PERFORMANCE WORK STATEMENT (PWS) TEMPLATE
TECHNICAL EXHIBIT LISTING
C.3.13 Attachment/Technical Exhibit List.
C.3.13.1 Technical Exhibit 1 – PM SPE FORM 1 Engineering Change Request (ECR)
C.3.13.2 Technical Exhibit 2 – Production Readiness Review
C.3.13.3 Technical Exhibit 3 – PM SPE FORM 11 Quality Management System (QMS) Crosswalk Matrix
C.3.13.4 Technical Exhibit 4 – PM SPE FORM 3 Corrective Action Report
C.3.13.5 Technical Exhibit 5– PM SPE FORM 15 Process Control Plan C.3.13.6 Technical Exhibit 6- AR/PD 14-01, ACH Gen II, Date TBD.
EXHIBIT 1
PM SPE FORM 1: ENGINEERING CHANGE REQUEST (ECR)
EXHIBIT 1
PM SPE FORM 1: ENGINEERING CHANGE REQUEST (ECR)
EXHIBIT 1
PM SPE FORM 1: ENGINEERING CHANGE REQUEST (ECR)
EXHIBIT 2
PRODUCTION READINESS REVIEW/AUDIT
| Agenda Topics |
| Description of Material to be Verified and Discussed |
Introduction
Contractor welcome, review of agenda, assessment schedule and orientation to the facility;
Opening Remarks
a. Introduction of assessment team and Contractor personnel;
b. Briefing to Contractor describing objectives and expectations for the PRR;
c. Contractor overview and discussion of the results of their self-assessment;
· Results and Findings of Internal PRR
· Results and Findings of Subcontractor PRRs
Contract Overview
Contractor must declare their production and documentation readiness level and provide a briefings to support their declaration
· Production Capability
1. Facility Capability/Controls
2. Identification of Manufacturing Personnel
3. Manufacturing Management Personnel
4. Facility capabilities/controls
Open Risk Management/Mitigation Discussion
Delivery Schedule Review
Verification of Subcontractor Awards
a. Purchase Order Review and Verification of Requirements Flow-down
b. Test contract verification/Material verification
Configuration Management
Verification of Production Documentation/Materials
a. Drawings
b. Purchase Descriptions
c. Work Instruction
d. Supply Chain Analysis
· Material availability
· Material proven and validated
· Material special handling requirements
| Audit on Production Area |
| Shop-floor visits to key areas by small groups (Contractor and Government) |
| Audit Meetings |
| Small group discussions between assessment team members and |
Contractor Subject Matter Experts (SMEs)
Private meeting of assessment team to record and discuss observations
Out-briefing by assessment team to Contractor
EXHIBIT 3
PRODUCT MANAGER SOLDIER PROTECTIVE EQUIPMENT
ISO 9001:2008 CROSSWALK
Company:
Contracting Officer:
Solicitation Number:
Contract Number:
PM SPE Reviewer: MACROBUTTON AcceptAllChangesInDoc Date: Click here to enter a date.
EXHIBIT 3
PRODUCT MANAGER SOLDIER PROTECTIVE EQUIPMENT
ISO 9001:2008 CROSSWALK
This ISO 9001:2008 crosswalk matrix is intended as a clarification map for a Contractor’s Quality Management System (QMS). All Soldier Personal Protective Equipment (PPE) are Critical Safety Items, therefore, the contracts for PPE incorporate FAR Clause 52.246.11 Higher Level Contract Quality and delineates ISO 9001:2008 as the standard for compliance. Contractors are not required to be ISO certified at this time, however, they must be ISO 9001:2008 compliant. The definition of compliance is that they must meet all the standard requirements with exception of 3rd party registration. The Contractor needs to demonstrate how they meet and maintain an ISO 9001:2008 Quality Management System. The Product Manager Soldier Protective Equipment (PM SPE) Quality Assurance (QA) and Defense Contract Management Agency (DCMA) will evaluate, audit, and monitor the Contractor’s QMS to ensure compliance. The crosswalk matrix must be completed and submitted to PM SPE QA for evaluation prior to the initial audit.
1. First column: ISO Standard clauses
2. Second column: Company Quality Management System – The Contractor shall populate this column by referencing their appropriate company document equivalent to requirement
3. Third column: Compliance Statement – If the Contractor is not certified, explain how your process is in compliance with the standard
4. All Procedures required by ISO 9001:2008 shall be submitted as attachments to the Crosswalk Matrix and three (3) samples of supporting documents/records as they pertain to the Procedures.
Example: ISO 9001:2008 requires a Corrective Action Procedure. The crosswalk shall describe it, the Procedure shall be an attachment to the crosswalk and examples of a Customer driven Corrective Action, an Internal Corrective Action and a Supplier Corrective Action would be supporting documents/records pertinent to the procedure.
