This document is a Standard Form 30 Amendment to Solicitation W91QV1-26-R-A068, issued on September 4, 2026, by the U.S. Army at Fort Belvoir, Virginia, with an effective date of September 8, 2026. The amendment provides answers to 126 industry questions and clarifications regarding a small business set-aside solicitation for the upgrade and replacement of an analog closed-circuit television (CCTV) surveillance system to Internet Protocol (IP) cameras at a forensic laboratory facility. The solicitation closing date is September 8, 2026, at 10:00 AM EDT. Offerors must submit electronic proposals via email to Aneisha Johnson (Contract Specialist) and Sheu Mojeed (Contracting Officer) with a technical proposal not to exceed five pages, a detailed equipment list, and completed FAR 52.212-3 representations and certifications. The Government anticipates awarding a firm-fixed-price contract using a Lowest Priced Technically Acceptable (LPTA) evaluation approach, with technical capability as the primary factor and price as the secondary factor. The contract includes a one-year base period of performance from September 25, 2026, through September 24, 2027, with delivery and installation to occur within 30-90 days of contract award.
The requirement encompasses the replacement of 55 IP cameras (54 interior and 1 exterior IP68-rated camera at the front entrance) to replace obsolete analog equipment, with distribution across four floors of the facility (8 cameras on the 1st floor, 18 on the 2nd, 9 on the 3rd, and 19 in the basement). The contractor must furnish all Category 6 plenum-rated cabling, PoE network switches, patch panels, rack space, uninterruptible power supply capacity, and related infrastructure. The existing exacqVision Professional license system (Software Version 25.1.7.0, NVR model EXACQ IP08-240T-R2XW-E, expiring September 29, 2026) will remain; the contractor must furnish new per-camera IP licenses for all newly installed cameras. Required deliverables include as-built drawings and camera location schedules (due two weeks prior to installation), cable certification test reports, end-user training, and a minimum 90-day warranty with maintenance service for the remainder of the fiscal year. The contractor is responsible for removing existing analog cameras and coaxial cabling, which shall remain Government property at the facility. All work must occur during normal duty hours (7:30 a.m. to 4:00 p.m., Monday through Friday), with after-hours work permitted at the laboratory's discretion for large or intrusive workloads. Contractors will require security clearance with names submitted one week prior to project start and will be escorted in forensic areas. The Buy America Act applies to all supplies and equipment, and offerors must comply with Section 889 of the National Defense Authorization Act regarding foreign manufacturers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final MICC PWS CCTV Camera and Cabling Upgrade.pdf | ||
| Solicitation - W91QV126RA068.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Deliveries or Performance
The delivery information for the following CLIN(s) / SLIN(s) / ELIN(s) were deleted:
Ship To - DoDAAC: HT0873
W91QV126RA0680001
52.212-1 ADDENDUM
FAR 52.212-1 is hereby amended to reflect the changes shown below as to the specific paragraph revised.
Para (a) Submission of Offers: The following supplements this paragraph with respect to the information and documents required for submission in response to this solicitation.
OFFEROR SUBMISSION
This section specifies the format and content that Offerors will use for submitting their offers in response to this Request for Proposal (RFP). Offerors shall ensure that the information provided within their offer is factual, accurate, and complete.
1. ELECTRONIC OFFERS. Offerors must submit electronic offers in response to this solicitation. The offer must arrive by the time specified in the solicitation to the following email address:
Aneisha.s.Johnson.civ@army.mil and Sheu.a.Mojeed.civ@army.mil.
2. The Government will not be responsible for any failure of transmission or receipt of the offer, or any failure of the offeror to verify receipt of the emailed offer.
3. The Government anticipates awarding a firm-fixed price (FFP) contract this solicitation.
a. The Government intends to evaluate offers and may make awards without exchanges with
Offerors. Therefore, the Offerors’ initial offer should contain the best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest.
4. Offeror Questions and Clarifications: Any questions, comments or clarifications concerning any aspect of the solicitation shall be submitted in writing via e-mail Aneisha.s.Johnson.civ@army.mil and Sheu.a.Mojeed.civ@army.mil One (1) business days after issuance of solicitation Questions or clarifications submitted should identify the topic (e.g., technical or price), and must reference the applicable section of the solicitation (e.g., Section, paragraph, and subparagraph) and RFP number. Telephone calls will not be accepted nor responded to. Responses will be emailed to all interested offerors.
5. The technical information required for evaluation purposes shall not exceed five (5) pages.
6. PROCESS FOR AWARD. Awards will be made to the offeror who is most advantageous to the Government, not using discussions but reserves the right to do so at his or her sole discretion.
7. BASIS FOR AWARD. Awards will be made on technically acceptable basis and fair and reasonable pricing. Discussions may be conducted whenever the Contracting Officer deems it appropriate. The contract will be awarded strictly in accordance with the criteria and process established in FAR 12.
8. SUBMISSION OF OFFERS. The solicitation must be completed, signed and received at this office not later than the date and time specified on page 1 of this solicitation. Please note that your offer must include all of the following information.
9. CLOSING DATE: Proposal closing date is 08 September 2026 at 10:00 AM EDT EST. The Offeror shall submit a proposal via email to the points of contact specified herein for Solicitation W91QV1-26-R- A068 before the due date.
