Pricing Model.xlsx
XLSX spreadsheet 36 KB Posted
- Solicitation number
- W91QV125RA006
About this file
This is a Pricing Model Excel file for an Indefinite Delivery/Indefinite Quantity (IDIQ) painting contract for Joint Base Myer-Henderson Hall (JBMHH). The document outlines a comprehensive pricing structure for various painting and repair services across five ordering periods, with detailed line items covering tasks such as repairing plaster and gypsum wallboard, painting interior and exterior surfaces, removing wall coverings, and applying different paint coatings. The pricing model includes separate rates for occupied and unoccupied spaces, with specific measurements noted in square feet and linear feet for each service category.
The contract (Solicitation Number W91QV125RA006) is issued by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Sam Houston. The pricing template requires bidders to provide unit costs for the base year, with an option to input an escalation rate that will automatically apply across the four additional ordering periods. The document emphasizes that task orders will be priced individually and issued as firm-fixed price orders against the overall contract ceiling, with the total price assuming maximum estimated square and linear footage over the five-year contract period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers on the Pricing Model - Added 07282025.xlsx | XLSX spreadsheet | |
| RFIs Paint IDIQ 20250724 Revised-Response RH.pdf | ||
| SOW Paint IDIQ.docx | DOCX document | |
| Solicitation - W91QV125RA006_Vendor Copy.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ Pricing
| CLIN | |||||||||||||||||
| NO. | SUPPLIES / SERVICES : Painting IDIQ | ORDERING PERIOD 1 | ORDERING PERIOD 2 | ORDERING PERIOD 3 | ORDERING PERIOD 4 | ORDERING PERIOD 5 | |||||||||||
| 0001 Repair cracks in plaster and gypsum wallboard surfaces | JBM-HH Estimated Quantities | Populate this Column Only with UNIT COST | PRICE | 7,735 | UNIT COST | PRICE | JBM-HH Estimated Quantities | UNIT COST | PRICE | JBM-HH Estimated Quantities | UNIT COST | PRICE | JBM-HH Estimated Quantities | UNIT COST | PRICE | ||
| 0001 | Repair cracks in plaster and gypsum wallboard surfaces (up to 1"wide) OCCUPIED. Per Linear Foot - Minimum 1 foot. | 7,735 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | ||
| 0001 | Repair cracks in plaster and gypsum wallboard surfaces (up to 1"wide) UNOCCUPIED - Per Linear Foot - Minimum 1 foot. | 12,885 | $ 0.00 | 12,885 | $ 0.00 | $ 0.00 | 12,885 | $ 0.00 | $ 0.00 | 12,885 | $ 0.00 | $ 0.00 | 12,885 | $ 0.00 | $ 0.00 | ||
| 0002 Patch holes in gypsum wallboard and plaster surfaces. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Patch holes in gypsum wallboard and plaster surfaces (holes 1" to 12" diameter) OCCUPIED. Per Linear Foot - Minimum 1 foot. | 1,051 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | ||
| 0001 | Patch holes in gypsum wallboard and plaster surfaces (holes 1" to 12" diameter) UNOCCUPIED - Per Linear Foot - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0003 Repair plaster system, including removal and disposal of old plaster system, and apply new plaster system | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Repair plaster system, including removal and disposal of old plaster system, and apply new plaster system (Durabond 90 or equivalent).OCCUPIED - Per square Foot - Minimum 1 foot | 1,056 | $ 0.00 | 1,056 | $ 0.00 | $ 0.00 | 1,056 | $ 0.00 | $ 0.00 | 1,056 | $ 0.00 | $ 0.00 | 1,056 | $ 0.00 | $ 0.00 | ||
| 0001 | Repair plaster system, including removal and disposal of old plaster system, and apply new plaster system (Durabond 90 or equivalent) - Per square Foot - Minimum 1 foot. | ||||||||||||||||
| UNOCCUPIED | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | |||
