W91QF4-21-B-0002_DPW_Installation_Concrete_Reqmts.pdf
PDF 941 KB Posted
- Attached to
- Installation Concrete Requirements Federal contract opportunity
- Solicitation number
- W91QF4-21-B-0002
About this file
This is a solicitation for a requirements contract to provide installation concrete requirements and miscellaneous construction and repairs at Fort Leavenworth, Kansas. The solicitation includes bid sheets for base year and two option years for concrete work in five geographic areas of the installation. Offerors must submit coefficients to the government estimates for pricing. The work includes concrete items like slabs, stairs, sidewalks, and retaining walls. It also includes miscellaneous metal, pavement, storm sewer, earthwork, and other construction and repair items. The period of performance is from March 29, 2021 through March 28, 2025. The pre-proposal conference will be held on January 7, 2021 via Microsoft Teams to review the solicitation format and award criteria. The response deadline is January 21, 2021 at 2:00 PM CST. The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 6 - W91QF4-21-B-0002 - Q and A Amendment.pdf | ||
| SOL_Amend 01_W91QF4-21-B-0002 -Q and A.pdf | ||
| 5 - Bid Sheet w-Coefficient Concrete_Reqmts.xlsx | XLSX spreadsheet | |
| 3 - Specs - Concrete Requirement 2020.pdf | ||
| 2 - Drawing Concr Reqmnts (Rev) - 2020.pdf | ||
| 4 - WD-KS20200141-Highway-29 May 20.pdf | ||
| 1 - Quality of Workmanship and Stds.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011582334
The Government requires performance of w ork described in these documents:
1. This Solicitation is 100% Set Aside for Small Business.
2. Section H, Contains: Required Bid Guarantees, Performance and Payment Bonds for this project.
3. The Magnitude of Construction is Betw een $5,000,000.00 and $10,000,000.00.
NOTICE: Bidders are responsible to routinely check referenced w ebsites in accordance w ith (IAW) FAR Part 52.252-1. All Bidders must adhere to FAR Part 52.214-3 for Amendments to the solicitation and to acknow ledge amendments. Failure to properly acknow ledge amendments prior to hour and date specif ied for receipts of bids w ill result in bid rejection.
X
ALPHONSO BARNES JR 913-684-1643
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
16-Dec-2020
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________21 Jan 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MICC FORT LEAVENWORTH
535 KEARNY AVE.
BLDG 338
FORT LEAVENWORTH KS 66027
W91QF4
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
913-684-1610FAX:TEL: 913-684-1614 TEL: FAX:
W91QF421B0002 65
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W91QF421B0002
Section A - Solicitation/Contract Form
BID NOTES
1) Information to Bidders:
a) Bidder’s Price.
i) The Bidder’s Coefficient is a numerical factor (decimal, i.e. 1.25, 1.30, 0.9 and etc).
ii) The price that results from the application of the Coefficient to the Government Estimate will be the Unit Price the Bidder is paid for the service under the corresponding line item. The Bidder shall develop the Coefficient after considering all the costs associated with providing the labor under the most applicable Construction Wage Determination and all materials and equipment to include profit, Overhead with General and Administrative Costs. A nonexclusive list of elements to be considered in developing the coefficient follows:
(1) Cost of required materials
(2) Cost of direct and indirect labor
(3) Contractor’s overhead and profit
(4) Subcontractor’s overhead and profit
(5) Insurance
(6) Employee payroll taxes, insurance and fringe benefits
(7) Business taxes, contributions, memberships, corporate headquarters support (legal, financial, etc.)
(8) All waste and excess material
(9) Equipment costs
(10) Testing
(11) Clean up
(12) Haul-off of non-hazardous waste material from job site to an authorized waste depository.
(13) Mobilization and close out for the total contract and each task order
(14) Compliance with environmental laws (overhead {indirect} costs associated with performing work in compliance with EPA/OSHA regulations, including obtaining any necessary licenses and permits, reporting requirements, etc.)
(15) Compliance with protection and safety laws (i.e., safety rails, face and clothing protection, etc.)
(16) Traffic and work site signs and barriers
(17) Project management and supervision
(18) Protection of and/or moving of government property
(19) Quality control
(20) Office management and equipment
(21) The Contractor will supply all needed items and functions (such as forms, curing compound, vibrating tools, etc.) to insure a satisfactory and complete product.
(22) Depreciation of mobile office(s)
(23) Interest associated with funding of equipment and payroll
(24) Submittal preparation
(25) Permits, licenses and fees
(26) Other risks of doing business (i.e., risk of a lower than expected contract dollar value; risk of a high inflation cost if factors are bid for option years; risk of poor subcontractor performance and re-performance)
iii) Bidder’s Coefficient. As part of its bid, the Bidder may adjust his option year Coefficient to account for projected increases or decreases in the price elements set out above.
2) Award will be made to a single offeror. OFFERORS SHALL INCLUDE Coefficients for each Bid Sheet
(Base Year, Option Year #1 and Option Year #2).
a) The quantities contained on the Bid Sheet represent the Government’s best estimate of its requirements for the period of contract performance. The Contractor acknowledges that the quantity listed in the Bid
Sheet at the time of competitive bidding is an estimated quantity; and the awarded contractor will only be paid for the actual quantities ordered, received and accepted by the designated Government Inspector.
The Government reserves the right to order quantities in excess of the stated estimated quantities on the
Bid Sheet. However, such quantities will not exceed 100 percent of the total estimated contract dollar amount unless otherwise lawfully modified by a Contracting Officer. It is estimated that the
Government’s requirements for any additional quantities of work for each numbered Bid Sheet line item will be in approximately the same proportions that each line item currently bears; however, mathematical precision is not required. The contractor shall perform work on these quantities at the same contract unit price. The Contractor’s lack of receipt of quantities in excess of the estimated quantities specified for a specific Bid Sheet line item shall not entitle the Contractor to an equitable adjustment. Nor does the
Government guarantee that the overall quantities ordered shall equal the estimates contained within the
Bid Sheet.
b) The word “remove” herein shall be understood to mean “remove and dispose of in a lawful manner off the installation”.
c) The word “provide” herein shall be understood to mean “furnish and install”.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 100 Job Concrete Requirement - Base Year (A)
FFP
Contract to repair concrete and all miscellaneous concrete requirements to include new work post wide. The work will be performed in accordance with the Statement of Work and all specifications. Price proposals will be in accordance with instructions in the SOW for the base year and all Government exercised option years. Funds will be placed on Task Orders as appropriated.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011582334
PSC CD: Z2JZ
Submit on Bid Sheet
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
0002 100 Job Bond Concrete - Base Year (A)
FFP
REF Section H.4 for Bond Requirements
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003 100 Job Concrete Requirement - Base Year (B)
FFP
All miscellaneous concrete work in accordance with the Statement of Work and
Bid Sheet.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0004 100 Job Bond Concrete - Base Year (B)
FFP
REF Section H.4 for Bond Requirements
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0005 100 Job Concrete Requirement - Base Year (C)
FFP
All miscellaneous concrete work in accordance with the Statement of Work and
Bid Sheet.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0006 100 Job Bond Concrete - Base Year (C)
FFP
REF Section H.4 for Bond Requirements
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0007 100 Job Concrete Requirement - Base Year (D)
FFP
All miscellaneous concrete work in accordance with the Statement of Work and
Bid Sheet
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0008 100 Job Bond Concrete - Base Year (D)
FFP
REF Section H.4 for Bond Requirements
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0009 100 Job Concrete Requirement - Base Year (E)
FFP
All miscellaneous concrete work in accordance with the Statement of Work and
Bid Sheet.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0010 100 Job Bond Concrete - Base Year (E)
FFP
REF Section H.4 for Bond Requirements
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001 100 Job OPTION Concrete Requirement - Option Yr #1 (A)
FFP
Contract to repair concrete and all miscellaneous concrete requirements to include new work post wide. The work will be performed in accordance with the Statement of Work and all specifications. Price proposals will be in accordance with instructions in the SOW for the base year and all Government exercised option years. Funds will be placed on Task Orders as appropriated.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002 100 Job OPTION Bond Concrete - Option Yr #1 (A)
FFP
REF Section H.4 for Bond Requirements
UNIT UNIT PRICE ESTIMATED AMOUNT
1003 100 Job OPTION Concrete Requirement - Option Yr #1 (B)
FFP
All miscellaneous concrete work in accordance with the Statement of Work and
Bid Sheet.
UNIT UNIT PRICE ESTIMATED AMOUNT
1004 100 Job OPTION Bond Concrete - Option Yr #1 (B)
FFP
REF Section H.4 for Bond Requirements
UNIT UNIT PRICE ESTIMATED AMOUNT
1005 100 Job OPTION Concrete Requirement - Option Yr #1 (C)
FFP
All miscellaneous concrete work in accordance with the Statement of Work and
Bid Sheet.
