5 - Bid Sheet w-Coefficient Concrete_Reqmts.xlsx

XLSX spreadsheet 62 KB Posted

Attached to
Installation Concrete Requirements Federal contract opportunity
Solicitation number
W91QF4-21-B-0002
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

About this file

This document contains a bid sheet for a federal contract solicitation for installation concrete requirements. The solicitation seeks bids for various concrete construction and repair items such as new or replaced pavement, curbs, sidewalks, slabs, and pavers. The bid sheet includes over 200 line items with detailed specifications, quantities, and unit pricing for concrete-related work. Pricing is provided by the government for estimates and contractors will submit their own adjusted pricing coefficients. The solicitation number is W91QF4-21-B-0002 and was issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Eustis. The pre-proposal conference will be held on January 7, 2021 to review instructions and award criteria. The deadline to register is January 5, 2021.

View the file

Other files for this federal contract opportunity

Other files attached to Installation Concrete Requirements, newest first.
File Type Posted
6 - W91QF4-21-B-0002 - Q and A Amendment.pdf PDF
SOL_Amend 01_W91QF4-21-B-0002 -Q and A.pdf PDF
W91QF4-21-B-0002_DPW_Installation_Concrete_Reqmts.pdf PDF
3 - Specs - Concrete Requirement 2020.pdf PDF
2 - Drawing Concr Reqmnts (Rev) - 2020.pdf PDF
4 - WD-KS20200141-Highway-29 May 20.pdf PDF
1 - Quality of Workmanship and Stds.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

MISCELLANEOUS CONCRETE REPAIRS - BIDDING SCHEDULE
BASE YEAR
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREDPW - Cost EstimateESTIMATED QUANTITYTOTAL COST
1New PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$141.3620$ 2,827.20
2New PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$70.3550$ 3,517.50
3New PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$60.50200$ 12,100.00
4New PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$155.1020$ 3,102.00
5New PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$90.7250$ 4,536.00
6New PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$70.35200$ 14,070.00
7New PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$181.2620$ 3,625.20
8New PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$100.5750$ 5,028.50
9New PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$65.10200$ 13,020.00
10Replace PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$203.7520$ 4,075.00
11Replace PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$115.0050$ 5,750.00
12Replace PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$72.68200$ 14,536.00
13Replace PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$225.5320$ 4,510.60
14Replace PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$130.9650$ 6,548.00
15Replace PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$90.88200$ 18,176.00
16Replace PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$230.6120$ 4,612.20
17Replace PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$135.3550$ 6,767.50
18Replace PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$95.77200$ 19,154.00
19New Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$35.22250$ 8,805.00
20Replace Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$59.50300$ 17,850.00
21New Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$39.85250$ 9,962.50
22Replace Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$80.15300$ 24,045.00
23New Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD$86.5040$ 3,460.00
24Replace Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD$165.7440$ 6,629.60
25New Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$104.0040$ 4,160.00
26Replace Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$189.2540$ 7,570.00
27New Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$192.95150$ 28,942.50
28Replace Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$401.55150$ 60,232.50
29New Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$1,058.345$ 5,291.70
30Replace Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$1,555.6520$ 31,113.00
31Falsework for Elevated SlabN/AN/ASQFT$25.25200$ 5,050.00
32Concrete Wall03 30 00Cast-in-Place ConcreteCUYD$805.78100$ 80,578.00
33Concrete Footer03 30 00Cast-in-Place ConcreteCUYD$322.1350$ 16,106.50
34New On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose$81.0075$ 6,075.00
35Replace On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose$184.83100$ 18,483.00
36New Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD$881.775$ 4,408.85
37Replace Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD$1,602.5010$ 16,025.00
38Capillary Water Barrier (4")03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD$12.00200$ 2,400.00
39Vaper Barrier03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD$2.75200$ 550.00
40Flowable Fill ConcreteN/AN/ACUYD$201.4530$ 6,043.50
41Reinforcing Steel03 20 00.10Concrete ReinforcingLBS$1.5110,000$ 15,100.00
42Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS$1.75500$ 875.00
43Woven Wire Steel Fabric 4 X 403 20 00.10Concrete ReinforcingSQYD$5.981,000$ 5,980.00
44Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT$15.11300$ 4,533.00
45Colored Concrete (Material Cost Dye)N/ANO BIDCUYD100$ - 0
46Stamp Pattern in Concrete (Additional Labor Costs)N/AN/ASQYD$10.27500$ 5,135.00
47Saw Cut Concrete or Asphalt 4" ThickN/AN/ALNFT$3.72300$ 1,116.00
48Saw Cut Concrete or Asphalt 6" ThickN/AN/ALNFT$5.26200$ 1,052.00
49Saw Cut Concrete or Asphalt 8" ThickN/AN/ALNFT$6.62200$ 1,324.00
50Sealing PCCP Joints (>1/8" to 1/2")32 01 19.61Sealing Cracks in Rigid PavementLNFT$3.35500$ 1,675.00
51Sealing PCCP Cracks (>1/2" to 1")32 01 19.61Sealing Cracks in Rigid PavementLNFT$7.01500$ 3,505.00
52Sealing PCCP Cracks (>1" to 2")32 01 19.61Sealing Cracks in Rigid PavementLNFT$14.9850$ 749.00
53New handrail (<30" above ground)05 52 00Metal RailingsLNFT$97.00100$ 9,700.00
54Replace handrail (<30" above ground)05 52 00Metal RailingsLNFT$166.3450$ 8,317.00
55New Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT$185.65200$ 37,130.00
56Replace Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT$262.3850$ 13,119.00
57Construct Sub-base Less than 5 CY32 11 23Aggregate Base CoursesCUYD$125.81100$ 12,581.00
58Construct Sub-base 5 to 50 cubic yards32 11 23Aggregate Base CoursesCUYD$112.20100$ 11,220.00
59Construct Sub-base over 50 cubic yards32 11 23Aggregate Base CoursesCUYD$99.98175$ 17,496.50
60Common Excavation31 00 00EarthworkCUYD$11.001,500$ 16,500.00
61Common Excavation (Government Furnished)31 00 00EarthworkCUYD$13.251,500$ 19,875.00
62Common Excavation (Contractor Furnished)31 00 00EarthworkCUYD$25.001,500$ 37,500.00
63Embankment31 00 00EarthworkCUYD$32.94500$ 16,470.00
64Embankment (Contractor Furnished)31 00 00EarthworkCUYD$41.77100$ 4,177.00
65Salvage Topsoil31 00 00EarthworkSQYD$1.011,000$ 1,010.00
66Topsoil (Government Furnished)31 00 00EarthworkCUYD$11.431,500$ 17,145.00
67Rock Excavation31 00 00EarthworkCUYD$59.631,500$ 89,445.00
68Rip-Rap (D50)(4")31 00 00EarthworkCUYD$68.0050$ 3,400.00
69Rip-Rap (D50)(6")31 00 00EarthworkCUYD$73.0050$ 3,650.00
70Manipulation for Treated Subgrade32 11 30Lime Treated SubgradesSQYD$24.451,500$ 36,675.00
71Quicklime for Treated Subgrade32 11 30Lime Treated SubgradesTONS$330.4620$ 6,609.20
72Hydrated Lime for Treated Subgrade32 11 30Lime Treated SubgradesTONS$485.7620$ 9,715.20
73Geotextile Separation Fabric31 05 19GeosyntheticsSQYD$2.751,000$ 2,750.00
74Core Drill (4”) Pavement SamplingN/AN/AEACH$100.3320$ 2,006.60
75In-Situ Soil Sampling and Testing for soil classification32 11 13.13Lime Treated SubgradesEACH$800.515$ 4,002.55
76Replace Asphalt Incidental to Work32 12 16HMACUFT$50.35100$ 5,035.00
77Pavement Marking (Paint)(4")(Yellow)(Without Glass Beads)32 17 23Pavement MarkingsLNFT$0.523,000$ 1,560.00
78Pavement Marking (Paint)(4")(White)(Without Glass Beads)32 17 23Pavement MarkingsLNFT$0.525,000$ 2,600.00
79Pavement Marking (Paint)(4")(Yellow)32 17 23Pavement MarkingsLNFT$0.5210,000$ 5,200.00
80Pavement Marking (Paint)(4")(White)32 17 23Pavement MarkingsLNFT$0.522,000$ 1,040.00
81Pavement Marking (Paint)(12")(White)32 17 23Pavement MarkingsLNFT$2.60500$ 1,300.00
82Pavement Marking (Paint)(18")(White)32 17 23Pavement MarkingsLNFT$3.50500$ 1,750.00
83Pavement Marking (Paint)(24")(White)32 17 23Pavement MarkingsLNFT$4.44500$ 2,220.00
84Pavement Marking (Paint)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$60.5910$ 605.90
85Pavement Marking (Paint)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$55.8220$ 1,116.40
86Pavement Marking (Paint)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$65.995$ 329.95
87Pavement Marking (Paint)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH$150.1315$ 2,251.95
88Pavement Marking (Paint)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH$150.1315$ 2,251.95
89Pavement Marking (Paint)(Symbol: Handicap)32 17 23Pavement MarkingsEACH$52.4130$ 1,572.30
90Pavement Marking (Paint)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$300.712$ 601.42
91Pavement Marking (Paint)(Word "ONLY")32 17 23Pavement MarkingsEACH$97.006$ 582.00
92Pavement Marking (Epoxy)(4")(Yellow)32 17 23Pavement MarkingsLNFT$1.1010,000$ 11,000.00
93Pavement Marking (Epoxy)(4")(White)32 17 23Pavement MarkingsLNFT$1.102,000$ 2,200.00
94Pavement Marking (Epoxy)(12")(White)32 17 23Pavement MarkingsLNFT$4.10500$ 2,050.00
95Pavement Marking (Epoxy)(18")(White)32 17 23Pavement MarkingsLNFT$6.10500$ 3,050.00
96Pavement Marking (Epoxy)(24")(White)32 17 23Pavement MarkingsLNFT$8.10500$ 4,050.00
97Pavement Marking (Epoxy)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$250.4510$ 2,504.50
98Pavement Marking (Epoxy)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$250.4520$ 5,009.00
99Pavement Marking (Epoxy)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$275.685$ 1,378.40
100Pavement Marking (Epoxy)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$350.722$ 701.44
101Pavement Marking (Epoxy)(Word "ONLY")32 17 23Pavement MarkingsEACH$250.455$ 1,252.25
102Pavement Marking (Thermoplastic)(12")(White)32 17 23Pavement MarkingsLNFT$10.00500$ 5,000.00
103Pavement Marking (Thermoplastic)(18")(White)32 17 23Pavement MarkingsLNFT$15.82500$ 7,910.00
104Pavement Marking (Thermoplastic)(24")(White)32 17 23Pavement MarkingsLNFT$20.05500$ 10,025.00
105Pavement Marking (Thermoplastic)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$150.4510$ 1,504.50
106Pavement Marking (Thermoplastic)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$150.4520$ 3,009.00
107Pavement Marking (Thermoplastic)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$200.225$ 1,001.10
108Pavement Marking (Thermoplastic)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH$175.6815$ 2,635.20
109Pavement Marking (Thermoplastic)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH$150.5515$ 2,258.25
110Pavement Marking (Thermoplastic)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$150.8530$ 4,525.50
111Pavement Marking (Thermoplastic)(Word "ONLY")32 17 23Pavement MarkingsEACH$125.572$ 251.14
112Inset Pavement Markings33 17 23Pavement MarkingsSQFT$8.151,000$ 8,150.00
113Pavement Marking Removal33 17 23Pavement MarkingsSQFT$5.851,000$ 5,850.00
114Install Curb Inlet 2' X 3' X 533 40 00Storm Drainage UtilitiesEACH$4,250.854$ 17,003.40
115Install Curb Inlet 5' X 5' X 5'33 40 00Storm Drainage UtilitiesEACH$4,285.854$ 17,143.40
116Install Junction Box 5’ X 5’ X 5”33 40 00Storm Drainage UtilitiesEACH$8,100.822$ 16,201.64
117Install additional depth of drainage structure33 40 00Storm Drainage UtilitiesLNFT$390.6730$ 11,720.10
118Raise Manhole Lid33 40 00Storm Drainage UtilitiesEACH$1,250.505$ 6,252.50
119Construct 12" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$54.0050$ 2,700.00
120Construct 15" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$62.4550$ 3,122.50
121Construct 18" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$71.9350$ 3,596.50
122Construct 24" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$83.7150$ 4,185.50
123Construct 30" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$92.5750$ 4,628.50
124Construct 18" RCP33 40 00Storm Drainage UtilitiesLNFT$81.1650$ 4,058.00
125Construct 24" RCP33 40 00Storm Drainage UtilitiesLNFT$93.9450$ 4,697.00
126Construct 30" RCP33 40 00Storm Drainage UtilitiesLNFT$104.3350$ 5,216.50
127Construct 36" RCP33 40 00Storm Drainage UtilitiesLNFT$155.9550$ 7,797.50
128Construct 42" RCP33 40 00Storm Drainage UtilitiesLNFT$198.6150$ 9,930.50
129Construct 48" RCP33 40 00Storm Drainage UtilitiesLNFT$225.3550$ 11,267.50
130Construct 18" Flared End Section33 40 00Storm Drainage UtilitiesEACH$1,225.594$ 4,902.36
131Construct 24" Flared End Section33 40 00Storm Drainage UtilitiesEACH$1,402.614$ 5,610.44
132Construct 30" Flared End Section33 40 00Storm Drainage UtilitiesEACH$1,601.384$ 6,405.52
133Construct 36" Flared End Section33 40 00Storm Drainage UtilitiesEACH$1,650.934$ 6,603.72
134Construct 42" Flared End Section33 40 00Storm Drainage UtilitiesEACH$2,350.612$ 4,701.22
135Construct 48" Flared End Section33 40 00Storm Drainage UtilitiesEACH$2,608.962$ 5,217.92
136Trench Excavation (Trenches 5 feet of less in depth)31 00 00EarthworkCUYD$37.21300$ 11,163.00
137Trench Excavation (Trenches exceeding 5 feet in depth)31 00 00EarthworkCUYD$41.00150$ 6,150.00
138Trench Box (8' Tall)31 00 00EarthworkWKLY$1,000.554$ 4,002.20
139Construct 12" Trench Drain33 40 00Storm Drainage UtilitiesLNFT$237.7530$ 7,132.50
140Down Spout Boot Cast Iron 4"33 40 00Storm Drainage UtilitiesEACH$475.885$ 2,379.40
141Down Spout Boot Cast Iron 6"33 40 00Storm Drainage UtilitiesEACH$701.835$ 3,509.15
142Down Spout Boot Cast Iron 8"33 40 00Storm Drainage UtilitiesEACH$1,100.775$ 5,503.85
143Down Spout Boot Steel 4"33 40 00Storm Drainage UtilitiesEACH$695.995$ 3,479.95
144Down Spout Boot Steel 6"33 40 00Storm Drainage UtilitiesEACH$975.295$ 4,876.45
145Down Spout Boot Steel 8"33 40 00Storm Drainage UtilitiesEACH$1,225.375$ 6,126.85
146Down Spout Lines PVC 6"33 40 00Storm Drainage UtilitiesLNFT$35.2440$ 1,409.60
147Down Spout Lines PVC 8"33 40 00Storm Drainage UtilitiesLNFT$42.2140$ 1,688.40
148Pipe Cleaning, Hydraulically Propelled Cleaning33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR$398.4640$ 15,938.40
149Pipe Cleaning, Combination Hydraulically Propelled Cleaning and Vac Truck33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR$501.6140$ 20,064.40
150TV Camera Inspection of Sewer Pipelines33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR$360.9640$ 14,438.40
151Fence Posts (Metal)(2")(End, Corner, and Pull Posts)(Concrete Filled)32 31 13FencingEACH$198.0010$ 1,980.00
152Fence Posts (Metal)(2")32 31 13FencingEACH$185.8720$ 3,717.40
153Fence Fabric, Chain-Link32 31 13FencingSQYD$60.331,400$ 84,462.00
1543 Strand Barbed-Wire on Extension Arms32 31 13FencingLNFT$5.99200$ 1,198.00
155Fence Gate, Singe Swing (4' Width) with Gate Posts32 31 13FencingEACH$889.003$ 2,667.00
156Fence Gate, Singe Swing (6' Width) with Gate Posts32 31 13FencingEACH$1,025.001$ 1,025.00
157Fence Gate, Double Swing (12' width) with Gate Posts32 31 13FencingEACH$1,945.001$ 1,945.00
158Concrete Mow Strip (24" wide x 4" deep)32 13 13.06Concrete PavementLNFT$68.25200$ 13,650.00
159Bollard (Steel Pipe)(Concrete Filled)32 31 13FencingEACH$748.925$ 3,744.60
160Replace Isolated Bricks (Group < 50 Bricks)04 20 00Unit MasonryEACH$60.0010$ 600.00
161Replace Bricks (Group ≥ 50 Bricks)04 20 00Unit MasonryEACH$20.33500$ 10,165.00
162New CMU (8"x8"x16") Block Wall04 20 00Unit MasonrySQFT$22.772,000$ 45,540.00
163Replace CMU04 20 00Unit MasonryEACH$55.91100$ 5,591.00
164Repointing Brick Masonry04 20 00Unit MasonryLNFT$12.75100$ 1,275.00
165Repointing Stone Masonry04 20 00Unit MasonryLNFT$18.10100$ 1,810.00
166Repointing Concrete Masonry04 20 00Unit MasonryLNFT$8.805,000$ 44,000.00
167Mortar Analysis04 03 00Conservation Treatement for Period MasonryEACH$1,600.0050$ 80,000.00
168Replace Isolated Bricks (Group < 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH$60.005,000$ 300,000.00
169Replace Bricks (Group ≥ 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH$20.975,000$ 104,850.00
170Replace Stone Masonry (Rough Field)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT$81.00500$ 40,500.00
171Replace Stone Masonry (Dressed)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT$81.00500$ 40,500.00
172Repointing Masonry(Historical)04 03 00Conservation Treatement for Period MasonryLNFT$15.96500$ 7,980.00
173Repointing Stone Masonry (Historical)04 03 00Conservation Treatement for Period MasonryLNFT$23.9150$ 1,195.50
174Joint Sealant, Masonry Joints (width < 1/2")04 20 00Unit MasonryLNFT$7.7550$ 387.50
175Joint Sealant, Masonry Joints (1/2" ≤ width < 3/4")04 20 00Unit MasonryLNFT$8.7550$ 437.50
176Joint Sealant, Masonry Joints (3/4" ≤ width < 1")04 20 00Unit MasonryLNFT$9.7550$ 487.50
177Joint Sealant, Masonry Joints (Width > 1")04 20 00Unit MasonryLNFT$15.76250$ 3,940.00
178Concrete Chimney Crown04 20 00Unit MasonryCUFT$1,125.8510$ 11,258.50
179Man Lift01 35 26Government Safety RequirementsDAY$350.505$ 1,752.50
180Scaffolding (errected to 30 feet in height)01 35 26Government Safety RequirementsCSF$1,250.75100$ 125,075.00
181Scaffolding (errected over 30 feet in height to 60 feet)01 35 26Government Safety RequirementsCSF$1,350.75300$ 405,225.00
182Scaffolding (errected over 60 feet in elevation)01 35 26Government Safety RequirementsCSF$1,500.55100$ 150,055.00
183Flashing EPDM04 03 00Conservation Treatement for Period MasonrySQFT$14.75100$ 1,475.00
184Remove and Replace Brick Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$35.66200$ 7,132.00
185Remove and Replace Brick Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT$38.98700$ 27,286.00
186Remove and Replace Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$31.11200$ 6,222.00
187Remove and Replace Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT$26.38700$ 18,466.00
188Remove and Replace Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$34.61200$ 6,922.00
189Remove and Replace Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT$30.00700$ 21,000.00
190New Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$25.00100$ 2,500.00
191New Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT$23.00500$ 11,500.00
192New Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$29.78100$ 2,978.00
193New Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT$26.15300$ 7,845.00
194Concrete Pole Base03 30 00Cast-in-Place ConcreteEACH$1,700.504$ 6,802.00
195Conduit, galvanized, 1" diameterN/AN/ALNFT$19.90200$ 3,980.00
196Clearing Vegetation31 11 00Clearing and GrubbingACRE$650.5030$ 19,515.00
197Clearing and Grubbing Vegetation31 11 00Clearing and GrubbingACRE$10,000.502$ 20,001.00
198Silt Fence01 57 19Temporary Environmental ControlsLNFT$7.65200$ 1,530.00
199Biodegrable Log01 57 19Temporary Environmental ControlsLNFT$8.79200$ 1,758.00
200Filter Sock01 57 19Temporary Environmental ControlsLNFT$14.83100$ 1,483.00
201Erosion Control Material (Class I)01 57 19Temporary Environmental ControlsSQYD$5.50200$ 1,100.00
202Erosion Control Material (Class II)01 57 19Temporary Environmental ControlsSQYD$7.5550$ 377.50
203Seeding (Tall Fescue application rate 0.1 LBS./SQYD)32 92 19SeedingSQYD$50.53500$ 25,265.00
204Sodding32 92 23SoddingSQYD$145.57300$ 43,671.00
205Hazarduous Material HandlingN/ANO BIDTBD1$ - 0