Electronic Submission. The Offeror shall submit the proposal electronically via email to the following points of contact and include the Combined Synopsis Solicitation number W91QV1-26-R- A068 in the subject line of the email.
1. Aneisha Johnson Contract Specialist Email: aneisha.s.johnson.civ@army.mil
2. Sheu Mojeed Contracting Officer Email: sheu.a.mojeed.civ@army.mil
PART I: Technical Capability - Factor 1.
a) The information provided by the offeror will be a significant factor in the Government’s determination of technical capability.
b) To be considered for award, the Offeror shall submit a detailed description of how to meet the requirements as outlined in the Performance Work Statement (PWS).
c) Offerors shall include (1) a detailed list of equipment provided to meet and fulfil the requirement of this solicitation (no page limit); and (2) A document (not more than 5 pages in length) that details how and length of services the offeror is providing to complete the PWS requirement.
TECHNICAL CAPABILITY/APPROACH
The Offeror shall submit sufficient information for the Government to make a comprehensive evaluation of its approach and capability in meeting the requirements listed in the PWS for successful performance. Offerors must provide a written narrative that specifically addresses their ability to meet the Forensic Toxicology Drug Testing Laboratory PWS sections 5.1 through 5.5 4 and Technical Exhibit 1,2 and 3. The offeror must also submit information to instructions provided in 52.212-2 Addendum, subfactors 1 and 2.
The proposal should NOT simply rephrase or restate the Government's requirements but rather should provide convincing rationale to address how the offeror intends to meet these requirements. Statements that the Offeror understands, can or will comply with the PWS (including reference publications, technical data, etc.), statements paraphrasing the PWS or parts therefore (including applicable publications, technical data, etc.) and phrases such as "standard procedures will be employed" or "well known techniques will be used, "etc., will be considered unacceptable.
The Offeror should assume that the Government has no prior knowledge of their experience and will base its evaluation on the information presented in the Offeror's proposal.
The proposal should be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the Offeror's technical competence and ability to comply with and manage the contract task requirements specified in the PWS.
The Offeror shall address as specifically as possible the actual methodology you would use to accomplish the PWS tasks.
The Offeror shall submit sufficient information for the Government to make a comprehensive evaluation of its approach and capability in meeting the requirements listed in the PWS for successful performance.
Note that any links to product samples included in the technical document will not be evaluated as part of the technical factor.
PART II: Price-Factor 2.
The information provided will be used to assist in the price analysis described in EVALUATION OF THE PROPOSED PRICES, in ADDENDUM TO FAR 52.212-2, Please submit the following:
a. Offerors shall provide pricing in the Schedule B Section for all item/s. The Offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.
a. Signed amendments (if any).
b. Representations and Certifications found at FAR 52.212-3 SHALL be completed and submitted with the offer.
Para (g) Contract award. This is amended to state that the Government may conduct discussions prior to contract award.
Para (j) Unique Entity Identifier (UEI) / CAGE Code. The offeror shall obtain these said Codes and submit them to Contracting Center. Registration in the System for Award Management (SAM), if you are a US firm. Award cannot and shall not be made to an offeror without these codes.
Para (n) Bid Preparation Costs. This solicitation does not commit the Government to pay any costs incurred in the submission of an offer, in making any necessary studies for the preparation thereof, or for any visit(s) the Contracting Officer may request for the purpose of clarification of the offer. The Government may reject a proposal if it is found that any information that has a negative impact on the offeror's past performance record has been deleted, misrepresented, or withheld.
Para (o) Protests received at a level higher than the contracting officer will be referred to the contracting officer. Protestor may request a review by the contracting officer or an independent review at a level higher than the contracting officer. Requests for appeals or independent review will be addressed to the contracting officer for referral to the review authority. Questions on this process will be referred to the cognizant contracting officer identified in the solicitation.
Para (p) The non-FAR Part 12 discretionary FAR, DFARS, AFARS, and LOCAL provisions included herein are incorporated into this solicitation either by reference or in full text. If incorporated by reference, see provision 52.252-1 herein for locations where full text can be found.
(End of Provision)
ADDENDUM TO 52.212-2
Award will be made using best value Lowest Priced Technically Acceptable (LPTA) procedures. Award will be made to the offeror provided its technical proposal conforms to the requirements of the solicitation; its price is determined to be fair and reasonable by the contracting officer; and the contracting officer determines the offeror is responsible. Proposals submitted in response to this solicitation shall include the following
FACTOR 1: TECHNICAL CAPABILITY EVALUATION.
Technical Capability reflects the Government’s confidence in each offeror’s ability, as demonstrated in its offer, to provide the requirements as stated in this solicitation. The Government will evaluate whether the offeror has demonstrated that it can meet the minimum requirements in the Performance Work Statement. Offers that do not demonstrate that it can meet the minimum requirements will not be considered further for award. If an offeror does not indicate whether it can meet the minimum requirements, the Government will determine that it cannot.
Technical Capability will be evaluated as either Acceptable or Unacceptable. Definitions are as follows:
TECHNICAL EVALUATION
RATING DESCRIPTION
Acceptable Offer clearly meets the minimum requirements of the solicitation.
Unacceptable Offer does not clearly meet the minimum requirements of the solicitation.
Note: Any offeror receiving a rating of “Unacceptable” for Technical Capability will no longer be considered for award.
FACTOR 2 3: PRICE:
Price will be evaluated separately from Technical and will be evaluated for fairness and reasonability in terms of the Government’s requirement. Price must be determined to be fair and reasonable. Offerors' price proposals will be evaluated to determine if the price is fair and reasonable in accordance with FAR 12.209. Pricing will be evaluated using various price analysis techniques and procedures similar to those listed in FAR 15.404-1(b) including, but not limited to, comparison of proposed price received in response to the solicitation with a comparison to the IGE.
52.217-8 Evaluation Criteria - As a part the price evaluation, the Government will evaluate the Option to Extend Services under FAR Clause 52.217-8 by adding one-half (1/2) of the offerors' final option period prices to the offerors' total contract price for the purpose of evaluation. Offerors shall not submit a price for the potential one-half extension of services period. Thus, the offerors' Total Evaluated Price (TEP) will include the total cost of the base period, all applicable option periods (OPYR 1-4) as proposed on the solicitation or most up-to-date amendment and the possible (6) month extension under FAR Clause52.217-8. The TEP will be assessed in accordance with the guidelines in 15.404to determine that the price is fair, reasonable, and balanced.
(End of Provision)
Solicitation W91QV1-26-R- A068 Q&A
1. PWS §1.2, §5.1(3), §5.4.1 — Existing exacqVision head end. Please provide the specifications of the existing exacqVision server and storage so that camera licenses and storage can be sized correctly: server model and exacqVision software version; license tier (Enterprise, Professional or Start); number of IP camera channel licenses currently installed and how many are unused; status and expiration date of the Software Subscription Agreement (SSA) / software updates plan; and the make, model and usable capacity of the network-attached storage.
Government Answer:
Software Name: Exacqvision Software Version: 25.1.7.0 Expiration Date: September 29, 2026
2. PWS §5.4.1 — License scope. Please confirm whether the per-camera IP licenses under §5.4.1 are to be furnished for all replacement cameras, or only for the number of cameras that exceed the unused licenses already on the server.
Government Answer: Per-camera IP licenses under §5.4.1 are to be furnished
3. PWS §1.2, §5.2.2 — Retention. Please confirm the required video retention period and the recording mode (continuous, motion-based, or a combination). If the retention requirement is on the order of three years, please state whether expansion of the existing storage is within the contractor's scope or will be furnished by the Government.
Government Answer: This will be furnished by the maintenance contract, not the upgrade contract.
TECHNICAL — CAMERA TYPES, LENSES AND RESOLUTION
4. PWS §5.2.2 — Resolution. Paragraph 5.2.2 states a minimum of 1080p (approximately 2 megapixels). Please confirm the resolution the Government wants furnished — 2 MP minimum as stated, or a higher resolution such as 4 MP or 5 MP — and whether a higher resolution will be evaluated as exceeding the minimum only, or is expected. Resolution drives bandwidth and storage against the retention requirement in question 3.
Government Answer: The minimum in 2MP.
5. PWS §1.3, §5.2.4, §5.2.5 — Camera form factors. Paragraph 5.2 describes fixed-lens dome cameras and paragraph 1.3 references one outdoor fisheye. Please confirm the camera types wanted by location: standard fixed-lens domes throughout, or a mix that includes 180° panoramic, 360° fisheye, or multi-sensor cameras in corridors, large rooms or open laboratory areas. If a mix is intended, please provide the quantity of each type, or confirm that offerors may propose the mix based on the walk-through and the existing camera positions.
Government Answer: We prefer what we have currently have but you can propose.
6. PWS §5.2.4 — Lens type. Paragraph 5.2.4 requires a fixed lens. Please confirm whether a varifocal (remote-adjustable) lens is acceptable or preferred where it allows the field of view to be set precisely at commissioning, and whether digital zoom (in live view and in recorded video) is a requirement, a preference, or not evaluated.
Government Answer: Prefer fixed lens.
7. PWS §1.3 — Outdoor camera. Please confirm the exact location of the outdoor camera (building elevation, entrance or area to be covered, approximate mounting height), the intended field of view (for example, a single 360° fisheye at the main entrance versus a 180° panoramic along a facade), and whether the existing outdoor camera position, mount and cable pathway are to be reused.
Government Answer: Entrance at the existing camera position.
TECHNICAL — CABLING, NETWORK AND BUILDING
8. PWS §1.2, §5.3 — Cable pathways and distances. Please confirm the location of the head end and whether any camera run exceeds the Category 6 limit of 100 m (295 ft). If any run exceeds that distance, please state whether intermediate distribution points, PoE switches and fiber uplinks are within the contractor's scope.
Government Answer: No camera length will exceed 295ft.
9. PWS §5.3, §6(9) — Pathway method. Please confirm the required installation method for the new Category 6 cabling above the ceilings and in the risers: whether the cable must be installed in conduit (and if so, EMT or another type, and whether existing conduit may be reused), or whether plenum-rated cable supported on J-hooks, cable tray or other open supports above the ceiling is acceptable. Please also confirm whether the existing coaxial pathways and any existing cable tray may be reused, and whether exposed cable in finished laboratory spaces must be in conduit or surface raceway.
Government Answer: It must be Plenum rated.
10. PWS §5.2.1, §5.3.2 — Network equipment. Please confirm who furnishes the PoE network switches, rack space and UPS required to power and connect the new IP cameras, and whether any contractor-furnished network equipment must meet RMF/ATO or DISA STIG requirements before connection (PWS §6(14), §6(15)).
Government Answer: The contractor
11. PWS §5.3, §3.1 — Location of additional switches. If additional network switches are required to serve camera positions that cannot reach the head end directly (in particular at the basement level), please identify where the Government will permit them to be installed — an existing telecommunications room or rack, a wall-mount enclosure, or another location
— and confirm that power and a network connection back to the head end will be available at that location, or whether providing them is contractor scope.
Government Answer: Not Needed.
12. PWS §1.4, §5.3 — Floor-to-floor penetrations. Where new cable routes require penetrations through walls, floors or fire-rated assemblies to connect between floors, please confirm (a) whether the contractor may create new penetrations, (b) any approval or permit process required before coring or drilling, and (c) who is responsible for patching, painting and fire-stopping the penetrations and for repairing any finishes disturbed by the work.
Government Answer: (a)New penetration will need to be created. (b) No approval for drilling. Only site Facility approval is needed no permit is required. The contractor is responsible for firestop.
13. PWS §1.4, §4.3.3 — Ceiling tiles and finishes at removed cameras. Please confirm the required treatment of the ceiling tiles, wall surfaces and mounting locations left by the removed analog cameras and coaxial cabling: whether the contractor is to replace the affected ceiling tiles with new matching tiles, blank and patch the openings, or leave them in place, and whether the Government will furnish matching tiles.
Government Answer: The Government will furnish matching tiles
TECHNICAL — SCOPE, QUANTITIES AND SITE ACCESS
14. PWS §1.2 vs. §1.3 — Camera count. Paragraph 1.2 inventories 54 analog cameras plus 1 IP camera; paragraph 1.3 refers to "obsolete analog cameras, one outdoor fisheye camera and associated cabling." Please confirm the total number of camera positions to be furnished (55 or 56) and whether the existing IP camera and the outdoor fisheye are to be replaced.
Government Answer: Total 55 cameras. 54 indoor and one IP camera at the front door/outside. The rear fisheye camera does not need replacement.
15. PWS §1.6.3, §1.6.4 — Work hours. The PWS states the contractor may work 7:30 a.m. to 4:00 p.m., Monday through Friday. Please confirm whether work inside the laboratory spaces is permitted during those hours while testing is under way, whether any areas are available only outside normal duty hours or on weekends, and whether the Government will permit after-hours work if needed to reduce disruption to laboratory operations.
Government Answer: Work inside the lab is permitted with escort in certain area. No particular area is available only outside normal duty hours or on weekends. After hour work is permitted for reasonable large workload and/or intrusive work in nature, at Laboratory’s discretion.
16. PWS §1.2, §1.6.7 — Working in the laboratories. Please describe the procedures for contractor work inside the forensically sensitive laboratory areas: escort requirements; whether the laboratory must be shut down, sealed or evidence secured while ceilings are opened; any required personal protective equipment, gowning or contamination controls; restrictions on tools, ladders, lifts or dust-producing work in laboratory spaces; and whether work must be scheduled around specific testing activities. Please also state whether a daily or weekly work schedule must be submitted for approval by the COR.
Government Answer: Must be escorted in forensic areas. All access must be coordinated with lab ahead of time. No PPE required. Work will be scheduled around certain activities, such as inspections.
17. PWS §1.6.7.2, §1.6.12 — Door access for multiple crews. Camera positions are spread across four floors and several controlled areas. Please confirm how contractor personnel will be given access to all rooms and doors where work is required — Government-issued key cards or keys under §1.6.7.2, a Government escort per crew, or doors unlocked on request — and whether the Government can support two or three crews working on different floors at the same time. If escorts are required, please state how many escorts can be made available per day, since this determines the installation schedule
Government Answer: Contractors will be escorted to access forensic areas. Not needed for admin area. Unable to determine the how many escorts are available at this time.
18. PWS §1.2 — Continuity of coverage. Is continuous camera coverage required in forensically sensitive areas during the changeover? If so, is phased cutover or temporary coverage a contractor responsibility?
Government Answer: Not required. Cutover plan should be negotiated between lab and contractor prior to the executions.
19. PWS §4.3 — Removed equipment. Please confirm the disposition of the removed cameras and coaxial cabling (turned over to the Government or disposed of by the contractor) and whether any media sanitization requirement applies.
Government Answer: Disposed of by the contractor.
TECHNICAL — SOLICITATION REFERENCES
20. Section L, Technical Capability/Approach — References to PWS §5.1 through §5.7 and Technical Exhibits 1, 2 and 3. The PWS attached to the solicitation contains §5.1 through §5.5 and no Technical Exhibits. Please provide the Technical Exhibits and §5.6–§5.7, or confirm that the narrative should address §5.1–§5.5 only.
Government Answer: See revised addendum.
21. Section L, Technical Capability/Approach — Reference to "52.212-2 Addendum, subfactors 1 and 2." The 52.212-2
Addendum lists Factor 1 (Technical Capability) and Factor 3 (Price) without subfactors. Please confirm what subfactors 1 and 2 are, or that no subfactor submission is required.
Government Answer: See revised addendum.
22. Section L, Part I — Page limits. Please confirm that the five-page limit applies to the technical narrative including past performance, and that the detailed equipment list is excluded from the page count.
