RFI-000.pdf

PDF 69 KB Posted

Attached to
Ohio National Guard (CJAG) Culvert Replacement Project Federal contract opportunity
Solicitation number
W91364-22-B-0004
Issued by
Department of the Army Ohio Army National Guard

About this file

This document provides details for a federal contract solicitation for culvert replacement and repair work at the Camp James A. Garfield Joint Military Training Center in Ohio. The Ohio National Guard is seeking bids to remove and replace three culverts identified in the Statement of Work, with options to replace an additional eleven culverts. Work will include measuring existing culverts, preparing sites, removing old pipes, grading, installing new culverts with headwalls, backfilling with stone and compacting. Erosion and sediment controls such as silt fences and rock dams must also be installed and maintained. Bidders must schedule and attend a mandatory site visit. Sealed bids are due by August 31st, 2022. The award will be made to the responsible bidder submitting the lowest priced technically acceptable bid in accordance with the criteria set forth in the Statement of Work. This is a Service-Disabled Veteran Owned Small Business set-aside with a NAICS code of 237110 and $39.5 million small business size standard.

View the file

Other files for this federal contract opportunity

Other files attached to Ohio National Guard (CJAG) Culvert Replacement Project, newest first.
File Type Posted
Bid Abstract W50S8Q-22-B-0004.pdf PDF
Instructions to Bidder.docx DOCX document
W91364-22-B-0004_CJAG_Culvert_prebid sign_in 08-9-22.pdf PDF
CJAG_Culvert_prebid sign in.pdf PDF
W91364-22-B-0004-0001.pdf PDF
Wage Determnation.pdf PDF
RFI-Form.pdf PDF
Wage Determination.pdf PDF
Sol W91364-22-B-0004.pdf PDF
Instructions to Bidder.docx DOCX document
SOW_CJAGJMTC Culvert Replacement 2022 (2).pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NUMBER:

REQUEST FOR INFORMATION

RFI NUMBER:

PROJECT NUMBER / CONTRACT TITLE:

PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:

SUBJECT/TITLE OF RFI:

DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:

PHONE: FAX: COST IMPACT:

YES NO

DATE SUBMITTED: RESPOND BY:

INFORMATION REQUESTED

By: Date:

RESPONSE

By: Date:

COR Concurrence: Date:

CO Concurrence: Date:

The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.

CONTRACT NUMBER:
RFI NUMBER:
PROJECT NUMBER CONTRACT TITLE:
PRIME CONTRACTOR:
SUBCONTRACTORSUPPLIER:
SUBJECTTITLE OF RFI:
DRAWINGS:
DETAILS:
SPECIFICATION:
CPM ACTIVITY:
PHONE:
FAX:
COST IMPACT: Off
DATE SUBMITTED:
RESPOND BY:
INFORMATION REQUESTED:
By:
Date:
RESPONSE:
By_2:
Date_2:
COR Concurrence:
Date_3:
CO Concurrence:
Date_4: