IQ-B-ADL_CDRLS.pdf
PDF 286 KB Posted
- Attached to
- Duplex ID Card System and Supplies Federal contract opportunity
- Solicitation number
- W91CRB19R5017
About this file
Contract Data Requirements List
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_W91CRB19R5017.xlsx | XLSX spreadsheet | |
| CombinedSynopsisSolicitation_W91CRB19R5017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
List of CDRLs For
Iraq Counter Terrorism Service (CTS) Identification Card System
Performance Work Statement (PWS)
CDRL# AUTHORITY EXHIBIT PWS
PARA TITLE PURPOSE
C001 DI-MGMT-80368A C 6.1.1 Status Report Antiterrorism Level I Training Verification C002 DI-MGMT-80368A C 6.2 Status Report iWatch Training Verification C003 DI-MGMT-80368A C 6.3 Status Report Threat Awareness and Reporting Program Training Verification C004 DI-MGMT-80368A C 6.4.2 Status Report Operations Security Training Verification
C005 DI-MGMT-80368A C 6.5.1 Status Report Army Training Certification Tracking System Registration Verification
C006 DI-MGMT-80368A C 6.5.2 Status Report Cybersecurity Awareness Training Verification
D001 DI-MGMT-80934C D 6.4.1 Operations Security (OPSEC) Plan OPSEC Plan
G001 DI-MISC-80508B G 3.1.1 Technical Report/Study Services Software License Information
G002 DI-MISC-80508B G 3.1.3 Technical Report/Study Services Instruction Manuals
G003 DI-MISC-80508B G 3.4 Technical Report/Study Services Custom Composite Card Draft Designs
H002 DI-MISC-80711A H 3.7.4 Scientific and Technical Reports Configuration Management
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All
B. EXHIBIT
C
C. CATEGORY:
TDP___ TM____ OTHER ILSS X
D. SYSTEM/ITEM
Iraq Military Communications System
E. CONTRACTOR/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
C001
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Antiterrorism Level I Training Verification
17.
PRICE
GRP
4. AUTHORITY
DI-MGMT-80368A
5. CONTRACT REFERENCE
PWS Para 6.1.1
6. REQUIRING OFFICE
CECOM
18. ESTIMATED
TOTAL PRICE
Insert in Sect B
7. DD 250
DD
9. DIST STMT
REQUIRED
10 FREQ
As Req.
12. DATE OF
FIRST SUBMSN
See Blk 16
14. DISTRIBUTION
8. APP CD N/A 11. AS 13 DATE OF b. COPIES A OF DATE SUBS SUBMSN a. ADDRESSEE Final N/A See Blk 16 Draft Req Repr
16. REMARKS
This document shall provide information required by PWS paragraph 6.1.1. The document shall be submitted and exchanged electronically using PDF format.
BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract).
Email notification required with any electronic submission.
BLK 8: Approval/disapproval with comments on the functional description shall be provided after the first review. The final review shall be provided within 3 days after final submission.
BLK 12: The first submission shall be 5 working days after the completion of the training. The Government requires 7 working days for review and comments. The contractor shall provide a final copy 5 working days after the contractor acknowledges receipt of Government comments. The final submission shall be 30 days before the contract period of performance ends or 10 days before contract termination, whichever occurs first.
BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.
BLK 14: Name and electronic address of Government shall be specified at time of contract award
Government SAMD Security Officer
1* 1* 1*
* - Each submission. 15. TOTAL 1* 1* 1*
G. PREPARED BY
Dimitra Bairaktaris, Weapon Systems Manager, 609-552-5943
H. DATE
7NOV18
I. APPROVED BY
Kathy Dixon, Contracting Officer’s Representative 443-395-7010
J. DATE
DD Form 1423-2, AUG 96 (EG) Previous editions are obsolete Page _1of _1Pages
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All
B. EXHIBIT
C
C. CATEGORY:
TDP___ TM____ OTHER ILSS X
D. SYSTEM/ITEM
C002
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
iWatch Training Verification
17.
