This document is a Questions and Answers Excel file for the Joint Base Myer-Henderson Hall (JBMHH) Paint Indefinite Delivery/Indefinite Quantity (IDIQ) contract, Solicitation Number W91QV125RA006. The pricing model details comprehensive painting and repair services for various surfaces, including plaster, gypsum wallboard, interior and exterior walls, wood surfaces, doors, and metal components. The contract covers five ordering periods with estimated quantities for occupied and unoccupied spaces, with specific line items for repairs ranging from crack and hole patching to full surface replacements and painting.
Key contract details include a requirement for two-proposal submission (one redacted, one unredacted), work to be performed at standard height (less than 20 feet) with additional provisions for second to third story improvements, and a focus on miscellaneous painting repairs. The government will not provide storage or staging areas, and the contract emphasizes that existing improvement restoration or complete reconstruction is not included. Pricing is to be submitted for the base year only, with an escalation rate option, and task orders will be issued as firm-fixed price orders against the contract's ceiling. The solicitation is issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Sam Houston, with proposals subject to a Lowest Price Technically Acceptable evaluation methodology.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFIs Paint IDIQ 20250724 Revised-Response RH.pdf | ||
| Solicitation - W91QV125RA006_Vendor Copy.pdf | ||
| Pricing Model.xlsx | XLSX spreadsheet | |
| SOW Paint IDIQ.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ Pricing
| CLIN | |||||||||||||||||||
| NO. | SUPPLIES / SERVICES : Painting IDIQ | ORDERING PERIOD 1 | ORDERING PERIOD 2 | ORDERING PERIOD 3 | ORDERING PERIOD 4 | ORDERING PERIOD 5 | |||||||||||||
| 0001 Repair cracks in plaster and gypsum wallboard surfaces | BSA RFIS | SPREADSHEET RFI RESPONSE - 28 JUL 25 | JBM-HH Estimated Quantities | Populate this Column Only with UNIT COST | PRICE | 7,735 | UNIT COST | PRICE | JBM-HH Estimated Quantities | UNIT COST | PRICE | JBM-HH Estimated Quantities | UNIT COST | PRICE | JBM-HH Estimated Quantities | UNIT COST | PRICE | ||
| 0001 | Repair cracks in plaster and gypsum wallboard surfaces (up to 1"wide) OCCUPIED. Per Linear Foot - Minimum 1 foot. | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 7,735 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | ||
| 0001 | Repair cracks in plaster and gypsum wallboard surfaces (up to 1"wide) UNOCCUPIED - Per Linear Foot - Minimum 1 foot. | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 12,885 | $ 0.00 | 12,885 | $ 0.00 | $ 0.00 | 12,885 | $ 0.00 | $ 0.00 | 12,885 | $ 0.00 | $ 0.00 | 12,885 | $ 0.00 | $ 0.00 | ||
| 0002 Patch holes in gypsum wallboard and plaster surfaces. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Patch holes in gypsum wallboard and plaster surfaces (holes 1" to 12" diameter) OCCUPIED. Per Linear Foot - Minimum 1 foot. | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 1,051 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | ||
| 0001 | Patch holes in gypsum wallboard and plaster surfaces (holes 1" to 12" diameter) UNOCCUPIED - Per Linear Foot - Minimum 1 foot. | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0003 Repair plaster system, including removal and disposal of old plaster system, and apply new plaster system | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Repair plaster system, including removal and disposal of old plaster system, and apply new plaster system (Durabond 90 or equivalent).OCCUPIED - Per square Foot - Minimum 1 foot | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 1,056 | $ 0.00 | 1,056 | $ 0.00 | $ 0.00 | 1,056 | $ 0.00 | $ 0.00 | 1,056 | $ 0.00 | $ 0.00 | 1,056 | $ 0.00 | $ 0.00 | ||
| 0001 | Repair plaster system, including removal and disposal of old plaster system, and apply new plaster system (Durabond 90 or equivalent) - Per square Foot - Minimum 1 foot. | ||||||||||||||||||
| UNOCCUPIED | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | |||
