W9133L-17-R-0004 Attachment J-5 (PWS Technical Exhibits 3-15)
TECHNICAL EXHIBIT 3
Monthly Report Summary
TECHNICAL EXHIBIT 4
Travel Authorization Request Form
TECHNICAL EXHIBIT 5
Trip Report
MEMORANDUM FOR:
FROM:
SUBJECT: Trip Report for (Event)
Event:
Dates:
Location:
PURPOSE:
1. EXERCISE OBJECTIVE
2. OBSERVATIONS AND FINDINGS:
a. Issue:
i. Observation:
ii. Recommendation:
iii. Implication:
b. Issue:
i. Observation:
ii. Recommendation:
iii. Implication:
c. Issue:
i. Observation:
ii. Recommendation:
iii. Implication:
3. CONCLUSIONS:
4. DUE OUTS:
POC: Point of contact on this report is _____________, (email address) or (Phone number).
ADDITIONAL TRAVELERS:
Signature and Signature Block
TECHNICAL EXHIBIT 6
Joint Event Life Cycle (JELC) Description/Deliverables
JELC Stage/JELC End Product
Topics Covered During Meeting
Expected Outcomes Contractor Deliverables
Pre-Concept Development Meeting (Pre CDM) 360 days prior to
Event
Exercise location
Exercise date
Site recon of training venue (if necessary)
Focus/Core Capabilities
Determination of the exercise location
Confirmation of the exercise execution dates
Evaluation of the venue site (if performed)
Identification focus areas
Identification of units/agencies desired to fit into the focus areas
Facilitate discussion as needed to ensure the above mentioned outcomes are met and known to stakeholders
Submit Travel Authorization Request (TAR) prior to travel (if applicable)
Create a report detailing meeting outcomes and issues arose
Update checklist
Concepts Development Meeting (CDM) 320 days prior to
Event
Focus areas
Role Player requirements
Structural Collapse Venue Site (SCVS) requirements
Training site requirements
Initial contracts formulation
Logistics plan (billeting, food, latrines, life support, etcetera)
Health Services Support medical plan
Equipment shortages or issues (J4 notified)
Lessons Learned and JTIMS input
Additional training requirements or support needed from outside offices
Identification of units/agencies interested
Role Player requirements determined
SCVS requirements determined
JELC planning dates confirmed
Additional requirements of the training site identified
Additional requirements unit may need outside offices
Primary logistical plan briefed
Health Services Support requirements addressed
Equipment shortages and operability reported to PATRIOT-J4
Develop agenda and presentation materials
Facilitate discussion as needed to ensure the above mentioned outcomes are met and known to stakeholders
Develop exercise brochure and exercise planning team trifold with exercise dates and information
Submit Travel Authorization Request (TAR) prior to travel (if applicable)
Create a report detailing meeting outcomes and issues arose
Update checklists
Modeling and simulation scenario (as needed)
Data input into JTIMS by specific completion date
Modeling and simulation scenario information developed
Submission of Basic Concept Brief to NGB/A2/3/6OY
Initial Planning Meeting (IPM) 180 days prior to event.
Unit training objectives
Training site support (logistics, billeting, transport, life support)
Hours of operation
Training site location
Contracts review
Unique exercise parameters
Equipment shortages or issues (J4 notified)
Scenario development & concept of operations (as required)
Local interagency officials coordination as needed
Request for JTIMS, DRRS, and JLLIS support as needed
Identification of communications support system requirements
Identification of unit training objectives
Training site location/venues reserved
Development of logistic requirements
Validation of the exercise milestones
Confirmation of event location
Confirmation of event dates
Confirmation of event operation hours
Health Service Support plan draft received by NGB and under review by NGB/A2/3/6OY
Outline of the Exercise Control Plan
Equipment shortages and operability reported to PATRIOT-J4
Contracts drafted
Preliminary exercise augmentation requirements
Identification of IPM tasks with establishment of suspense dates
Office of Primary Responsibility
(OPR)
assignments
Develop the IPM agenda
Develop IPM presentation slides
Develop work group guides to aid in the documentation of unit training objectives
Develop Extent of Play (XPA)/ EX Directive for Commander's signatures
Develop draft scenario
Facilitate discussion as needed to ensure the above mentioned outcomes are met and known to stakeholders
Develop an IPM feedback form to handout to participants
Conduct an analysis of the feedback form to provide to the exercise director
Refine role player requirements
Develop an outline of the Exercise Control Plan
Submit Travel Authorization
Development of the MPM agenda
Identification of local agencies participating in or supporting the event
JTIMS, DRRS,
and JLLIS supported and current
Communication assets identified
Request (TAR) prior to travel (if applicable)
Create a report detailing meeting outcomes and issues arose
Update IPM Checklist
Mid-Term Planning Meeting (MPM).
