION Demand Maintenance Order
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Cleaning (COC)
FFP
(Requirements Portion) The contractor shall perform the services in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AA 17 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AB 103 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AC 25 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1004AD 6 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Maintenance (COM)
FFP
(Requirements Portion) The contractor shall perform the services in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AA 17 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AB 103 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AC 25 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AD 6 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Painting (COP)
FFP
(Requirements Portion) The contractor shall perform the services in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AA 17
OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AB 103 Each OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AC 25 Each OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1006AD 6 Each OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Project Works
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AA 5,000 Square
OPTION Interior and Exterior Painting
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AB 30,000 Square
OPTION Interior Painting (Latex)
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AC 5,000 Square
OPTION Painting Enamel
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AD 5,000 Square
OPTION Floor Repair or Replacement
Vinyl Composition Tile 12"x12"x1/8"thk. The contractor shall perform the
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AE 1,000 Square
Repair Wooden Floring 1/4" Thick. The contractor shall perform the services in
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AF 5,000 Square
Repair Sheet Vinyl or Vinyl Deco Floor covering. The contractor shall perform
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AG 2,000 Square
OPTION Ceramic Mosaic Floor Tile
(And similar applications) Installation or Replacement or Repair. The contractor
UNIT UNIT PRICE ESTIMATED AMOUNT
1007AH 2,000 Square
OPTION Quarry Floor Tile
(And similar applications) Installation or Replacement or Repair. The contractor
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Major Replacements/Repair Service
FFP
(Requirements Portion). Any replacement/repair works that require labor, materials and equipment costing between $500.00 and $2,000.00. The contractor shall perform the major replacement/repair service works upon receipt of delivery orders as needed basis in accordance with Para. 7.8. of the PWS. The contractor
1009 1 Job OPTION Accounting for Contract Services
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 12. of PWS for CMR requirement herein. NOTE:
OPTION Estimated Cost for War Hazard Losses is
FFP
2001 12 Months OPTION Cleaning Services
FFP
2002 12 Months OPTION Police Call Services
FFP
Policing of Common Areas and Ground Maintenance Services. The contractor
2003 12 Months OPTION Demand Maintenance Order
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Cleaning (COC)
FFP
(Requirements Portion) The contractor shall perform the services in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AA 17 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AB 103 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AC 25 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2004AD 6 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Maintenance (COM)
FFP
(Requirements Portion) The contractor shall perform the services in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
2005AA 17 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2005AB 103 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2005AC 25 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2005AD 6 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Painting (COP)
FFP
(Requirements Portion) The contractor shall perform the services in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AA 17
OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AB 103 Each OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AC 25 Each OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2006AD 6 Each OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Project Works
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AA 5,000 Square
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AB 30,000 Square
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AC 5,000 Square
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AD 5,000 Square
Vinyl Composition Tile 12"x12"x1/8"thk. The contractor shall perform the
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AE 1,000 Square
Repair Wooden Floring 1/4" Thick. The contractor shall perform the services in
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AF 5,000 Square
Repair Sheet Vinyl or Vinyl Deco Floor covering. The contractor shall perform
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AG 2,000 Square
(And similar applications) Installation or Replacement or Repair. The contractor
UNIT UNIT PRICE ESTIMATED AMOUNT
2007AH 2,000 Square
(And similar applications) Installation or Replacement or Repair. The contractor
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Major Replacements/Repair Service
FFP
(Requirements Portion). Any replacement/repair works that require labor, materials and equipment costing between $500.00 and $2,000.00. The contractor shall perform the major replacement/repair service works upon receipt of delivery orders as needed basis in accordance with Para. 7.8. of the PWS. The contractor
2009 1 Job OPTION Accounting for Contract Services
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 12. of PWS for CMR requirement herein. NOTE:
OPTION Estimated Cost for War Hazard Losses is
FFP
3001 12 Months OPTION Cleaning Services
FFP
3002 12 Months OPTION Police Call Services
FFP
Policing of Common Areas and Ground Maintenance Services. The contractor
3003 12 Months OPTION Demand Maintenance Order
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Cleaning (COC)
FFP
(Requirements Portion) The contractor shall perform the services in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
3004AA 17 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3004AB 103 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3004AC 25 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3004AD 6 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Maintenance (COM)
FFP
(Requirements Portion) The contractor shall perform the services in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
3005AA 17 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3005AB 103 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3005AC 25 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3005AD 6 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Painting (COP)
FFP
(Requirements Portion) The contractor shall perform the services in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AA 17
OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AB 103 Each OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AC 25 Each OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3006AD 6 Each OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Project Works
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AA 5,000 Square
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AB 30,000 Square
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AC 5,000 Square
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AD 5,000 Square
Vinyl Composition Tile 12"x12"x1/8"thk. The contractor shall perform the
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AE 1,000 Square
Repair Wooden Floring 1/4" Thick. The contractor shall perform the services in
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AF 5,000 Square
Repair Sheet Vinyl or Vinyl Deco Floor covering. The contractor shall perform
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AG 2,000 Square
(And similar applications) Installation or Replacement or Repair. The contractor
UNIT UNIT PRICE ESTIMATED AMOUNT
3007AH 2,000 Square
(And similar applications) Installation or Replacement or Repair. The contractor
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Major Replacements/Repair Service
FFP
(Requirements Portion). Any replacement/repair works that require labor, materials and equipment costing between $500.00 and $2,000.00. The contractor shall perform the major replacement/repair service works upon receipt of delivery orders as needed basis in accordance with Para. 7.8. of the PWS. The contractor
3009 1 Job OPTION Accounting for Contract Services
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 12. of PWS for CMR requirement herein. NOTE:
OPTION Estimated Cost for War Hazard Losses is
FFP
4001 12 Months OPTION Cleaning Services
FFP
4002 12 Months OPTION Police Call Services
FFP
Policing of Common Areas and Ground Maintenance Services. The contractor
4003 12 Months OPTION Demand Maintenance Order
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Cleaning (COC)
FFP
(Requirements Portion) The contractor shall perform the services in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
4004AA 17 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4004AB 103 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4004AC 25 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4004AD 6 Each OPTION Change of Occupancy Cleaning (COC)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Maintenance (COM)
FFP
(Requirements Portion) The contractor shall perform the services in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
4005AA 17 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4005AB 103 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4005AC 25 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4005AD 6 Each OPTION Change of Occupancy Maintenance (COM)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Change of Occupancy Painting (COP)
FFP
(Requirements Portion) The contractor shall perform the services in accordance
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AA 17
OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AB 103 Each OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AC 25 Each OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4006AD 6 Each OPTION Change of Occupancy Painting (COP)
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Project Works
FFP
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AA 5,000 Square
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AB 30,000 Square
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AC 5,000 Square
Two (2) Coats. The contractor shall perform the services in accordance with Para.
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AD 5,000 Square
Vinyl Composition Tile 12"x12"x1/8"thk. The contractor shall perform the
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AE 1,000 Square
Repair Wooden Floring 1/4" Thick. The contractor shall perform the services in
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AF 5,000 Square
Repair Sheet Vinyl or Vinyl Deco Floor covering. The contractor shall perform
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AG 2,000 Square
(And similar applications) Installation or Replacement or Repair. The contractor
UNIT UNIT PRICE ESTIMATED AMOUNT
4007AH 2,000 Square
(And similar applications) Installation or Replacement or Repair. The contractor
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Major Replacements/Repair Service
FFP
(Requirements Portion). Any replacement/repair works that require labor, materials and equipment costing between $500.00 and $2,000.00. The contractor shall perform the major replacement/repair service works upon receipt of delivery orders as needed basis in accordance with Para. 7.8. of the PWS. The contractor
4009 1 Job OPTION Accounting for Contract Services
FFP
CMR requirement must be reported by 31 October of each calendar year during the life of the contract. See Para. 12. of PWS for CMR requirement herein. NOTE:
OPTION Estimated Cost for War Hazard Losses is
FFP
NOTICE TO OFFERORS
All sources may submit a proposal or quote as applicable. However, the Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative Status to any offeror, for this requirement. All sources submitting a proposal or quote, as applicable, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea, must submit adequate verification in its initial proposal or quote- that it has the requisite business licenses directly from the ROK Government to perform the contract and the capacity to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If an initial proposal does not fully demonstrate this authorization and capacity, it will not be further considered for award. Whether an offeror demonstrates this authorization and capacity shall be determined by the Contracting Officer. “All offerors interested in competing for this requirement are required to submit their price proposal in Korean Won (KW) only. A proposal submitted in currency other than Korean Won will not be considered for award.
During the life of this contract some or all contract requirements may be reduced due to planned redeployment of U.S. Forces from Yongsan (Seoul) to the Camp Humphreys (Pyongtaek) starting 2017 year.
SCHEDULE OF SERVICES
1. GENERAL.
The contractor shall perform Demand Maintenance Order (DMO), including both, Scheduled and Un-Scheduled Maintenance, Repair, Grounds and Cleaning Services for Army Family Housing (AFH) at USAG Yongsan; and in strict compliance with this Performance Work Statement (PWS) and other terms and conditions contained herein.
2. SCHEDULE OF SERVICES.
Period of Performance CLINs
Phase-In 1 March 2016 - 31 March 2016 CLIN 0009
Base Period 1 April 2016 - 29 February 2017 CLIN 0001 –0008, 0010, 0011
1st Option Period 1 March 2017 - 28 February 2018 CLIN 1001 – 1010
2nd Option Period 1 March 2018 - 28 February 2019 CLIN 2001 – 2010
3rd Option Period 1 March 2019 - 29 February 2020 CLIN 3001 –3010
4th Option Period 1 March 2020 - 28 February 2021 CLIN 4001 –4010
PWS
PERFORMANCE WORK STATEMENT
FOR
DEMAND MAINTENANCE ORDER, REPAIR, CLEANING SERVICE, AND GROUNDS
MAINTENANCE SERVICE FOR ARMY FAMILY HOUSING, USAG-YONGSAN
1.0. GENERAL: This is a non-personal service contract to provide Demand Maintenance Order (DMO), including both, Scheduled and Un-Scheduled Maintenance, Repair, Grounds and Cleaning Services for Army Family Housing (AFH) at USAG Yongsan. The contractor shall provide all personnel, Management Staff, Supervisory Staff, Quality Control, Labor, Equipment, Transportation, Tools, Materials, Licensing, Certifications and other items and services necessary to perform to the standards in the Performance Work Statement (PWS), except Government-Furnished Property (GFP) and services as specified in this PWS.
1.1. SCOPE OF WORK: The contractor shall perform the contracted services to the standards identified in this contract. The contractor’s performance will be evaluated by the Performance Requirements Summary (PRS) located in the Quality Assurance Surveillance Plan (QASP). The main functions are:
Demand Maintenance Orders including both scheduled and unscheduled Maintenance Repair, Major Replacement/Repair Service, Emergency Minor Repair Service, and Project Works Between Occupancy Maintenance (BOM) which includes: Change of Occupancy Maintenance (COM), Change of Occupancy Cleaning (COC), and Change of Occupancy Painting (COP) Maintenance of Common Areas, Maintenance and Operation of Heating, Ventilation and Air Conditioning (HVAC) Equipment, Playground Inspections and Maintenance, Cleaning Services including, policing and ground maintenance services in Common Areas and Facilities Repairs and Safety Inspections of all Army Family Housing (AFH) Facilities.
1.1.2 Working Hours: Normal duty hours for providing support under this contract are from 08:00-17:00 hrs Monday to Saturday. However support for DMOs at different levels as described PWS is required 7 days a week, 24 hrs a day to include US and Korean Holidays.
1.2. CONTRACTOR AND KEY PERSONNEL QUALIFICATION:
1.2.1. Contractor’s Qualification: Certificate of Business Registration and Permission: The contractor shall submit all valid and current Certificates of Business Registration and Permission: The offeror shall provide all three (3) below identified requirements. For the ii) & iii) requirement, subcontractor’s registration and permission is allowable. In case of subcontractor(s) use, the offeror shall submit copies of the subcontract agreement with official companies who possess the permission. Additionally, the offeror shall submit copies of the subcontractor’s specific registration and permission issued by the Republic of Korea (ROK).
i) Prime Contractor’s valid Construction Business Registration for the business item category of “Building/Facilities Maintenance” (시설물유지보수면허증) in accordance with (IAW) Article 9 of ROK Law "Framework Act on Construction Industry".
ii) Electric Work Business registration (전기공사업 허가증) IAW the “Electric Work Business Act, Article 4, Para 1 of the ROK Law.
iii) Public Sanitation Control Business Permission. (위생관리용역업신고증)
1.2.2. Prior Experience: The contractor shall have at least two (2) years of verifiable experience in residential, scheduled and unscheduled Maintenance Repair, Major Replacement/Repair Service, Emergency Minor Repair Service, and Project Works, cleaning service and general residential facilities maintenance service within the last five (5) years from the release date of this solicitation.
