Amendment W912WJ26QA154-0001.pdf
PDF 4 MB Posted
- Solicitation number
- W912WJ26QA154
About this file
This is Amendment 0001 to Solicitation W912WJ26QA154 issued by the U.S. Army Corps of Engineers New England District on August 24, 2026, extending the response due date from August 26, 2026 to September 2, 2026 at 5:00 PM Eastern. The amendment provides responses to 27 industry questions and clarifies requirements for a concrete floor polyaspartic epoxy coating project at the Cold Regions Research and Engineering Laboratory (CRREL) in Hanover, New Hampshire.
The project scope requires furnishing all labor, materials, and equipment to mechanically prepare and apply a polyaspartic epoxy flooring system to eight rooms totaling approximately 3,242 square feet, with 694 linear feet of perimeter walls. Key technical specifications include a mandatory 1/8-inch finished thickness system with 96% solids, 33 g/L VOC, compressive strength of 12,500 psi, tensile strength of 4,000 psi, and coefficient of friction exceeding 0.6. The system must include primer, topping, basecoat, broadcast, grout, and topcoats in light to medium grey with 50% white and 50% light grey colored paint chips. Additional requirements include a six-inch integral epoxy cove base with aluminum termination strips at 707 linear feet (694 perimeter plus 13 linear feet for columns), repair of approximately 30 divots and 5 static cracks, nine stainless-steel transitions at approximately 48 linear feet, and one exposed floor joint in Room 154 that must remain functional. Work must be completed within 90 days of award, Monday through Friday 8:00 AM to 4:00 PM, with comprehensive safety, environmental, and security compliance requirements including contractor provision of Level 3 Site Safety and Health Officer, competent person designation, and First Aid/CPR certification for personnel. Contractors must submit samples, mockups (minimum 16 square feet), and all pre-construction documentation within 21 days of award, with the Government reserving 21 days for review of submittals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Additional Attachments 26QA154.pdf | ||
| Attachments 26QA154.pdf | ||
| Solicitation W912WJ26QA154.pdf | ||
| Solicitation Survey 26QA154.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date
26 Aug 2026 02 Sep 2026
Miscellaneous text in this section has been added to:
REQUEST FOR INFORMATION:
QUESTION 1: The Solicitation references an epoxy polyaspartic system then goes on to mention a poly base and topcoat. Is this a typo?
RESPONSE 1: No, this is not a typo. The base is what provides the desired final 1/8" thickness.
The polyaspartic can function as the topcoat. The goal is to provide an epoxy polyaspartic system for 1/8" finish thickness.
QUESTION 2: The 6" integral cove base does not reference type of material. Will the Government allow for a prefab system or a mortar resin system?
RESPONSE 2: No, a prefab or mortar resin system is not allowed. The cove base is a seamless integral epoxy cove base to match the epoxy flooring.
QUESTION 3: Because the floor is currently covered by tile, we cannot evaluate the bare concrete. Can the Government confirm that bids should be priced for standard mechanical prep, and any major structural cracking or spalling discovered after the Government removes the tile will be treated as an unforeseen differing site condition?
RESPONSE 3: Please refer to Part 3, Section 2, of the solicitation for included Preparation mechanical preparation tasks that should be accounted for in pricing. Please also refer to the additional information photos provided in the attachments for a visual of the bare concrete surface.
Interested vendors are highly encouraged to attend a site visit to confirm understanding of the scope, inspect field conditions, access, and existing utilities prior to bidding. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements.
W912WJ26QA1540001
QUESTION 4: Due to the nature of the Cold Clean Lab, are we permitted to route generator cables from the exterior into the lab, or must we rely strictly on facility-provided 220v/110v power?
RESPONSE 4: Routing cables is acceptable. Any "tripping hazards" must be marked with a traffic cone.
QUESTION 5: Are we permitted to securely store our heavy equipment and materials inside the designated work area overnight, or must all tools be entirely removed from the facility at the end of each daily shift?
RESPONSE 5: Yes, storing tools overnight is permitted.