90 days prior
Reconfirm training site support
Validate training site
Finalizing scenario development
Finalizing role player requirements
Identify equipment and IT requirements
Coordination with local interagency officials as needed
Developing and finalizing concept of execution
Any outstanding logistical requirements
Finalizing modeling and simulation scenario
Finalizing logistics support plans
Conducting Table Top as needed
Address any additional outstanding issues
Data collection plan development
Discuss open funding issues Communication systems support
Contracts reviewed and submitted for bidding
Venue secured for site improvement and exercise
Scenario finalized
All equipment deficiencies are identified and addressed to
PATRIOT J4
Participation of other agencies confirmed and detailed
Modeling and simulation scenario developed
Logistics support plans developed
Funding issues identified
NGB approved Real World Medical Plan discussed
Coordinated for communications system support
Develop the MPM agenda
Develop MPM presentation slides
Develop work group guides to aid in the documentation of unit training objectives
Finalize the scenario
Finalize role player requirements
Facilitate discussion as needed to ensure the above mentioned outcomes are met and known to stakeholders
Develop a data collection plan
Develop the Incident Command (IC) and/or Unified Command (UC) construct
Develop an MPM feedback form to handout to participants
Conduct an analysis of the feedback form to provide to the exercise director
Finalize role player requirements
Develop an outline of the Exercise Control Plan
Draft EXPLAN
Facilitate discussion as needed to ensure the above mentioned outcomes are met and known to stakeholders
Submit Travel Authorization Request (TAR) prior to travel (if applicable)
Create a report detailing meeting outcomes and issues arose
Update checklists
Final Planning Meeting (FPM).
30 days prior
Contract awards
Daily VIP list
Modeling and simulation equipment shipping plan
Local interagency coordination with officials as needed
Final address of training site concerns & issues
Final logistical requirements
OC/T support
DRRS Support
JTIMS support
JLLIS Support
Work station operator list for
SIMCELL
“Real World” medical support
Communications system support
Draft MSEL
Contracts are awarded
Letter of Instruction (LOI) distributed
VIP visits identified
Estimated date of arrival of modeling and simulation equipment determined
Other agency participation reconfirmed
ROC drill scheduled (if needed)
OC/T support confirmed
Information management
(DRRS, JTIMS,
JLLIS) support resourced
Develop the FPM agenda
Develop FPM presentation slides
Develop work group guides to aid in the documentation of unit training objectives
Refine the scenario, if needed
Facilitate discussion as needed to ensure the above mentioned outcomes are met and known to stakeholders
Finalize data collection plan
Finalize the Incident Command (IC)
Workstation operator list finalized
“Real World” medical support detailed and reconfirmed
Plan for dissemination of final publications and instructions
Communications system support confirmed
Draft MSEL and/or Unified Command (UC) construct
Develop an FPM feedback form to handout to participants
Conduct an analysis of the feedback form to provide to the exercise director
Reconfirm other agency participation
Draft MSEL
Develop Controller Handbook
Submit Travel Authorization Request (TAR) prior to travel (if applicable)
Create a report detailing meeting outcomes and issues arose
Update checklists
Master Scenario Events List Meeting.
After the MPM and before exercise conduct
Facilitate discussion as needed to ensure the MSEL is sufficiently developed
Submit Travel Authorization Request (TAR) prior to travel (if applicable)
Create a report detailing meeting outcomes and issues arose
Update branch continuity products
Event Execution Facilitate a TTX
Facilitate an observer/ controller/ evaluator training session
Facilitate ROC drill, if needed
Review scenario events with role player contractor
Collect after action/ lessons learned data from participants
Disseminate final documents/books
Refine and facilitate MSEL execution
Facilitate controller hot wash meetings
Facilitate return of equipment and supplies to J4
Submit Travel Authorization Request (TAR) prior to travel (if applicable)
Provide input to the exercise director daily for daily status reports
Create a final report detailing meeting outcomes and issues arose
Update checklist
After Action Review Ensure lessons learned are entered into JLLIS
Archive reports into NGB libraries
Develop an after action report
TECHNICAL EXHIBIT 7
Pre Concept Development and Concept Development Meeting Checklist
TECHNICAL EXHIBIT 8
Initial Planning Meeting Checklist
TECHNICAL EXHIBIT 9
Mid Planning Meeting Checklist
TECHNICAL EXHIBIT 10
Final Planning Meeting Checklist
TECHNICAL EXHIBIT 11
Exercise Checklist
TECHNICAL EXHIBIT 12
After Action Checklist
TECHNICAL EXHIBIT 13
Daily Status Report (SITREP)
TECHNICAL EXHIBIT 14
Controller Handbook
TECHNICAL EXHIBIT 15
After Action Report