This is Amendment 0004 to Solicitation W912WJ27BA003, issued by the U.S. Army Corps of Engineers (USACE) New England District Contracting Division on November 5, 2026. The amendment is necessary to respond to Requests for Information (RFIs) and addresses dredging equipment specifications outlined in Section 01 11 00 of the contract.
The primary change documented in this amendment clarifies requirements regarding mechanical excavator-type dredging equipment with hydraulic clamshell buckets. The government clarified that material handlers equipped with hydraulic clamshell buckets—which provide both hydraulic downward pressure and hydraulic closing functionality—are acceptable alternatives to the original specification prohibiting clamshell buckets. However, contractors must demonstrate during the Responsibility Determination prior to award that the configured machine and bucket can deliver sufficient downward force to remove specified materials while accounting for material type, channel depth, and approximately 10-foot tide swings, and while meeting or exceeding all contract production requirements. The contracting officer is Maxwell Oxendine, reachable at maxwell.m.oxendine@usace.army.mil or 978-318-8256. All other contract terms and conditions remain unchanged and in full force and effect.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0005.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0003 Revised Specification Sections.pdf | ||
| Amendment0001.pdf | ||
| Amendment0002.pdf | ||
| Amendment 0003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 2
0004 05 NOV 2026 XXXX
W912WJ
W2SD ENDIST NEW ENGLAND
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
MAXWELL OXENDINE, EMAIL: MAXWELL.M.OXENDINE@USACE.ARMY.MIL
TELEPHONE: 978-318-8256
SCD: PAS:
W912WJ27BA003
01 OCT 2026
SEE SECTION G - CONTRACT ADMINISTRATION DATA
This amendment is necessary to respond to RFIs. All other aspects remain unchanged.
ERIN E. BRADLEY
05 NOV 2026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 21 13 - Instructions to Bidders
Miscellaneous text in this section has been added to:
REQUEST FOR INFORMATION
1. Mechanical Excavator-Type Dredging Equipment / Hydraulic Clamshell Bucket (Section 01 11 00, Paragraph 1.2):
Specification section 01 11 00, sub-section 1.2 states "The work shall be performed with mechanical excavator-type dredging equipment capable of applying sufficient downward pressure to remove the material described, and scow(s). Clamshell buckets must not be used.". Will a material handler (excavator-type dredging equipment) with a hydraulic clamshell bucket, that provides both hydraulic downward pressure and hydraulic closing of the bucket, meet the requirements of this performance specification?
The government has no objection to the use of a material handler. However, if requested during the Responsibility Determination prior to award, the contractor must demonstrate that the configured machine and bucket can deliver the necessary downward force to remove the specified material--considering the material type, channel depth, and ~10-foot tide swing--while meeting or exceeding all contract production requirements.