A07_Attachment_6__W91CRB-16-R-0004_PM_SPE_Form_1_(Engineering_Change_Request).pdf
PDF 541 KB Posted
- Attached to
- Advanced Combat Helmet Generation II (ACH GEN II) Federal contract opportunity
- Solicitation number
- W91CRB-16-R-0004
About this file
Attachment 6- PM SPE Form 1 (ECP)
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PM SPE ENGINEERING CHANGE REQUEST (ECR)
(Vendors – Complete Blocks 2 – 19 and Submit to PM SPE)
1. PM SPE CONTROL NUMBER
2. ORIGINATOR 3. ECR TYPE
a. TYPED NAME (First, Middle Initial, Last)
b. ADDRESS (Street, City, State, Zip Code)
□ ECP □ RFD
□ RFW
4. CLASSIFICATION
□ Critical □ Minor
□ Major
5. TITLE OF ECR
6. ITEM DESIGNATION 7. PROCUREMENT ACTIVITY
8. BASELINE AFFECTED
a. MCN / NSN b. MODEL / DESIGN CODE □ Functional □ Product
□ Allocated
9. END ITEM NOMENCLATURE 10. CONTRACT NUMBER AND LINE ITEM
11. LOTS / MATERIAL AFFECTED
12. REOCCURING DEVIATION (if Yes, Provide CAR# in Block 12 & Status in Block 18)
13. EFFECT ON COST / PRICE
14. EFFECT ON DELIVERY SCHEDULE
15. OTHER SYSTEMS / CONFIGURATION ITEMS / INTERFACES AFFECTED
16. DESCRIPTION OF ECR
17. NEED FOR ECR
18. CORRECTIVE ACTION TAKEN
19. SUBMITTING ACTIVITY
a. TYPED NAME (FIRST, MIDDLE INITIAL, LAST)
c. SIGNATURE
b. TITLE / ORGANIZATION
d. DATE (YYYYMMDD)
PM SPE FORM 1 (ECR), JULY 15 Page 1
PM SPE CONTROL NUMBER
TITLE OF ECR
20. PM SPE JUSTIFICATION
21. ATTACHMENTS
22. COR (APPROVAL AUTHORITY FOR MINOR ECRS) / PM SPE TECHNICAL STAFF APPROVAL / DISAPPROVAL FOR MAJOR OR CRITICAL ECRS)
a. APPROVAL
□ Approved
□ Disapproved
b. SIGNATURE
c. DATE SIGNED
(YYYYMMDD)
23. APM APPROVAL / DISAPPROVAL (APPROVAL AUTHORITY FOR MAJOR ECRs)
□ Approved
24. PM SPE APPROVAL / DISAPPROVAL (APPROVAL AUTHORITY FOR CRITICAL ECRs)
□ Approved
PM SPE FORM 1 (ECR), JULY 15 Page 2
PM SPE CONTROL NUMBER
TITLE OF ECR
PM SPE FORM 1 (ECR), JULY 15 Page 3
| ORIGINATOR NAME: |
| ORIGINATOR ADDRESS: |
| ECP Checkbox: Off |
| RFD Checkbox: Off |
| RFW Checkbox: Off |
| Critical Checkbox: Off |
| Major Checkbox: Off |
| Minor Checkbox: Off |
| MCN NSN: |
| MODEL DESIGN CODE: |
| PROCUREMENT ACTIVITY: |
| Functional Checkbox: Off |
| Allocated Checkbox: Off |
| Product Checkbox: Off |
| END ITEM NOMENCLATURE: |
| CONTRACT NUMBER AND LINE ITEM: |
| LOTS MATERIAL AFFECTED: |
| REOCCURING DEVIATION: |
| EFFECT ON COST PRICE: |
| EFFECT ON DELIVERY SCHEDULE: |
| OTHER SYSTEMS CONFUGRATION ITEMS INTERFACES AFFECTED: |
| DESCRIPTION OF ECR: |
| NEED FOR ECR: |
| CORRECTIVE ACTION TAKEN: |
| SUBMITTING ACTIVITY NAME: |
| SUBMITTING ACTIVITY TITLE: |
| SUBMISSION DATE: |
| PM SPE Control Number: |
| TITLE: |
| PM SPE JUSTIFICATION: |
| ATTACHMENTS: |
| COR APPROVAL: Off |
| COR DISAPPROVAL: Off |
| APM APPROVAL: Off |
| APM DISAPPROVAL: Off |
| PM APPROVAL: Off |
| PM DISAPPROVAL: Off |
| COR DATE: |
| APM DATE: |
| PM DATE: |
| ADDITIONAL INFO: |