1.2.3. Key Personnel Qualification: The contractor shall provide sufficient onsite personnel as a Demand Maintenance Order and Repair Team which consists of at least a Contract Manager (CM), Plumber(s), Painter(s), HVAC Mechanic(s), Electrician(s), Facility Repair Craftsman(s), and Customer Service Representative to accomplish the PWS requirements.
1.2.3.1. Contract Manager (CM): The Contractor shall provide an onsite Contract Manager (CM) the CM shall be physically present during normal duty hours to handle any problems/complaints that may occur, shall conduct overall management, coordination, furnish liaison with the Government and shall be responsible for the performance and management of Maintenance and Repairs services required under this contract. The CM shall have a minimum two (2) years’ experience as a CM of facility repair and scheduled and unscheduled maintenance of similar projects or larger scope than this contract within the last five (5) years. The CM shall be able to read, write, speak and understand English and shall fully understand the requirements of this contract. English speaking staff members are required to have a Test of English for International Communication (TOEIC) IAW paragraph 1.4. English Proficiency of the PWS. The contractor/CM shall notify the COR or ACOR of any changes in Contract’s personnel. The CM shall have full authority and responsibility to act for the contractor on all contract matters relating to daily operations under this contract.
1.2.3.2. Plumber: The Contractor shall provide an onsite plumber. The Plumber shall be physically present during normal duty hours to handle any Maintenance and Repair problems and/or services required under this contract. The plumbers shall possess technician licenses issued by ROK Government in plumbing repair and replacement (배관 기능사 자격증) with at least two (2) years of experience in plumbing repair within the last five (5) years.
1.2.3.3. Heating, Ventilating and Air Conditioning (HVAC) Mechanic: The Contractor shall provide an onsite HVAC Mechanic. The HVAC Mechanic shall be physically present during normal duty hours to handle any Maintenance and Repair problems and/or services required under this contract. The HVAC Mechanics shall possess technician licenses issued by ROK Government in mechanical repair (공조냉동 기능사 자격증) with at least two (2) years of experience within the last five (5) years in mechanical repair, inspection and maintenance of HVAC systems. The contractor shall have the ability to maintain, inspect and repair HVAC Systems IAW International Standard for HVAC Cleaning Professionals, National Air Duct Cleaners Association (NADCA) Standard (ACR) Assessment, Cleaning and Restoration. If HVAC Mechanic does not have this ability, the contractor is responsible for the cost to subcontract personnel who are qualified to maintain and repair Carrier and other HVAC Systems.
1.2.3.4. Electrical Craftsman: The Contractor shall provide an onsite Electrical Craftsman. The Electrical Craftsman shall be physically present during normal duty hours to handle any Maintenance and Repair problems and/or services required under this contract. The Electrical Craftsman shall possess technician licenses issued by ROK Government in electrical repair and replacement (전기 기능사 자격증) with at least two (2) years of experience within the last five (5) years in electrical repair.
1.2.3.5. Skilled Facility Repair Craftsman: The Contractor shall provide an onsite Skilled Facility Repair Craftsman. The Skilled Facility Repair Craftsman shall be physically present during normal duty hours to handle any Maintenance and Repair of masonry work which shall include repair of foundations, walls, wallboard, floor slabs, sidewalks, steps, tile, grout, brick problems and/or services required under this contract. The Skilled Facility Repair Craftsmen shall have at least two (2) years of experience in this type of work within the last five (5) years.
1.2.3.5.1. Skilled Facility Painter: The Contractor shall provide an onsite Skilled Facility Painter that can complete painting of interior and exterior walls, windows and door units. Painting services shall include, but is not limited to, surface prep, move, reset, and protect furniture and equipment; mix paints. The Skilled Facility Painter shall have at least two (2) years of experience in this type of work within the last five (5) years.
1.2.3.5.2. Customer Service Representative (CSR): The Contractor shall provide an onsite Customer Service Representative. The CSR shall be physically present during normal duty hours to handle any situations involving Customer Service with the occupants. The CSR must have general administrative skills; be able to read, write, speak and understand English and shall fully understand the requirements of this contract.
English speaking staff members are required to have a Test of English for International Communication (TOEIC) IAW paragraph 1.4. English Proficiency of the PWS. The CSR shall have at least two (2) years of experience in General Customer Service within the last five (5) years.
1.2.3.5.3. The Contractor shall provide Miscellaneous Labor for onsite scheduled and unscheduled, maintenance, cleaning and general housekeeping of Army Family Housing areas.
1.2.3.5.4. The contractor shall provide the COR or ACOR with an up-to-date list of all employees when there is a change in employee status. In the event of a change of employee, the contractor shall advise the COR or ACOR of the change to include name and qualifications. The timeline for submission of employee changes will be within seven working days.
1.3. Contractor Plans: The contractor shall provide Staffing Plan, Phase-In Plan, Equipment Plan, Customer Service Plan, Quality Control Plan (QCP), and Safety Plan. Contractor shall prepare and submit their Plans to the COR/ACOR within 10 calendar days after award of contract.
1.3.1. Staffing Plan: The contractor shall provide a staffing plan that clearly demonstrates how the Contractor manages the Demand Maintenance Order system including both scheduled and unscheduled Maintenance Repair, Major Replacement/Repair Service, Emergency Minor Repair Service, Project Works, Between Occupancy Maintenance (BOM), Grounds Maintenance, and Cleaning Services for AFH at USAG Yongsan to include but not limited to:
- Labor categories and number of technicians by contract year to support PWS
- Recruitment policy and timeline for replacement of technicians
- Transition strategy between each contract year to include labor categories and number of technicians
1.3.2. Phase-In Plan: The Contractor shall clearly demonstrate how the contractor will prepare for 100% full performance in accordance with the PWS and transition. The contractor shall include all general and administrative (G&A) functions and pre-hiring activities normally accomplished by contractor prior to physical phase-in performance. The contractor shall describe in detail how the contractor will provide required level of security cleared personnel at all locations, training and implementation on all reports, services, suspense dates, a time phased and milestone driven schedule of key events and procedures needed to assure readiness and 100% full performance under the contract by the end of the one (1) month phase-in period.
The approach must be designed to ensure successful transition to full performance of work by the conclusion of the phase in period. If unable to meet any task timeline, you will notify the KO and COR, before the conclusion of the phase in period.
1.3.3. Equipment Plan: The contractor shall submit their equipment plan to the COR or ACOR prior to performance commencement according to the scope of work described. The contractor shall provide evidence that all materials, vehicles and equipment are in his possession or ability to secure required equipment in time for full performance.
1.3.4. Customer Service Plan: The Contractor shall have a comprehensive plan for customer service, designed to manage the relationship with both the Government and the occupants. The primary means for managing the Contractor/Occupant relationship shall be the Demand Maintenance Order system described in the PWS. The Government reserves the right to review the records of the Demand Maintenance Order system at any time during normal work hours. The primary means for managing the Contractor/Government relationship shall be periodic meetings IAW with the PWS. The Contractor shall ensure that customer service personnel are available to the Government/Occupant 24 hours a day, seven days a week, to receive and act on any valid DMO IAW with the "Response and Repair Time" defined in the PWS. The Contractor shall have a central point of contact for receiving DMOs. DMOs shall be received via email, phone call or in person from the Government’s designated point of contact (POC). Normal duty hours are defined in the PWS. Emergency personnel will be available during the hours outside normal duty hours for emergencies. DMOs received during normal duty hours, the Contractor shall tell the occupant the DMO number and refer to that number until completion of the work. Additionally, during normal duty hours, English speaking management staff shall be available within 30 minutes to meet on the installation with the occupant. After normal duty hours, the primary or an alternate English speaking management staff person shall be available within 1 hour.
1.3.5. The Quality Control plan shall include: The name(s) and qualification(s) of the contractor's quality control representative(s) and clearly defined authority of these personnel under the contractor's organization. The names of the individuals performing these inspections and the extent of their authority shall be in the form of an organizational chart or other form included with the QC program.
1.3.6. Phase In/Phase Out: To minimize any decreases in productivity and to prevent possible negative impacts on contract services, the Contractor shall have personnel on board, during the thirty (30) days phase in/phase out period. The Contractor shall support the succeeding contractor during the contract phase-out period. This support includes the transition of all management and technical services to the successor contractor while minimizing operational impacts.
1.3.7. Phase-In: This requirement includes a one month phase-in period after initial contract award. The contractor shall meet all requirements IAW the contractor’s phase-in plan and shall meet weekly with the Government (COR or ACOR) to assess progress. The contractor shall perform contract requirements the first day of contract full performance. The contract staffing will include successful completion of PWS and contract requirements. The Government transition actions include, but are not limited to, processing the contract and contractor personnel for access to the installation to perform contract services. There shall be no negative impact on scheduled performance due to contractor phase-in. The contractor shall participate in a joint inventory of all property provided by the Government. The joint inventory, property control plan and safety plan will be complete and accurate by final day of phase-in period. Prior to the start of performance, the contractor shall submit to the COR or ACOR, in writing, a list of all employees who will perform under this contract. The list shall include the full name of each employee and his/her position. In the event the incumbent is awarded the contract, phase in cost will not be allowed.
1.3.8. Phase-Out: The contractor shall retain full responsibility for meeting contract requirements until completion of the contract. The contractor shall provide access to the sites and to all documentation generated as a result of performing services on this contract to the new contractor during the new contract phase-in period. The contractor shall conduct a joint inventory with the government of all sub hand-receipted equipment during the phase out period.
The contractor shall certify the inventory after completion of each site inventory. The contractor shall be responsible for replacing missing items.
1.3.8.1. Phase out transition conference: The contractor shall participate in the phase out transition conference, and periodic follow on meetings to begin phase out planning and to address the status and issues of the transition.
The date and time of the conference will be determined by the Government in coordination with the contractor.
1.3.9 Transition of data and items: During phase-out, the contractor shall also account for turn-in all cards, keys, and badges.
1.4. English Proficiency:
1.4.1 The Contractor shall ensure that the Contract Manager and Customer Service Representative at Section 1.2.3.
Key Personnel Qualification, meet all of the following TOEIC requirements. The minimum combined speaking and writing score must be 270 on the Speaking and Writing TOEIC exam with a minimum score of 130 on the speaking part of the exam and a minimum score of 120 on the writing score of the exam. The minimum combined listening and reading score must be 650 on Listening plus Reading TOEIC exam with a minimum score of 250 on the listening part of the exam and a minimum score of 300 on the reading part of the exam.
1.5. Base Passes: Upon notice of award, the contractor shall obtain all the passes and necessary vehicle permits required for entry by authorized contractor personnel (IAW 3.1.4. References and Technical Documentation) USFK Regulation 190-7, Installation Access Control, before full implementation of the contract. The POC information for this action will be provided upon notice of award. The contractor shall complete USFK Form 82-E, Application for Post Pass for all new employees prior to reporting to the Pass and ID Section. The contractor shall retrieve all identification media, including vehicle decals from employees who depart for any reason before the contract expires.
The retrieved identification media and vehicle decals shall be turned into the COR or ACOR within one (1) day of such action.
1.5.1. Escort Privilege: Escort Privileges are only authorized for the following personnel, CM, CSR, Plumber, Electrician, HVAC Mechanic, Painter and Facility Repair Man. This privilege is only for employees working on this contract or those providing supporting roles under emergency conditions and only during hours stated under this contract. It is the escort’s responsibility to ensure he/she maintains full control of all individuals at all times.
1.5.2. Physical Security: The contractor and its employees entering USAG Yongsan shall support all security requirements imposed by the local installation commander at all times and shall be subject to security checks. The contractor personnel and property shall be subject to search and seizure upon entering the USAG Yongsan in accordance with the installation's security regulations and procedures.
1.5.3. Entry into Quarters: Except in an emergency, contractor personnel shall not enter occupied quarters unless requested by the occupant, and an adult member of the occupant’s family is at home, or an adult who is responsible for the quarters during the occupant’s absence is present. Adult is anyone, 18 years of age or older. The housing unit shall be continuously occupied except for short periods of time when housing occupants move out and move in.
The contractor shall coordinate operations with the occupant not later than one workday before work is scheduled for accomplishment except for COCs and emergency service calls.