| 0004 Replace plaster finish coat, clean, apply new finish coat. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Replace plaster finish coat, clean, apply new finish coat including accelerator. (Durabond 90 or equivalent) OCCUPIED. - Per square Foot - Minimum 1 foot. | 1,060 | $ 0.00 | 1,060 | $ 0.00 | $ 0.00 | 1,060 | $ 0.00 | $ 0.00 | 1,060 | $ 0.00 | $ 0.00 | 1,060 | $ 0.00 | $ 0.00 | ||
| 0001 | Replace plaster finish coat, clean, apply new finish coat including accelerator. (Durabond 90 or equivalent) UNOCCUPIED - Per square Foot - Minimum 1 foot. | 1,246 | $ 0.00 | 1,246 | $ 0.00 | $ 0.00 | 1,246 | $ 0.00 | $ 0.00 | 1,246 | $ 0.00 | $ 0.00 | 1,246 | $ 0.00 | $ 0.00 | ||
| 0005 Replace gypsum wallboard including removal and disposal of old drywall. Install new drywall 1/2" or 5/8" including jointing, spackling, sanding and | |||||||||||||||||
| taping. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Replace gypsum wallboard including removal and disposal of old drywall. Install new drywall 1/2" or 5/8" including jointing, spackling, sanding and taping. OCCUPIED - Per square Foot - Minimum 1 foot. | 1,051 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | ||
| 0001 | Replace gypsum wallboard including removal and disposal of old drywall. Install new drywall 1/2" or 5/8" including jointing, spackling, sanding and taping. UNOCCUPIED - Per square Foot - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0006 Install new drywall, 1/2" or 5/8" including jointing spackling, sanding and taping. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Install new drywall, 1/2" or 5/8" including jointing spackling, sanding and taping. OCCUPIED - Per square Foot - Minimum 1 foot. | 1,051 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | ||
| 0001 | Install new drywall, 1/2" or 5/8" including jointing spackling, sanding and taping. UNOCCUPIED - Per square Foot - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0007 Apply 1/4", 1/2" or 5/8" gypsum board over severely cracked, but sound plaster. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Apply 1/4", 1/2" or 5/8" gypsum board over severely cracked, but sound plaster. OCCUPIED - Per square Foot - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0001 | Apply 1/4", 1/2" or 5/8" gypsum board over severely cracked, but sound plaster. UNOCCUPIED - Per square Foot - Minimum 1 foot. | 2,585 | $ 0.00 | 2,585 | $ 0.00 | $ 0.00 | 2,585 | $ 0.00 | $ 0.00 | 2,585 | $ 0.00 | $ 0.00 | 2,585 | $ 0.00 | $ 0.00 | ||
| 0008 Replace missing or damaged resilient cove base | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Replace missing or damaged resilient cove base OCCUPIED - Per Linear Foot - Minimum 1 foot. | 1,051 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | ||
| 0001 | Replace missing or damaged resilient cove base UNOCCUPIED - Per Linear Foot - Minimum 1 foot. | 1,051 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | ||
| 0009 Install new cove base | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Install new cove base. OCCUPIED - Per Linear Foot - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0001 | Install new cove base. UNOCCUPIED - Per Linear Foot - Minimum 1 foot. | 15,553 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | ||
| 0010 Replace putty and glazing around windows. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Replace putty and glazing around windows. UNOCCUPIED - Per Linear Foot - Minimum 1 foot. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0001 | Replace putty and glazing around windows. OCCUPIED- Per Linear Foot - Minimum 1 foot. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0011 Paint exterior concrete masonry units, latex. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Paint exterior concrete masonry units, latex. One coat - Per square Foot - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0001 | Paint exterior concrete masonry units, latex. Two coats - Per square Foot - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0012 Exterior ferrous surfaces, exposed, unless otherwise specified. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Exterior ferrous surfaces, exposed, unless otherwise specified. One coat. (Exterior oil base paint) - Per square foot. - Minimum 1 foot. | 12,463 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | ||
| 0001 | Exterior ferrous surfaces, exposed, unless otherwise specified. Two coats. (Exterior oil base paint)- Per square foot. - Minimum 1 foot. | 12,463 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | 12,463 | $ 0.00 | $ 0.00 | ||
| 0001 | Exterior ferrous surfaces, exposed. One coat - Per square foot. - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0001 | Exterior ferrous surfaces, exposed. Two coats - Per square foot. - Minimum 1 foot. | 104,133 | $ 0.00 | 104,133 | $ 0.00 | $ 0.00 | 104,133 | $ 0.00 | $ 0.00 | 104,133 | $ 0.00 | $ 0.00 | 104,133 | $ 0.00 | $ 0.00 | ||
| 0001 | Exterior ferrous surfaces, exposed unless otherwise specified. One coat - Per square foot - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0013 Exposed interior/exterior silicone/latex caulking compound. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Exposed interior/exterior silicone/latex caulking compound. OCCUPIED - Per Linear Foot - Minimum 1 foot. | 1,051 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | 1,051 | $ 0.00 | $ 0.00 | ||
| 0001 | Exposed interior/exterior silicone/latex caulking compound. UNOCCUPIED - Per Linear Foot - Minimum 1 foot. | 15,975 | $ 0.00 | 15,975 | $ 0.00 | $ 0.00 | 15,975 | $ 0.00 | $ 0.00 | 15,975 | $ 0.00 | $ 0.00 | 15,975 | $ 0.00 | $ 0.00 | ||
| 0014 Interior concrete masonry units, plaster gypsum board, and concrete, except concrete floors, unless otherwise specified. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Interior concrete masonry units, plaster gypsum board, and concrete, except concrete floors, unless otherwise specified. One coat. OCCUPIED - Per square foot. - Minimum 1 foot. | 31,106 | $ 0.00 | 31,106 | $ 0.00 | $ 0.00 | 31,106 | $ 0.00 | $ 0.00 | 31,106 | $ 0.00 | $ 0.00 | 31,106 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior concrete masonry units, plaster gypsum board, and concrete, except concrete floors, unless otherwise specified. One coat. UNOCCUPIED - Per square foot. - Minimum 1 foot. | 155,540 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior concrete masonry units, plaster gypsum board, and concrete, except concrete floors, unless otherwise specified. Two coats. OCCUPIED - Per square foot. - Minimum 1 foot. | 423,536 | $ 0.00 | 423,536 | $ 0.00 | $ 0.00 | 423,536 | $ 0.00 | $ 0.00 | 423,536 | $ 0.00 | $ 0.00 | 423,536 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior concrete masonry units, plaster gypsum board, and concrete, except concrete floors, unless otherwise specified. Two coats. - Per square foot. - Minimum 1 foot. | ||||||||||||||||
| UNOCCUPIED | 10,506 | $ 0.00 | 10,506 | $ 0.00 | $ 0.00 | 10,506 | $ 0.00 | $ 0.00 | 10,506 | $ 0.00 | $ 0.00 | 10,506 | $ 0.00 | $ 0.00 | |||
| 0001 | Interior concrete masonry units, plaster gypsum board, and concrete, except concrete floors, unless otherwise specified. Three coats. - Per square foot. - Minimum 1 foot. | ||||||||||||||||
| UNOCCUPIED | 209,000 | $ 0.00 | 209,000 | $ 0.00 | $ 0.00 | 209,000 | $ 0.00 | $ 0.00 | 209,000 | $ 0.00 | $ 0.00 | 209,000 | $ 0.00 | $ 0.00 | |||
| 0015 Interior walls and ceilings in shower areas, except ferrous surfaces and concrete masonry units, unless otherwise specified. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Interior walls and ceilings in shower areas, except ferrous surfaces and concrete masonry units, unless otherwise specified. Two coats. - Per square foot. - Minimum 1 foot. | 8,343 | $ 0.00 | 8,343 | $ 0.00 | $ 0.00 | 8,343 | $ 0.00 | $ 0.00 | 8,343 | $ 0.00 | $ 0.00 | 8,343 | $ 0.00 | $ 0.00 | ||
