4 - Debris Recovery Statement (DPW).pdf

PDF 336 KB Posted

Attached to
Ft. Leavenworth Harney Gym Renovations Federal contract opportunity
Solicitation number
W91QF4
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis

View the file

Other files for this federal contract opportunity

Other files attached to Ft. Leavenworth Harney Gym Renovations, newest first.
File Type Posted
1 - Progress Schedule (With Instructions)( 59-R).xlsx XLSX spreadsheet
8 - DRAWINGS-B664 Harney-100_MICC-23-00616.pdf PDF
3 - Abatement_ACM_Standards_2020.pdf PDF
6 - Utility Locate Request Form-20230301.pdf PDF
2 - Submittals_Form_928-R.pdf PDF
5 - Sustainment Management Systems.pdf PDF
7 - WD_CONST_BLDG_KS20230053_dtd_16JUN2023.pdf PDF
0 - DRAFT_IFB_W91QF4-23-B-0005_Harney_Gym_B-664.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form Rev: 10 February 2023

DEBRIS RECOVERY STATEMENT – Post Demolition/Construction

Project Address: _____________________________________ Contractor: _________________________________________ Date: ______________________________________________ Contact: ____________________________________________ Phone: _____________________________________ ________ Email: _____________________________________________ Project: ____________________________________________

Identify which materials were reused, recycled or disposed by completing the table below. You must recycle at least 60% of all waste generated. Check the designated box and provide the name of each facility or service provider and weight of materials. If the materials were reused on site, describe the reuse application under the facilities/service provider column. Salvaged materials from deconstruction should be designated as reuse. Attach copies of receipts, gate tags, or other verifying documentation.

Material Reuse Recycle Dispose Facility Service

Provider Weight (tons)

Asphalt Brick Cardboard Carpet Concrete Dirt/Clean Fill Dry Wall Metal Pallets Plastics Plant Debris Roofing - asphalt composition shingle, tile, wood shake, tar or gravel

Wood - clean Wood - treated Other Other

MATERIAL GENERATION SYNOPSIS

A. Total tons of materials generated for the project: _____________ B. Total tons of materials disposed (not recycled): _____________ C. Total tons of materials salvaged, reused, or recycled: _____________ D. Percentage of materials recycled/reused (divide C by A):_____________ %

For assistance in recovering materials at the jobsite, visit the following website for a Builders Guide to Reuse and Recycling for the Kansas Department of Health and Environment.

https://www.kdhe.ks.gov/710/Waste-Reduction-Grant-Guidelines-Forms

Project Address:
Contractor:
Date:
Contact:
Phone:
Email:
Project:
Other_2:
A Total tons of materials generated for the project:
B Total tons of materials disposed not recycled:
C Total tons of materials salvaged reused or recycled:
D Percentage of materials recycledreused divide C by A:
Text2:
13:
12:
11:
9:
8:
7:
6:
5:
4:
3:
2:
1:
0:
14:
15:
10:
0:
3:
4:
1:
0:
1:
2:
3:
4:
2:
0:
1:
2:
3:
4:
Text7:
Text3:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
15:
Text4:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
10:
Text5:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
13:
14:
Text6:
0:
1:
2:
3:
4:
5:
6:
7:
8:
9:
10:
11:
12:
13:
14:

File details come from the government source that posted it. Updated .