Government Answer: The five pages applies to the technical narrative. Detailed equipment lists are excluded.
PRICE AND CONTRACT
23. Section B, Section F, PWS §1.5 — Period of performance. Section F states a delivery date on or before 25 September 2026 and a period of performance of 25 September 2026 through 24 September 2027; PWS §1.5 states delivery and installation 30 to 90 days after the initial order. Please confirm the intended delivery schedule.
Government Answer: 30-90 days is sufficient. Please specify a delivery window you can provide.
24. Section L, 52.212-2 Addendum — Option evaluation. The addendum references evaluation of an option under FAR
52.217-8. Section B contains a single firm-fixed-price CLIN with no option periods. Please confirm that no option pricing is required.
Government Answer: There is no option period. See revised copy
25. Section I / PWS Part 6 — Wage determination. No Service Contract Act or Davis-Bacon wage determination is included in the solicitation. Please state which wage determination, if any, applies, and provide the WD number.
Government Answer: Wage determination is not applicable to this requirement. This is nonconstruction contract more than $2,000 involving some construction work contract IAW FRO 22.402-1(2)(b)
26. SF 1449 Block 10 — Set-aside. Please confirm whether this solicitation is a total small business set-aside, and whether it has been or will be posted to SAM.gov.
Government Answer: This is 100% total small business set-aside and has been posted to SAM.gov
27. Section L, paragraph 9 — Closing time. The closing time is stated as 10:00 AM EST on 8 September 2026. Please confirm this is 10:00 AM Eastern Daylight Time.
Government Answer: 10AM EDT
28. Section K / Section L, Part II — Representations. Please confirm that current representations and certifications in SAM.gov satisfy the requirement to submit FAR 52.212-3 with the offer, and whether a signed SF 1449 is required as part of the submission.
Government Answer: Yes, a signed SF1449 is required with submission. Your current SAM.gov representations and certifications satisfy the requirement.
29. Topic: Technical – Camera quantities Reference: PWS Sections 1.2, 1.3, 1.4, and 5.1The PWS describes an existing system consisting of 54 analog cameras and one IP camera and separately references one outdoor fisheye camera. Please confirm the total number and types of cameras to be removed, replaced, retained, and licensed.
Government Answer: Total 55 cameras. 54 indoor and one IP camera at the front door/outside. The rear fisheye camera
30. Topic: Technical – Camera specifications Reference: PWS Sections 1.3, 5.2.4, and 5.2.5The PWS requires fixed-lens, dome-encased cameras but also references an outdoor fisheye camera. Please provide the minimum specifications, form factor, and environmental rating required for the fisheye or other exterior camera.
Government Answer: The exterior fisheye camera will not be replaced.
31. Topic: Technical – Camera locations and cabling Reference: PWS Sections 1.2, 1.4, 5.1, and 5.3 Please provide, if available, floor plans, camera locations, approximate cable-run lengths, cable pathways, ceiling types, penetration and firestopping requirements, and any lift or special-access requirements.
Government Answer: The lab can provide the information onsite. This should be answered during onsite visit. For security reason, the lab cannot provide a copy of the floor plans and camera locations.
32. Topic: Technical – Existing head-end system Reference: PWS Sections 1.2, 5.1, 5.3.2, and 5.4.1. Please provide the model numbers and software versions of the existing exacqVision recorders, exacqVision Enterprise video-management system, network switches, and related head-end equipment. Please also identify available PoE capacity and any approved camera compatibility list.
Government Answer: IT. Software Name: Exacqvision Software Version: 25.1.7.0 Expiration Date: September 29, 2026
33. Topic: Technical/Schedule – Performance period Reference: Solicitation Sections C and F; PWS Section 1.5 Sections C and F establish a period of performance from September 25, 2026, through September 24, 2027, and Section F lists delivery on or before September 25, 2026. PWS Section 1.5 states that delivery and installation will occur 30–90 days after the initial order. Please confirm the required delivery date, installation period, and final completion date.
Government Answer: delivery and installation will occur 30–90 days after the initial order
34. Topic: Technical – Proposal instructions Reference: Section L, Part I, “Technical Capability/Approach”; PWS Part 5. Section L directs offerors to address PWS Sections 5.1 through 5.7 and Technical Exhibits 1, 2, and 3. The supplied PWS appears to end its specific tasks at Section
5.5 and does not include Technical Exhibits 1–3. Please confirm the PWS sections and technical exhibits that offerors must address.
Government Answer: See attached revised copy.
35. Topic: Price – FAR 52.217-8 evaluation Reference: Section M, Addendum to FAR 52.212-2, Factor 3, “52.217-8 Evaluation Criteria”; Section B, CLIN 0001. The evaluation language provides for adding one-half of the final option-period price when evaluating an extension of services.
Section B contains one firm-fixed-price CLIN and does not identify any option periods. Please confirm whether FAR 52.217-8 and its associated evaluation methodology apply to this requirement.
Government Answer: There is no option period.
36. Topic: Technical/Administrative – Site visit Reference: Section L, Paragraph 8, Submission of Offers; PWS Sections 1.2, 1.4, and 1.6.5. The solicitation does not identify a site visit. Will the Government conduct a site visit before proposals are due? If so, please provide the date, registration procedure, attendance limitations, and facility-access requirements.
Government Answer: There was site visits scheduled upon submissions of responses to the sources sought notice that was posted in SAM.gov. There will be no further site visits scheduled at this time.
37. Topic: Technical – Disposition of removed equipment Reference: PWS Sections 1.4, 3.5, 4.3.1, and 5.1. Please confirm whether removed cameras, coaxial cabling, and associated equipment must be returned to the Government, stored onsite, recycled, or disposed of by the contractor.
Government Answer: Yes, the cameras, coaxial cabling, and associated equipment are considering Government property and all equipment SHALL remain at the Government facility.
38. Topic: Technical – Testing and acceptance Reference: PWS Sections 1.6.1, 1.6.2, 2.1.13, 4.3.3, and 5.1–5.4. Please identify the required testing and acceptance criteria, including cable-certification reports, camera-view approval, system configuration, recording or retention settings, as-built drawings, equipment inventories, user training, and final turnover documentation.
Government Answer: All installed cameras must be tested and verified they are working fine.
39. Topic: Technical – ExacqVision licensing Reference: PWS Sections 1.2, 1.4, 5.1, 5.4, and 5.4.1. Please confirm the required exacqVision Enterprise license type or SKU, the total number of licenses, whether the licenses must be perpetual, and whether any existing licenses may be reused or transferred.
Government Answer: The License type is Professional
40. Topic: Administrative – Proposal closing time Reference: Standard Form 1449, Block 8; Section L, Paragraph 9; solicitation transmittal email. The solicitation states that proposals are due September 8, 2026, at 10:00 a.m. EST, while the transmittal email states 10:00 a.m. EDT. Please confirm the controlling Eastern Time deadline.
Government Answer: The solicitation closes at 10am EDT
41. I would like to do a site visit to put a proposal together for this project? When may I come onto base for it
Government Answer: See number #36 for Government answer
42. Given the one (1) business day question period and the 08 September 2026 closing date, will the Government extend the proposal due date to allow offerors sufficient time to incorporate the Government’s responses, confirm equipment availability, and finalize their technical approach?
Government Answer: Extension will not be provided.
43. Will the Government conduct a pre-proposal site visit or walk-through? Camera locations, mounting conditions, cable pathways, and head-end connection points cannot be verified without physical access to the facility
Government Answer: See number #36 for Government answer.
44. This paragraph directs offerors to address PWS Sections 5.1 through 5.7 and Technical Exhibits 1, 2, and 3. The Performance Work Statement provided as Attachment 0001 contains Specific Tasks 5.1 through 5.5 only and proceeds directly to Part 6; no Technical Exhibits are attached. Will the Government issue PWS Sections 5.6 and 5.7 and Technical Exhibits 1, 2, and 3, or confirm that Sections 5.1 through 5.5 constitute the complete requirement?
Government Answer: See number #34 for Government answer.
45. Does the five (5) page technical limitation include the offeror’s past work experience, or may past performance information be submitted as a separate document? Please confirm that manufacturer datasheets, compliance documentation, and the detailed equipment list are excluded from the page count.
Government Answer: No
46. The Addendum states that the Government will evaluate the Option to Extend Services by adding one-half of the offeror’s final option period price. Schedule B contains a single line item (CLIN 0001) with no option periods. Please confirm that FAR 52.217-8 is not applicable to this acquisition.
Government Answer: See number #24 for Government answer.
47. Is there a maximum email or attachment file size for electronic submission, and will the Government acknowledge receipt of offers
Government Answer: Its offeror responsibility to ensure government received timely proposal and attachments. Proposal receipt acknowledgement will be provided.
48. Section F states Delivery on or Before 25 September 2026 with a Period of Performance of 25 September 2026 through
24 September 2027. PWS 1.5 states delivery and installation 30 to 90 days after the date of the initial order. These provisions are inconsistent. Which requirement governs for purposes of the offeror’s proposed schedule.
Government Answer: See number #23 for Government answer.
49. Please confirm that the required completion period is measured in calendar days from the date of award or order issuance and identify the maximum allowable duration the Government will accept.
Government Answer: Period of performance is measured by calendar days.
50. What is the anticipated processing time for installation access approval, background checks, badging, and required training for contractor personnel at Fort Meade? Does this period run concurrently with, or in addition to, the performance period
Government Answer: Fort Meade controlled base access.
51. Is all work restricted to the normal duty day of 7:30 a.m. to 4:00 p.m., Monday through Friday, or will the Government permit or require after-hours, evening, or weekend work to minimize disruption to laboratory operations?
Government Answer: All shall be completed within Government duty hours and days.
52. PWS 1.2 and 1.3: PWS 1.2 identifies 54 analog cameras and 1 IP camera. PWS 1.3 requires replacement of the obsolete analog cameras, one outdoor fisheye camera, and associated cabling. Please confirm the exact total quantity of new IP cameras the contractor is to furnish and install.
Government Answer: Total 55 cameras. 54 indoor and one IP camera at the front door/outside. The rear fisheye camera
53. PWS 1.2 and 1.3: Is the outdoor fisheye camera identified in PWS 1.3 the same device as the single existing IP camera referenced in PWS 1.2, or is it an additional camera? Is the existing IP camera to be retained in place or replaced under this effort?
Government Answer: It is an additional camera. Total 55 cameras. 54 indoor and one IP camera at the front door/outside.