| 0016 Wood and metal interior trim, doors and windows | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Wood and metal interior trim, doors and windows. One coat. OCCUPIED - Per Linear Foot. - Minimum 1 foot. | 51,706 | $ 0.00 | 51,706 | $ 0.00 | $ 0.00 | 51,706 | $ 0.00 | $ 0.00 | 51,706 | $ 0.00 | $ 0.00 | 51,706 | $ 0.00 | $ 0.00 | ||
| 0001 | Wood and metal interior trim, doors and windows. Two costs. OCCUPIED - Per Linear Foot. - Minimum 1 foot. | 78,393 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | ||
| 0001 | Wood and metal interior trim, doors and windows. One coat. UNOCCUPIED - Per Linear Foot. - Minimum 1 foot. | 78,393 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | ||
| 0001 | Wood and metal interior trim, doors and windows. Two costs. UNOCCUPIED - Per Linear Foot. - Minimum 1 foot. | 78,393 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | 78,393 | $ 0.00 | $ 0.00 | ||
| 0017 Interior exposed ferrous surfaces, unless otherwise specified. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | |||||||||||
| 0001 | Interior exposed ferrous surfaces, unless otherwise specified. One coat. OCCUPIED | 10,609 | $ 0.00 | 10,609 | $ 0.00 | $ 0.00 | 10,609 | $ 0.00 | $ 0.00 | 10,609 | $ 0.00 | $ 0.00 | 10,609 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior exposed ferrous surfaces, unless otherwise specified. Two coats. OCCUPIED | 12,669 | $ 0.00 | 12,669 | $ 0.00 | $ 0.00 | 12,669 | $ 0.00 | $ 0.00 | 12,669 | $ 0.00 | $ 0.00 | 12,669 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior exposed ferrous surfaces, unless otherwise specified. One coat. UNOCCUPIED | 7,416 | $ 0.00 | 7,416 | $ 0.00 | $ 0.00 | 7,416 | $ 0.00 | $ 0.00 | 7,416 | $ 0.00 | $ 0.00 | 7,416 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior exposed ferrous surfaces, unless otherwise specified. Two coats. UNOCCUPIED | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior galvanized surfaces, unless otherwise specified, two coats of paint to match adjacent areas. OCCUPIED | 2,266 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | ||
| 0018 Interior/exterior wood or concrete surfaces as follows: steps, platforms, and floors of open porches. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Interior/exterior wood or concrete surfaces as follows: steps, platforms, and floors of open porches. One coat OCCUPIED - Price per square foot.. - Minimum 1 foot. | 15,553 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | 15,553 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior/exterior wood or concrete surfaces as follows: steps, platforms, and floors of open porches. Two coats OCCUPIED - Price per square foot.. - Minimum 1 foot. | 7,735 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior/exterior wood or concrete surfaces as follows: steps, platforms, and floors of open porches. One coat UNOCCUPIED - Price per square foot.. - Minimum 1 foot. | 18,643 | $ 0.00 | 18,643 | $ 0.00 | $ 0.00 | 18,643 | $ 0.00 | $ 0.00 | 18,643 | $ 0.00 | $ 0.00 | 18,643 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior/exterior wood or concrete surfaces as follows: steps, platforms, and floors of open porches. Two coats UNOCCUPIED - Price per square foot.. - Minimum 1 foot. | 10,825 | $ 0.00 | 10,825 | $ 0.00 | $ 0.00 | 10,825 | $ 0.00 | $ 0.00 | 10,825 | $ 0.00 | $ 0.00 | 10,825 | $ 0.00 | $ 0.00 | ||
| 0019 Interior wood handrails. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Interior wood handrails. One coat. OCCUPIED - Price per square foot. - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior wood handrails.Two coats. OCCUPIED - Price per square foot. - Minimum 1 foot. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior wood handrails.One coat UNOCCUPIED - Price per square foot. - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0001 | Interior wood handrails.Two coats. UNOCCUPIED - Price per square foot. - Minimum 1 foot. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0020 Exterior wood or concrete surfaces to include steps, platforms, and floors of open porches. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Exterior wood or concrete surfaces to include steps, platforms, and floors of open porches. One coat. (Exterior oil paint) - Price per square foot. - Minimum 1 foot. | 42,240 | $ 0.00 | 42,240 | $ 0.00 | $ 0.00 | 42,240 | $ 0.00 | $ 0.00 | 42,240 | $ 0.00 | $ 0.00 | 42,240 | $ 0.00 | $ 0.00 | ||