QUESTION 6: Will there be a designated area on site where we can park and stage our equipment trailer for the duration of the project?
RESPONSE 6: Yes, there will be a designated area on site where equipment and trailer can be parked for the duration of the project.
QUESTION 7: Given the secure nature of the CRREL facility, what is the required protocol and anticipated processing time for personnel background checks or base access passes once the contract is awarded?
RESPONSE 7: The designated location of entry shall be through the security gate at 72 Lyme Rd.
or the South main entrance gate which are manned by armed security personnel. It is a violation of Federal statute to enter the facility at any point other than the designated location without authorization. The authority to issue search, seizure and apprehension authorizations for persons, places, and vehicles on the facility has been delegated to the Department of Defense (DoD) police.
Failure to obtain entry approval will not affect the contract price or time of completion. Acceptable forms of ID to get on a military installation include a U.S. passport, a Real ID-compliant driver's license, or a Military ID card. CRREL does not have the necessary personnel availability to provide escorted access for the duration of the contract performance, if the Contractor does not meet the requirements for unescorted access as indicated in the Security Requirements section of the solicitation. Therefore, if the Contractor does not meet the requirements for unescorted access, it is their responsibility to provide personnel that meets the requirements which includes a DoD employee with Secret clearance to escort them on site while work is being performed. This person or persons shall remain with Contractor personnel at all times while on site.
QUESTION 8: Can the Government provide the required forms/documentation, and expected processing time for foreign-national Contractor site access in advance of contract award?
RESPONSE 8: The Government will provide any required forms for access to the site for foreign-national Contractors, after contract award, not prior to. Requests for site access for foreign-national Contractors must be submitted to the Technical Point of Contact a minimum of 30 days in advance of the requested access date.
QUESTION 9: Please confirm whether the nominal 1/8-inch overall system thickness is a mandatory minimum requirement. Also, did the Government use a specific manufacturer/product system as the basis of design when developing the specification? If so, please identify the manufacturer and system. If there is no basis-of-design product, may a manufacturer-engineered resinous flooring system with a different nominal thickness be submitted if it meets or exceeds all specified performance requirements, or must the completed system be nominally 1/8 inch regardless of manufacturer recommendations?
RESPONSE 9: 1/8-inch thickness is a mandatory requirement to match the finish flooring of adjacent flooring material as the epoxy flooring will be replacing the existing VCT flooring. There is no basis-of-design product. The flooring system shall meet or exceed the specified requirements as long as the product can achieve a 1/8" finished thickness under the typical manufacturer installation requirements.
QUESTION 10: Please clarify the intended meaning of "topping" in the specified system. Is the topping expected to be an epoxy mortar, slurry, self-leveling epoxy, or another specific type of material? Please also clarify whether the specified "grout" coat may constitute one of the two required polyaspartic coats, or whether the grout coat is required in addition to two separate polyaspartic finish coats.
RESPONSE 10: The topping can be whatever the manufacturer calls for in the epoxy system so long as it meets the minimum product requirements as specified in the Statement of Work. If the Contractor uses an epoxy system that uses a grout coat as the "topcoat", the grout coat may constitute as one of the required polyaspartic coats. The second coat shall be used to achieve an orange peel texture per the manufacturer's recommendation.
QUESTION 11: Is a specific traction aggregate or nonslip additive required by the Government, including a specified material, particle size, broadcast/addition rate, or installation coat?
Alternatively, may the flooring-system manufacturer determine the appropriate method and additive, if any, provided the completed system meets the specified traction requirements and the mockup is approved?
RESPONSE 11: All materials must meet the requirements specified in the Statement of Work and meet manufacturer's recommendations. Yes, if the epoxy system meets the requirements of the Statement of Work, the manufacturer may determine the appropriate method and additive for traction requirements.
QUESTION 12: The Statement of Work identifies approximately 694 linear feet of perimeter walls and requires the 6-inch integral cove base at every wall and column. Please confirm whether the stated 694 LF includes the column perimeters. If column perimeters are not included, please provide the approximate additional linear footage or the number and dimensions of the columns requiring cove base. Please also advise whether there is a required cove radius, cove thickness, or construction detail beyond the manufacturer's recommended system.