1.5.4. Vehicle Operators: The contractor shall ensure employees have a current and valid driver’s license/up to date vehicle insurance, before allowing the employee to operate a POV or Contractor-owned vehicle on USAG Yongsan. The contractor shall report to the COR/ACOR/KO immediately, after occurrence of all vehicle accidents (see 1.4 Safety and Health Requirements). Contractor personnel who operate motorcycles or mopeds on USAG Yongsan shall wear safety equipment as specified in EM-385-1-1. The Contractor shall ensure that all employees operating vehicles and or equipment in support of this contract have current and valid certification, registration and licenses for equipment being operated. The Contractor and all Contractor employees are subject to comply with all base traffic regulations IAW USFK Regulation 190-1.
1.5.5. Employee Identification: Each employee, when working under this contract, shall have a badge in the vicinity of the upper right portion of the chest area, at all times. The employees' name, company name and the words “USAG Yongsan Family Housing Maintenance” shall be printed legibly on the badge. Two samples of the badge shall be submitted to the COR or ACOR for approval within Five (5) calendar days after award.
1.5.5.1. Business Card: A business card shall be offered to the housing occupant where work is to be performed with employee's name. The card shall be printed in English with the contractor's name, local telephone and the words “USAG Yongsan Family Housing Maintenance ". Two samples of the business card shall be submitted to the COR or ACOR for approval within Five (5) calendar days after award of contract.
1.6. Environmental Controls:
1.6.1. The contractor or his personnel are prohibited at all times from cooking and living on post. There shall be no smoking in or within 50 feet of any government facility.
1.6.2. The contractor shall ensure that all articles such as vehicle tools, Nuclear Biological Chemical (NBC) parts, Organizational Clothing and Individual Equipment (OCIE), ammunitions, office equipment, non-expendable items, and Government property found by the Contractor and/or its employees during the performance of work are immediately required to turn over to the COR or ACOR for disposition. This includes personal articles such as wallets, rings, watch, small electric appliances, and those with and without monetary value.
1.6.3. The contractor is responsible for advising all employees of Environmental and Hazardous Materials Handling and is also required to have and maintain Material Safety Data Sheets (MSDS) on all material(s) in use by the contractor during the duration of this contract. A copy of all MSDS shall be provided to the COR/ACOR, be posted in the contractor’s office and shall be readily available for contractor employees.
1.6.4. Entomology Support: The contractor shall be responsible for prevention and repairing of exterior and interior damages caused by birds, rodents, termites, and other types of pests which have been removed or where spraying for insects or pests was done (with a surface which matches adjoining surface in color, texture, and appearance) with adequate actions. The Government may provide rodent and pest control management. When the contractor encounters a pest control problem, they shall contact the COR or ACOR immediately.
1.7. Safety and Health Requirements:
1.7.1. The contractor shall exercise safety precautions as necessary to prevent and eliminate safety hazard to personnel, material and equipment. The contractor shall take all safety measures as specified in EM-385-1-1K, General Safety and Health Requirements, and US Army Regulation 385-10, The Army Safety Program.
1.7.2. The contractor shall report to the COR/ACOR/KO immediately, after occurrence of all accidents resulting in death, traumatic injury, and occupational disease, lost time injuries over one working day, or damage to Government owned property, materials, supplies or equipment.
1.7.3. The contractor shall be responsible for damage to Government property/facilities. The contractor shall comply with ROK law regarding employees’ injuries.
1.7.4. The contractor shall comply with the requirements of the Post Fire Safety Protection and Prevention Division, DPW, USAG Yongsan, AK Pam 420-1 Fire Prevention and Protection Program and all Local Laws and Regulation.
1.7.5. The contractors Safety Official shall conduct weekly Safety Briefings with all contractors Employees and shall provide a report of each weeks briefing to the COR or ACOR.
1.8. Quality Control:
1.8.1. The contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed IAW this PWS to include but not limited to:
- Shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.
-Is the means by which the contractor assures them self that their work complies with the requirement of the contract.
-The QCP shall be submitted in a contractor's proposal as an evaluation factor and shall be updated thereafter to maintain an effective and efficient quality control program. The Quality Control Plan shall be reviewed by the COR/ACOR and approved by the KO.
-The Contractor will submit a Quality Control Report (QCR) for final review and approval of the QCR and any subsequent changes within 30 days after the contract is awarded.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .