TECHNICAL_EXHIBIT_1_PRS_ELEVATOR.pdf
PDF 106 KB Posted
- Attached to
- Elevator Maintenance & Repair
- Solicitation number
- W91QF5-17-T-0003
About this file
Technical Exhibit 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CORRECTIVE_CLIN_ITEM_IN_YELLOW.xlsx | XLSX spreadsheet | |
| Attachment_2_Addendum_to_FAR_52_212-1_Instructions_to_Offerors_v2_021417(Revised).docx | DOCX document | |
| TE_3_PREVENTIVE_MAINTENANCE_CHECKLIST_.pdf | ||
| TECHNICAL_EXHIBIT_6.pdf | ||
| Attachment_4__Pricing_Worksheet_v2_021417.docx | DOCX document | |
| Attachment_5_-_DFARS_252.209-7999_(1).pdf | ||
| TECHNICAL_EXHIBIT_2_Elevator_List.pdf | ||
| TECHNICAL_EXHIBIT_4.pdf | ||
| Attachment_6_Site_Visit_Information_Revised.docx | DOCX document | |
| Attachment_1_-_Clauses_and_Provisions_(1).docx | DOCX document | |
| Attachment_3_PWS.pdf | ||
| TECHNICAL_EXHIBIT_5.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
Required Service
Paragraph Number
Standard Maximum Allowable Degree of Deviation From Requirement
(AQL)
Method of Surveillance
The Proportion Deducted of Required Service to Invoice Price
1. Submit
PM
Schedules and Reports
C.5.1 C.5.2.1 C.5.2.2
a. Weekly / Monthly inspection schedule and reports submitted within specified time frames.
0% 100% Inspection
5% of Invoice
2. Accomp-lish Emergency Service Calls
C.5.5.1 a. Respond to service call within 4 hours.
0% 100%
30% of Invoice
C.5.5.1 thru C.5.5.3
b. Service call work meets specifications.
0% 100%
20% of
3. Provide Preventive Maintenance /Inspection
C.5.3 C.5.3.1 C.5.3.2
a. Preventive maintenance/ inspections performed by the end of the month and annually.
2 defects Planned Sampling
30% of
4. Submit Checklist
C.5.2.2 C.5.3.2
b. Submit properly documented preventive maintenance records and reports as specified.
0% 100% Inspection
5% of Invoice
5. Repair Work
C.1.1 c. Repairs performed IAW manufacturer’s specifications.
0% Planned Sampling
10% of
File details come from the government source that posted it. Updated .