SUBTOTAL $81,016.25 $3,053,254.82

Contractor Co-Efficient 0.00

Concrete Line Items Sub-Total (Pre-Bond) $0.00

206Payment & Performance Bond - On Task Order at or over $35,000.00%3%$ - 0$ - 0
207Payment & Performance Bond - On Task Order at or over $150,000.00%3%$ - 0$ - 0

TOTAL $0.00

Fort Leavenworth, Kansas

&P of &N

Option Year #1

MISCELLANEOUS CONCRETE REPAIRS - BIDDING SCHEDULE
OPTION YEAR #1
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREDPW - Cost EstimateESTIMATED QUANTITYTOTAL COST
1New PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$141.3620$ 2,827.20
2New PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$70.3550$ 3,517.50
3New PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$60.50200$ 12,100.00
4New PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$155.1020$ 3,102.00
5New PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$90.7250$ 4,536.00
6New PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$70.35200$ 14,070.00
7New PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$181.2620$ 3,625.20
8New PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$100.5750$ 5,028.50
9New PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$65.10200$ 13,020.00
10Replace PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$203.7520$ 4,075.00
11Replace PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$115.0050$ 5,750.00
12Replace PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$72.68200$ 14,536.00
13Replace PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$225.5320$ 4,510.60
14Replace PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$130.9650$ 6,548.00
15Replace PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$90.88200$ 18,176.00
16Replace PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$230.6120$ 4,612.20
17Replace PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$135.3550$ 6,767.50
18Replace PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$95.77200$ 19,154.00
19New Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$35.22250$ 8,805.00
20Replace Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$59.50300$ 17,850.00
21New Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$39.85250$ 9,962.50
22Replace Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$80.15300$ 24,045.00
23New Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD$86.5040$ 3,460.00
24Replace Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD$165.7440$ 6,629.60
25New Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$104.0040$ 4,160.00
26Replace Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$189.2540$ 7,570.00
27New Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$192.95150$ 28,942.50
28Replace Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$401.55150$ 60,232.50
29New Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$1,058.345$ 5,291.70
30Replace Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$1,555.6520$ 31,113.00
31Falsework for Elevated SlabN/AN/ASQFT$25.25200$ 5,050.00
32Concrete Wall03 30 00Cast-in-Place ConcreteCUYD$805.78100$ 80,578.00
33Concrete Footer03 30 00Cast-in-Place ConcreteCUYD$322.1350$ 16,106.50
34New On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose$81.0075$ 6,075.00
35Replace On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose$184.83100$ 18,483.00
36New Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD$881.775$ 4,408.85
37Replace Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD$1,602.5010$ 16,025.00
38Capillary Water Barrier (4")03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD$12.00200$ 2,400.00
39Vaper Barrier03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD$2.75200$ 550.00
40Flowable Fill ConcreteN/AN/ACUYD$201.4530$ 6,043.50
41Reinforcing Steel03 20 00.10Concrete ReinforcingLBS$1.5110,000$ 15,100.00
42Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS$1.75500$ 875.00
43Woven Wire Steel Fabric 4 X 403 20 00.10Concrete ReinforcingSQYD$5.981,000$ 5,980.00
44Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT$15.11300$ 4,533.00
45Colored Concrete (Material Cost Dye)N/ANO BIDCUYD100$ - 0
46Stamp Pattern in Concrete (Additional Labor Costs)N/AN/ASQYD$10.27500$ 5,135.00
47Saw Cut Concrete or Asphalt 4" ThickN/AN/ALNFT$3.72300$ 1,116.00
48Saw Cut Concrete or Asphalt 6" ThickN/AN/ALNFT$5.26200$ 1,052.00
49Saw Cut Concrete or Asphalt 8" ThickN/AN/ALNFT$6.62200$ 1,324.00
50Sealing PCCP Joints (>1/8" to 1/2")32 01 19.61Sealing Cracks in Rigid PavementLNFT$3.35500$ 1,675.00
51Sealing PCCP Cracks (>1/2" to 1")32 01 19.61Sealing Cracks in Rigid PavementLNFT$7.01500$ 3,505.00
52Sealing PCCP Cracks (>1" to 2")32 01 19.61Sealing Cracks in Rigid PavementLNFT$14.9850$ 749.00
53New handrail (<30" above ground)05 52 00Metal RailingsLNFT$97.00100$ 9,700.00
54Replace handrail (<30" above ground)05 52 00Metal RailingsLNFT$166.3450$ 8,317.00
55New Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT$185.65200$ 37,130.00
56Replace Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT$262.3850$ 13,119.00
57Construct Sub-base Less than 5 CY32 11 23Aggregate Base CoursesCUYD$125.81100$ 12,581.00
58Construct Sub-base 5 to 50 cubic yards32 11 23Aggregate Base CoursesCUYD$112.20100$ 11,220.00
59Construct Sub-base over 50 cubic yards32 11 23Aggregate Base CoursesCUYD$99.98175$ 17,496.50
60Common Excavation31 00 00EarthworkCUYD$11.001,500$ 16,500.00
61Common Excavation (Government Furnished)31 00 00EarthworkCUYD$13.251,500$ 19,875.00
62Common Excavation (Contractor Furnished)31 00 00EarthworkCUYD$25.001,500$ 37,500.00
63Embankment31 00 00EarthworkCUYD$32.94500$ 16,470.00
64Embankment (Contractor Furnished)31 00 00EarthworkCUYD$41.77100$ 4,177.00
65Salvage Topsoil31 00 00EarthworkSQYD$1.011,000$ 1,010.00
66Topsoil (Government Furnished)31 00 00EarthworkCUYD$11.431,500$ 17,145.00
67Rock Excavation31 00 00EarthworkCUYD$59.631,500$ 89,445.00
68Rip-Rap (D50)(4")31 00 00EarthworkCUYD$68.0050$ 3,400.00
69Rip-Rap (D50)(6")31 00 00EarthworkCUYD$73.0050$ 3,650.00
70Manipulation for Treated Subgrade32 11 30Lime Treated SubgradesSQYD$24.451,500$ 36,675.00
71Quicklime for Treated Subgrade32 11 30Lime Treated SubgradesTONS$330.4620$ 6,609.20
72Hydrated Lime for Treated Subgrade32 11 30Lime Treated SubgradesTONS$485.7620$ 9,715.20
73Geotextile Separation Fabric31 05 19GeosyntheticsSQYD$2.751,000$ 2,750.00
74Core Drill (4”) Pavement SamplingN/AN/AEACH$100.3320$ 2,006.60
75In-Situ Soil Sampling and Testing for soil classification32 11 13.13Lime Treated SubgradesEACH$800.515$ 4,002.55
76Replace Asphalt Incidental to Work32 12 16HMACUFT$50.35100$ 5,035.00
77Pavement Marking (Paint)(4")(Yellow)(Without Glass Beads)32 17 23Pavement MarkingsLNFT$0.523,000$ 1,560.00
78Pavement Marking (Paint)(4")(White)(Without Glass Beads)32 17 23Pavement MarkingsLNFT$0.525,000$ 2,600.00
79Pavement Marking (Paint)(4")(Yellow)32 17 23Pavement MarkingsLNFT$0.5210,000$ 5,200.00
80Pavement Marking (Paint)(4")(White)32 17 23Pavement MarkingsLNFT$0.522,000$ 1,040.00
81Pavement Marking (Paint)(12")(White)32 17 23Pavement MarkingsLNFT$2.60500$ 1,300.00
82Pavement Marking (Paint)(18")(White)32 17 23Pavement MarkingsLNFT$3.50500$ 1,750.00
83Pavement Marking (Paint)(24")(White)32 17 23Pavement MarkingsLNFT$4.44500$ 2,220.00
84Pavement Marking (Paint)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$60.5910$ 605.90
85Pavement Marking (Paint)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$55.8220$ 1,116.40
86Pavement Marking (Paint)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$65.995$ 329.95
87Pavement Marking (Paint)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH$150.1315$ 2,251.95
88Pavement Marking (Paint)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH$150.1315$ 2,251.95
89Pavement Marking (Paint)(Symbol: Handicap)32 17 23Pavement MarkingsEACH$52.4130$ 1,572.30
90Pavement Marking (Paint)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$300.712$ 601.42
91Pavement Marking (Paint)(Word "ONLY")32 17 23Pavement MarkingsEACH$97.006$ 582.00
92Pavement Marking (Epoxy)(4")(Yellow)32 17 23Pavement MarkingsLNFT$1.1010,000$ 11,000.00
93Pavement Marking (Epoxy)(4")(White)32 17 23Pavement MarkingsLNFT$1.102,000$ 2,200.00
94Pavement Marking (Epoxy)(12")(White)32 17 23Pavement MarkingsLNFT$4.10500$ 2,050.00
95Pavement Marking (Epoxy)(18")(White)32 17 23Pavement MarkingsLNFT$6.10500$ 3,050.00
96Pavement Marking (Epoxy)(24")(White)32 17 23Pavement MarkingsLNFT$8.10500$ 4,050.00
97Pavement Marking (Epoxy)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$250.4510$ 2,504.50
98Pavement Marking (Epoxy)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$250.4520$ 5,009.00
99Pavement Marking (Epoxy)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$275.685$ 1,378.40
100Pavement Marking (Epoxy)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$350.722$ 701.44
101Pavement Marking (Epoxy)(Word "ONLY")32 17 23Pavement MarkingsEACH$250.455$ 1,252.25
102Pavement Marking (Thermoplastic)(12")(White)32 17 23Pavement MarkingsLNFT$10.00500$ 5,000.00
103Pavement Marking (Thermoplastic)(18")(White)32 17 23Pavement MarkingsLNFT$15.82500$ 7,910.00
104Pavement Marking (Thermoplastic)(24")(White)32 17 23Pavement MarkingsLNFT$20.05500$ 10,025.00
105Pavement Marking (Thermoplastic)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$150.4510$ 1,504.50
106Pavement Marking (Thermoplastic)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$150.4520$ 3,009.00
107Pavement Marking (Thermoplastic)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$200.225$ 1,001.10
108Pavement Marking (Thermoplastic)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH$175.6815$ 2,635.20
109Pavement Marking (Thermoplastic)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH$150.5515$ 2,258.25
110Pavement Marking (Thermoplastic)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$150.8530$ 4,525.50
111Pavement Marking (Thermoplastic)(Word "ONLY")32 17 23Pavement MarkingsEACH$125.572$ 251.14
112Inset Pavement Markings33 17 23Pavement MarkingsSQFT$8.151,000$ 8,150.00
113Pavement Marking Removal33 17 23Pavement MarkingsSQFT$5.851,000$ 5,850.00
114Install Curb Inlet 2' X 3' X 533 40 00Storm Drainage UtilitiesEACH$4,250.854$ 17,003.40
115Install Curb Inlet 5' X 5' X 5'33 40 00Storm Drainage UtilitiesEACH$4,285.854$ 17,143.40
116Install Junction Box 5’ X 5’ X 5”33 40 00Storm Drainage UtilitiesEACH$8,100.822$ 16,201.64
117Install additional depth of drainage structure33 40 00Storm Drainage UtilitiesLNFT$390.6730$ 11,720.10
118Raise Manhole Lid33 40 00Storm Drainage UtilitiesEACH$1,250.505$ 6,252.50
119Construct 12" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$54.0050$ 2,700.00
120Construct 15" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$62.4550$ 3,122.50
121Construct 18" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$71.9350$ 3,596.50
122Construct 24" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$83.7150$ 4,185.50
123Construct 30" Corrugated HDPE33 40 00Storm Drainage UtilitiesLNFT$92.5750$ 4,628.50
124Construct 18" RCP33 40 00Storm Drainage UtilitiesLNFT$81.1650$ 4,058.00
125Construct 24" RCP33 40 00Storm Drainage UtilitiesLNFT$93.9450$ 4,697.00
126Construct 30" RCP33 40 00Storm Drainage UtilitiesLNFT$104.3350$ 5,216.50
127Construct 36" RCP33 40 00Storm Drainage UtilitiesLNFT$155.9550$ 7,797.50
128Construct 42" RCP33 40 00Storm Drainage UtilitiesLNFT$198.6150$ 9,930.50
129Construct 48" RCP33 40 00Storm Drainage UtilitiesLNFT$225.3550$ 11,267.50
130Construct 18" Flared End Section33 40 00Storm Drainage UtilitiesEACH$1,225.594$ 4,902.36
131Construct 24" Flared End Section33 40 00Storm Drainage UtilitiesEACH$1,402.614$ 5,610.44
132Construct 30" Flared End Section33 40 00Storm Drainage UtilitiesEACH$1,601.384$ 6,405.52
133Construct 36" Flared End Section33 40 00Storm Drainage UtilitiesEACH$1,650.934$ 6,603.72
134Construct 42" Flared End Section33 40 00Storm Drainage UtilitiesEACH$2,350.612$ 4,701.22
135Construct 48" Flared End Section33 40 00Storm Drainage UtilitiesEACH$2,608.962$ 5,217.92
136Trench Excavation (Trenches 5 feet of less in depth)31 00 00EarthworkCUYD$37.21300$ 11,163.00
137Trench Excavation (Trenches exceeding 5 feet in depth)31 00 00EarthworkCUYD$41.00150$ 6,150.00
138Trench Box (8' Tall)31 00 00EarthworkWKLY$1,000.554$ 4,002.20
139Construct 12" Trench Drain33 40 00Storm Drainage UtilitiesLNFT$237.7530$ 7,132.50
140Down Spout Boot Cast Iron 4"33 40 00Storm Drainage UtilitiesEACH$475.885$ 2,379.40
141Down Spout Boot Cast Iron 6"33 40 00Storm Drainage UtilitiesEACH$701.835$ 3,509.15
142Down Spout Boot Cast Iron 8"33 40 00Storm Drainage UtilitiesEACH$1,100.775$ 5,503.85
143Down Spout Boot Steel 4"33 40 00Storm Drainage UtilitiesEACH$695.995$ 3,479.95
144Down Spout Boot Steel 6"33 40 00Storm Drainage UtilitiesEACH$975.295$ 4,876.45
145Down Spout Boot Steel 8"33 40 00Storm Drainage UtilitiesEACH$1,225.375$ 6,126.85
146Down Spout Lines PVC 6"33 40 00Storm Drainage UtilitiesLNFT$35.2440$ 1,409.60
147Down Spout Lines PVC 8"33 40 00Storm Drainage UtilitiesLNFT$42.2140$ 1,688.40
148Pipe Cleaning, Hydraulically Propelled Cleaning33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR$398.4640$ 15,938.40
149Pipe Cleaning, Combination Hydraulically Propelled Cleaning and Vac Truck33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR$501.6140$ 20,064.40
150TV Camera Inspection of Sewer Pipelines33 01 30.16TV Inspection and Cleaning of Sewer PipelinesHOUR$360.9640$ 14,438.40
151Fence Posts (Metal)(2")(End, Corner, and Pull Posts)(Concrete Filled)32 31 13FencingEACH$198.0010$ 1,980.00
152Fence Posts (Metal)(2")32 31 13FencingEACH$185.8720$ 3,717.40
153Fence Fabric, Chain-Link32 31 13FencingSQYD$60.331,400$ 84,462.00
1543 Strand Barbed-Wire on Extension Arms32 31 13FencingLNFT$5.99200$ 1,198.00
155Fence Gate, Singe Swing (4' Width) with Gate Posts32 31 13FencingEACH$889.003$ 2,667.00
156Fence Gate, Singe Swing (6' Width) with Gate Posts32 31 13FencingEACH$1,025.001$ 1,025.00
157Fence Gate, Double Swing (12' width) with Gate Posts32 31 13FencingEACH$1,945.001$ 1,945.00
158Concrete Mow Strip (24" wide x 4" deep)32 13 13.06Concrete PavementLNFT$68.25200$ 13,650.00
159Bollard (Steel Pipe)(Concrete Filled)32 31 13FencingEACH$748.925$ 3,744.60
160Replace Isolated Bricks (Group < 50 Bricks)04 20 00Unit MasonryEACH$60.0010$ 600.00
161Replace Bricks (Group ≥ 50 Bricks)04 20 00Unit MasonryEACH$20.33500$ 10,165.00
162New CMU (8"x8"x16") Block Wall04 20 00Unit MasonrySQFT$22.772,000$ 45,540.00
163Replace CMU04 20 00Unit MasonryEACH$55.91100$ 5,591.00
164Repointing Brick Masonry04 20 00Unit MasonryLNFT$12.75100$ 1,275.00
165Repointing Stone Masonry04 20 00Unit MasonryLNFT$18.10100$ 1,810.00
166Repointing Concrete Masonry04 20 00Unit MasonryLNFT$8.805,000$ 44,000.00
167Mortar Analysis04 03 00Conservation Treatement for Period MasonryEACH$1,600.0050$ 80,000.00
168Replace Isolated Bricks (Group < 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH$60.005,000$ 300,000.00
169Replace Bricks (Group ≥ 50 Bricks)(Historical)04 03 00Conservation Treatement for Period MasonryEACH$20.975,000$ 104,850.00
170Replace Stone Masonry (Rough Field)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT$81.00500$ 40,500.00
171Replace Stone Masonry (Dressed)(Historical)04 03 00Conservation Treatement for Period MasonrySQFT$81.00500$ 40,500.00
172Repointing Masonry(Historical)04 03 00Conservation Treatement for Period MasonryLNFT$15.96500$ 7,980.00
173Repointing Stone Masonry (Historical)04 03 00Conservation Treatement for Period MasonryLNFT$23.9150$ 1,195.50
174Joint Sealant, Masonry Joints (width < 1/2")04 20 00Unit MasonryLNFT$7.7550$ 387.50
175Joint Sealant, Masonry Joints (1/2" ≤ width < 3/4")04 20 00Unit MasonryLNFT$8.7550$ 437.50
176Joint Sealant, Masonry Joints (3/4" ≤ width < 1")04 20 00Unit MasonryLNFT$9.7550$ 487.50
177Joint Sealant, Masonry Joints (Width > 1")04 20 00Unit MasonryLNFT$15.76250$ 3,940.00
178Concrete Chimney Crown04 20 00Unit MasonryCUFT$1,125.8510$ 11,258.50
179Man Lift01 35 26Government Safety RequirementsDAY$350.505$ 1,752.50
180Scaffolding (errected to 30 feet in height)01 35 26Government Safety RequirementsCSF$1,250.75100$ 125,075.00
181Scaffolding (errected over 30 feet in height to 60 feet)01 35 26Government Safety RequirementsCSF$1,350.75300$ 405,225.00
182Scaffolding (errected over 60 feet in elevation)01 35 26Government Safety RequirementsCSF$1,500.55100$ 150,055.00
183Flashing EPDM04 03 00Conservation Treatement for Period MasonrySQFT$14.75100$ 1,475.00
184Remove and Replace Brick Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$35.66200$ 7,132.00
185Remove and Replace Brick Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT$38.98700$ 27,286.00
186Remove and Replace Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$31.11200$ 6,222.00
187Remove and Replace Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT$26.38700$ 18,466.00
188Remove and Replace Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$34.61200$ 6,922.00
189Remove and Replace Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT$30.00700$ 21,000.00
190New Concrete Paver Pedestrian/Light Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$25.00100$ 2,500.00
191New Concrete Pavers Pedestrian/Light Vehicle over 100 SF32 16 15Unit PaversSQFT$23.00500$ 11,500.00
192New Concrete Pavers Vehicle 1 to 100 SF32 16 15Unit PaversSQFT$29.78100$ 2,978.00
193New Concrete Pavers Vehicle Over 100 SF32 16 15Unit PaversSQFT$26.15300$ 7,845.00
194Concrete Pole Base03 30 00Cast-in-Place ConcreteEACH$1,700.504$ 6,802.00
195Conduit, galvanized, 1" diameterN/AN/ALNFT$19.90200$ 3,980.00
196Clearing Vegetation31 11 00Clearing and GrubbingACRE$650.5030$ 19,515.00
197Clearing and Grubbing Vegetation31 11 00Clearing and GrubbingACRE$10,000.502$ 20,001.00
198Silt Fence01 57 19Temporary Environmental ControlsLNFT$7.65200$ 1,530.00
199Biodegrable Log01 57 19Temporary Environmental ControlsLNFT$8.79200$ 1,758.00
200Filter Sock01 57 19Temporary Environmental ControlsLNFT$14.83100$ 1,483.00
201Erosion Control Material (Class I)01 57 19Temporary Environmental ControlsSQYD$5.50200$ 1,100.00
202Erosion Control Material (Class II)01 57 19Temporary Environmental ControlsSQYD$7.5550$ 377.50
203Seeding (Tall Fescue application rate 0.1 LBS./SQYD)32 92 19SeedingSQYD$50.53500$ 25,265.00
204Sodding32 92 23SoddingSQYD$145.57300$ 43,671.00
205Hazarduous Material HandlingN/ANO BIDTBD1$ - 0