Remember, compliance and certification is not the same thing, but they require the same effort and management involvement. Early ISO developed the phrase that is still relevant today, “Say what you do, do what you say, and prove it.”
EXHIBIT 3
PRODUCT MANAGER SOLDIER PROTECTIVE EQUIPMENT
ISO 9001:2008 CROSSWALK
| ISO 9001:2008 Clause |
| Company Quality Management System |
| Compliance Statement |
Introduction (title only)
| General |
| 0.1 |
| Process approach |
| 0.2 |
| Relationship with ISO 9004 |
| 0.3 |
| Compatibility with other management systems |
| 0.4 |
| Scope (title only) |
| 1 |
| General |
| 1.1 |
| Application |
| 1.2 |
| Normative references |
| 2 |
| Terms and definitions |
| 3 |
| Quality management system (title only) |
| 4 |
| General requirements |
| 4.1 |
| Documentation requirements (title only) |
| 4.2 |
| General |
| 4.2.1 |
| Quality manual |
| 4.2.2 |
| Control of documents |
| 4.2.3 |
| Control of records |
| 4.2.4 |
ISO 9001:2008 CROSSWALK
| ISO 9001:2008 Clause |
| Company Quality Management System |
| Compliance Statement |
| Management responsibility (title only) |
| 5 |
| Management commitment |
| 5.1 |
| Customer focus |
| 5.2 |
| Quality policy |
| 5.3 |
| Planning (title only) |
| 5.4 |
| Quality objectives |
| 5.4.1 |
| Quality management system planning |
| 5.4.2 |
| Responsibility, authority and communication (title only) |
| 5.5 |
| Responsibility and authority |
| 5.5.1 |
| Management representative |
| 5.5.2 |
| Internal communication |
| 5.5.3 |
| Management review (title only) |
| 5.6 |
| General |
| 5.6.1 |
| Review input |
| 5.6.2 |
| Review output |
| 5.6.3 |
ISO 9001:2008 CROSSWALK
| ISO 9001:2008 Clause |
| Company Quality Management System |
| Compliance Statement |
| Resource management (title only) |
| 6 |
| Provision of resources |
| 6.1 |
| Human resources (title only) |
| 6.2 |
| General |
| 6.2.1 |
| Competence, training and awareness |
| 6.2.2 |
| Infrastructure |
| 6.3 |
| Work environment |
| 6.4 |
| Product realization (title only) |
| 7 |
| Planning of product realization |
| 7.1 |
| Customer-related processes (title only) |
| 7.2 |
| Determination of requirements related to the product |
| 7.2.1 |
| Review of requirements related to the product |
| 7.2.2 |
| Customer communication |
| 7.2.3 |
| Design and development (title only) |
| 7.3 |
| Design and development planning |
| 7.3.1 |
| Design and development inputs |
| 7.3.2 |
| Design and development outputs |
| 7.3.3 |
ISO 9001:2008 CROSSWALK
Compliance Statement
| Design and development (title only-continued) |
| 7.3 |
| Design and development review |
| 7.3.4 |
| Design and development verification |
| 7.3.5 |
| Design and development validation |
| 7.3.6 |
| Control of design and development changes |
| 7.3.7 |
| Purchasing (title only) |
| 7.4 |
| Purchasing process |
| 7.4.1 |
| Purchasing information |
| 7.4.2 |
| Verification of purchased product |
| 7.4.3 |
| Production and service provision (title only) |
| 7.5 |
| Control of production and service provision |
| 7.5.1 |
| Validation of processes for production and service provision |
| 7.5.2 |
| Identification and traceability |
| 7.5.3 |
| Customer property |
| 7.5.4 |
| Preservation of product |
| 7.5.5 |
| Control of monitoring and measuring equipment |
| 7.6 |
ISO 9001:2008 CROSSWALK
Compliance Statement
| Measurement, analysis and improvement (title only) |
| 8 |
| General |
| 8.1 |
| Monitoring and measurement (title only) |
| 8.2 |
| Customer satisfaction |
| 8.2.1 |
| Internal audit |
| 8.2.2 |
| Monitoring and measurement of processes |
| 8.2.3 |
| Monitoring and measurement of product |
| 8.2.4 |
| Control of nonconforming product |
| 8.3 |
| Analysis of data |
| 8.4 |
| Improvement (title only) |
| 8.5 |
| Continual improvement |
| 8.5.1 |
| Corrective action |
| 8.5.2 |
| Preventive action |
| 8.5.3 |
ISO 9001:2008 CROSSWALK
Submitting Activity
a. Typed Name (First, Middle Initial, Last)
b. TITLE
c. DIGITAL SIGNATURE
EXHIBIT 4
CORRECTIVE ACTION REPORT FORM
INSTRUCTION PAGE 1
| Discipline Category |
| Requested Information |
Problem Description
Section 1
Problem Description – The following shall be documented:
· A detailed, specific description of the problem
· How many items were initially found that contain the problem
· When was the problem discovered
· Where was the problem discovered
How was the problem discovered
Note: This section will be completed by the CAR Issuing Activity.