RESPONSE 12: Contractors should assume a minimum additional 13 linear feet for column cove base. Provide 1/8" thick cove base with 3/4" radius. Reference floor plan on SK-1 in attachments.
QUESTION 13: Please provide the required profile, dimensions, finish, and fastening/installation method for the continuous aluminum termination strip at the top of the integral cove base. Please also confirm the approximate total linear footage to be included, including both wall and column locations.
RESPONSE 13: L shaped or L-strip/cove cap aluminum termination strip, 1/8" to match the 1/8" thickness of the epoxy cove base, shall be mechanically fastened to vertical substrate. There are 694 linear feet of room perimeters plus 13 linear feet for columns for a total of 707 LF. Reference floor plan on SK-1 in attachments.
QUESTION 14: The Statement of Work requires a 1/4-inch-wide stainless-steel transition where the new epoxy flooring meets differing floor types. Please provide the number and locations of these transitions, approximate total linear footage, and any required profile or installation detail.
RESPONSE 14: There are 9 locations which require stainless-steel transitions for approximately 48 linear feet. Profile and installation details are to be consistent with product manufacturer.
Reference floor plan on SK-1 in attachments.
QUESTION 15: We understand that the Government will remove existing floor coverings and that the Contractor is not required to remove flooring residue. Please confirm that the floor surfaces will be provided to the Contractor free of adhesive, mastic, leveling materials, or other floor-covering residue requiring removal. Please also advise whether the Government is aware of any asbestos-containing or otherwise hazardous floor-covering adhesive/material within the designated flooring work areas.
RESPONSE 15: This is confirmed for all floor surfaces. The bottom 6" of the walls has glue residue that must be removed prior to new system. There are no asbestos containing or otherwise hazardous materials within the designated work areas.
QUESTION 16: The Statement of Work identifies approximately 30 divots approximately 1/2 inch deep x 3 inches wide and approximately five cracks approximately 1/8 inch wide. Please confirm whether these quantities represent the Government's estimated repair quantities to be included in the base quotation. Are the identified cracks considered static/non-moving cracks? If any are active /moving joints or cracks, please identify them and provide the required treatment detail.
RESPONSE 16: The estimation of 30 divots is confirmed. All cracks are considered static/non-moving cracks.
QUESTION 17: We understand that the existing floor joint in Room 154 must remain exposed and functional and must not be cut, filled, or coated. Please provide the approximate length and width of this joint and advise whether a specific edge termination/detail is required where the new resinous flooring terminates at the joint.
RESPONSE 17: The existing floor joint is approximately 71 feet long by 8 inches wide. The new flooring shall be applied and terminated just before the joint on both sides. Reference floor plan on SK-1 in attachments.
QUESTION 18: Please confirm whether any additional requirements apply for HEPA filtration, minimum air changes per hour, negative-pressure monitoring/documentation, or containment inspection beyond the requirements expressly stated in the Statement of Work. Please also confirm whether the existing ductwork identified in the Statement of Work is an approved exhaust route for purposes of preparing our base quotation.
RESPONSE 18: No additional requirements are needed. Confirmed that the existing ductwork is an approved exhaust route.
QUESTION 19: The Statement of Work indicates that 120V outlets are available and that CRREL can accommodate 240V electrical connections with coordination. Please provide the available amperage and connection/receptacle configuration for the 240V service available to the flooring work area so our subcontractor can confirm compatibility with its grinding, dust-collection and ventilation equipment.
RESPONSE 19: All grinding, dust-collection, and ventilation equipment shall be considered compatible for quoting purposes. Specific coordination and configurations for electrical connections will be handled accordingly upon award.
QUESTION 20: The Statement of Work requires at least two First Aid/CPR-certified employees on shifts with multiple employees and references EM 385-1-1 Chapter 3-3. Please confirm whether current American Heart Association or American Red Cross First Aid/CPR/AED certification that includes an in-person hands-on skills component satisfies this project requirement.