PRICE
GRP
4. AUTHORITY
DI-MGMT-80368A
5. CONTRACT REFERENCE
PWS Para 6.2
6. REQUIRING OFFICE
CECOM
18. ESTIMATED
TOTAL PRICE
Insert in Sect B
7. DD 250
DD
9. DIST STMT
REQUIRED
10 FREQ
As Req.
12. DATE OF
FIRST SUBMSN
See Blk 16
14. DISTRIBUTION
8. APP CD N/A 11. AS 13 DATE OF b. COPIES A OF DATE SUBS SUBMSN a. ADDRESSEE Final paragraph 6.2. The document shall be submitted and exchanged electronically using PDF format.
BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract).
Email notification required with any electronic submission.
BLK 8: Approval/disapproval with comments on the functional days for review and comments. The contractor shall provide a final copy 5 working days after the contractor acknowledges receipt of Government comments. The final submission shall be 30 days before the contract period of performance ends or 10 days before contract termination, whichever occurs first.
BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.
BLK 14: Name and electronic address of Government shall be specified at time of contract award
Government SAMD Security Officer
1* 1* 1*
* - Each submission. 15. TOTAL 1* 1* 1*
G. PREPARED BY
Dimitra Bairaktaris, Weapon Systems Manager, 609-552-5943
Representative 443-395-7010
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All
B. EXHIBIT
C
C. CATEGORY:
TDP___ TM____ OTHER ILSS X
D. SYSTEM/ITEM
C003
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Threat Awareness and Reporting Program Training Verification
17.
PRICE
GRP
4. AUTHORITY
DI-MGMT-80368A
5. CONTRACT REFERENCE
PWS Para 6.3
6. REQUIRING OFFICE
CECOM
18. ESTIMATED
TOTAL PRICE
Insert in Sect B
7. DD 250
DD
9. DIST STMT
REQUIRED
10 FREQ
As Req.
12. DATE OF
FIRST SUBMSN
See Blk 16
14. DISTRIBUTION
8. APP CD N/A 11. AS 13 DATE OF b. COPIES A OF DATE SUBS SUBMSN a. ADDRESSEE Final paragraph 6.3. The document shall be submitted and exchanged electronically using PDF format.
BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract).
Email notification required with any electronic submission.
BLK 8: Approval/disapproval with comments on the functional days for review and comments. The contractor shall provide a final copy 5 working days after the contractor acknowledges receipt of Government comments. The final submission shall be 30 days before the contract period of performance ends or 10 days before contract termination, whichever occurs first.
BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.
BLK 14: Name and electronic address of Government shall be specified at time of contract award
Government SAMD Security Officer
1* 1* 1*
* - Each submission. 15. TOTAL 1* 1* 1*
G. PREPARED BY
Dimitra Bairaktaris, Weapon Systems Manager, 609-552-5943
Representative 443-395-7010
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All
B. EXHIBIT
C
C. CATEGORY:
TDP___ TM____ OTHER ILSS X
D. SYSTEM/ITEM
C004
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Operations Security Training Verification
17.
PRICE
GRP
4. AUTHORITY
DI-MGMT-80368A
5. CONTRACT REFERENCE
PWS Para 6.4.2
6. REQUIRING OFFICE
CECOM
18. ESTIMATED
TOTAL PRICE
Insert in Sect B
7. DD 250
DD
9. DIST STMT
REQUIRED
10 FREQ
As Req.
12. DATE OF
FIRST SUBMSN
See Blk 16
14. DISTRIBUTION
8. APP CD N/A 11. AS 13 DATE OF b. COPIES A OF DATE SUBS SUBMSN a. ADDRESSEE Final paragraph 6.4.2. The document shall be submitted and exchanged electronically using PDF format.
BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract).
Email notification required with any electronic submission.
BLK 8: Approval/disapproval with comments on the functional days for review and comments. The contractor shall provide a final copy 5 working days after the contractor acknowledges receipt of Government comments. The final submission shall be 30 days before the contract period of performance ends or 10 days before contract termination, whichever occurs first.
BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.
