PWS v3_Invasive_Species_2026__Final.pdf

PDF 856 KB Posted

Attached to
Amendment 0002 - Removal of Invasive Species (Bush Honeysuckle)
Solicitation number
W91QF426QA033
Issued by

About this file

This is a Performance Work Statement (PWS) for the removal of invasive bush honeysuckle from Area B of the oak-hickory uplands at Fort Leavenworth, Kansas, issued by the DPW Environmental Division. The project targets the eradication of mature bush honeysuckle (Lonicera spp.) from approximately 185 acres, with the primary focus on seed-producing bushes characterized by crowns exceeding 8 feet and basal diameters greater than 2 inches. The performance period runs from August 15, 2026, through March 29, 2027. The contractor must achieve 100% treatment of the designated 185 acres with a minimum 95% mortality rate of treated honeysuckle stumps. Key objectives include eliminating mature, seed-producing bushes to halt spread; restoring native understory vegetation; enhancing recreational quality and safety; and minimizing human exposure to tick-borne infections by reducing tick habitat.

The contractor must perform mechanical and manual eradication by cutting all mature stems and stems greater than 0.5 inches in diameter near ground level, followed by immediate application of a 1:1 glyphosate-to-water mixture to cut stumps within 15 minutes of cutting. Additional tasks include developing a detailed work plan and safety plan with tick-mitigation protocols, expanding and maintaining buffer zones along approximately 20,000 linear feet of existing trails (expanding from 10 feet to a newly designated width), managing slash and debris through chipping or designated piling, and conducting post-treatment monitoring with a final efficacy report. All herbicide applications must be performed by or under direct supervision of a Kansas-certified commercial pesticide applicator. Deliverables include the work and safety plans (due within 15 calendar days of award), a mid-project progress report (December 15, 2026), and a final treatment report with before/after photo documentation (both due March 29, 2027). Submittals required within 15 days of award include Material Safety Data Sheets, construction schedule, key personnel staffing plan, site-specific safety plan, quality control plan, project signage, and submittal registry. All work must comply with erosion and soil protection requirements prohibiting heavy or tracked machinery on slopes greater than 15% or during wet soil conditions, and an absolute "no-cut" restriction applies to all native oak and hickory species.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Working Statement Removal of Invasive Bush Honeysuckle from Old Growth Oak-Hickory Uplands

Fort Leavenworth, KS DPW – Environmental Division

1. Introduction and Overview

This Performance Work Statement outlines the requirements for the control and removal of invasive Bush Honeysuckle (Lonicera spp.) from a designated area within the Fort Leavenworth Military Reservation. The objective is to restore native habitat, improve recreational quality, and reduce public health risks associated with tick-borne diseases.

1.1 Background

Fort Leavenworth encompasses over 1,000 acres of oak-hickory deciduous forest, roughly bounded by Sheridan Avenue. This forest surrounds high-use recreational and physical training areas, including Camps Conestoga and Miles. The largest intact old-growth units within this ecosystem are divided into two parcels: Area A and Area B. Area B (Figure 1), the smaller and southernmost unit, covers approximately 185 acres. Currently, a heavy infestation of invasive bush honeysuckle affects 40 to 50 percent of this parcel.

This severe infestation is characterized by mature bushes with crowns exceeding 8 feet and basal diameters greater than 2 inches. As prolific seed producers, bushes of this size significantly exacerbate the spread of the invasive species into adjacent areas. In 2024, the trail network in Area B underwent initial renovation. This effort involved physically removing stems and applying herbicide to the stumps of bush honeysuckle within a 10-foot buffer on either side of 95% of the trail network (approximately 20,000 linear feet).

Follow-up removal and chemical treatments to expand this buffer are scheduled for completion by December 2026. Given the global significance of these old-growth habitats (Freeman et al., 2003), implementing more aggressive management actions is essential.

These restorative efforts will reduce the negative impact of bush honeysuckle on native ecological processes, preserve the quality of recreational opportunities in these unique areas, and minimize human exposure to tick-borne infections.

1.2 Scope of Work

The contractor shall provide all necessary personnel, equipment, materials, and supervision to conduct the mechanical removal and chemical treatment of Bush Honeysuckle within the 185-acre Area B. The primary focus is the eradication of mature, seed-producing bushes, which are characterized as having crowns over 8 feet and basal diameters greater than 2 inches. This work also includes expanding and maintaining the buffer zone along the existing trail network. The primary objective is to aggressively reduce the Bush Honeysuckle infestation to protect the Oak-Hickory old-growth forest ecosystem. Key goals include:

• Eliminate mature, seed-producing Bush Honeysuckle to halt its spread.

• Restore the native understory to support neotropical migratory species.

• Enhance the quality and safety of recreational opportunities.

• Minimize human exposure to tick-borne infections by reducing tick habitat.

1.3 Objectives

Eliminate all mature invasive Bush Honeysuckle from Area B.

Specific details of objective: Eliminate Bush Honeysuckle by severing stems greater than 0.5 inches in diameter near ground level and applying a 1:1 glyphosate:water mixture to the cut stumps. Period of Performance: 15 AUG 2026 – 29 MAR 2027

2. Requirements

2.1 Tasks

The contractor shall conduct the following tasks:

1. Work Plan & Pre-Work Survey - Contractor shall develop a detailed work plan, a safety plan (including tick-mitigation protocols), and establish staging areas.