RESPONSE 20: Yes, American Heart Association or American Red Cross First Aid/CPR/AED certification that includes an in-person hands-on skills component satisfies this requirement.
QUESTION 21: Will the existing HVAC supply and return systems remain operational within the work area during mechanical surface preparation and coating installation? If the return-air system remains operational, how is the Contractor expected to prevent dust, odors, and coating vapors from entering the building HVAC system?
RESPONSE 21: The return air system will not be operational during this contract.
QUESTION 22: Is the Contractor permitted to temporarily cover or isolate individual return-air openings while maintaining the required building airflow through another means?
RESPONSE 22: All air handling for the work areas will be not operational; however, all air supply /returns shall be covered.
QUESTION 23: The SOW indicates that existing ductwork running directly through the roof may be used for negative-air exhaust. Can the Government identify which ductwork is intended to be available for Contractor use?
RESPONSE 23: Available ductwork is shown in additional photos.
QUESTION 24: Are there specific air-change, negative-pressure, or pressure-differential requirements the Contractor should use when sizing the temporary ventilation system?
RESPONSE 24: No.
QUESTION 25: Do you have any moisture tests for this floor? Is the floor 1st floor or subfloor?
RESPONSE 25: No moisture tests are available. The work area is on the first floor with working levels below and above.
QUESTION 26: What is the overall square footage?
RESPONSE 26: Refer to Part 1.4. of the Statement of Work.
QUESTION 27: What's the length of the cove base?
RESPONSE 27: Refer to Part 1.4. of the Statement of Work.
Section C - Description/Specifications/Statement of Work
Miscellaneous text in this section has been modified to:
STATEMENT OF WORK :(REVISED)
CONCRETE FLOOR POLYASPARTIC EPOXY COATING
U.S. ARMY CORPS OF ENGINEERS
COLD REGIONS RESEARCH AND ENGINEERING LABORATORY (CRREL)
HANOVER, NH
STATEMENT OF WORK
I. General:
1. Scope - Furnish all labor, materials and equipment necessary to provide a polyaspartic epoxy floor system on eight (8) rooms comprising the CRREL Cold Clean Laboratory in Hanover, NH.
The work includes the following:
a. Mechanical preparation of the concrete substrate in accordance with manufacturer's preparation recommendations.
b. Application of the polyaspartic floor coating system in accordance with manufacturer's application recommendations.
2. Location - CRREL is located at 72 Lyme Road Hanover, NH 03755.
3. Site Visit - Contact the Technical Point of Contact to arrange a site visit. The Technical Point of Contact (POC) for the project is Project Manager, Eric Rosenberg. The POC can be contacted at
(978) 318-8216 or Eric.C.Rosenberg@usace.army.mil.
4. Schedule - The work shall be completed no later than 90 days from the contract award date.
Work shall be performed Monday through Friday 8:00 AM to 4:00 PM, unless otherwise approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.
After-hours work is permitted with prior approval by the TPOC.
5. Safety Requirements - All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable OSHA, federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at Headquarters USACE website under publications using the following link: http://www.publications.usace.army.mil/Portals/76/Publications /EngineerManuals/EM_385-1-1.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
a. Accident Prevention Plan:
The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described below. A non-mandatory, fillable APP template is available upon request. However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements of EM 385-1-1, Appendix A, Section K.
A preparatory meeting shall be conducted by the prime contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
b. Activity Hazard Analysis (AHA):
An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level.
The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
c. Emergency Response:
Emergency procedures shall be documented in the Accident Prevention Plan and will include a map with directions to the nearest hospital, emergency contact numbers, and onsite First Aid/CPR responders.
d. Required Personnel:
Site Safety and Health Officer (SSHO)
The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.
b and 2-4.b.
Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.
The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.pdf
Competent Person (CP)
The Contractor shall designate one employee as the site's Competent Person (CP) who is responsible for ensuring a safe environment for all employees. The CP shall be present at the project site and report to the contractor's upper management. The CP is required to have related construction and/or service experience. The Prime Contractor can designate a subcontractor as the CP if all qualifications and certifications of EM 385-1-1 are met.
The Competent Person and SSHO can be one in the same.
For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.
Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.
e. Accident Reporting:
All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the TPOC within four
(4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the TPOC. ENG Form 3394 shall be completed and submitted to the TPOC within five (5) working days of the incident.
The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the TPOC no later than close of business on the 10th calendar day of the following month.
The method of transmission by the prime contractor to the TPOC shall be electronically.
6. Pre-Construction Conference - Prior to the start of any work, the Technical Point of Contact will schedule and conduct a "Pre-Construction Conference". The Contractor's Project Manager and Quality Control Personnel will physically present to attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Construction conference the contractor shall provide the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Pre-Construction Conference:
i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.
ii. Contractor's Safety Program (including sub-contractors).
iii. Accident Prevention Plan and Activity Hazard Analysis
(Submitted & accepted prior to start of work on site)
iv. Accident Reporting (ENG Form 3394)
v. Safety Data Sheet (SDS) requirements
vi. Contractor's Equipment
vii. Correspondence, Communication, Security and Administrative Procedures.
viii. Invoice and payment.
7. Permits - The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
8. Security - The Contractor will comply with all established security policies at CRREL. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and /or cancel any subsequent service. The Contractor shall be given at least 24-hour notice of any such closure.
The designated location of entry shall be through the security gate at 72 Lyme Rd. or the South main entrance gate which are manned by armed security personnel. It is a violation of Federal statute to enter the facility at any point other than the designated location without authorization.
The authority to issue search, seizure and apprehension authorizations for persons, places, and vehicles on the facility has been delegated to the Department of Defense (DoD) police. Failure to obtain entry approval will not affect the contract price or time of completion. Acceptable forms of ID to get on a military installation include a U.S. passport, a Real ID-compliant driver's license, or a Military ID card. CRREL does not have the necessary personnel availability to provide escorted access for the duration of the contract performance, if the Contractor does not meet the requirements for unescorted access as indicated in the Security Requirements section of the solicitation. Therefore, if the Contractor does not meet the requirements for unescorted access, it is their responsibility to provide personnel that meets the requirements which includes a DoD employee with Secret clearance to escort them on site while work is being performed. This person or persons shall remain with Contractor personnel at all times while on site.
9. Contractor Conduct - Alcohol and firearms are prohibited on project grounds. Contractor and employees must comply with CFR 36 Rules and Regulations.
10. Payment - After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item. The invoice must also include the company letterhead and this must match the data that is registered in the System for Award Management (SAM) registry. For jobs greater than 30 days the contractor may request progress payment.
All invoices may be mailed to
U.S. Army Corps of Engineers
New England District
696 Virginia Rd.
Concord, Massachusetts 01742
Or Emailed to Eric Rosenberg at eric.c.rosenberg@usace.army.mil
II. Technical Requirements:
Part 1 General:
1. Summary - Furnish all labor, materials, and equipment to mechanically prepare, repair damaged substrate if necessary, and apply a polyaspartic epoxy system to eight rooms (approximately 3,242 square feet total) which comprise the CRREL Cold Clean Laboratory.
2. Submittals - Although the Government reviews submissions required by this Statement of Work, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing.
The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and accepted by the Government.
Pre-construction Submittals: Submitted within 21 days of Contract Award. Submittals must be accepted prior to the commencement of any field work.
Accident Prevention Plan (APP) - Prior to the start of field work
Activity Hazard Analysis - to include mechanical floor preparation plan (barriers, ventilation, dust collection, protection of equipment or materials not being treated etc.) Prior to the start of field work
CPR and First Aid documentation
Epoxy flooring product and color sample
Manufacturer's product data sheets - Prior to ordering
Manufacturer's cut sheets for all new and replaced materials
Manufacturer's Warranty information
3. References - All work shall be in conformance with:
a. U.S. Army Corps of Engineers (USACE)
i. EM-385-1-1 2014 Safety and Health Requirements Manual, U.S. Army Engineering Manual
b. Other appropriate Federal, State, and Local codes for such an installation
4. Existing Conditions:
a. Cold Regions Research and Engineering Lab:
i. Cold Clean Laboratory Lab consists of eight (8) adjacent rooms.