UNIT UNIT PRICE ESTIMATED AMOUNT
1006 100 Job OPTION Bond Concrete - Option Yr #1 (C)
FFP
REF Section H.4 for Bond Requirements
UNIT UNIT PRICE ESTIMATED AMOUNT
1007 100 Job OPTION Concrete Requirement - Option Yr #1 (D)
FFP
All miscellaneous concrete work in accordance with the Statement of Work and
Bid Sheet.
UNIT UNIT PRICE ESTIMATED AMOUNT
1008 100 Job OPTION Bond Concrete - Option Yr #1 (D)
FFP
REF Section H.4 for Bond Requirements
UNIT UNIT PRICE ESTIMATED AMOUNT
1009 100 Job OPTION Concrete Requirement - Option Yr #1 (E)
FFP
All miscellaneous concrete work in accordance with the Statement of Work and
Bid Sheet.
UNIT UNIT PRICE ESTIMATED AMOUNT
1010 100 Job OPTION Bond Concrete - Option Yr #1 (E)
FFP
REF Section H.4 for Bond Requirements
UNIT UNIT PRICE ESTIMATED AMOUNT
2001 100 Job OPTION Concrete Requirement - Base Year (A)
FFP
Contract to repair concrete and all miscellaneous concrete requirements to include new work post wide. The work will be performed in accordance with the Statement of Work and all specifications. Price proposals will be in accordance with instructions in the SOW for the base year and all Government exercised option years. Funds will be placed on Task Orders as appropriated.
UNIT UNIT PRICE ESTIMATED AMOUNT
2002 100 Job OPTION Bond Concrete - Option Yr #2 (A)
FFP
REF Section H.4 for Bond Requirements
UNIT UNIT PRICE ESTIMATED AMOUNT
2003 100 Job OPTION Concrete Requirement - Option Yr #2 (B)
FFP
All miscellaneous concrete work in accordance with the Statement of Work and
Bid Sheet.
UNIT UNIT PRICE ESTIMATED AMOUNT
2004 100 Job OPTION Bond Concrete - Option Yr #2 (B)
FFP
REF Section H.4 for Bond Requirements
UNIT UNIT PRICE ESTIMATED AMOUNT
2005 100 Job OPTION Concrete Requirement - Option Yr #2 (C)
FFP
All miscellaneous concrete work in accordance with the Statement of Work and
Bid Sheet.
UNIT UNIT PRICE ESTIMATED AMOUNT
2006 100 Job OPTION Bond Concrete - Option Yr #2 (C)
FFP
REF Section H.4 for Bond Requirements
UNIT UNIT PRICE ESTIMATED AMOUNT
2007 100 Job OPTION Concrete Requirement - Option Yr #2 (D)
FFP
All miscellaneous concrete work in accordance with the Statement of Work and
Bid Sheet.
UNIT UNIT PRICE ESTIMATED AMOUNT
2008 100 Job OPTION Bond Concrete - Option Yr #2 (D)
FFP
REF Section H.4 for Bond Requirements
UNIT UNIT PRICE ESTIMATED AMOUNT
2009 100 Job OPTION Concrete Requirement - Option Yr #2 (E)
FFP
All miscellaneous concrete work in accordance with the Statement of Work and
Bid Sheet.
UNIT UNIT PRICE ESTIMATED AMOUNT
2010 100 Job OPTION Bond Concrete - Option Yr #2 (E)
FFP
REF Section H.4 for Bond Requirements
Section C - Descriptions and Specifications
SOW
STATEMENT OF WORK
CONCRETE REQUIREMENTS AND MISCELLANEOUS CONSTRUCTION AND REPAIRS
FORT LEAVENWORTH, KANSAS
SW-1 DESCRIPTION OF WORK
3) Work to be Done: The work to be done consists of furnishing all plant, labor, equipment, and materials as well as performing all work in strict accordance with the drawings and specifications for Concrete
Requirement Repair and Miscellaneous Repair to OMA Buildings, at Fort Leavenworth, Kansas. All work performed by the Contractor shall result in a complete and functional system.
4) Incidental Work that May be Done by Others: When a building is undergoing a major renovation by another contractor the concrete work may be done by the contractor doing the major renovation as part of his work. There are other requirements contracts in which line items cross such as the Asphalt
Requirements which has painting on asphalt roads also. The work described above may be done by others.
a) Task Orders (TO).
i) Each Task Order (TO) will be issued for one or more buildings.
ii) Procedures
(1) The Contractor will be notified of a pending Task Order either by telephone, e-mail, FAX, or in writing.
(2) After notification of a pending Task Order(s), the Contractor will have 2 working days to conduct a site visit with the Government Representative, for the purpose of defining the line items and quantities of line items to be used.
(3) Either during the site visit or within 2 working days after the site visit, the Contractor and
Government Representative shall seek to jointly agree upon all the line items and quantities to be used for each Task Order, and fill out and sign the “Project Task Order Reconciliation
Form”, TF-
1. A sample of the form is located at the end of the SOW.
(4) The “Project Task Order Reconciliation Form” TF-1 will be part of the contractual Task Order and shall be binding to both parties once task order is issued.
(5) The Contracting Officer may issue a binding task order even though agreement is not reached.
(6) Initial notification of a pending task order, a site visit, and/or negotiation and agreement on the price of a task order do not bind or otherwise require the Government to issue a task order or orders. The Contractor is not entitled to a separate compensation for the costs incurred as a result of task orders that are not issued by the Government.
b) Variation in Estimated Quantities. Once the TO has been issued, the line item quantities shall not be modified if the actual quantities are within + 10% of the quantity stated in the task order except for unforeseen site conditions or changes modifying the original requirement of the task order.
SW-2 PRINCIPAL FEATURES. The project is to repair and install new concrete items and other miscellaneous items throughout Fort Leavenworth, Kansas, but not limited to:
1) Concrete items: Replace or install new concrete pads, stairs with hand rails, elevated slabs, curb and gutter, sidewalk, handicap ramps, retaining walls and other concrete items.
2) Miscellaneous metal items: Install 6’ high chain link fencing, metal handrail.
3) Pavement items: Replace and install new concrete pavements.
4) Replace Storm Sewer Items: Install reinforced concrete pipe of various sizes, install corrugated
HDPE pipe of various sizes. Install concrete storm inlets.
5) Earthwork, excavation, dirt spoils or fill, fine grading, clear cutting of trees, erosion control.
6) Miscellaneous Items: crack repair on concrete pavements, and pavement striping. Storm sewer pipe cleaning. Core drilling or test pit and evaluation of road pavements.
7) Miscellaneous Repair Items: Repoint brick, replace damaged brick to match existing, replace masonry control joints. Raise manholes.
SW-3 APPROVAL OF MATERIALS AND EQUIPMENT
a. Within 10 calendar days of receipt of Notice to Proceed, and before installation, the Contractor shall submit for approval all items listed or specified on attached SUBMITTAL REGISTER in the specifications. The government has 10 days to review and return submittals once they are received. If the Contractor submits an item for re-approval, the Government has 10 days to review and return once it is received. It is acceptable for
Contractor to bring submittals to the pre-construction conference to expedite work. The submittals shall be e-mailed to usarmy.leavenworth.acc-micc.mbx.construction@mail.mil. Submittals shall be made on TRADOC
Form 928-R and attached as one PDF file.
b. Submittal procedures are contained in Section 013300, SUBMITTAL PROCEDURES. Specific submittal requirements are contained in each section of the technical specifications. Submittals required by the
CONTRACT CLAUSES and other non-technical parts of the contract are not included in this section. The
Contractor shall submit one (1) transmittal form shall be provided with each set of submittals. See attachment 4, Submittal Register for list of material submittals requested for this project.
c. The Contractor shall submit an Accident Prevention Plan prior to start of work. Material Safety Data
Sheets shall be provided when hazardous chemicals are used. The Accident Prevention Plan shall be prepared in accordance with the required and advisory provisions of COE EM-385-1-1 including Appendix A, "Minimum
Basic Outline for Preparation of Accident Prevention Plan." The Safety Plan shall be prepared as required by 29
CFR 1910.120 and COE EM-385-1-1.
d. The Government Representative may request submittals in addition to those listed when deemed necessary to adequately describe the work covered in this section.
SW-4 INSTRUCTIONS – TASK ORDERS
a. General: The Contractor shall make every effort to avoid damage to buildings and personal and/or private property. When work cannot proceed without damage, it shall be brought to the attention of the
Contracting Officer. The Contractor shall restore anything damaged due to the Contractor’s negligence to its original conditions at no additional cost to the Government.
b. Site Visit: Contractor will have the opportunity to tour the proposed construction site to document material take-offs and discover site conditions pertinent to the development of their bid. Choosing not to attend this site visit will have no claim rights on job site conditions that affect the cost for this project.
c. Coordination: Before starting any work, the contractor shall coordinate said work through the Contracting
Officer. Verbal notification shall be given to the Contracting Officer prior to starting work. The
Contractor shall take all reasonable measures necessary to minimize the disruption of the occupants during performance of contract work.
d. Normal Working Hours: The Contractor shall schedule delivery or service hours to coincide with the working hours of the military installation, 7:30am to 4:00pm, a normal 5-day, 40 hour week, Monday through Friday, except legal holidays which include the following – mailto:usarmy.leavenworth.acc-micc.mbx.construction@mail.mil
Federal Government holidays are:
New Year’s Day 1st day of January
Martin Luther King Jr.'s Birthday 3rd Monday of January
Presidents Day 3rd Monday of February
Memorial Day last Monday of May
Independence Day 4th day of July
Labor Day 1st Monday of September
Columbus Day 2nd Monday of October
Veterans Day 11th day of November
Thanksgiving Day 4th Thursday of November
Christmas Eve 24th day of December
Christmas Day 25th day of December
NOTE: Any of the above holidays falling on a Saturday will be observed on the preceding Friday. Holidays falling on a Sunday will be observed on the following Monday.
e. Sustainable Management of Waste: In accordance with ACSIM Memorandum dated 06 FEB 06, Subject:
Sustainable Management of Waste in Military Construction, Renovation and Demolition Activities, the contractor shall, at his/her own expense, ensure that 50% by weight of the demolition or deconstruction material or construction waste is diverted from landfill disposal. This may be accomplished through recycling, reuse of material (such as crushed concrete or asphalt), diversion (material which may be used on a future project) or waste minimization (accurate planning and ordering, proper material storage and handling, right-sizing). A consolidated report outlining the amounts of diverted and disposed waste resulting in the 60% diversion shall be provided to the Directorate of Logistics/Directorate of Public
Works Environmental Division. All waste reduction measures must be in full compliance of federal, state and local regulations and in full compliance with material specifications. All measures involving storage of material on the installation or future use of the material by the installation must be coordinated in advance with the Directorate of Logistics/Directorate of Public Works.
f. Scrap and Salvageable Materials: The Contractor retains right and control of scrap and salvageable material generated from Government owned facilities, by this contract. All Scrap and salvaged material retained by the contractor shall be removed from the Post daily at the Contractor’s expense.
g. Payments and Invoicing: Under contract clauses, Payments under the Fixed Price Construction Contracts and Prompt Payment for Construction Contracts, the contractor must submit a “proper” invoice to obtain payment. To prevent errors in preparation of invoices, along with resulting delays in payment, the contractor shall meet with the government’s Construction Representative 7 calendar days prior to submittal of an invoice and reach an agreement on the quantities and percentage of completion to be billed on the invoice.
h. As-Built Drawings: Contractor is responsible to keep accurate records of the installation of all new equipment and to provide one set of as-built drawings illustrating all of the work performed on this contract. Drawings are to be supplied to the Contracting Officer in the form of (1) paper, hard copy, and
(1) digital copy in AutoCAD format upon completion.
i. Exceeding Line Item Quantities: If line item quantities are exceeded additional quantities will be added at the same price set at the award of the contract.
SW-5 SAFETY REQUIREMENTS
a. All Contractors and their employees working on the confines of the Combined Arms Center and
Fort Leavenworth (CAC&FL) will be required to abide by the safety standards outlined in:
(1) The Occupational Safety and Health Standards (29 CFR 1910) - General Industry.
1910.1200 Hazardous Communication
(2) The Occupational Safety and Health Standards (29 CFR 1926) - Construction Industry, to include, but is not limited to the following:
1926.62 Lead
1926.65 Hazardous Waste Operations Emergency Response
1926.451 Scaffolding
1926.500-503 Fall Protection
1926.1101 Asbestos
(3) The American National Standards Institute (ANSI) which applies to the task(s) being performed.
(4) The National Electric Code.
(5) The National Fire Protection Association (NFPA) 101 Life Safety Code.
(6) Department of the Army Regulation 385-10, The Army Safety Program.
(7) Department of the Army Regulation 385-40, Accident Reporting and Records.
(8) The US Army Corps of Engineers Safety and Health Requirements
Manual, EM 385-1-1.
(9) CAC & FT LVN 385-1. CAC Safety Program.
b. Contractors found performing unsafe acts or creating unsafe conditions may be subject to a work stoppage until the deficiencies are corrected. A work stoppage due to unsafe acts or conditions will not constitute an adjustment to the contract.
c. The contractor shall submit a safety plan according to DA PAM 385-10 Chapter 4 Para 4-4 which call for a site specific safety plan with focus on paragraph c. (1) thru (17), d. Contractor disciplinary process, e.
Contracting Officers representative requirements, f. Hazard analysis and g. Hazard analysis briefs by supervision driving tool box meetings and throughout as work progress. The strength of this paragraph is derived by the backing of Federal Acquisition Regulation (FAR) Clause 52.
SW-6 INTERRUPTION OF UTILITY SERVICES
All interruptions to electrical, water or other utilities must be coordinated with the Contracting Officer. The
Contractor shall notify the Contracting Office seven (7) days prior to the disruption of utility services.
Unanticipated interruptions of utilities will be reported to the Contracting Officer immediately.
a. The Contractor is responsible for checking and locating all the utilities in the field before construction.
The cost of all these checks shall be included in each bid item. The Contractor may use utilities locator equipment or may hire a subcontractor to locate all the utilities for him. The Contractor shall furnish all labor, supervision, tools equipment, and transportation as required to locate and mark utilities for the Fort
Leavenworth owned utilities excluding fiber/telephone and communications. The Contractor will be given access to the Fort Leavenworth DPW (Directorate of Public Works) utility drawings to aid in locating storm sewer and natural gas. Water lines and Sanitary Sewer line are owned by American Water.
Electric power distribution lines are owned by Leavenworth Jefferson Electric Co. The utilities that are of nonconductive construction such as plastic, or Transite and have no tracer wire or other means of applying a signal are to be located from the utility maps. The utilities that are located from maps that appear to be in the vicinity of the excavation are to be hand dug for location purposes. If a line is damaged, that is within 10 feet of that shown on the utility maps; the Contractor will be held responsible for its repair.
b. The Contractor shall contact Kansas One-Call for utility checks for Southern Star Central Gas Pipeline, Sprint, AT&T, Spectrum Cable, American Water, and Sunflower Electric.
c. The Fort Leavenworth telephone and communication lines are responsibility of the Network Enterprise
Center (NEC) and will be located by Fort Leavenworth personnel. The Contractor shall visit the sites and mark his proposed route or limits to his excavation on a map and take this marked up map to Directorate of Public Works (DPW) Help Desk before any excavation. NEC will mark lines in the field within 10 working days, after which the Contractor shall proceed with actual excavation. If the Contractor damages any marked lines during excavation the Contractor shall contact DPW Inspector immediately to determine if the post will repair the line with the Contractor reimbursing the Government for repairs, or if the
Contractor will be required to repair the lines.
d. After all utility locations or existence of any utility for the site are completed, the Contractor shall provide a copy of the summary to the Inspector for his review prior to the start of any excavation as a daily report.
SW-7 CONSTRUCTION PROJECT SIGNAGE
Contractor shall provide all necessary signage to notify Installation personnel of construction. If during construction signage is damaged due to weather, it will be the contractor’s responsibility to replace.
Signage shall be 5’ x 3’. Signage size may change depending on project and proposed location. Size changes must be requested through the contracting officer. Signage shall be installed at a minimum 1 week prior to start of construction. If signage is to be placed in the ground, plan ahead for utility locates through Kansas One-Call. If possible, install signage on existing structures. Exact verbiage for the signage shall be approved by the contracting officer prior to installation. All text shall be black and at an appropriate size in proportion to the individual signs. The following are items required as a minimum to be included on the signage:
Basic title
Purpose of project
General time frame of project, i.e. spring 2021
Use phrases such as: Pardon our dust, thanks for your patience, or Watch for construction equipment when appropriate to the project. If relevant to the project, a picture shall be used to convey the project to the public. DPW can assist with providing an appropriate image for the signage.
SW-8 TASK ORDER EXAMPLES
TASK ORDER EXAMPLE TO REPAIR CONCRETE SLAB.
1. STATEMENT OF WORK: REPLACE CONCRETE SLAB 30’ BY 20’ BY 4 INCH
2. CACULATE UNITS: 20 X 30 X .333 = 199.8 / 27 = 7.4 CY
3. Line items to use (see price schedule for actual line item numbers and costs)
a. 0001AA 0002; Replace Slabs, 7.40 CY x $390.00 (Contractors Price) = $2886.00
SW-9 DESCRIPTION OF WORK ON BID ITEMS (Reference Bid Sheet)
SW-10 ABBREVATIONS
1) CY
2) CF
3) EA
4) HDPE
Cubic Yard
Cubic Foot
Each
High Density Polyethylene Plastic
5) HR = Hour
6) LB = Pound
7) LF = Linear Foot
8) MO = Month
9) O.C. = On Center
10) RCP = Reinforced Concrete Pipe
11) SF = Square Foot
12) SY = Square Yard
13) CLF = One hundred square feet
Section D - Packaging and Marking
PACKING & MARKING
D.1. SHIPPING ADDRESS
All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the
Government. The Contractor shall retain full responsibility for the delivery and acceptance of shipments to this installation or elsewhere that are required for the completion of this task order.
D.2. PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
The Government singularly identifies each Task Order with a Task Order number at time of award. The Task Order number is a unique identifier to purposely and permanently represent an awarded project. The Government issued
Task Order number is to be referenced on all official communications starting upon notice of award.
D.3. PACKAGE MARKING
The packing of deliverables, containers, and packages to be delivered pursuant to the requirements of each individual Task Order shall be in accordance with the instructions provided with each Task Order, and shall be marked with the following information.
Contract Number (example – W91QF4-20-D-0001)
Task Order Number (example – W91QF4-20-F-0291)
Short title of contract/job order requirement
Section E - Inspection and Acceptance
INSPECTION & ACCEPTANCE
E.1. QUALITY CONTROL
When the Contractor is ready for final inspection; they shall request final inspection in writing to their assigned
DPW Inspector. The final inspection shall be requested a minimum of two (2) work days prior to desired final inspection date. Prior to a request for final inspection, the Contractor's Quality Control (QC) representative shall conduct an inspection and insure that all work has been completed and is in compliance with all Task Order documents. The Contractor’s QC representative will provide a copy of their inspection report to the Government’s
Inspector with a copy of the status of deficiency correction, if applicable.
E.2. INSPECTION PHASES
In the event there are phases of work that will cover or mask a contractor’s work, it is the sole responsibility of the contractor to ensure acceptance of that phase of work prior to continuance of the follow-on phase of work. Should the contractor disregard this information, they may be subject to the Contracting Officer’s discretion to tear out or remove the covered or masked work completed prior to allow for Government inspection. Should corrections by the contractor be required, the costs for removal and re-installation of the work will be the responsibility of the contractor.
(e.g. drywall installed that covers electrical wiring prior to Government inspection would then have to be removed for Government inspection and subsequently re-installed by the contractor at their costs if the wiring contained deficiencies)
E.3. INSPECTION AND ACCEPTANCE
The Contractor’s representative(s) shall be present during final inspection. Any discrepancies noted will be corrected within the time specified by the Contracting Officer or their designated representative and prior to final payment.
Inspection and Acceptance point will be at destination specified in each Task Order.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
0007 Destination Government Destination Government
0008 Destination Government Destination Government
0009 Destination Government Destination Government
0010 Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
1003 Destination Government Destination Government
1004 Destination Government Destination Government
1005 Destination Government Destination Government
1006 Destination Government Destination Government
1007 Destination Government Destination Government
1008 Destination Government Destination Government
1009 Destination Government Destination Government
1010 Destination Government Destination Government
2001 Destination Government Destination Government
2002 Destination Government Destination Government
2003 Destination Government Destination Government
2004 Destination Government Destination Government
2005 Destination Government Destination Government
2006 Destination Government Destination Government
2007 Destination Government Destination Government
2008 Destination Government Destination Government
2009 Destination Government Destination Government
2010 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
CLAUSES INCORPORATED BY FULL TEXT
52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The
Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the
Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.
(b) The Contractor shall obtain the Contracting Officer's approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the
Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer's approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the
Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor's expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.
(c) All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.
(End of clause)
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 29-MAR-2021 TO
28-MAR-2022
N/A DIRECTORATE OF PUBLIC WORKS
STORM SAVAGE
DESIGN BRANCH
820 MCCLELLAN
FT LEAVENWORTH KS 66027-1399
913-684-8947
W90F2S
0002 POP 29-MAR-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 29-MAR-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 29-MAR-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 29-MAR-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 29-MAR-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 29-MAR-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 29-MAR-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0009 POP 29-MAR-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
0010 POP 29-MAR-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 29-MAR-2022 TO
28-MAR-2023
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 29-MAR-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 29-MAR-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 29-MAR-2021 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 29-MAR-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 29-MAR-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1007 POP 29-MAR-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1008 POP 29-MAR-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1009 POP 29-MAR-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
1010 POP 29-MAR-2022 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 29-MAR-2023 TO
28-MAR-2024
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 29-MAR-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 29-MAR-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 29-MAR-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 29-MAR-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2006 POP 29-MAR-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2007 POP 29-MAR-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2008 POP 28-MAR-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2009 POP 29-MAR-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
2010 POP 29-MAR-2023 TO
N/A (SAME AS PREVIOUS LOCATION)
52.211-13 Time Extensions SEP 2000
52.242-14 Suspension of Work APR 1984
52.242-15 Stop-Work Order AUG 1989
52.247-34 F.O.B. Destination NOV 1991
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the completion days specified within each individual task order award. The time stated for completion shall include final cleanup of the premises.
*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $351.45 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
Section G - Contract Administration Data
252.201-7000 Contracting Officer's Representative DEC 1991
252.204-7006 Billing Instructions OCT 2005
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of
Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-
7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
https://www.sam.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting
Officer.
Construction Only
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the
Contracting Officer.
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0490
Issue By DoDAAC W91QF4
Admin DoDAAC** W91QF4
Inspect By DoDAAC W90F2S
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition
Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
TBD at Task Order Level
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s
WAWF point of contact.
ATTN: Alphonso Barnes Jr.
Contracting Officer
MICC - Fort Leavenworth
Telephone Number: 913-684-1643
E-Mail: alphonso.barnes3.civ@mail.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
mailto:alphonso.barnes3.civ@mail.mil
Section H - Special Contract Requirements
LOCAL INSTRUCTIONS
H-1. WAGE DETERMINATION
A copy of Wage Determination Number as contained in the Register of Wage Determinations applicable to this order may be accessed at: https://wdolhome.sam.gov/.
Base Year 29 March 2021 - 28 March 2022 (Davis Bacon) Wage Determination KS4 Highway dtd 29 May 2020
Option Year #1 - TBD if option Exercised by Government
Option Year #2 - TBD if option Exercised by Government
H-2. RESPONSIBILITY FOR ADMINISTRATION OF CONTRACT
a. The Contracting Officer is responsible for the administration of this contract. The Contracting Officer alone is authorized to the extent indicated in the contract to take action on behalf of the government which results in changes in the terms of the contract, including deviations from specifications, details and delivery schedules. Communications pertaining to contractual administrative matters will be addressed to the Contracting Officer. No changes in or deviation from the scope of work shall be effected without a written modification to the contract executed by the
Contracting Officer. BPA Calls will be issued by a Warranted Contracting Officer.
b. No oral statement of any person will in any manner or degree, modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer.
c. All matters pertaining to Government administration of this contract should be directed to:
ATTN: ALPHONSO BARNES Jr.
MICC-LEAVENWORTH
535 KEARNY AVE., ROOM 102
FORT LEAVENWORTH, KS 66027-1417
TELEPHONE NUMBER: (913) 684-1643
FAX NUMBER: (913) 684-1610
EMAIL ADDRESS: alphonso.barnes3.civ@mail.mil
H-3. CONTRACTOR CORRESPONDENCE AND CONTRACTUAL DOCUMENT SUBMISSIONS
All Contractor and subcontractor originated correspondence under this contract shall be on or attached to the Prime
Contractor’s letterhead, except in the case where pre-printed Government forms are used, shall be typed or handwritten in a legible manner, and shall be submitted in the signed original, with supporting copies as required by the Contracting Officer or their designated representative. All contractual documents shall be submitted to the
Government in an electronic format and accessible through Microsoft Word/Excel or Adobe Reader (.pdf), unless otherwise stated.
H-4. PRECONSTRUCTION CONFERENCE
A Preconstruction Conference will be scheduled by the Contracting Officer after contract award and prior to the time and date set for commencement of work. The meeting will be held at Fort Leavenworth. At this meeting, the
Contractor will be oriented with respect to Government procedures and lines of authority, as well as contractual, administrative, and construction matters. The Contractor is required to furnish:
- Current Certificate of Insurance (Updated certificate is required annually for the base contract)
- Letter appointing the Project Manager and other company key personnel associated with project execution.
- Proposed Project Schedule of Performance (DRAFT FORM) https://wdolhome.sam.gov/ mailto:alphonso.barnes3.civ@mail.mil
- Proposed Schedule of Values (SOV) based upon the planned allocation of construction by division, and/or materials and labor where appropriate shall be submitted at the pre-construction meeting or at a minimum prior to invoicing…
This is the start of the file's text. The full file is on GovTribe.