SUBTOTAL $81,016.25 $3,053,254.82

Contractor Co-Efficient 0.00

Concrete Line Items Sub-Total (Pre-Bond) $0.00

206Payment & Performance Bond - On Task Order at or over $35,000.00%3%$ - 0$ - 0
207Payment & Performance Bond - On Task Order at or over $150,000.00%3%$ - 0$ - 0

TOTAL $0.00

Fort Leavenworth, Kansas

&P of &N

Option Year #2

MISCELLANEOUS CONCRETE REPAIRS - BIDDING SCHEDULE
BASE YEAR
BID ITEMDESCRIPTIONUnified Facilities Guide SpecificationUNIT OF MEASUREDPW - Cost EstimateESTIMATED QUANTITYTOTAL COST
1New PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$141.3620$ 2,827.20
2New PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$70.3550$ 3,517.50
3New PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$60.50200$ 12,100.00
4New PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$155.1020$ 3,102.00
5New PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$90.7250$ 4,536.00
6New PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$70.35200$ 14,070.00
7New PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$181.2620$ 3,625.20
8New PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$100.5750$ 5,028.50
9New PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$65.10200$ 13,020.00
10Replace PCCP 6" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$203.7520$ 4,075.00
11Replace PCCP 6" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$115.0050$ 5,750.00
12Replace PCCP 6" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$72.68200$ 14,536.00
13Replace PCCP 8" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$225.5320$ 4,510.60
14Replace PCCP 8" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$130.9650$ 6,548.00
15Replace PCCP 8" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$90.88200$ 18,176.00
16Replace PCCP 10" Thick 1 to 25 Square Yards32 13 13.06Concrete PavementSQYD$230.6120$ 4,612.20
17Replace PCCP 10" Thick 25 to 100 Square Yards32 13 13.06Concrete PavementSQYD$135.3550$ 6,767.50
18Replace PCCP 10" Thick over 100 Square Yards32 13 13.06Concrete PavementSQYD$95.77200$ 19,154.00
19New Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$35.22250$ 8,805.00
20Replace Curb & Gutter32 16 19Concrete Curbs Gutters and SidewalksLNFT$59.50300$ 17,850.00
21New Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$39.85250$ 9,962.50
22Replace Concrete Sidewalk32 16 19Concrete Curbs Gutters and SidewalksSQYD$80.15300$ 24,045.00
23New Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD$86.5040$ 3,460.00
24Replace Sidewalk Ramp32 16 19Concrete Curbs Gutters and SidewalksSQYD$165.7440$ 6,629.60
25New Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$104.0040$ 4,160.00
26Replace Sidewalk Ramp (Detectable Warning)32 16 19Concrete Curbs Gutters and SidewalksSQYD$189.2540$ 7,570.00
27New Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$192.95150$ 28,942.50
28Replace Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$401.55150$ 60,232.50
29New Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$1,058.345$ 5,291.70
30Replace Elevated Concrete Slab03 30 00Cast-in-Place ConcreteCUYD$1,555.6520$ 31,113.00
31Falsework for Elevated SlabN/AN/ASQFT$25.25200$ 5,050.00
32Concrete Wall03 30 00Cast-in-Place ConcreteCUYD$805.78100$ 80,578.00
33Concrete Footer03 30 00Cast-in-Place ConcreteCUYD$322.1350$ 16,106.50
34New On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose$81.0075$ 6,075.00
35Replace On-Grade Steps03 30 00Cast-in-Place ConcreteLF Nose$184.83100$ 18,483.00
36New Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD$881.775$ 4,408.85
37Replace Above-Grade Steps03 30 00Cast-in-Place ConcreteCUYD$1,602.5010$ 16,025.00
38Capillary Water Barrier (4")03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD$12.00200$ 2,400.00
39Vaper Barrier03 30 00 31 00 00Cast-in-Place Concrete EarthworkSQYD$2.75200$ 550.00
40Flowable Fill ConcreteN/AN/ACUYD$201.4530$ 6,043.50
41Reinforcing Steel03 20 00.10Concrete ReinforcingLBS$1.5110,000$ 15,100.00
42Reinforcing Steel (Epoxy Coated)03 20 00.10Concrete ReinforcingLBS$1.75500$ 875.00
43Woven Wire Steel Fabric 4 X 403 20 00.10Concrete ReinforcingSQYD$5.981,000$ 5,980.00
44Dowel Bars, Epoxy Coated and Baskets for Roadway 3/4"03 20 00.10Concrete ReinforcingLNFT$15.11300$ 4,533.00
45Colored Concrete (Material Cost Dye)N/ANO BIDCUYD100$ - 0
46Stamp Pattern in Concrete (Additional Labor Costs)N/AN/ASQYD$10.27500$ 5,135.00
47Saw Cut Concrete or Asphalt 4" ThickN/AN/ALNFT$3.72300$ 1,116.00
48Saw Cut Concrete or Asphalt 6" ThickN/AN/ALNFT$5.26200$ 1,052.00
49Saw Cut Concrete or Asphalt 8" ThickN/AN/ALNFT$6.62200$ 1,324.00
50Sealing PCCP Joints (>1/8" to 1/2")32 01 19.61Sealing Cracks in Rigid PavementLNFT$3.35500$ 1,675.00
51Sealing PCCP Cracks (>1/2" to 1")32 01 19.61Sealing Cracks in Rigid PavementLNFT$7.01500$ 3,505.00
52Sealing PCCP Cracks (>1" to 2")32 01 19.61Sealing Cracks in Rigid PavementLNFT$14.9850$ 749.00
53New handrail (<30" above ground)05 52 00Metal RailingsLNFT$97.00100$ 9,700.00
54Replace handrail (<30" above ground)05 52 00Metal RailingsLNFT$166.3450$ 8,317.00
55New Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT$185.65200$ 37,130.00
56Replace Guardrail/Handrail (≥ 30" above ground)05 52 00Metal RailingsLNFT$262.3850$ 13,119.00
57Construct Sub-base Less than 5 CY32 11 23Aggregate Base CoursesCUYD$125.81100$ 12,581.00
58Construct Sub-base 5 to 50 cubic yards32 11 23Aggregate Base CoursesCUYD$112.20100$ 11,220.00
59Construct Sub-base over 50 cubic yards32 11 23Aggregate Base CoursesCUYD$99.98175$ 17,496.50
60Common Excavation31 00 00EarthworkCUYD$11.001,500$ 16,500.00
61Common Excavation (Government Furnished)31 00 00EarthworkCUYD$13.251,500$ 19,875.00
62Common Excavation (Contractor Furnished)31 00 00EarthworkCUYD$25.001,500$ 37,500.00
63Embankment31 00 00EarthworkCUYD$32.94500$ 16,470.00
64Embankment (Contractor Furnished)31 00 00EarthworkCUYD$41.77100$ 4,177.00
65Salvage Topsoil31 00 00EarthworkSQYD$1.011,000$ 1,010.00
66Topsoil (Government Furnished)31 00 00EarthworkCUYD$11.431,500$ 17,145.00
67Rock Excavation31 00 00EarthworkCUYD$59.631,500$ 89,445.00
68Rip-Rap (D50)(4")31 00 00EarthworkCUYD$68.0050$ 3,400.00
69Rip-Rap (D50)(6")31 00 00EarthworkCUYD$73.0050$ 3,650.00
70Manipulation for Treated Subgrade32 11 30Lime Treated SubgradesSQYD$24.451,500$ 36,675.00
71Quicklime for Treated Subgrade32 11 30Lime Treated SubgradesTONS$330.4620$ 6,609.20
72Hydrated Lime for Treated Subgrade32 11 30Lime Treated SubgradesTONS$485.7620$ 9,715.20
73Geotextile Separation Fabric31 05 19GeosyntheticsSQYD$2.751,000$ 2,750.00
74Core Drill (4”) Pavement SamplingN/AN/AEACH$100.3320$ 2,006.60
75In-Situ Soil Sampling and Testing for soil classification32 11 13.13Lime Treated SubgradesEACH$800.515$ 4,002.55
76Replace Asphalt Incidental to Work32 12 16HMACUFT$50.35100$ 5,035.00
77Pavement Marking (Paint)(4")(Yellow)(Without Glass Beads)32 17 23Pavement MarkingsLNFT$0.523,000$ 1,560.00
78Pavement Marking (Paint)(4")(White)(Without Glass Beads)32 17 23Pavement MarkingsLNFT$0.525,000$ 2,600.00
79Pavement Marking (Paint)(4")(Yellow)32 17 23Pavement MarkingsLNFT$0.5210,000$ 5,200.00
80Pavement Marking (Paint)(4")(White)32 17 23Pavement MarkingsLNFT$0.522,000$ 1,040.00
81Pavement Marking (Paint)(12")(White)32 17 23Pavement MarkingsLNFT$2.60500$ 1,300.00
82Pavement Marking (Paint)(18")(White)32 17 23Pavement MarkingsLNFT$3.50500$ 1,750.00
83Pavement Marking (Paint)(24")(White)32 17 23Pavement MarkingsLNFT$4.44500$ 2,220.00
84Pavement Marking (Paint)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$60.5910$ 605.90
85Pavement Marking (Paint)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$55.8220$ 1,116.40
86Pavement Marking (Paint)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$65.995$ 329.95
87Pavement Marking (Paint)(Symbol: Bicycle)32 17 23Pavement MarkingsEACH$150.1315$ 2,251.95
88Pavement Marking (Paint)(Symbol: Sharrow)32 17 23Pavement MarkingsEACH$150.1315$ 2,251.95
89Pavement Marking (Paint)(Symbol: Handicap)32 17 23Pavement MarkingsEACH$52.4130$ 1,572.30
90Pavement Marking (Paint)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$300.712$ 601.42
91Pavement Marking (Paint)(Word "ONLY")32 17 23Pavement MarkingsEACH$97.006$ 582.00
92Pavement Marking (Epoxy)(4")(Yellow)32 17 23Pavement MarkingsLNFT$1.1010,000$ 11,000.00
93Pavement Marking (Epoxy)(4")(White)32 17 23Pavement MarkingsLNFT$1.102,000$ 2,200.00
94Pavement Marking (Epoxy)(12")(White)32 17 23Pavement MarkingsLNFT$4.10500$ 2,050.00
95Pavement Marking (Epoxy)(18")(White)32 17 23Pavement MarkingsLNFT$6.10500$ 3,050.00
96Pavement Marking (Epoxy)(24")(White)32 17 23Pavement MarkingsLNFT$8.10500$ 4,050.00
97Pavement Marking (Epoxy)(Symbol: Thru Arrow)32 17 23Pavement MarkingsEACH$250.4510$ 2,504.50
98Pavement Marking (Epoxy)(Symbol: Turn Arrow)32 17 23Pavement MarkingsEACH$250.4520$ 5,009.00
99Pavement Marking (Epoxy)(Symbol: Turn and Thru Arrow)32 17 23Pavement MarkingsEACH$275.685$ 1,378.40
100Pavement Marking (Epoxy)(Symbol: RR Crossing)32 17 23Pavement MarkingsEACH$350.722$ 701.44
101Pavement Marking (Epoxy)(Word "ONLY")32 17 23Pavement MarkingsEACH$250.455$ 1,252.25
102Pavement Marking (Thermoplastic)(12")(White)32 17 23Pavement MarkingsLNFT$10.00500$ 5,000.00
103Pavement Marking (Thermoplastic)(18")(White)32 17 23Pavement MarkingsLNFT$15.82500$ 7,910.00

This is the start of the file's text. The full file is on GovTribe.