Room 154 is approximately 706 square feet, and room perimeter is approximately 159'
Room 154A is approximately 42 square feet, and room perimeter is approximately 27'
Room 154B is approximately 1,993 square feet, and room perimeter is approximately 317'
Room 154E is approximately 34 square feet, and room perimeter is approximately 24'
Room 154F is approximately 35 square feet, and room perimeter is approximately 24'
Room 154H is approximately 27 square feet, and room perimeter is approximately 22'
Room 156 is approximately 95 square feet, and room perimeter is approximately 41'
Room 158 is approximately 310 square feet, and room perimeter is approximately 80'
Total is 3,242 square feet; 694 linear feet of perimeter walls.
The rooms are all bare concrete floors.
b. NOTE: The Government will move any non-fixed items off the floor surface prior to the start of work. Any existing floor coverings will be removed by the Government, and all rooms will be bare concrete at the start of work.
5. Clean Up and Waste Disposal - The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any designated storage areas, free from accumulation of waste materials. Upon completing work in an area the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from Contractor activities shall be restored by the contractor to the satisfaction of the Technical Point of Contact. All waste material will be disposed of offsite in accordance with all Federal, State, and Local regulations.
6. Environmental Protection - Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/ cleaned on a daily basis when working onsite. Water, air and land resources shall not be adversely impacted during the course of the work. The Contractor will take necessary steps to ensure all Federal, State, and Local environmental regulatory requirements are met at no additional cost to the Government.
Assurance of compliance with this section by subcontractors shall be the responsibility of the Contractor. CRREL strictly prohibits the use of products which contain Trichloroethylene (TCE).
7. Sustainability & Environmentally Preferred Products - The contractor shall provide Safer Choice labeled products under this contract, as applicable. The contractor is encouraged to visit https://www.epa.gov/saferchoice/products for updated lists of qualifying products. Products that are identified as "environmentally preferable" have a lesser or reduced effect on human health and the environment when compared with competing products that serve the same purpose, and bio-based will be selected over those which do not carry such designations. The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio-based content level. Visit the BioPreferred web site https://www.biopreferred.gov/BioPreferred/faces /pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio-based content level requirements. Safer Choice or BioPreferred labeling is only required where an applicable designated product exists.
8. Reduced Volatile Organic Compounds - Provide products with reduced organic volatile compounds (VOC). The VOC content of adhesives, sealants, and sealant primers shall be determined and limited in accordance with SCAQMD Rule 1168. The VOC content of aerosol adhesives shall be determined and limited in accordance with Green Seal Standard GS-36, Section 3. For Construction submittal documentation, provide certifications or labels that demonstrate compliance with cited requirements.
9. Building Protection - Any involved building or structure, and all of its contents shall be protected from the elements during the duration of this contract. The Contractor shall keep on site the means to quickly cover and protect all areas open to the elements during an unforeseen weather related event that could cause damage to the building and or any of its contents during all phases of this contract.
10. Personal Protective Equipment - It is the Contractor's responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.
11. Government Resources - The Government will supply any electricity necessary for the project work from points of existing outlets when available. The Contractor shall carefully conserve the use of electricity provided. There are several existing outlets (120V) available in the work area for the contractor's use. The Government can accommodate 240V electrical connections provided the contractor has equipment with a standard plug pattern or a "pigtail" device with a compatible amperage. All 240V or higher connections must be coordinated with the CRREL facilities staff. The Contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, water, telephone services, or other resources. The Contractor may use the sanitary facilities at CRREL but must proceed directly to and from the sanitary facilities.
12. Damage to Government and Private Property - The Contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the Contractor's operation.
The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the Contractor's operation. The Contractor shall notify the Project Manager immediately of damage to Government and private property and injury to any person resulting from the Contractor's operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the contractor's operation. Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.