| 0001 | Exterior wood or concrete surfaces to include steps, platforms, and floors of open porches. Two coats. (Exterior oil paint) - Price per square foot. - Minimum 1 foot. | 43,363 | $ 0.00 | 43,363 | $ 0.00 | $ 0.00 | 43,363 | $ 0.00 | $ 0.00 | 43,363 | $ 0.00 | $ 0.00 | 43,363 | $ 0.00 | $ 0.00 | ||
| 0021 Exposed to view paper facing of vapor barrier jackets of pre-sized or adhesive finished glass cloth over insulation on pipes, ducts, and equipment, | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Exposed to view paper facing of vapor barrier jackets of pre-sized or adhesive finished glass cloth over insulation on pipes, ducts, and equipment, interior. Two coats to match adjacent areas. - Price per square foot. - Minimum 1 foot. | 4,223 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | ||
| 0022 Chain link fence, including posts, gates and supports. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Chain link fence, including posts, gates and supports. Primer - Price per linear foot. - Minimum 1 foot. | 25,853 | $ 0.00 | 25,853 | $ 0.00 | $ 0.00 | 25,853 | $ 0.00 | $ 0.00 | 25,853 | $ 0.00 | $ 0.00 | 25,853 | $ 0.00 | $ 0.00 | ||
| 0001 | Chain link fence, including posts, gates and supports. One coat. Oil base enamel (exterior) Price per linear foot. - Minimum 1 foot. | 52,540 | $ 0.00 | 52,540 | $ 0.00 | $ 0.00 | 52,540 | $ 0.00 | $ 0.00 | 52,540 | $ 0.00 | $ 0.00 | 52,540 | $ 0.00 | $ 0.00 | ||
| 0001 | Chain link fence, including posts, gates and supports. Two coats. Oil base enamel (exterior) Price per linear foot. - Minimum 1 foot. | 155,540 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | 155,540 | $ 0.00 | $ 0.00 | ||
| 0023 Remove existing wall covering. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Remove existing wall covering. UNOCCUPIED - Per square foot. - Minimum 1 foot. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0001 | Remove existing wall covering. UNOCCUPIED - Per square foot. - Minimum 1 foot. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0024 Furnish and instal wall covering. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Furnish and install wall covering, medium duty. OCCUPIED - Per square foot. - Minimum 1 foot. | 2,266 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | 2,266 | $ 0.00 | $ 0.00 | ||
| 0001 | Furnish and install wall covering. UNOCCUPIED - Per square foot. - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0001 | Furnish and install wall covering, medium duty. OCCUPIED - Per square foot. - Minimum 1 foot. | 1,133 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | 1,133 | $ 0.00 | $ 0.00 | ||
| 0025 Install Government furnished wall covering. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Install Government furnished wall covering. OCCUPIED - Per square foot. - Minimum 1 foot. | 4,223 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | ||
| 0001 | Install Government furnished wall covering. UNOCCUPIED - Per square foot. - Minimum 1 foot. | 4,223 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | 4,223 | $ 0.00 | $ 0.00 | ||
| 0026 Furnish and apply 2 coats Polymix paint system. | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Furnish and apply 2 coats Polymix paint system. OCCUPIED - Per square foot. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0001 | Furnish and apply 2 coats Polymix paint system. UNOCCUPIED - Per square foot. - Minimum 1 foot. | 2,163 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | 2,163 | $ 0.00 | $ 0.00 | ||