The rear fisheye camera does not need replacement.
54. PWS 5.2: Will the Government furnish floor plans, a camera schedule, or a location matrix identifying each camera position across the four floors, including interior versus exterior application, mounting surface, and mounting height?
Government Answer: Yes after the contract is awarded.
55. PWS 5.2 and 5.3: Are all new cameras to be installed at the existing camera locations, or does the Government intend to add, delete, or relocate any camera positions under this requirement?
Government Answer: All new cameras will be installed at existing camera locations.
56. PWS 5.2.5: PWS 5.2.5 requires dome-encased cameras. Do any locations require an alternate form factor, such as corner-mount, pendant, vandal-resistant, or outdoor-rated housings? Are any locations subject to environmental conditions requiring a specific ingress protection or impact rating?
Government Answer: No.
57. PWS 5.2.4: PWS 5.2.4 requires fixed lens cameras. Will the Government provide the required field of view or coverage area for each camera location, or will fields of view be established in coordination with the COR during installation?
Government Answer: During the installation.
58. PWS 1.2 and 5.4.1: Please provide the current exacqVision software version, the X-Series recorder model, and the existing license tier (Professional or Enterprise). Is the exacqVision Software Subscription Agreement (SSA) current, and which party is responsible for its renewal?
Software Version: 25.1.7.0
NVR: EXACQ IP08-240T-R2XW-E
Subscription is current
59. PWS 5.4.1: How many per-camera IP licenses are required? Do any existing licenses transfer to the replacement cameras, or must the contractor furnish a new license for every camera installed?
Government Answer: All newly installed cameras will require new license keys.
60. PWS 1.2 and 5.4.1: Does the existing X-Series recorder have sufficient channel capacity, processing capability, and throughput to support the full IP camera count at the PWS 5.2.2 parameters (1080p, H.265/HEVC, 15 FPS, 1 Mbps average bitrate)? If not, is head-end hardware upgrade within the scope of this requirement?
Government Answer: Yes.
61. PWS 1.2: PWS 1.2 identifies a 500 TB Network Attached Storage server. What video retention period, expressed in days, is the system required to maintain following conversion to IP cameras?
Government Answer: 1095 Days.
62. PWS 1.2 and 4.1: The existing system uses a central encoder. Is the contractor responsible for removing the existing analog encoders? If so, are removed encoders to be turned over to the Government or disposed of by the contractor?
Government Answer: Turn over to the government.
63. PWS 5.4.1: Which party is responsible for exacqVision server-side configuration, camera addition, stream configuration, and recording schedule setup — the contractor, the Government, or the Government’s VMS support vendor?
Government Answer: A separate contract being solicited.
64. PWS 3.4, 4.1, and 5.3: Will the Government furnish PoE network switches and available switch ports for the new IP cameras, or is the contractor required to furnish switching equipment? If Government-furnished, how many ports and what PoE power budget are available?
Government Answer: The government will not provide PoE network switches.
65. PWS 4.1: Are patch panels, rack space, uninterruptible power supply capacity, and network terminations existing and available for contractor use, or is the contractor to furnish this infrastructure?
Government Answer: Items listed above should be provided by the contractor.
66. PWS 5.3: May the existing coaxial cable pathways, conduits, sleeves, and penetrations be reused for the new Category 6 cabling? Is plenum-rated cable required in any area of the facility?
67. PWS 5.3.1: Are any camera locations situated more than 90 meters of cable distance from the nearest telecommunications room or intermediate distribution frame? If so, will the Government provide intermediate distribution locations with available power and rack space?
68. PWS 4.1 and 5.1: Is the contractor required to remove the existing coaxial cabling in its entirety, or may abandoned cable remain in place where removal is impractical or would damage finishes? If full removal is required, are there asbestos, lead, or other hazardous material considerations in the affected pathways?
Government Answer: Remove the existing coaxial cabling in its entirety.
69. PWS 5.1: Is the contractor responsible for patching, painting, ceiling tile replacement, or other restoration of finishes disturbed during removal and installation?
Government Answer: Same question above.
70. PWS 5.4.1: Which party provides IP addressing, VLAN assignment, DHCP or static address ranges, and network credentials for the new cameras? Will the cameras reside on a dedicated physical or logical security network?
Government Answer: The contractor. This new cameras system will not interface with our network.
71. PWS Part 6, items (3), (5), (13), (14), and (15): Will the new IP cameras reside on a Government-managed network requiring Risk Management Framework authorization and DISA Security Technical Implementation Guide compliance?
Which party is responsible for accreditation, device hardening, and STIG application — the contractor or the Government?
Government Answer: The government.
72. PWS Part 6: Does the Government maintain an approved products list, an approved firmware baseline, or a required cybersecurity configuration standard for IP cameras connected to this network? If so, please provide it.
73. PWS Part 6, item (12), DoDD 8140.01: Are contractor personnel performing camera configuration, network connection, or VMS integration required to hold DoD 8140 cyber workforce certifications? If so, please identify the specific certification levels required.
Government Answer: Not Required.
74. Section I, DFARS 252.204-7012: Will the contractor receive, store, generate, or transmit Covered Defense Information in the performance of this contract? Is a DD Form 254 applicable, and is a current NIST SP 800-171 self-assessment posted in SPRS a condition of award?