13. Omissions - This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
14. Quality Assurance - The Contractor is responsible for the quality control of the contract work.
The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.
15. Other Contracts - The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.
16. Receiving and Storing Materials - The Contractor is responsible for protecting any stored material until it is placed in service. The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to the Contractor's equipment or materials.
A designated staging area will be coordinated in close proximity to the work area. All materials, equipment, and waste containers must be maintained daily to ensure safe circulation for personnel and emergency vehicles.
17. Requests for information - Requests concerning the work after award of this project should be directed to the Technical Point of Contact, Project Manager, Eric Rosenberg, at (978) 318-8216 or Eric.C.Rosenberg@usace.army.mil.
Part 2 Products:
All products shall be new, unused, and to the satisfaction of the Technical Point of Contact.
Products shall be approved by the Technical Point of Contact prior to installation.
1. Polyaspartic epoxy system shall meet the following requirements:
i. Will not chip, crack, or peel.
ii. Waterproof product intended to protect concrete from heavy traffic, oil, chemicals.
iii. Meets or exceeds slip resistance per coefficient of friction as listed in product requirements.
iv. The epoxy system must consist of primer, topping, basecoat, broadcast, grout and topcoats for an overall thickness of 1/8". All material must be from a single manufacturer or approved by the manufacturer for use on their epoxy system.
v. Product Requirements:
1. Epoxy Flooring:
a. Percent Solids 96 %
b. VOC 33 g/L3.
c. Compressive Strength, ASTM C579 12,500 psi
d. Tensile Strength, ASTM D638 4,000 psi
e. Service Temperature Up to 200F
f. Abrasion Resistance, ASTM D4060 25 mg
C-17 Wheel, 1,000 gm load, 1,000 cycles
g. Potlife @ 70 F 10-15 minutes
h. Film Hardness (ASTM D4366),
i. Seconds, ultimate 90
i. Gloss (ASTM D523) 60 91
j. Coefficient of Friction, ANSI B101.1 >0.6
k. Dynamic Coefficient of Friction -
Wet, ANSI A326.3 >0.42
vi. Colored paint chips must have 100% coverage with 50% white and 50% light grey.
vii. Provide a six-inch integral polyaspartic epoxy cove base with continuous top aluminum termination strip at wall perimeter.
2. Color shall be light to medium grey and approved by the Technical Point of Contact. (Color samples shall be submitted for approval.)
3. Flooring texture shall be an orange peel texture that is simple to clean up spills, chemically non-reactive, and has good traction. A sample provided shall be approved by the Technical Point of Contact.
Part 3 Execution:
1. Safety Equipment: It is the Contractor's responsibility to furnish and supply personnel with the proper personal protective equipment (Hardhats, Hand Protection, Eye Protection, Ventilation, etc.) when and where necessary.
2. Preparation:
The Contactor shall supply all materials, equipment and labor to prepare the floor surface for the coatings. Surface preparation shall include mechanically preparing the floor surface by grinding, shot blasting or other means as specified by the approved product. Floor must be clean and sound prior to application. This shall be done according to the best practice standards for installing epoxy flooring and polyaspartic coating. All rooms are currently bare concrete and no removal of residue is required. There are various cracks, spalls, and divots that are required to be filled before epoxy application. There are ~30 divots that are ~1/2" depth and 3" wide. There are also ~5 cracks that are 1/8" wide that must be repaired.
a. Appropriate Personal Protective Equipment (PPE) shall be utilized for each step of this job including protection from potentially hazardous airborne particulates that could be inhaled.
b. Industry standard containment barriers, dust collection mechanisms, and ventilation systems with dust collection capabilities shall be properly utilized and functioning during mechanical preparation of floor surfaces. The adjacent rooms will be occupied, and each work area must be sealed with poly sheeting meeting OSHA standards. Contractor shall provide equipment to achieve negative pressure to force air outside the building and ensure venting is away from occupied spaces and operable windows. There is existing ductwork in the work area which the contractor may utilize for the negative air system. The ductwork goes directly up through the roof. The contractor will NOT be permitted to temporarily isolate or protect HVAC returns/supplies in the work area during surface preparation and coating installation. Contractor shall tape off the doorways in the nearby offices/work areas.
c. Appropriate protection shall be incorporated around any wood surfaces, plumbing and electrical components, and any other surface that could be damages due to the mechanical preparation of the floor surface.
d. There is one (1) floor drain in room 154A. This drain shall be plugged and shall be protected throughout installation. If blasting, the recommended blasting media is glass beads or similar non-toxic blasting media to obtain an appropriate Concrete Surface Profile (CSP) recommended for the polyaspartic floor coating system.
e. NOTE: SILICA SAND MAY NOT BE USED ON FEDERAL INSTALLATIONS AS A BLAST
MEDIA.
f. The Contractor shall dispose of any paint, dust, and other waste materials according to Federal, State, and Local requirements regarding this type of material.
g. There is NO concrete moisture testing, relative humidity testing, calcium chloride testing, or pH testing required as part of the contact.
h. The contractor may perform the work across all rooms in one continuous sequence, and no work is required to be phased.
3. Application of Epoxy System:
The Contractor shall supply all materials, equipment, and labor necessary to properly apply the polyaspartic epoxy system to all eight (8) rooms.
a. The Contractor shall prepare the floor surface to receive topping per manufacturer's recommendation.
b. The Contractor shall furnish and apply topping per manufacturer's recommendation to provide an overall epoxy system thickness of 1/8". The floor coating shall be applied evenly to assure seamless coverage of the floor surface. Where the new floor meets existing flooring, the new epoxy flooring shall be flushed with existing. Provide 1/4" wide stainless-steel transition between differing floor types.
c. The Contractor shall apply two (2) coats of a polyaspartic flooring system. Second coat shall be applied according to the manufacturer's instruction for an orange peel texture.
d. The Contractor shall apply colored paint chips with 100% coverage and 50% of them white and 50% light grey.
e. The contractor shall apply a six-inch integral cove base where the floor meets every wall and column. Provide a top aluminum termination strip at all integral cove base locations. Miter aluminum termination joints at all outside and insider corner locations.
f. There is a floor joint in room 154. The floor joint shall remain exposed and functional. Do not cut, fill, or apply coating to the floor joint. The contractor will ensure the joint is protected during the painting process.
g. The Contractor shall follow all cure times and manufacturer recommendations regarding surface preparation, humidity, and temperature.
h. Mockups: Apply mockups to verify selections made under sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution. Do not cover up mockup area.
i. Apply full-thickness mockups at a minimum of 16 square feet floor area as selected by the TPOC. Mockup must also include cove base conditions for one inside corner and one outside corner.
ii. Approved mockups may become part of the completed work if undisturbed at time of Substantial Completion.
iii. Mockup shall demonstrate desired slip resistance for review and approval by the TPOC prior to installing in other project areas.
iv. Government review will occur within 24 hours once mockup is complete.
4. Disposal:
The Contractor shall dispose of all materials in the appropriate waste streams. Any new and unused epoxy product shall be mixed and cured before being disposed in required waste streams.
5. Warranty of Construction:
a. In addition to any other warranties in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free from defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
b. The warranty shall continue for a minimum period of one (1) year from the date of final acceptance of the work.
| IDCode: J |
| Page: 1 |
| Pages: 19 |
| AmendNo: 0001 |
| EffDate: 24 AUG 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W912WJ |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW ENGLAND |
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
ALICIA LACROSSE, EMAIL: ALICIA.N.LACROSSE@USACE.ARMY.MIL TELEPHONE: 978-318-8902
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912WJ26QA154 |
| SolDate: 12 AUG 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Amendment is necessary to provide responses to questions from industry, provide a revised Statement of Work, provide additional informational photos, and extend the solicitation closing. |
The solicitation closing is extended until September 2, 2026 at 5:00 PM Eastern.
All other terms and conditions remain unchanged.