| 0027 Lead paint removal by wet sanding method | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Lead paint removal by wet sanding method - Per square foot. - Minimum 1 foot. | 7,735 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | 7,735 | $ 0.00 | $ 0.00 | ||
| 0028 Replace rotten wood around window | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Replace rotten wood around window - Per linear foot. - Minimum 1 foot. | 7,210 | $ 0.00 | 7,210 | $ 0.00 | $ 0.00 | 7,210 | $ 0.00 | $ 0.00 | 7,210 | $ 0.00 | $ 0.00 | 7,210 | $ 0.00 | $ 0.00 | ||
| 0029 Paints & Coatings, Interiors, Doors | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | $ 0.00 | ||||||||||||
| 0001 | Paints & Coatings, Interiors, Doors. One coat. OCCUPIED - Per square foot. - Minimum 1 foot. | 8,755 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | ||
| 0001 | Paints & Coatings, Interiors, Doors. Two coats. OCCUPIED - Per square foot. - Minimum 1 foot. | 8,755 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | 8,755 | $ 0.00 | $ 0.00 | ||
| 0001 | Paints & Coatings, Interiors, Doors. One coat. UNOCCUPIED - Per square foot. - Minimum 1 foot. | 4,635 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | ||
| 0001 | Paints & Coatings, Interiors, Doors. Two coats. UNOCCUPIED - Per square foot. - Minimum 1 foot. | 4,635 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | 4,635 | $ 0.00 | $ 0.00 | ||
| SUBTOTAL | $ 0.00 | SUBTOTAL | $ 0.00 | SUBTOTAL | $ 0.00 | SUBTOTAL | $ 0.00 | SUBTOTAL | $ 0.00 |
Input the Dollar Amount Here. Price can be whole Dollars or Cents.
Five Year Total Price $ 0.00
Esaclation Rate - Choose / Input Percentage 0.00% Escalation Rate should be whole number or Tenths Ex. 3 or 2.56
Instructions
Please follow the specific instructions below:
1. Please provide a price only for the BASE year Ordering Period (Column D) "Cells C3 - C103" Do not complete any other cells.
2. At the bottom of the Excel on the Pricing Tab is a box where you are required to provide your escalation rate. "Cell C108" Denoted with Directional Arrow
3. This rate will automatically apply across the four additional Ordering Periods. *Escalation as well as overall price is subject to a Fair and Reasonable Determination even if the overall proposed price is the Lowest Price of the Technically Acceptable Proposals.
4. When a Task Order is issued the combined value of all work proposed shall be priced by the square foot, linear foot in consideration of the type of material required, existing condition of the surfaces, and time required to deliver a finished project in a manner that meets the standards identified in the SOW / PWS.
5. The overall price from this pricing Model will be used to establish the CLIN 0001 Ceilings at the IDIQ level, Task Orders will be priced by the job and are issued as Firm-fixed price Orders against the CLIN 0001 Ceiling.
6. The contractor shall ensure that the submitted proposal includes the entire scope of work to be performed. Any work performed beyond the proposed scope and proposal accepted by the government will only be compensated if a bilateral Modification to the Task Order or a Notice to Proceed has been issued by the Contracting Office or Officer.
7. The Contracting Officer of Record has no authority to bind the government nor obligate the government for any work performed outside the original scope / proposal on the awarded Task Order.
****Ensure that the total price of all items over the entire Ordering Period equal the price proposed on the Solicitation itself on CLIN 0001. This price assumes work using the maximum square feet and maximum linear feet over the life of the contract. Individual Task Orders issued over the five (5) year Ordering Period may total less than the calculated price for the maximum effort using the estimated Square Feet and Linear Feet in this template.