2. Mechanical & Manual Eradication - Contractor shall physically extract or cut all mature Bush Honeysuckle stems (crowns >8 ft, basal diameters >2 in.), and any other stems greater than 0.5 inches in diameter, utilizing hand tools, chainsaws, or low-impact forestry equipment. Extraction or cutting of 100% of designated mature stems within target treatment blocks without damaging native canopy trees.

3. Chemical Treatment (Cut-Stump) - Contractor shall apply an approved systemic herbicide (e.g., 1:1 mixture of glyphosate) directly to cut stumps within 15 minutes of cutting to prevent re-sprouting. Minimum 95% mortality rate of treated stumps;

zero off-target damage to native understory species.

4. Trail Buffer Expansion & Maintenance - Contractor shall execute follow-up removal and chemical treatments to expand the existing 10-foot buffer along the 20,000 linear feet of the trail network, integrating with previous 2024–2025 trail renovation boundaries. Completed buffer expansion to the newly designated width (e.g., 20 or 30 feet) with all slash piled or chipped.

5. Slash & Debris Management - Contractor shall process cut vegetation by chipping, distributing mulch to a depth of no more than 2 inches, or piling debris in designated locations to rot naturally. Stems may also be left in place as specified. All trails, fire breaks, and waterways kept completely clear of debris; slash piles constructed to forestry specifications.

6. Quality Control & Post-Treatment Monitoring - Contractor shall perform post-treatment inspections to identify missed stems or re-sprouting and submit a final treatment efficacy report.

2.2 Submittals

1. Each submittal is to be complete and with sufficient detail to allow ready determination of compliance with contract requirements.

2. For variations proposed by the contractor, that include design changes or some material or product substitutions, the Government may require an evaluation and analysis by a licensed professional engineer hired by the contractor. When proposing a variation, deliver a submittal, which is clearly marked as a "VARIATION" to the Contracting Officer/COR, with documentation illustrating the nature and features of the variation including any necessary technical submittals and why the variation is desirable and beneficial to Government. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item.

3. Within 15 calendar days of contract award and before installation, the Contractor shall submit for approval for all Pre- Construction Submittals (SD-01) items listed. The government has 10 working days to review and return submittals once they are received. If the contractor submits an item for re-approval, the Government has 5 days to review and return once it is received. All submittals shall be approved before work requiring the materials can be used on the project. The Contracting Officer/COR may request submittals in addition to those listed below when deemed necessary to adequately describe the work covered in this contract.

4. Submittals shall be e-mailed to the Contracting Officer/COR at: robert.m.parvin.civ@army.mil / Andrew.t.talmage.civ@army.mil

5. Submittals shall be labeled utilizing the keyword “submittal” with the contract number, task order, building number, and submittal short description or number. Each task order will list its required submittals in the SOW or the applicable named construction specifications. Form Attached Below - (e.g., Submittal_26-P-0001_Pesticides)

SD-01 Pre-Construction Submittals

Material Safety Data Sheets (MSDS) for all hazardous chemicals used Construction Schedule – PDF format, updated weekly or as changes occur Key Personnel Staffing Plan Site Specific Safety Plan Quality Control Plan Project Signage Submittal Registry / LOG for all submittals intended for the project (prior to start of project) mailto:robert.m.parvin.civ@army.mil mailto:Andrew.t.talmage.civ@army.mil

2.3 End Results/Deliverables

The contractor is responsible for the successful eradication of the targeted species and the submission of all required reports and data.

The expected result is the treatment of 100% of the designated 185 acres with a minimum 95% mortality rate of treated honeysuckle stumps.

2.3.1 List of Deliverables

Deliverable

Work Plan, Safety Plan

Mid-Project Progress Report (Covering first 50% of area)

Final Treatment Report

Before/After Photo point Documentation

Due Date

Within 15 calendar days of contract award

December 15, 2026

March 29, 2027

March 29, 2027

2.4 Schedules/Milestones

Scheduling will be coordinated with the DPW Environmental Division Mr. Neil Bass @ 913-684-8979 / michael.n.bass.civ@army.mil and/or Mr. Andrew Talmage @913-290-0694 / andrew.t.talmage.civ@army.mil

3. Other Considerations:

1. Erosion & Soil Protection - Heavy or tracked machinery is prohibited on slopes greater than 15% or during wet soil conditions to prevent rutting and soil compaction.

2. Native Species Protection - An absolute "no-cut" restriction applies to all native species, particularly mature Oak (Quercus spp.) and Hickory (Carya spp.) trees. Care must be taken to avoid off-target herbicide damage.

3. Applicator Licensing - All herbicide applications must be performed by, or under the direct supervision of, a Kansas-certified commercial pesticide applicator.

4. Operational Window - To maximize effectiveness, cut-stump herbicide treatments should be prioritized during the late summer, autumn, or early winter to align with the plant's natural systemic translocation to its roots.

mailto:michael.n.bass.civ@army.mil mailto:andrew.t.talmage.civ@army.mil

4. Notes: Tech Exhibit/Maps

Figure 1. Area B in the Oak-Hickory Forest. Red line indicates the perimeter of the 185-acre unit.

Figure 2 – Walking/Horse riding trail map.

1. Introduction and Overview
1.1 Background
1.2 Scope of Work
1.3 Objectives
2. Requirements
2.2 Submittals
2.3 End Results/Deliverables
2.3.1 List of Deliverables
2.4 Schedules/Milestones
3. Other Considerations:
4. Notes: Tech Exhibit/Maps