A07_Attachment_7_Solicitation_Questions_ACH_25_April_2016.pdf

PDF 186 KB Posted

Attached to
Advanced Combat Helmet Generation II (ACH GEN II) Federal contract opportunity
Solicitation number
W91CRB-16-R-0004
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

Attachment 12 to solicitation W91CRB-16-R-0004. Questions and answers as of 26 April 2016

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Combat Helmet Generation II (ACH GEN II), newest first.
File Type Posted
A07_Amendment_12_W91CRB-16-R-0004_26_Sept_16.pdf PDF
A07_Amendment_11_W91CRB-16-R-0004_15_Sept_16.pdf PDF
A07_Attachment_12_Solicitation_Questions_ACH_15_Sept_2016.pdf PDF
A07_Attachment_1_ACH_Gen_II_ARPD_14-01_Rev_A.pdf PDF
A07_Attachment_12_Solicitation_Questions_ACH_12_Sept_2016.pdf PDF
A07_Amendment_10_W91CRB-16-R-0004_13_Sept_16.pdf PDF
A07_Amendment_09_ACH_06_Sept_16.pdf PDF
A07_Attachment_3_ACH-Gen_II_Source_Selection_Plan_-_20160811.pdf PDF
A07_Amendment_08_ACH_GEN_II_16_Aug_16.pdf PDF
Copy_of_Copy_of_A07_Attachment_12_Solicitation_Questions_ACH_20_July2016.xlsx XLSX spreadsheet
A07_Amendment_07_ACH_GEN_II_20_July_2016.pdf PDF
Copy_of_A07_Attachment_12_Solicitation_Questions_ACH_28_June_2016.xlsx XLSX spreadsheet
A07_Amendment_06_W91CRB-16-R-0004_ACH_30_JUNE_2016.pdf PDF
A07_Amendment_04_W91CRB-16-R-0004_ACH.pdf PDF
A07_Amendment_04_W91CRB-16-R-0004_ACH_CONFORM.pdf PDF
A07_Attachment_1_W91CRB-16-R-0004_ACH_Gen_II_ARPD_14-01.pdf PDF
A07_Attachment_7_W91CRB-16-R-0004_ARPD_12-01_Improved_Retention_System_with_Change_8.pdf PDF
A07_Attachment_3_ACH_Gen_II_Source_Selection_Sample_Testing_Examination_-_Changes_in_red_ _Linked.pdf PDF
A07_Attachment_12_Solicitation_Questions_ACH_03_June_2016.xlsx XLSX spreadsheet
A07_Amendment_03_W91CRB-16-R-0004_ACH.pdf PDF
A07_Attachment_12_Solicitation_Questions_ACH_13_May_2016.xlsx XLSX spreadsheet
A07_Attachment_1_W91CRB-16-R-0004_ACH_Gen_II_ARPD_14-01.pdf PDF
A07_Attachment_1_ACH_Gen_II_ARPD_14-01_27_April_2016.pdf PDF
A07_Amendment_02_ACH_W91CRB-16-R-0004_28_April_2016.pdf PDF
A07_W91CRB-16-R-0004_Amend_01_12_April_16.pdf PDF
A07_W91CRB-16-R-0004_CONFORM_Amend_01_12_April_16.pdf PDF
A07_Attachment_1_W91CRB-16-R-0004_ACH_Gen_II_ARPD_14-01.pdf PDF
A07_Attachment_2_W91CRB-16-R-0004_ACH_Shell_Drawings_23Nov15.pdf PDF
A07_Attachment_11_W91CRB-16-R-0004_07-99-101_ACH-CHINSTRAP_S-XL_REV-G.PDF PDF
A07_Attachment_1_W91CRB-16-R-0004_ACH_Gen_II_ARPD_14-01.pdf PDF
A07_Attachment_3_W91CRB-16-R-0004_ACH_Gen_II_Source_Selection_Sample_Testing_ _Examination.docx DOCX document
A07_Attachment_6__W91CRB-16-R-0004_PM_SPE_Form_1_(Engineering_Change_Request).pdf PDF
A07_Attachment_7_W91CRB-16-R-0004_ARPD_12-01_Improved_Retention_System_with_Change_8.pdf PDF
A07_Attachment_10_W91CRB-16-R-0004_07-96-101_ECH_S-XL_REV-G.pdf PDF
A07_W91CRB-16-R-0004_ACH_07_APRIL_16.pdf PDF
A07_Attachment_9_W91CRB-16-R-0004_SPE-HP-15-216-B_RevA.PDF PDF
A07_Attachment_4_W91CRB-16-R-0004_PPQ.docx DOCX document
A07_Attachment_5_W91CRB-16-R-0004_SOW_PM_SPE_Technical_Exhibits.doc DOC document
A07_Attachment_8_W91CRB-16-R-0004_SPE-HP-15-216-A_RevA.PDF PDF
A01_ACH_Shell_Drawings_23Nov15.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 7, Questions and Answers dated 25 April, 2016

Document Question Answer Changes made (y) or (n)

1 Product Description, Appendix B Regarding elimination of the 9mm requirement in appendix B, it seems the

FAT has two purposes, but could this please be clarified?

The 9mm Resistance to Penetration (RTP) requirement exists as detailed in Purchase Description AR/PD 14-01. 9mm Ballistic Transient

Deformation (BTD) is no longer an accept/reject criteria, but will be measured and recorded for Government reference during each 9mm

RTP shot. It is unclear what two purposes are being referenced in this question. The purpose of First Article Test (FAT) is to qualify the helmet design for production. Appendix B details the intended calculations to be conducted to review BTD performance for Government reference.

N

1a Product Description First, what is the reason for checking on statistical differences between test conditions?

In order to conduct a valid statistical analysis, data from statistically different distributions cannot be aggregated. Checking the difference in

BTD performance across test conditions allows for aggregation and examination of the largest statistically allowable sample size without introducing data from different distributions.

N

1b Product Description Second, given the “baseline BTD performance” established during FAT, what is the stability measurement approach during LAT?

See response under Question 1d N

1c Product Description How is the comparison done statistically? See response under Question 1d N

1d Product Description How would the check for statistical difference be done and over what sample size?

Combined answer for 1.b-d.: BTD performance will be measured during

FAT and LAT for Government reference. It will not be used as an accept/reject criteria. The Government intends to use this data to document BTD performance of the ACH Gen II. Exact calculations may vary depending on the specific goals of different analyses. One possibility is to conduct a rolling Upper Tolerance Limit (UTL) of the last

48 shots of the same helmet size, to mirror the analysis in FAT.

However, the Government may use this data for other analyses as necessary for understanding the performance of the ACH Gen II.

N

2 RFP, Section M

In reference to evaluation for integration/compatibility (table 12, technical sub-factor 4), testing against NVG type III is required.

How are these to be checked against a 3 hole system if a 3 hole system does not exist? Only NVG type I and II are listed in the PD.

ACH NVG (Type III – Three Hole Configuration) low profile shroud was removed from the evaluation criteria, Section M, of the RFP as of

Amendment 02.

Y - see updated Section M of the

RFP

3 RFP

Basis of award notes that weight is significantly more important than price and represents the best value to the Government in a trade-off with price.

What is the expected trade-off percentage or ratio?

The RFP intentionally did not include a specific percentage or ratio assignment to the execution of a trade-off determination. Based upon the comprehensive evaluation of all stated evaluation criteria in accordance with their stated relative order of importance, the

Government will make a final award decision based on which offer represents the best value to the Government. Based on the best value trade-off analysis, its possible award can go to the lowest priced offero

N