W91CRB20R0009 Attachment J-4 CDRL A003 - CWB Tech Plan RevA.PDF

PDF 190 KB Posted

Attached to
W91CRB20R0009 Conformal Wearable Batteries Solicitation
Solicitation number
W91CRB20R0009
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) and related details for a federal contract opportunity. The opportunity is for the development of a Conformal Wearable Battery to power electronic devices for soldiers, including the Nett Warrior suite, Integrated Visual Augmentation System, and Next Generation Squad Weapon. The battery must conform to body and equipment constraints. The CDRL requires the contractor to submit an annual Technology Management Plan following acceptance of first article testing, with subsequent annual updates. The plan should follow the DI-MGMT-81650 guideline and be submitted electronically to the specified government office. All questions regarding the opportunity must be submitted by August 7, 2020. The Department of the Army Materiel Command Army Contracting Command at Aberdeen Proving Ground is the contracting agency.

View the file

Other files

File Type Posted
W91CRB20R0009 Attachment J-9 Questions and Answers Round 3.xlsx XLSX spreadsheet
W91CRB20R0009 Attachment J-4 CDRL A004 - CWB QA PLAN REvA 8 13 20.PDF PDF
W91CRB20R0009 Attachment J-1 MIL-PRF-32383-4X Final (clean)_updates highlighted 81220.docx DOCX document
W91CRB20R0009 Attachment J-4 CDRL A003 - CWB Tech Plan RevA 8 13 20.PDF PDF
W91CRB20R0009 Attachment J-1 MIL-PRF-32383-4X Final (clean) 81220.pdf PDF
W91CRB20R0009 Amendment 0002.pdf PDF
W91CRB20R0009 Attachment J-9 Questions and Answers Round 2.xlsx XLSX spreadsheet
W91CRB20R0009 Attachment J-3 TEP PRICING MATRIX 7 30 20.xlsx XLSX spreadsheet
W91CRB20R0009 Amendment 0001.pdf PDF
W91CRB20R0009 Attachment J-1 CWB 200609-MIL-PRF-32383-4X P. Spec Sheet - Battery, Rechargeable, Selaed Lithium-Ion, BB-2525 and BB-3525 29JUL2020.pdf PDF
W91CRB20R0009 Attachment J-6 CWB DD254.pdf PDF
W91CRB20R0009 Attachment J-4 CDRL A005 - CWB DMSMS Rev A.PDF PDF
W91CRB20R0009 Attachment J-7 CWB OPSEC Work Sheet.PDF PDF
W91CRB20R0009 Attachment J-4 CDRL A014 - Conformance Acceptance Test Report REvA.PDF PDF
W91CRB20R0009 Attachment J-4 CDRL A008 - CWB TECHNICAL DATA PACKAGE REv A.PDF PDF
W91CRB20R0009 Attachment J-4 CDRL A016 - Commercial Manual.pdf PDF
W91CRB20R0009 Attachment J-4 CDRL A009 - CWB TECH READINESS REVIEW REvA.PDF PDF
W91CRB20R0009 CWB Solicitation.pdf PDF
W91CRB20R0009 Attachment J-4 CDRL A004 - CWB QA PLAN REvA.PDF PDF
W91CRB20R0009 RFP Response Format.XLSX XLSX spreadsheet
W91CRB20R0009 Attachment J-4 CDRL A013 - CWB SAR REv A.PDF PDF
W91CRB20R0009 Attachment J-4 CDRL A002 - CWB IMS REvA (1).pdf PDF
W91CRB20R0009 Attachment J-4 CDRL A007 - FIRST ARTICLE TEST REPORT RevA.PDF PDF
W91CRB20R0009 Attachment J-5 CWB CDRL CLIN Crosswalk.xlsx XLSX spreadsheet
W91CRB20R0009 Attachment J-4 CDRL A006 - CWB FIRST ARTICLE TEST PLAN RevA.PDF PDF
W91CRB20R0009 Attachment J-4 CDRL A001 - CWB Meeting Minutes RevA.PDF PDF
W91CRB20R0009 Attachment J-4 CDRL A015 - EDFP.pdf PDF
W91CRB20R0009 Attachment J-2 CWB MIL-PRF-32383 P. Spec Batteries, Rechargeable, Sealed General Specification For -.pdf PDF
W91CRB20R0009 Attachment J-4 CDRL A010 - CWB PHYSICAL CONFIGURATION AUDIT REvA.PDF PDF
W91CRB20R0009 Attachment J-4 CDRL A012 - CWB FRACAS RevA.PDF PDF
W91CRB20R0009 Attachment J-1 CWB 200609-MIL-PRF-32383-4X P. Spec Sheet - Battery, Rechargeable, Selaed Lithium-Ion, BB-2525 and BB-3525.pdf PDF
W91CRB20R0009 Attachment J-8 Past Performance Questionnaire.docx DOCX document
W91CRB20R0009 Attachment J-3 TEP PRICING MATRIX.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A003
title: TECHNOLOGY MANAGEMENT PLAN
sub: PRODUCT IMPROVEMENT
auth: SEE BLOCK 16
ref: CWB SOW PARA. C.3.2
req_ofc: SFAE-SDR-CCS-GSS
dd250: LT
appcode: N/A
dist: D
freq: ANNUALLY
asof:
firstsub: SEE BLK 16
subsub: SEE BLK 16
addressee1: SFAE-SDR-CCS-GSS
draft1:
reg1: 1
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 1
total_repro: 0
remarks: Block 4: Contractor format allowed, use DI-MGMT-81650 should be used as a guide

Block 12: The first submission shall be 6 months after the Government acceptance of the first article test report.

Block 13: Subsequent updates shall be submitted not later than every twelve months after the initial submission.

Block 14: CDRL shall be electronically submitted

Block 14: KO shall be notified when the original plan is submitted to the Government

Content of the Technology Master Plan shall conform to the requirements of CWB SOW para. 3.2

Microsoft Office 2013 software or higher shall be used to create the required .xls, .ppt and .doc files. Adobe Acrobat Version 7.0 or higher shall be used to create .pdf files.

group:
total_price:
prep_name:
line_item:
exhibit: A
xtdp: Off
xtm: Off
othercat: X
system: CONFORMAL WEARABLE BATTERY
ctr_no:
contr:
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .