This solicitation seeks bids for a culvert replacement project at Camp James A. Garfield Joint Military Training Center in Ohio. The Ohio Army National Guard requires removal and replacement of three culverts in the base bid with options for eleven additional locations. Work includes measurements, removal of existing culverts, preparation of sites, installation of new culverts with headwalls, backfilling, and erosion controls. Bidders must schedule site visits by August 9th and submit sealed bids at the camp by August 31st. The award will go to the lowest price technically acceptable bid from a service-disabled veteran owned small business. Questions are due by August 18th with answers posted by August 22nd.

View the file

Other files for this federal contract opportunity

Other files attached to Ohio National Guard (CJAG) Culvert Replacement Project, newest first.
File Type Posted
Bid Abstract W50S8Q-22-B-0004.pdf PDF
Instructions to Bidder.docx DOCX document
W91364-22-B-0004_CJAG_Culvert_prebid sign_in 08-9-22.pdf PDF
CJAG_Culvert_prebid sign in.pdf PDF
W91364-22-B-0004-0001.pdf PDF
Wage Determnation.pdf PDF
RFI-000.pdf PDF
Wage Determination.pdf PDF
Sol W91364-22-B-0004.pdf PDF
Instructions to Bidder.docx DOCX document
SOW_CJAGJMTC Culvert Replacement 2022 (2).pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NUMBER: REQUEST FOR INFORMATION RFI NUMBER:

PROJECT NUMBER / CONTRACT TITLE:

PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:

SUBJECT/TITLE OF RFI:

DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:

PHONE: FAX: COST IMPACT:

YES NO

DATE SUBMITTED: RESPOND BY:

INFORMATION REQUESTED

By: Date:

RESPONSE

By: Date:

COR Concurrence: Date:

CO Concurrence: Date:

The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.

REQUEST FOR INFORMATION
INFORMATION REQUESTED
By:
Date:
RESPONSE
By:
Date:
COR Concurrence:
Date:
CO Concurrence:
Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
CONTRACT NUMBER:
PROJECT NUMBER CONTRACT TITLE:
PRIME CONTRACTOR:
SUBCONTRACTORSUPPLIER:
SUBJECTTITLE OF RFI:
DRAWINGS:
DETAILS:
SPECIFICATION:
CPM ACTIVITY:
PHONE:
FAX:
DATE SUBMITTED:
RESPOND BY:
INFORMATION REQUESTED:
Date:
RESPONSE:
Date_2:
Date_3:
Date_4:
RFI NUMBER:
2021-11-09T08:08:30-0500
Michael J. Hovis
Check Box6: Off
Check Box7: Off

File details come from the government source that posted it. Updated .