A07_Attachment_6__W91CRB-16-R-0004_PM_SPE_Form_1_(Engineering_Change_Request).pdf

PDF 541 KB Posted

Attached to
Advanced Combat Helmet Generation II (ACH GEN II) Federal contract opportunity
Solicitation number
W91CRB-16-R-0004
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

Attachment 6- PM SPE Form 1 (ECP)

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Combat Helmet Generation II (ACH GEN II), newest first.
File Type Posted
A07_Amendment_12_W91CRB-16-R-0004_26_Sept_16.pdf PDF
A07_Amendment_11_W91CRB-16-R-0004_15_Sept_16.pdf PDF
A07_Attachment_1_ACH_Gen_II_ARPD_14-01_Rev_A.pdf PDF
A07_Attachment_12_Solicitation_Questions_ACH_15_Sept_2016.pdf PDF
A07_Attachment_12_Solicitation_Questions_ACH_12_Sept_2016.pdf PDF
A07_Amendment_10_W91CRB-16-R-0004_13_Sept_16.pdf PDF
A07_Amendment_09_ACH_06_Sept_16.pdf PDF
A07_Attachment_3_ACH-Gen_II_Source_Selection_Plan_-_20160811.pdf PDF
A07_Amendment_08_ACH_GEN_II_16_Aug_16.pdf PDF
Copy_of_Copy_of_A07_Attachment_12_Solicitation_Questions_ACH_20_July2016.xlsx XLSX spreadsheet
A07_Amendment_07_ACH_GEN_II_20_July_2016.pdf PDF
Copy_of_A07_Attachment_12_Solicitation_Questions_ACH_28_June_2016.xlsx XLSX spreadsheet
A07_Amendment_06_W91CRB-16-R-0004_ACH_30_JUNE_2016.pdf PDF
A07_Amendment_04_W91CRB-16-R-0004_ACH.pdf PDF
A07_Amendment_04_W91CRB-16-R-0004_ACH_CONFORM.pdf PDF
A07_Attachment_1_W91CRB-16-R-0004_ACH_Gen_II_ARPD_14-01.pdf PDF
A07_Attachment_12_Solicitation_Questions_ACH_03_June_2016.xlsx XLSX spreadsheet
A07_Attachment_7_W91CRB-16-R-0004_ARPD_12-01_Improved_Retention_System_with_Change_8.pdf PDF
A07_Attachment_3_ACH_Gen_II_Source_Selection_Sample_Testing_Examination_-_Changes_in_red_ _Linked.pdf PDF
A07_Amendment_03_W91CRB-16-R-0004_ACH.pdf PDF
A07_Attachment_1_W91CRB-16-R-0004_ACH_Gen_II_ARPD_14-01.pdf PDF
A07_Attachment_12_Solicitation_Questions_ACH_13_May_2016.xlsx XLSX spreadsheet
A07_Attachment_7_Solicitation_Questions_ACH_25_April_2016.pdf PDF
A07_Attachment_1_ACH_Gen_II_ARPD_14-01_27_April_2016.pdf PDF
A07_Amendment_02_ACH_W91CRB-16-R-0004_28_April_2016.pdf PDF
A07_W91CRB-16-R-0004_Amend_01_12_April_16.pdf PDF
A07_W91CRB-16-R-0004_CONFORM_Amend_01_12_April_16.pdf PDF
A07_Attachment_1_W91CRB-16-R-0004_ACH_Gen_II_ARPD_14-01.pdf PDF
A07_Attachment_2_W91CRB-16-R-0004_ACH_Shell_Drawings_23Nov15.pdf PDF
A07_Attachment_11_W91CRB-16-R-0004_07-99-101_ACH-CHINSTRAP_S-XL_REV-G.PDF PDF
A07_Attachment_1_W91CRB-16-R-0004_ACH_Gen_II_ARPD_14-01.pdf PDF
A07_Attachment_3_W91CRB-16-R-0004_ACH_Gen_II_Source_Selection_Sample_Testing_ _Examination.docx DOCX document
A07_Attachment_9_W91CRB-16-R-0004_SPE-HP-15-216-B_RevA.PDF PDF
A07_Attachment_4_W91CRB-16-R-0004_PPQ.docx DOCX document
A07_Attachment_5_W91CRB-16-R-0004_SOW_PM_SPE_Technical_Exhibits.doc DOC document
A07_Attachment_8_W91CRB-16-R-0004_SPE-HP-15-216-A_RevA.PDF PDF
A07_Attachment_7_W91CRB-16-R-0004_ARPD_12-01_Improved_Retention_System_with_Change_8.pdf PDF
A07_Attachment_10_W91CRB-16-R-0004_07-96-101_ECH_S-XL_REV-G.pdf PDF
A07_W91CRB-16-R-0004_ACH_07_APRIL_16.pdf PDF
A01_ACH_Shell_Drawings_23Nov15.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PM SPE ENGINEERING CHANGE REQUEST (ECR)

(Vendors – Complete Blocks 2 – 19 and Submit to PM SPE)

1. PM SPE CONTROL NUMBER

2. ORIGINATOR 3. ECR TYPE

a. TYPED NAME (First, Middle Initial, Last)

b. ADDRESS (Street, City, State, Zip Code)

□ ECP □ RFD

□ RFW

4. CLASSIFICATION

□ Critical □ Minor

□ Major

5. TITLE OF ECR

6. ITEM DESIGNATION 7. PROCUREMENT ACTIVITY

8. BASELINE AFFECTED

a. MCN / NSN b. MODEL / DESIGN CODE □ Functional □ Product

□ Allocated

9. END ITEM NOMENCLATURE 10. CONTRACT NUMBER AND LINE ITEM

11. LOTS / MATERIAL AFFECTED

12. REOCCURING DEVIATION (if Yes, Provide CAR# in Block 12 & Status in Block 18)

13. EFFECT ON COST / PRICE

14. EFFECT ON DELIVERY SCHEDULE

15. OTHER SYSTEMS / CONFIGURATION ITEMS / INTERFACES AFFECTED

16. DESCRIPTION OF ECR

17. NEED FOR ECR

18. CORRECTIVE ACTION TAKEN

19. SUBMITTING ACTIVITY

a. TYPED NAME (FIRST, MIDDLE INITIAL, LAST)

c. SIGNATURE

b. TITLE / ORGANIZATION

d. DATE (YYYYMMDD)

PM SPE FORM 1 (ECR), JULY 15 Page 1

PM SPE CONTROL NUMBER

TITLE OF ECR

20. PM SPE JUSTIFICATION

21. ATTACHMENTS

22. COR (APPROVAL AUTHORITY FOR MINOR ECRS) / PM SPE TECHNICAL STAFF APPROVAL / DISAPPROVAL FOR MAJOR OR CRITICAL ECRS)

a. APPROVAL

□ Approved

□ Disapproved

b. SIGNATURE

c. DATE SIGNED

(YYYYMMDD)

23. APM APPROVAL / DISAPPROVAL (APPROVAL AUTHORITY FOR MAJOR ECRs)

□ Approved

24. PM SPE APPROVAL / DISAPPROVAL (APPROVAL AUTHORITY FOR CRITICAL ECRs)

□ Approved

PM SPE FORM 1 (ECR), JULY 15 Page 2

PM SPE CONTROL NUMBER

TITLE OF ECR

PM SPE FORM 1 (ECR), JULY 15 Page 3

ORIGINATOR NAME:
ORIGINATOR ADDRESS:
ECP Checkbox: Off
RFD Checkbox: Off
RFW Checkbox: Off
Critical Checkbox: Off
Major Checkbox: Off
Minor Checkbox: Off
MCN NSN:
MODEL DESIGN CODE:
PROCUREMENT ACTIVITY:
Functional Checkbox: Off
Allocated Checkbox: Off
Product Checkbox: Off
END ITEM NOMENCLATURE:
CONTRACT NUMBER AND LINE ITEM:
LOTS MATERIAL AFFECTED:
REOCCURING DEVIATION:
EFFECT ON COST PRICE:
EFFECT ON DELIVERY SCHEDULE:
OTHER SYSTEMS CONFUGRATION ITEMS INTERFACES AFFECTED:
DESCRIPTION OF ECR:
NEED FOR ECR:
CORRECTIVE ACTION TAKEN:
SUBMITTING ACTIVITY NAME:
SUBMITTING ACTIVITY TITLE:
SUBMISSION DATE:
PM SPE Control Number:
TITLE:
PM SPE JUSTIFICATION:
ATTACHMENTS:
COR APPROVAL: Off
COR DISAPPROVAL: Off
APM APPROVAL: Off
APM DISAPPROVAL: Off
PM APPROVAL: Off
PM DISAPPROVAL: Off
COR DATE:
APM DATE:
PM DATE:
ADDITIONAL INFO:

File details come from the government source that posted it. Updated .