1. General Scope of Work

1.1. Maintain a fleet of 4 each Z-Backscatter Vans owned by the Afghan National Police (ANP). For each vehicle, the Contractor shall maintain both the vehicle chassis and the backscatter technology suit The Vans are on a Mercedes Benz chassis, and are manufactured by AS&E (http://www.as-e.com/products-solutions/cargo-vehicle-inspection/mobile/product/zbv#options). The contractor shall be required to: understand the backscatter technology suit, be able to use the technology, train ANP how to operate the vans’ technology suit, and how to perform routine and emergency maintenance on the vehicles.

Van serial numbers: ZBV: 173, 174, 204 AND 248 Chassis VIN: TBD Vans will be located at various ANP sites in Central Kabul (proximate to the Green Zone/Enhanced Security Zone) – specific sites TBD. Contractor will service vehicles on-site or coordinate with ANP to transport a disabled vehicle to a service site of contractor’s providing. Use of OEM parts and equipment is required (although substitutions may be approved by the COR on a case by case basis). Vans will be used daily, up to 24/7 cycle. Contractor will provide ANP the planned downtimes for scheduled maintenance and schedule all at least 30 days in advance. All break fix, immediate requirements will be handled via an on call support system (see sec 2.2.2).

1.2 Definitions

a. Sustainment is defined as maintenance and technical support.

b. Maintenance is defined as regularly scheduled Preventative Maintenance Checks and Services (PMCS) being annotated and performed to keep all vehicle systems fully operational. PMCS refers to those maintenance tasks that are used to identify and prevent potential equipment problems. PMCS includes daily checks to monitor the condition of an item of the system, and quick turnaround repairs (response time metrics are detailed in sect. 2.2.2) by component replacement and adjustment.

c. Technical support is defined as a combination of in-country help desk support (24/7 call number), unscheduled (other than scheduled maintenance, such as operator training, and damage due to acts of God and war), maintenance and repair tasks, and related spare parts supply and management. Technical support includes spare parts management.

d. On-site maintenance shall include activities such as replenishing fuel, oil, and other vehicle fluids.

e. Fully Mission Capable (FMC) (Green) is defined as all vehicle systems (to include the x-ray technology suite, transmission, suspension, braking, etc…) being in their proper working condition and able to operate as designed without alteration. For example, all systems in a vehicle are fully operable, and the vehicle does not require an outside power source to run.

f. Partially Mission Capable (PMC) (Yellow) is defined as some vehicle systems being operable while others are not. An example of a PMC vehicle would be one that is able to scan images properly, but cannot move under its own power source. .

g. Non Mission Capable (NMC) (Red) is defined as none of the vehicle’s primary systems being operable. For example, the vehicle is unable to scan images, or the vehicle is not drivable.

2. Maintenance Activities and Standards

2.1 Sustainment

All vehicle systems shall consistently be maintained at an operational readiness rating (OR) of 90.0 percent. An exception to this standard is allowed for vehicle/system damage resulting from hostile acts, attacks, etc. The OR rating is determined by the following formula:

OR rating = Number of days in reporting period MINUS number of (PMC+NMC) days DIVIDED by total number of days in reporting period MULTIPLIED by 100 Ex. ((30 – (2+1) / 30) * 100 = 90.0% OR rating

*PMC or NMC conditions = 1) vehicle did not arrive on station on time due to maintenance issues, 2) did not arrive under its own power, 3) or did not perform its mission during a given duty window without interruption

The OR rating is effected by the following:

a. Any and all computer software associated with the system
b. The computer hardware hosting the software, and associated supporting hardware
c. The electronic source and associated electronics and safety systems
d. Platform Vehicle (to include all sub-systems/components)

The OR rating will be determined each month for each vehicle and the overall monthly rating determined by the average of the four vehicles.

2.2 Maintenance

2.2.1 The Contractor shall be required to provide on-site maintenance, as prescribed in paragraph 1.2.d.

2.2.2 Standards

The Contractor shall maintain the following response times and maintenance standards.

Task
Standard
Frequency
Response time to customer calls
Within 2 hours of initial contact from customer (24/7)
As required
Troubleshoot reported faults
100%
Daily/As Required
System Repair
Diagnose within 8 hours. Repair within 24 hours subject to parts availability

As Required

Maintenance Repair Parts (on order within 24hrs of inspection)

Ordered within 24 hours of initial inspections
As Required
Operational Readiness Reporting
100%
Daily/As Required

2.2.3 Contractor will provide all parts and items to keep the vehicle operational to include, but not limited to lamps and fuses, batteries, wiper blades, tires, window glass, components specific to the x-ray technology etc. Parts will be OEM. Substitution will be only authorized by approval of the COR. ZBV system parts will be OEM and come from the manufacturer. Basic shop parts such as nuts, bolts, washers, hose clamps, ties, etc. can be non OEM.

2.2.4 Contractor can have a split of in county and out of country support. Back end of ZBV will be maintained IAW operators and owner’s manual and all required services (monthly, quarterly, and annual services). Vehicle chassis will be maintained IAW Mercedes owner’s manual (daily, monthly, and per prescribed miles/hours).

2.3 Training

2.3.1 Operator Training

Contractor shall provide all initial ZBV operator training to all ANP ZBV operators. Contractor will conduct operator training classes that will result in certification of the operators; certification standards are prescribed by the objectives detailed in the manufacturer’s training materials. Individuals who successfully complete the training (by demonstrating comprehension of training objectives and the ability to practically apply those objectives) will be provided a certificate. Bi-monthly classes should be anticipated. Classes will be taught in Dari. It is anticipated that classes will be held at designated ANP training or maintenance facilities. Exact locations TBD.

2.3.2 Maintenance Training

Contractor is responsible for ensuring all maintenance support personal are fully trained and certified IAW manufacturer’s certification program on the ZBV so they can effectively troubleshoot problems.

2.4 References

The following references will be provided upon request.

1. ZBV Vehicle Maintenance Manual

2. ZBV X-ray technology Manual

3. Instruction Manual for ZBV Operators

File details come from the government source that posted it. Updated .