BLK 14: Name and electronic address of Government shall be specified at time of contract award
Government SAMD Security Officer
1* 1* 1*
* - Each submission. 15. TOTAL 1* 1* 1*
G. PREPARED BY
Dimitra Bairaktaris, Weapon Systems Manager, 609-552-5943
Representative 443-395-7010
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All
B. EXHIBIT
C
C. CATEGORY:
TDP___ TM____ OTHER ILSS X
D. SYSTEM/ITEM
C005
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Army Training Certification Tracking System Registration Verification
17.
PRICE
GRP
4. AUTHORITY
DI-MGMT-80368A
5. CONTRACT REFERENCE
PWS Para 6.5.1
6. REQUIRING OFFICE
CECOM
18. ESTIMATED
TOTAL PRICE
Insert in Sect B
7. DD 250
DD
9. DIST STMT
REQUIRED
10 FREQ
As Req.
12. DATE OF
FIRST SUBMSN
See Blk 16
14. DISTRIBUTION
8. APP CD N/A 11. AS 13 DATE OF b. COPIES A OF DATE SUBS SUBMSN a. ADDRESSEE Final N/A See Blk 16 Draft Req Repr
16. REMARKS
This document shall provide information required by PWS paragraph 6.5.1. The document shall be submitted and exchanged electronically PDF format.
BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract).
Email notification required with any electronic submission.
BLK 8: Approval/disapproval with comments on the functional
BLK 12: The first submission shall be 2 working days after the completion of the registration. The Government requires 7 working days for review and comments. The contractor shall provide a final copy 5 working days after the contractor acknowledges receipt of Government comments. The final submission shall be 30 days before the contract period of performance ends or 10 days before contract termination, whichever occurs first.
BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.
BLK 14: Name and electronic address of Government shall be specified at time of contract award
Government SAMD Representative
1* 1* 1*
* - Each submission. 15. TOTAL 1* 1* 1*
G. PREPARED BY
Dimitra Bairaktaris, Weapon Systems Manager, 609-552-5943
Representative 443-395-7010
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All
B. EXHIBIT
C
C. CATEGORY:
TDP___ TM____ OTHER ILSS X
D. SYSTEM/ITEM
C006
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Cybersecurity Awareness Training Verification
17.
PRICE
GRP
4. AUTHORITY
DI-MGMT-80368A
5. CONTRACT REFERENCE
PWS Para 6.5.2
6. REQUIRING OFFICE
CECOM
18. ESTIMATED
TOTAL PRICE
Insert in Sect B
7. DD 250
DD
9. DIST STMT
REQUIRED
10 FREQ
As Req.
12. DATE OF
FIRST SUBMSN
See Blk 16
14. DISTRIBUTION
8. APP CD N/A 11. AS 13 DATE OF b. COPIES A OF DATE SUBS SUBMSN a. ADDRESSEE Final paragraph 6.5.2. The document shall be submitted and exchanged electronically using PDF format.
BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract).
Email notification required with any electronic submission.
BLK 8: Approval/disapproval with comments on the functional days for review and comments. The contractor shall provide a final copy 5 working days after the contractor acknowledges receipt of Government comments. The final submission shall be 30 days before the contract period of performance ends or 10 days before contract termination, whichever occurs first.
BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.
BLK 14: Name and electronic address of Government shall be specified at time of contract award
Government SAMD Representative
1* 1* 1*
* - Each submission. 15. TOTAL 1* 1* 1*
G. PREPARED BY
Dimitra Bairaktaris, Weapon Systems Manager, 609-552-5943
Representative 443-395-7010
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All
B. EXHIBIT
D
C. CATEGORY:
TDP___ TM____ OTHER ILSS X
D. SYSTEM/ITEM
D001
2. TITLE OF DATA ITEM
Operations Security (OPSEC) Plan
3. SUBTITLE
OPSEC Plan
17.