| 0004 Replace plaster finish coat, clean, apply new finish coat. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Replace plaster finish coat, clean, apply new finish coat including accelerator. (Durabond 90 or equivalent) OCCUPIED. - Per square Foot - Minimum 1 foot. | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 1,060 | $ 0.00 | 1,060 | $ 0.00 | $ 0.00 | 1,060 | $ 0.00 | $ 0.00 | 1,060 | $ 0.00 | $ 0.00 | 1,060 | $ 0.00 | $ 0.00 | ||
| 0001 | Replace plaster finish coat, clean, apply new finish coat including accelerator. (Durabond 90 or equivalent) UNOCCUPIED - Per square Foot - Minimum 1 foot. | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 1,246 | $ 0.00 | 1,246 | $ 0.00 | $ 0.00 | 1,246 | $ 0.00 | $ 0.00 | 1,246 | $ 0.00 | $ 0.00 | 1,246 | $ 0.00 | $ 0.00 | ||
| 0005 Replace gypsum wallboard including removal and disposal of old drywall. Install new drywall 1/2" or 5/8" including jointing, spackling, sanding and | |||||||||||||||||||
| taping. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Replace gypsum wallboard including removal and disposal of old drywall. Install new drywall 1/2" or 5/8" including jointing, spackling, sanding and taping. OCCUPIED - Per square Foot - Minimum 1 foot. | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 1,051 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | ||
| 0001 | Replace gypsum wallboard including removal and disposal of old drywall. Install new drywall 1/2" or 5/8" including jointing, spackling, sanding and taping. UNOCCUPIED - Per square Foot - Minimum 1 foot. | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0006 Install new drywall, 1/2" or 5/8" including jointing spackling, sanding and taping. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Install new drywall, 1/2" or 5/8" including jointing spackling, sanding and taping. OCCUPIED - Per square Foot - Minimum 1 foot. | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 1,051 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | ||
| 0001 | Install new drywall, 1/2" or 5/8" including jointing spackling, sanding and taping. UNOCCUPIED - Per square Foot - Minimum 1 foot. | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0007 Apply 1/4", 1/2" or 5/8" gypsum board over severely cracked, but sound plaster. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Apply 1/4", 1/2" or 5/8" gypsum board over severely cracked, but sound plaster. OCCUPIED - Per square Foot - Minimum 1 foot. | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0001 | Apply 1/4", 1/2" or 5/8" gypsum board over severely cracked, but sound plaster. UNOCCUPIED - Per square Foot - Minimum 1 foot. | What height we working at ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 2,585 | $ 0.00 | 2,585 | $ 0.00 | $ 0.00 | 2,585 | $ 0.00 | $ 0.00 | 2,585 | $ 0.00 | $ 0.00 | 2,585 | $ 0.00 | $ 0.00 | ||
| 0008 Replace missing or damaged resilient cove base | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Replace missing or damaged resilient cove base OCCUPIED - Per Linear Foot - Minimum 1 foot. | 1,051 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | ||||
| 0001 | Replace missing or damaged resilient cove base UNOCCUPIED - Per Linear Foot - Minimum 1 foot. | 1,051 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | ||||
| 0009 Install new cove base | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Install new cove base. OCCUPIED - Per Linear Foot - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||||
| 0001 | Install new cove base. UNOCCUPIED - Per Linear Foot - Minimum 1 foot. | 15,553 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | ||||
| 0010 Replace putty and glazing around windows. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Replace putty and glazing around windows. UNOCCUPIED - Per Linear Foot - Minimum 1 foot. | at what height is this ? Are we also replacing the glass ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. Replacement of windows not included in contract SOW. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0001 | Replace putty and glazing around windows. OCCUPIED- Per Linear Foot - Minimum 1 foot. | at what height is this ? Are we also replacing the glass ? | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. Replacement of windows not included in contract SOW. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0011 Paint exterior concrete masonry units, latex. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Paint exterior concrete masonry units, latex. One coat - Per square Foot - Minimum 1 foot. | What prep is required ? Power wash and block filled ? Loose coating we will be included | Contractor is responsible for all means, methods, supervision and coordination to produce a quality, finished product. See SOW Section 09 90 00 Paints and Coatings, Paragraph 3.7.4, Sub-Paragraph b in SOW. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0001 | Paint exterior concrete masonry units, latex. Two coats - Per square Foot - Minimum 1 foot. | What prep is required ? Power wash and block filled ? Loose coating we will be included | Contractor is responsible for all means, methods, supervision and coordination to produce a quality, finished product. See SOW Section 09 90 00 Paints and Coatings, Paragraph 3.7.4, Sub-Paragraph b in SOW. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0012 Exterior ferrous surfaces, exposed, unless otherwise specified. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Exterior ferrous surfaces, exposed, unless otherwise specified. One coat. (Exterior oil base paint) - Per square foot. - Minimum 1 foot. | we are going to price alkyd oil base paint because oil based is being replace by alkyd . What could be ? Stairs, railings or posts or lintels specify what ? And at what height ? | Material Standards shall meet or exceed Section 09 90 00 Paints and Coatings, Paragraph 1.2 References (industry standards), including other Sections within the SOW. Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 12,463 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | ||
| 0001 | Exterior ferrous surfaces, exposed, unless otherwise specified. Two coats. (Exterior oil base paint)- Per square foot. - Minimum 1 foot. | is this prime and two coats or just two finish coats ? | Contractor shall meet or exceed industry standards stated in Section 09 90 00 Paints and Coatings, Paragraph 1.2 References in SOW. | 12,463 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | ||
| 0001 | Exterior ferrous surfaces, exposed. One coat - Per square foot. - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||||
| 0001 | Exterior ferrous surfaces, exposed. Two coats - Per square foot. - Minimum 1 foot. | 104,133 | $ 0.00 | 104,133 | $ 0.00 | $ 0.00 | 104,133 | $ 0.00 | $ 0.00 | 104,133 | $ 0.00 | $ 0.00 | 104,133 | $ 0.00 | $ 0.00 | ||||
| 0001 | Exterior ferrous surfaces, exposed unless otherwise specified. One coat - Per square foot - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||||
| 0013 Exposed interior/exterior silicone/latex caulking compound. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Exposed interior/exterior silicone/latex caulking compound. OCCUPIED - Per Linear Foot - Minimum 1 foot. | is it outside ? At what hight , interior is different than exterior to price. | Task Orders can include exposed interior, exterior silicone, and/or latex caulking. Contractor required to select materials that meet or exceed standards for improvement location. | 1,051 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | ||
| 0001 | Exposed interior/exterior silicone/latex caulking compound. UNOCCUPIED - Per Linear Foot - Minimum 1 foot. | is it outside ? At what hight , interior is different than exterior to price. | Task Orders can include exposed interior, exterior silicone, and/or latex caulking. Contractor required to select materials that meet or exceed standards for improvement location. | 15,975 | $ 0.00 | 15,975 | $ 0.00 | $ 0.00 | 15,975 | $ 0.00 | $ 0.00 | 15,975 | $ 0.00 | $ 0.00 | 15,975 | $ 0.00 | $ 0.00 | ||
| 0014 Interior concrete masonry units, plaster gypsum board, and concrete, except concrete floors, unless otherwise specified. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Interior concrete masonry units, plaster gypsum board, and concrete, except concrete floors, unless otherwise specified. One coat. OCCUPIED - Per square foot. - Minimum 1 foot. | what height ? Is it offices or ceilings ? Assuming one coat finish paint no prime. | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. |
Task Order(s) shall specify improvements to be painted.
| Contractor shall meet or exceed industry standards stated in Section 09 90 00 Paints and Coatings, Paragraph 1.2 References in SOW. | 31,106 | $ 0.00 | 31,106 | $ 0.00 | $ 0.00 | 31,106 | $ 0.00 | $ 0.00 | 31,106 | $ 0.00 | $ 0.00 | 31,106 | $ 0.00 | $ 0.00 | |
| 0001 | Interior concrete masonry units, plaster gypsum board, and concrete, except concrete floors, unless otherwise specified. One coat. UNOCCUPIED - Per square foot. - Minimum 1 foot. | what height ? Is it offices or ceilings ? Assuming one coat finish paint no prime. | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. |
Task Order(s) shall specify improvements to be painted.
| Contractor shall meet or exceed industry standards stated in Section 09 90 00 Paints and Coatings, Paragraph 1.2 References in SOW. | 155,540 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | |
| 0001 | Interior concrete masonry units, plaster gypsum board, and concrete, except concrete floors, unless otherwise specified. Two coats. OCCUPIED - Per square foot. - Minimum 1 foot. | what height ? Is it offices or ceilings ? Assuming two coat finish paint no prime. | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. |
Task Order(s) shall specify improvements to be painted.
| Contractor shall meet or exceed industry standards stated in Section 09 90 00 Paints and Coatings, Paragraph 1.2 References in SOW. | 423,536 | $ 0.00 | 423,536 | $ 0.00 | $ 0.00 | 423,536 | $ 0.00 | $ 0.00 | 423,536 | $ 0.00 | $ 0.00 | 423,536 | $ 0.00 | $ 0.00 | |
| 0001 | Interior concrete masonry units, plaster gypsum board, and concrete, except concrete floors, unless otherwise specified. Two coats. - Per square foot. - Minimum 1 foot. | ||||||||||||||
| UNOCCUPIED | what height ? Is it offices or ceilings ? Assuming 2 coat finish paint no prime. | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. |
Task Order(s) shall specify improvements to be painted.
| Contractor shall meet or exceed industry standards stated in Section 09 90 00 Paints and Coatings, Paragraph 1.2 References in SOW. | 10,506 | $ 0.00 | 10,506 | $ 0.00 | $ 0.00 | 10,506 | $ 0.00 | $ 0.00 | 10,506 | $ 0.00 | $ 0.00 | 10,506 | $ 0.00 | $ 0.00 | |
| 0001 | Interior concrete masonry units, plaster gypsum board, and concrete, except concrete floors, unless otherwise specified. Three coats. - Per square foot. - Minimum 1 foot. | ||||||||||||||
| UNOCCUPIED | assuming 1 coat primer and 2 finish coats. | Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. |
Task Order(s) shall specify improvements to be painted.
| Contractor shall meet or exceed industry standards stated in Section 09 90 00 Paints and Coatings, Paragraph 1.2 References in SOW. | 209,000 | $ 0.00 | 209,000 | $ 0.00 | $ 0.00 | 209,000 | $ 0.00 | $ 0.00 | 209,000 | $ 0.00 | $ 0.00 | 209,000 | $ 0.00 | $ 0.00 | |||||
| 0015 Interior walls and ceilings in shower areas, except ferrous surfaces and concrete masonry units, unless otherwise specified. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Interior walls and ceilings in shower areas, except ferrous surfaces and concrete masonry units, unless otherwise specified. Two coats. - Per square foot. - Minimum 1 foot. | latex or epoxy ? | Task Order(s) shall specify improvements to be painted. | ||||||||||||||||
| Contractor shall meet or exceed industry standards stated in Section 09 90 00 Paints and Coatings, Paragraph 1.2 References in SOW. | 8,343 | $ 0.00 | 8,343 | $ 0.00 | $ 0.00 | 8,343 | $ 0.00 | $ 0.00 | 8,343 | $ 0.00 | $ 0.00 | 8,343 | $ 0.00 | $ 0.00 | |||||
| 0016 Wood and metal interior trim, doors and windows | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Wood and metal interior trim, doors and windows. One coat. OCCUPIED - Per Linear Foot. - Minimum 1 foot. | 51,706 | $ 0.00 | 51,706 | $ 0.00 | $ 0.00 | 51,706 | $ 0.00 | $ 0.00 | 51,706 | $ 0.00 | $ 0.00 | 51,706 | $ 0.00 | $ 0.00 | ||||
| 0001 | Wood and metal interior trim, doors and windows. Two costs. OCCUPIED - Per Linear Foot. - Minimum 1 foot. | 78,393 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | ||||
| 0001 | Wood and metal interior trim, doors and windows. One coat. UNOCCUPIED - Per Linear Foot. - Minimum 1 foot. | 78,393 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | ||||
| 0001 | Wood and metal interior trim, doors and windows. Two costs. UNOCCUPIED - Per Linear Foot. - Minimum 1 foot. | 78,393 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | ||||
| 0017 Interior exposed ferrous surfaces, unless otherwise specified. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | |||||||||||||
| 0001 | Interior exposed ferrous surfaces, unless otherwise specified. One coat. OCCUPIED | does this include exposed ceilings if so ? And what height ? What about the rust ? | Task Order(s) shall specify improvements to be painted. |
Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW.
| Contractor shall meet or exceed industry standards stated in Section 09 90 00 Paints and Coatings, Paragraph 1.2 References in SOW. | 10,609 | $ 0.00 | 10,609 | $ 0.00 | $ 0.00 | 10,609 | $ 0.00 | $ 0.00 | 10,609 | $ 0.00 | $ 0.00 | 10,609 | $ 0.00 | $ 0.00 | |||||
| 0001 | Interior exposed ferrous surfaces, unless otherwise specified. Two coats. OCCUPIED | does this include exposed ceilings if so ? And what height ? | Task Order(s) shall specify improvements to be painted. | ||||||||||||||||
| Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 12,669 | $ 0.00 | 12,669 | $ 0.00 | $ 0.00 | 12,669 | $ 0.00 | $ 0.00 | 12,669 | $ 0.00 | $ 0.00 | 12,669 | $ 0.00 | $ 0.00 | |||||
| 0001 | Interior exposed ferrous surfaces, unless otherwise specified. One coat. UNOCCUPIED | does this include exposed ceilings if so ? And what height ? | Task Order(s) shall specify improvements to be painted. | ||||||||||||||||
| Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 7,416 | $ 0.00 | 7,416 | $ 0.00 | $ 0.00 | 7,416 | $ 0.00 | $ 0.00 | 7,416 | $ 0.00 | $ 0.00 | 7,416 | $ 0.00 | $ 0.00 | |||||
| 0001 | Interior exposed ferrous surfaces, unless otherwise specified. Two coats. UNOCCUPIED | does this include exposed ceilings if so ? And what height ? | Task Order(s) shall specify improvements to be painted. | ||||||||||||||||
| Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | |||||
| 0001 | Interior galvanized surfaces, unless otherwise specified, two coats of paint to match adjacent areas. OCCUPIED | does it mean one prime and one coat or prime and two coats what height? | Contractor shall meet or exceed industry standards stated in Section 09 90 00 Paints and Coatings, Paragraph 1.2 References in SOW. | ||||||||||||||||
| Standard height shall be single story (less than 20 feet in height) and prime shall include second to three story (20 feet and greater) improvements. See Section 01 35 26 Governmental Safety Requirement, Paragraph 3.6 Work Platforms in SOW. | 2,266 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | |||||
| 0018 Interior/exterior wood or concrete surfaces as follows: steps, platforms, and floors of open porches. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Interior/exterior wood or concrete surfaces as follows: steps, platforms, and floors of open porches. One coat OCCUPIED - Price per square foot.. - Minimum 1 foot. | need to sepeare between wood and concrete due to materials use. Two different prices | Remove "Exterior" from description, for Interior improvements. Contractor required to select materials for the improvement location and use. | 15,553 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior/exterior wood or concrete surfaces as follows: steps, platforms, and floors of open porches. Two coats OCCUPIED - Price per square foot.. - Minimum 1 foot. | need to sepeare between wood and concrete due to materials use. Two different prices | Remove "Exterior" from description, for Interior improvements. Contractor required to select materials for the improvement location and use. | 7,735 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior/exterior wood or concrete surfaces as follows: steps, platforms, and floors of open porches. One coat UNOCCUPIED - Price per square foot.. - Minimum 1 foot. | need to sepeare between wood and concrete due to materials use. Two different prices | Remove "Exterior" from description, for Interior improvements. Contractor required to select materials for the improvement location and use. | 18,643 | $ 0.00 | 18,643 | $ 0.00 | $ 0.00 | 18,643 | $ 0.00 | $ 0.00 | 18,643 | $ 0.00 | $ 0.00 | 18,643 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior/exterior wood or concrete surfaces as follows: steps, platforms, and floors of open porches. Two coats UNOCCUPIED - Price per square foot.. - Minimum 1 foot. | need to sepeare between wood and concrete due to materials use. Two different prices | Remove "Exterior" from description, for Interior improvements. Contractor required to select materials for the improvement location and use. | 10,825 | $ 0.00 | 10,825 | $ 0.00 | $ 0.00 | 10,825 | $ 0.00 | $ 0.00 | 10,825 | $ 0.00 | $ 0.00 | 10,825 | $ 0.00 | $ 0.00 | ||