Problem Solution Team Section 2 A list of Team Members that includes the following information shall be documented:
· Member name
· Member title
· Member phone number
· Approval authority
· Member e-mail address
Containment Actions / Short Term Corrections Section 3 The quantity of suspect product at the Contractor’s facility (this include Subcontractors and material suppliers). This is to include the method of Quarantine, Quarantine Identification, method of Certification against the problem and Certification Identification. (Example: If product is screened and bad product is removed, good product is re-packaged and the package has a green “Certified” label adhered to it).
The quantity of suspect product in transit. This is to include the method of notification to the recipient. A proposed method of Certification against the problem (Return Authorization, Contractor to go on-site and rework or screen product, etc.). A method of Certification Identification.
The quantity of suspect product in the Government’s possession. This is to include Return Authorization and details of Quarantine and Certification upon receipt back into the Contractor’s facility, or details of arrangements made for Quarantine and Certification at the Government’s facility.
Root Cause Analysis Section 4 Root Cause Analysis – The following shall be documented:
· An explanation of why the failure happened.
· An explanation of why the failure was not detected.
NOTE: Root Cause Verification – Explain in detail what actions were taken to assure the TRUE Root Cause was found
Corrective Action Plan Section 5 Document the specific plan for changes to meet the contract and product requirements for the items that were out of control. This plan shall include the responsible individual for each action plan item along with the expected date of completion.
INSTRUCTION PAGE
| Discipline Category |
| Requested Information |
Validation Section 6
· Identify each nonconformance individually and include the corrective action implemented.
Applicable to the occurrence of the problem:
· List each Action individually and include the date of implementation and the name of the Team Member responsible.
· Provide detail for each Action of how it was proven that the action taken eliminated the problem. Include the date and the name of the Team Member responsible.
Applicable to the non-detection of the problem:
· List each Action individually and include the date of implementation and the name of the Team Member responsible.
· Provide detail for each Action of how it was proven that the action taken eliminated the problem. Include the date and the name of the Team Member responsible.
The following shall be documented:
· Describe the methods used (i.e. – number of trials with corrections in place, measurements, inspections, etc; this includes data on the number of items inspected vs. number of subject defects found, etc.) to verify the actions taken are effective and will remain effective. Include hard data as applicable.
Prevention Error Proofing Section 7
· Consider other processes where these Corrective Actions could be of benefit.
· Identify Poke-Yoke’s or error proofing processes implemented for each problem.
Standardization and Control Section 7B The following shall be documented:
· Provide details regarding updates of documents such as – Process Failure Modes and Effects Analysis (FMEA), Process Control Plan, Process Flow Diagrams, Visual Aids, Work Instructions, Operating Procedures, Training Methods / Records, Preventive Maintenance Plans, Etc.
Examples of each, as applicable, should be included with the Corrective Action Report.
| Section 8 |
| The following shall be documented: |
· List the Team Members by name, input the date and allow each Team Member the opportunity to comment on the project.
· Secure DCMA signature on CAR response
CAR Timeline:
NOTE: Contractor shall not exceed 15 working days for final CAR response without written request for an extension from DCMA.
| Gov. notification to the Contractor |
| DAY 1 |
| DAY 2 |
| DAY 3 |
| DAY 4 |
| DAY 5 |
| Day |
| DAY 7 |
| DAY 8 |
| DAY 9 |
| DAY 10 |
| DAY |
| DAY 12 |
| DAY 13 |
| DAY 14 |
| DAY 15 |
Supplier:
Address:
| Point of Contact: |
| Phone Number: |
| Fax Number: |
| CAR Number: |
| CAR Date: Click here to enter a date. |
Status:
Recurrent Failure:
| Part Name: |
| Affected Part Number: |
1. Problem Description
Description of the problem:
How many parts have the problem?
When were the parts found?
Where were the parts found?
How were the parts found?