PRICE
GRP
4. AUTHORITY
DI-MGMT-80934C
5. CONTRACT REFERENCE
PWS Para 6.4.1
6. REQUIRING OFFICE
CECOM
18. ESTIMATED
TOTAL PRICE
Insert in Sect B
7. DD 250
DD
9. DIST STMT
REQUIRED
10 FREQ
Once
12. DATE OF
FIRST SUBMSN
See Blk 16
14. DISTRIBUTION
8. APP CD N/A 11. AS 13 DATE OF b. COPIES A OF DATE SUBS SUBMSN a. ADDRESSEE Final paragraph 6.4.1. The document shall be submitted and exchanged electronically using the Microsoft ® Word format, or PDF format if applicable.
BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract).
Email notification required with any electronic submission.
BLK 8: Approval/disapproval with comments on the functional
BLK 12: The first submission shall be 30 calendar days after contract award. The Government requires 5 working days for review and comments. The contractor shall provide a final copy 5 working days after the contractor acknowledges receipt of Government comments.
BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.
BLK 14: Name and electronic address of Government shall be specified at time of contract award
Government SAMD Representative
1* 1* 1*
* - Each submission. 15. TOTAL 1* 1* 1*
G. PREPARED BY
Dimitra Bairaktaris, Weapon Systems Manager, 609-552-5943
Representative 443-395-7010
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All
B. EXHIBIT
G
C. CATEGORY:
TDP___ TM____ OTHER ILSS X
D. SYSTEM/ITEM
G001
2. TITLE OF DATA ITEM
Technical Report Study/Services
3. SUBTITLE
Software License Information
17.
PRICE
GRP
4. AUTHORITY
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS Para 3.1.1
6. REQUIRING OFFICE
CECOM
18. ESTIMATED
TOTAL PRICE
Insert in Sect B
7. DD 250
DD
9. DIST STMT
REQUIRED
10 FREQ
Once
12. DATE OF
FIRST SUBMSN
See Blk 16
14. DISTRIBUTION
8. APP CD N/A 11. AS 13 DATE OF b. COPIES A OF DATE SUBS SUBMSN a. ADDRESSEE Final paragraph 3.1.1. The document shall be submitted and exchanged electronically using PDF format.
BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract).
Email notification required with any electronic submission.
BLK 8: Approval/disapproval with comments on the functional
BLK 12: The first submission shall be 10 working days after software test verification. Subsequent submission shall be due 5 days after any change. The Government requires 5 working days for review and comments. The contractor shall provide a final copy 5 working days after the contractor acknowledges receipt of Government comments.
submission shall be acknowledged and accepted as the final submission.
BLK 14: Name and electronic address of Government shall be specified at time of contract award
Government SAMD Representative
1* 1* 1*
* - Each submission. 15. TOTAL 1* 1* 1*
G. PREPARED BY
Dimitra Bairaktaris, Weapon Systems Manager, 609-552-5943
Representative 443-395-7010
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All
B. EXHIBIT
G
C. CATEGORY:
TDP___ TM____ OTHER ILSS X
D. SYSTEM/ITEM
G002
2. TITLE OF DATA ITEM
Technical Report Study/Services
3. SUBTITLE
Instruction Manuals
17.
PRICE
GRP
4. AUTHORITY
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS Para 3.1.3
6. REQUIRING OFFICE
CECOM
18. ESTIMATED
TOTAL PRICE
Insert in Sect B
7. DD 250
DD
9. DIST STMT
REQUIRED
10 FREQ
Once
12. DATE OF
FIRST SUBMSN
See Blk 16
14. DISTRIBUTION
8. APP CD N/A 11. AS 13 DATE OF b. COPIES A OF DATE SUBS SUBMSN a. ADDRESSEE Final paragraph 3.1.3. The document shall be submitted and exchanged electronically using PDF format.
BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract).
Email notification required with any electronic submission.
BLK 8: Approval/disapproval with comments on the functional
BLK 12: The first submission shall be 30 days prior to installation and training. The Government requires 5 working days for review and comments. The contractor shall provide a final copy 5 working days after the contractor acknowledges receipt of Government comments.
BLK 13: Subsequent submissions shall be 3 days after the first review. If the second review is not held, the first submission shall be acknowledged and accepted as the final submission.