| 0019 Interior wood handrails. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Interior wood handrails. One coat. OCCUPIED - Price per square foot. - Minimum 1 foot. | is it wall mounted hand rail or is it a guard rail system ? Can you LF rather than SF | Handrail mounting varies. SF unit of measure allows different handrail components including not limited to spindle, banister, baluster elements. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior wood handrails. Two coats. OCCUPIED - Price per square foot. - Minimum 1 foot. | is it wall mounted hand rail or is it a guard rail system ? | Handrail mounting varies. SF unit of measure allows different handrail components including not limited to spindle, banister, baluster elements. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior wood handrails. One coat UNOCCUPIED - Price per square foot. - Minimum 1 foot. | is it wall mounted hand rail or is it a guard rail system ? | Handrail mounting varies. SF unit of measure allows different handrail components including not limited to spindle, banister, baluster elements. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior wood handrails. Two coats. UNOCCUPIED - Price per square foot. - Minimum 1 foot. | is it wall mounted hand rail or is it a guard rail system ? | Handrail mounting varies. SF unit of measure allows different handrail components including not limited to spindle, banister, baluster elements. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0020 Exterior wood or concrete surfaces to include steps, platforms, and floors of open porches. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Exterior wood or concrete surfaces to include steps, platforms, and floors of open porches. One coat. (Exterior oil paint) - Price per square foot. - Minimum 1 foot. | wood split between wood and concrete what is the diffrence between 020 and 018 | Contractor required to select materials for the improvement location and use. | 42,240 | $ 0.00 | 42,240 | $ 0.00 | $ 0.00 | 42,240 | $ 0.00 | $ 0.00 | 42,240 | $ 0.00 | $ 0.00 | 42,240 | $ 0.00 | $ 0.00 | ||
| 0001 | Exterior wood or concrete surfaces to include steps, platforms, and floors of open porches. Two coats. (Exterior oil paint) - Price per square foot. - Minimum 1 foot. | 43,363 | $ 0.00 | 43,363 | $ 0.00 | $ 0.00 | 43,363 | $ 0.00 | $ 0.00 | 43,363 | $ 0.00 | $ 0.00 | 43,363 | $ 0.00 | $ 0.00 | ||||
| 0021 Exposed to view paper facing of vapor barrier jackets of pre-sized or adhesive finished glass cloth over insulation on pipes, ducts, and equipment, | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Exposed to view paper facing of vapor barrier jackets of pre-sized or adhesive finished glass cloth over insulation on pipes, ducts, and equipment, interior. Two coats to match adjacent areas. - Price per square foot. - Minimum 1 foot. | the jackets wont be able to paint because is flexible and paint wont work with flixibility ? Specify more details | Contractor shall meet or exceed industry standards stated in Section 09 90 00 Paints and Coatings and Section 09 01 90.50 Preparation of Historic Wood and Metal Surfaces for Painting requirements in SOW. | 4,223 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | ||
| 0022 Chain link fence, including posts, gates and supports. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Chain link fence, including posts, gates and supports. Primer - Price per linear foot. - Minimum 1 foot. | the chain fnce link itself norammly wll not be painted, however the posts gates and supports yes specify if the chain link needs to be painted if so it will crack soon. | Painting of chain link fence, including posts, gates and supports may be required in Task Order(s). | 25,853 | $ 0.00 | 25,853 | $ 0.00 | $ 0.00 | 25,853 | $ 0.00 | $ 0.00 | 25,853 | $ 0.00 | $ 0.00 | 25,853 | $ 0.00 | $ 0.00 | ||
| 0001 | Chain link fence, including posts, gates and supports. One coat. Oil base enamel (exterior) Price per linear foot. - Minimum 1 foot. | the chain fnce link itself norammly wll not be painted, however the posts gates and supports yes specify if the chain link needs to be painted if so it will crack soon. | Painting of chain link fence, including posts, gates and supports may be required in Task Order(s). | 52,540 | $ 0.00 | 52,540 | $ 0.00 | $ 0.00 | 52,540 | $ 0.00 | $ 0.00 | 52,540 | $ 0.00 | $ 0.00 | 52,540 | $ 0.00 | $ 0.00 | ||
| 0001 | Chain link fence, including posts, gates and supports. Two coats. Oil base enamel (exterior) Price per linear foot. - Minimum 1 foot. | the chain fnce link itself norammly wll not be painted, however the posts gates and supports yes specify if the chain link needs to be painted if so it will crack soon. | Painting of chain link fence, including posts, gates and supports may be required in Task Order(s). | 155,540 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | ||
| 0023 Remove existing wall covering. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Remove existing wall covering. UNOCCUPIED - Per square foot. - Minimum 1 foot. | confirm if its vynil | Existing wall coverings vary. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0001 | Remove existing wall covering. UNOCCUPIED - Per square foot. - Minimum 1 foot. | Existing wall coverings vary. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | |||
| 0024 Furnish and install wall covering. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Furnish and install wall covering, medium duty. OCCUPIED - Per square foot. - Minimum 1 foot. | need an alloance for wall cover or range for material because material ranges greatly this will need to be LY | SF Unit of Measure shall be maintained. | 2,266 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | ||
| 0001 | Furnish and install wall covering. UNOCCUPIED - Per square foot. - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||||
| 0001 | Furnish and install wall covering, medium duty. OCCUPIED - Per square foot. - Minimum 1 foot. | why different quinity | Quantities are estimations of need. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0025 Install Government furnished wall covering. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Install Government furnished wall covering. OCCUPIED - Per square foot. - Minimum 1 foot. | will this include murals ? Can this be by linear Yard | Existing Specialized murals or other wall coverings are not included within contract SOW. | 4,223 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | ||
| 0001 | Install Government furnished wall covering. UNOCCUPIED - Per square foot. - Minimum 1 foot. | will this include murals ? | Existing Specialized murals or other wall coverings are not included within contract SOW. | 4,223 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | ||
| 0026 Furnish and apply 2 coats Polymix paint system. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Furnish and apply 2 coats Polymix paint system. OCCUPIED - Per square foot. | does this mean one base coat and one splatter coat ? Polu mix normally has more than one splatter coat | Contractor shall meet or exceed Section 09 90 00 Paints and Coatings requirements in SOW. Contractor is responsible for all means, methods, supervision and coordination to produce a quality, finished product. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0001 | Furnish and apply 2 coats Polymix paint system. UNOCCUPIED - Per square foot. - Minimum 1 foot. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||||
| 0027 Lead paint removal by wet sanding method | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Lead paint removal by wet sanding method - Per square foot. - Minimum 1 foot. | cant no be removed by wet sanding it goes against EPA regs, So it could be encapsulated , | Contractor is responsible for all means, methods, supervision and coordination to produce a quality, finished product. Task Orders under this Paint IDIQ are for minor repairs. Existing improvement restoration or complete reconstruction of existing historic or recent improvements is not included in this Contract for paint repairs. | 7,735 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | ||
| 0028 Replace rotten wood around window | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Replace rotten wood around window - Per linear foot. - Minimum 1 foot. | does this mean dutch repair or entire framing. | Existing improvement restoration or complete reconstruction of existing historic or recent improvements is not included in this Contract for paint repairs. Examples of type of improvements include not limited to molding, trim, sill, etc. | 7,210 | $ 0.00 | 7,210 | $ 0.00 | $ 0.00 | 7,210 | $ 0.00 | $ 0.00 | 7,210 | $ 0.00 | $ 0.00 | 7,210 | $ 0.00 | $ 0.00 | ||
| 0029 Paints & Coatings, Interiors, Doors | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||||
| 0001 | Paints & Coatings, Interiors, Doors. One coat. OCCUPIED - Per square foot. - Minimum 1 foot. | can this be change per unit . | SF Unit of Measure shall be maintained. | 8,755 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | ||
| 0001 | Paints & Coatings, Interiors, Doors. Two coats. OCCUPIED - Per square foot. - Minimum 1 foot. | can this be change per unit . | SF Unit of Measure shall be maintained. | 8,755 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | ||
| 0001 | Paints & Coatings, Interiors, Doors. One coat. UNOCCUPIED - Per square foot. - Minimum 1 foot. | can this be change per unit . | SF Unit of Measure shall be maintained. | 4,635 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | ||
| 0001 | Paints & Coatings, Interiors, Doors. Two coats. UNOCCUPIED - Per square foot. - Minimum 1 foot. | can this be change per unit . | SF Unit of Measure shall be maintained. | 4,635 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | ||
| SUBTOTAL | $ 0.00 | SUBTOTAL | $ 0.00 | SUBTOTAL | $ 0.00 | SUBTOTAL | $ 0.00 | SUBTOTAL | $ 0.00 |
Input the Dollar Amount Here. Price can be whole Dollars or Cents.
Five Year Total Price $ 0.00
Escalation Rate - Choose / Input Percentage 0.00% Escalation Rate should be whole number or Tenths Ex. 3 or 2.56
Instructions
Please follow the specific instructions below:
1. Please provide a price only for the BASE year Ordering Period (Column D) "Cells C3 - C103" Do not complete any other cells.
2. At the bottom of the Excel on the Pricing Tab is a box where you are required to provide your escalation rate. "Cell C108" Denoted with Directional Arrow
3. This rate will automatically apply across the four additional Ordering Periods. *Escalation as well as overall price is subject to a Fair and Reasonable Determination even if the overall proposed price is the Lowest Price of the Technically Acceptable Proposals.
4. When a Task Order is issued the combined value of all work proposed shall be priced by the square foot, linear foot in consideration of the type of material required, existing condition of the surfaces, and time required to deliver a finished project in a manner that meets the standards identified in the SOW / PWS.
5. The overall price from this pricing Model will be used to establish the CLIN 0001 Ceilings at the IDIQ level, Task Orders will be priced by the job and are issued as Firm-fixed price Orders against the CLIN 0001 Ceiling.
6. The contractor shall ensure that the submitted proposal includes the entire scope of work to be performed. Any work performed beyond the proposed scope and proposal accepted by the government will only be compensated if a bilateral Modification to the Task Order or a Notice to Proceed has been issued by the Contracting Office or Officer.
7. The Contracting Officer of Record has no authority to bind the government nor obligate the government for any work performed outside the original scope / proposal on the awarded Task Order.
****Ensure that the total price of all items over the entire Ordering Period equal the price proposed on the Solicitation itself on CLIN 0001. This price assumes work using the maximum square feet and maximum linear feet over the life of the contract. Individual Task Orders issued over the five (5) year Ordering Period may total less than the calculated price for the maximum effort using the estimated Square Feet and Linear Feet in this template.
File details come from the government source that posted it. Updated .