2. Problem Solution Team
| Name: |
| Position: |
| Phone Number: |
| Email Address: |
3. Containment Action
Your action taken to capture all non-conforming product in your inventory, finished goods, WIP, & in transit, prior to receipt
Action:
| Assignee: |
| Date: Click here to enter a date. |
At Government Facility
Action:
| Assignee: |
| Date: Click here to enter a date. |
Verification (Date and result):
Material at Government Facility Disposition
No. RMA:
Material in Transit
Action:
| Assignee: |
| Date: Click here to enter a date. |
Verification (Date and result):
At Supplier’s Facility
Action:
Total Number of parts sorted:
Percentage defective:
Total Number of defective parts:
What is the identification mark to signify?
| Assignee: |
| Date: Click here to enter a date. |
4. Root Cause Analysis
Use the “5 Why’s Analysis” technique to determine the most basic cause that resulted in a nonconformity that can be reasonably identified, fixed, or eliminated through process improvement.
Why did the failure occur?
| 1st Cause |
| 2nd Cause |
| 3rd Cause |
1. Why?
2. Why?
3. Why?
4. Why?
5. Why?
Why was the failure not detected?
| 1st Cause |
| 2nd Cause |
| 3rd Cause |
1. Why?
2. Why?
3. Why?
4. Why?
5. Why?
Verification of Effectiveness Explain in detail what actions were taken to verify that the root cause was found and effective.
5. Identify Solutions
Solutions that address and correct the root cause. Solutions determined to be the best of all alternatives. Document and verify the permanent Corrective Action in the Action Item Table
Applicable to occurrence of failure
| Actions |
| Date |
| Assignee |
Click here to enter a date.
Click here to enter a date.
Click here to enter a date.
How did you validate that the action/improvement measure eliminated the non conformance?
| Actions |
| Date |
| Assignee |
Click here to enter a date.
Click here to enter a date.
Click here to enter a date.
Applicable to non-detection of failure
| Actions |
| Date |
| Assignee |
Click here to enter a date.
Click here to enter a date.
Click here to enter a date.
6. Validation
Implement and validate to ensure that corrective action does “what it is suppose to do.” Detect undesirable side effect. Document this on the action Item Table. Return to root cause analysis, if necessary
Evidence:
| Assignee: |
| Date: Click here to enter a date. |
7. Prevention (Design/Information System Review)
Determine what improvements in the systems and processes would prevent problem from recurring. Ensure that corrective action remains in place and are successful.
| Assignee: |
| Date: Click here to enter a date. |
Were Pokes-Yokes (Error Proofing) Implemented because of this failure?
| Yes (Describe the operation): |
| No (Why not?): |
7B. Standardization and Control:
| Check if Applicable |
| Document |
| Assignee |
| Completion |
| What Changed? |
| Planned |
| Actual |
Control Plan
FMEA
Flow Process Diagram
Visual Aid
Operation Standards
Manufacturing Set-up Sheet
Manufacturing Check Sheet
Process Work Instructions
QA Inspection Forms
Preventive Maintenance Plan
Job Certifications/
Recertification requirement
Other
8B. Attach any additional information to end of this report.
Submitted By:
Signature/Title: X______________________________
| Effect Date: Click here to enter a date. |
| Date Submitted: Click here to enter a date. |
Government Status:
CONTROL Forms.CheckBox.1 Government Signature/Title:
X____________________________ Date: Click here to enter a date..
8B. Defense Contract Management Agency.
Reviewed By:
Signature/Title: X______________________________
| Effect Date: Click here to enter a date. |
| Date Submitted: Click here to enter a date. |
DCMA Status:
CONTROL Forms.CheckBox.1 DCMA Signature/Title:
X____________________________ Date: Click here to enter a date.
Action Item Table
| Action |
| Implement and Verify Actions |
| Action Number |
| Fault/item |
| Containment/Corrective Action |
| Verify |
| How Verified |
| Action |
| Assignee |
| Planned |
| Actual |
| Status |
EXHIBIT 5
PM SPE FORM 15: PROCESS CONTROL PLAN
| Proc. Step No. |
| Process Name |
| Machine, Device, Tools for Manufacturing |
| Process Parameters |
| Product Characteristics |
| Class |
| Product / Process Specification |
| Evaluation Method |
| Sample Size / Frequency |
| Analysis Method |
| Reactions if Out-of-Control Conditions are Encountered |
EXHIBIT 6
AR/PD 14-01, ACH Gen II
CAR response Section 4-6 completed
CAR response Section 2-3 completed
Final CAR response updated: Section 7-8, completed
Revision 3.2
_1468734891.unknown
_1468734895.unknown
_1468734899.unknown
_1468734903.unknown
_1468734905.unknown
_1468734906.unknown
_1468734907.unknown
_1468734904.unknown
_1468734901.unknown
_1468734902.unknown
_1468734900.unknown
_1468734897.unknown
_1468734898.unknown
_1468734896.unknown
_1468734893.unknown
_1468734894.unknown
_1468734892.unknown
_1468734887.unknown
_1468734889.unknown
_1468734890.unknown
_1468734888.unknown
_1468734885.unknown
_1468734886.unknown
_1427711551.doc