BLK 14: Name and electronic address of Government shall be specified at time of contract award
Government SAMD Representative
1* 1* 1*
* - Each submission. 15. TOTAL 1* 1* 1*
G. PREPARED BY
Dimitra Bairaktaris, Weapon Systems Manager, 609-552-5943
Representative 443-395-7010
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All
B. EXHIBIT
G
C. CATEGORY:
TDP___ TM____ OTHER ILSS X
D. SYSTEM/ITEM
G003
2. TITLE OF DATA ITEM
Technical Report Study/Services
3. SUBTITLE
Custom Composite Card Draft Designs
17.
PRICE
GRP
4. AUTHORITY
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS Para 3.4
6. REQUIRING OFFICE
CECOM
18. ESTIMATED
TOTAL PRICE
Insert in Sect B
7. DD 250
DD
9. DIST STMT
REQUIRED
10 FREQ
Once
12. DATE OF
FIRST SUBMSN
See Blk 16
14. DISTRIBUTION
8. APP CD N/A 11. AS 13 DATE OF b. COPIES A OF DATE SUBS SUBMSN a. ADDRESSEE Final paragraph 3.4. The document shall be submitted and exchanged electronically using PDF format.
BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract).
Email notification required with any electronic submission.
BLK 8: Approval/disapproval with comments on the functional
BLK 12: The first submission shall be 30 calendar days after contract award. The Government requires 5 working days for review and comments. The contractor shall provide a final copy 5 working days after the contractor acknowledges receipt of Government comments.
submission shall be acknowledged and accepted as the final submission.
BLK 14: Name and electronic address of Government shall be specified at time of contract award
Government SAMD Representative
1* 1* 1*
* - Each submission. 15. TOTAL 1* 1* 1*
G. PREPARED BY
Dimitra Bairaktaris, Weapon Systems Manager, 609-552-5943
Representative 443-395-7010
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va. 22202- 4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
All
B. EXHIBIT
H
C. CATEGORY:
TDP___ TM____ OTHER ILSS X
D. SYSTEM/ITEM
H002
2. TITLE OF DATA ITEM
Scientific and Technical Reports
3. SUBTITLE
Configuration Management
17.
PRICE
GRP
4. AUTHORITY
DI-MISC-80711A
5. CONTRACT REFERENCE
PWS Para 3.7.4
6. REQUIRING OFFICE
CECOM
18. ESTIMATED
TOTAL PRICE
Insert in Sect B
7. DD 250
DD
9. DIST STMT
REQUIRED
10 FREQ
Once
12. DATE OF
FIRST SUBMSN
See Blk 16
14. DISTRIBUTION
8. APP CD N/A 11. AS 13 DATE OF b. COPIES A OF DATE SUBS SUBMSN a. ADDRESSEE Final paragraph 3.7.4. The document shall be submitted and exchanged electronically using Microsoft ® Office Suite format.
BLK 7: If the CDRL data deliverable is to be priced and is not NSP, then an electronic DD Form 250 will be required via the Wide Area Workflow Web Site in order to received payment for the data deliverable. (See Section G of the Contract).
Email notification required with any electronic submission.
BLK 8: Approval/disapproval with comments on the functional
BLK 12: The first submission shall be 10 working days after system test and validation. The Government requires 5 working days for review and comments. The contractor shall provide a final copy 5 working days after the contractor acknowledges receipt of Government comments. The final submission shall be 30 days before the contract period of performance ends or 10 days before contract termination, whichever occurs first.
submission shall be acknowledged and accepted as the final submission.
BLK 14: Name and electronic address of Government shall be specified at time of contract award
Government SAMD Representative
1* 1* 1*
* - Each submission. 15. TOTAL 1* 1* 1*
G. PREPARED BY
Dimitra Bairaktaris, Weapon Systems Manager, 609-552-5943
Representative 443-395-7010
| List of CDRLs |
| For |
| Iraq Counter Terrorism Service (CTS) |
| Identification Card System |
| Performance Work Statement (PWS) |
File details come from the government source that posted it.