Attach 2-Performance Requirements Summary
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20170523_SF30_Amend-0002_W91QF417R0012.pdf | ||
| 20170508_Attach-4_Exh-2_Rvsd_Relevant_Contract_Form_Template.doc | DOC document | |
| 20170511_SF30-Amend-0001_W91QF417R0012.pdf | ||
| 20170511_Solicitation_Q-A_W91QF417R0012.pdf | ||
| 20170428_SF33_Solicitation_W91QF417R0012.pdf | ||
| Ex-1_Consent_Form_Template.docx | DOCX document | |
| Ex-2_Relevant_Contract_Form_Template.doc | DOC document | |
| 20170428_Attach-3_DD254_TRAC_Security_signed.pdf | ||
| 20170428_Attach-1_PWS-TRAC_Security_v6.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91QF4-17-R-0012
Attachment 2
Version date: 28 April 2017
Performance Requirements Summary
Information, Personnel, Physical Security Support
Task / Deliverable Performance Standard Performance Threshold
Method of Surveillance
PWS Para 5 Staffing of security office
Contractor shall adjust operating hours as necessary to accomplish tasks and ensure at a minimum the office is staffed during the operating hours of 7:15 a.m. to 5:45 p.m. each work day.
During period of performance no more than five workdays when the office is not staffed.
Periodic Inspection
Customer Feedback
PWS Para 5.1.1 Task 1, Subtask 1.
Support annual security inspection.
Provide current guidance and initiate pre-inspection audits of all directorates. Timely correction of deficiencies
The Contractor shall not fail to rectify more than one inspection deficiency within the required 30 days.
100% Inspection.
PWS Para 5.2.2 Task 2, Subtask 2.
Personnel clearance status and submissions.
Monitor JPAS for all government and Contractor employees working within or visiting TRAC@FLVN facilities.
Not more than two instances during the POP shall the Contractor fail to verify security clearance information for personnel accessing
TRAC@FLVN.
Periodic Inspection
PWS Para 5.3.5 Task 3, Subtask 5.
After Duty Notification Call-in roster.
Prepare and publish the After Duty Notification Call-in roster.
The Contractor shall publish the rosters on time.
Additionally, the Contractor shall not fail to respond and perform the requisite building inspection function in conjunction with
100% Inspection the military police on not more than two occasions during the period of performance.
PWS Para 5.3.6 Task 3, Subtask 6.
After duty notification call-in log.
Maintain spreadsheet documenting all after-hours security-related call-ins by the PMO.
The Contractor shall not fail to provide the updated log for more than two monthly IPRs during the period of performance.
100% Inspection
PWS Para 5.3.7 Task 3, Subtask 7.
Collateral duty appointments & training.
Maintain copies of collateral duty appointments & training.
The Contractor shall not fail to provide the updated appointment orders within three working days on more than two instances during the period of performance.
100% Inspection
PWS Para 5.3.8 Task 3, Subtask 8.
Security codes.
Change security codes to OSA entrance doors.
The Contractor shall be no more than 10 working days late changing the security codes by the specified annual delivery dates. The Contractor shall process PIC actions within three working days after the requirement has been identified.
100% Inspection
PWS Para 5.3.9 Task 3, Subtask 9.
Serve as key custodian for
Perform all duties as specified in AR-190-51 regarding key control management.
TRAC passes the annual physical security inspection of the
Funston Hall (Bldg 314, McNair Hall (Bldg 286) and TRAC Warehouse (Bldg 107) key control program with no more than one minor deficiency.
PWS Para 5.5 Task 5. Contractor Manpower Reporting (CMR)
Report ALL contractor labor hours (including subcontractor).
- Reporting inputs documented labor executed during the POP during each Government fiscal year (FY) which runs 1 Oct - 30 Sep.
- Input will be reported no later than 31 Oct of each calendar year.
Note: Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PRS. The Government reserves the right to conduct compliance surveillance of any contractual requirement of this acquisition.