Government Answer: Not Required.
75. PWS 5.1 and Part 6: Will the contractor be required to submit camera and network configuration documentation for Government cybersecurity review prior to placing devices on the network? If so, what is the anticipated review duration, and does it count against the performance period?
Government Answer: These cameras will not be on our network.
76. PWS 1.2 and 1.3: PWS 1.2 states that forensic integrity of testing activities is essential to the legal defensibility of drug test results. Is any interruption of recording coverage permitted in forensically sensitive areas during the analog-to-IP migration? If so, what is the maximum allowable outage duration per camera or per area, and does the Government require advance written notice of planned outages?
Government Answer: Advanced notice required.
77. PWS 1.2 and 5.1: Will the Government accept a phased, area-by-area cutover in which existing analog cameras remain operational until the replacement IP camera in that area is installed, licensed, and verified recording? If so, does the Government require the contractor to maintain temporary coverage in any area where this is not achievable?
Government Answer: Yes. No need to maintain temporary coverage.
78. PWS 1.6.7: Are contractor personnel required to be escorted in any portion of the facility? If so, will the Government furnish escorts at no cost to the contractor, and during what hours will escorts be available?
Government Answer: Government POC will be provided at award for escorting as necessary.
79. PWS 1.6.7 and 1.6.15: Please identify the specific access requirements for contractor personnel, including background check standards, required forms and lead times, whether a Common Access Card is required, and whether U.S.
citizenship is required for personnel performing on site.
Government Answer: All contractor names must be submitted to security at least one week before the project starts.
80. PWS 1.6.14: Beyond the contractor-issued identification badge required by PWS 1.6.14, will contractor personnel be issued installation or facility access badges, and what is the anticipated issuance timeline?
Government Answer: No, FTDTL identification badges will be issued to each contractor at the start of the day.
81. PWS 5.1.1 and 5.2: Please confirm that any manufacturer’s camera meeting the performance requirements of PWS 5.2, NDAA Section 889 compliance, and exacqVision Enterprise compatibility is acceptable, and that no specific camera manufacturer is required.
Government Answer: All contractors shall follow Section 889.
82. Section I, DFARS 252.225-7001: Will end products manufactured in non-qualifying countries be acceptable under the Buy American and Balance of Payments Program, subject to the applicable evaluation factor? Please confirm the country-of-origin documentation the Government requires with the offer.
Government Answer: Buy America Act applies to the acquisition of supplies and services.
83. PWS 5.1.1: Does the Government require a minimum warranty period beyond the standard OEM warranty? What workmanship warranty duration does the Government require on installation labor?
Government Answer: Minimum manufacture warranty shall be provided.
84. PWS 1.6.1: Is the written Quality Control Plan required to be submitted with the offer, or is submission following award acceptable? If required with the offer, does it count against the five (5) page technical limitation?
Government Answer: Quality Control plan count towards factor 1(c) (1) be submitted with the offer.
85. PWS 1.6.13: PWS 1.6.13 lists Key Personnel as "TBD." Does the Government intend to designate key personnel positions, and are there minimum qualifications, certification, or experience requirements that must be addressed in the technical proposal?
Government Answer: This section is for Government personnels. Contractor shall provide one POC.
86. PWS 5.1 and 5.4: Are as-built drawings, a camera location and addressing schedule, operation and maintenance documentation, or end-user training required deliverables? Neither training nor closeout documentation is identified in the PWS. If required, please identify the format, quantity, and delivery timeframe.
Government Answer: As-built drawings and camera location and addressing schedule should be provided to the laboratory two weeks prior to the installation.
87. PWS 5.1 and 5.4: What testing and acceptance criteria will the Government apply? Does the Government require documented Category 6 cable certification test results, and will a formal joint acceptance inspection be conducted at completion?
88. Sections B, C, and L: No Service Contract Act or Davis-Bacon Act wage determination is included in the solicitation.
Please confirm whether either statute applies to the installation labor under this requirement, and if so, provide the applicable wage determination.
Government Answer: See number #25 for Government answer
89. Please confirm requirements for Key Personnel Contract Manager/Project Manager, does this position need to be on-site at all times during the installation work, or just available as needed?
Government Answer: The resulting contract from this solicitation will be for firm fixed price. LoE is offerors responsibility.
90. Please confirm parking for up to two contractor vehicles will be available.
Government Answer: Packing is available on site
91. Please define delivery/access for materials, how are equipment deliveries handled to the building and what inspections must occur?
Government Answer: Delivery is to be made at the rear of the building at the loading dock.
92. Please clarify if the existing cabling infrastructure (i.e. conduits or cable tray) is to be reused or do new conduits need to be installed to each of the camera locations?
Government Answer: Not needed
93. If conduits are not desired, are the ceilings accessible and may the cable be run via J-hooks or other means?
Government Answer: The ceilings are accessible.
94. Are there any other current or planned construction efforts taking place during the expected period of performance which the contractor will need to coordinate activities with?
95. Please clarify what existing equipment at the head end shall remain, and what shall be replaced with new equipment.
Does any new monitoring equipment (Displays, KVM, etc) need to be provided?
Government Answer: Everything need to be replace.
96. Please clarify if the existing-to-remain NVR has an active software subscription agreement or if a catch-up/renewal software is required?
Government Answer: There is an active subscription on the NVR.