Amendment W912WJ26QA152-0002.pdf

PDF 4 MB Posted

Attached to
Deck and Gate Replacements, Camp Edwards, Joint Base Cape Cod, Buzzards Bay, MA
Solicitation number
W912WJ26QA152
Issued by

About this file

This is Amendment 0002 to solicitation W912WJ26QA152, issued by the U.S. Army Corps of Engineers (W92D ENDIST NEW ENGLAND, KO CONTRACTING DIVISION) on August 20, 2026. The amendment provides responses to eleven industry questions submitted during the Request for Information phase, with a closing date of August 27, 2026 at 5:00 PM Eastern.

The amendment addresses technical clarifications for a federal facility deck and gate renovation project at an IAGWSP installation. Key clarifications include: (1) no municipal building permits are required for federal property; (2) contractors must provide EM 385-1-1 compliant temporary access during demolition if primary access is disabled; (3) self-adhering butyl joist/flashing tape is required over all framing joists and stair stringers to extend structural lifespan; (4) asphalt repair is outside the scope of work; (5) contractors must furnish and install new heavy-duty, corrosion-resistant conduit hangers at 5-to-7-foot intervals, with base personnel handling de-energization and re-energization of the 240V utility line; (6) the Site Safety and Health Officer may perform dual roles as Project Superintendent and/or Quality Control Manager if qualified; (7) rope access certification is not applicable; (8) new steel gate posts may be slightly offset from original locations to avoid subsurface conflicts if approved by the Technical Point of Contact; (9) work scope is limited to awarded quantities with modifications issued separately; and (10) suitable teaming arrangements require signed documentation from subcontractors confirming willingness to perform work with the prime contractor.

View the file

Other files

File Type Posted
Attachment 4.pdf PDF
Amendment W912WJ26QA152-0004.pdf PDF
Attachment 3.docx DOCX document
Amendment W912WJ26QA152-0003.pdf PDF
Amendment W912WJ26QA152-0001.pdf PDF
Solicitation Survey 26QA152.pdf PDF
Attachment 2 - Gate Replacement.pdf PDF
Solicitation W912WJ26QA152.pdf PDF
Attachment 1 - Deck Replacement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

Miscellaneous text in this section has been modified to:

REQUEST FOR INFORMATION:

Question1: Building Department Jurisdiction: Under which municipal building department or authority having jurisdiction (AHJ) does this federal installation fall for any required building permits (e.g., Town of Bourne or Sandwich)?

Response 1: Federal buildings/property are not under the jurisdiction of any municipal building department. As such, there is no authority having jurisdiction other than the Federal Government itself. No building permits are required.

Question 2: Temporary Access: During active deck demolition and reconstruction, will temporary egress/access (e.g., temporary steps or ramps) be required for building occupants to enter and exit the trailers?

Response 2: The trailers will remain occupied during normal business hours. The Contractor shall provide safe, EM 385-1-1 compliant temporary access (e.g., temporary steps) if primary access points are disabled. Alternatively, the Contractor may phase the work to ensure at least one usable, safe exit is maintained for each trailer at all times. The UXO trailer has a second set of stairs that will not be impacted by this project therefore allowing for entrance and egress by its occupants.

Question 3: Joist Tape: Is installing self-adhering joist butyl/flashing tape over the top of framing joists required or included in the scope to extend frame life?

W912WJ26QA1520002

Response 3: Yes. To maximize the lifespan of the pressure-treated substructure, the Contractor shall install self-adhering butyl joist/flashing tape over the top of all framing joists and stair stringers prior to installing the composite decking. Tape shall be wide enough to cover all joints, or overlapped to prevent water intrusion into joints.

Question 4: Asphalt Repair Scope: Is repairing or patching the damaged asphalt hole located at the base landing of the existing handicap ramp included in the scope of work?

Response 4: No. Asphalt repair is outside the scope.

Question 5: What is the operating voltage of the existing 4-inch conduit running between the IAGWSP office trailers? Does the contract require furnishing and installing new support hangers for this conduit during deck reconstruction?

Response 5: The 4-inch conduit running between the IAGWSP office trailers houses a 240V utility power feed linking the structures. The Contractor shall coordinate with the TPOC to de-energize the power lines fed through the conduit. To minimize electrical downtime and operational impact on the occupied trailers, the Contractor shall utilize a phased approach. The Contractor shall replace the deck framing in the immediate vicinity of the conduit in the shortest time possible, install the new hangers, and coordinate with the TPOC for rapid re-energization. The Contractor shall furnish and install new, heavy-duty, corrosion-resistant conduit hangers (specifically hot-dipped galvanized steel or heavy-duty UV-resistant polymer matching the 4-inch conduit exterior diameter). Hangers shall be securely anchored to the new structural framing members and installed at intervals not to exceed 5 to 7 feet in accordance with NEC Article 352.30 support standards.

Question 6: Site Safety and Health Officer (SSHO) Dual-Role Eligibility (SOW Section 1.5 / EM 385-1-1): SOW Section 1.5 states that the Contractor shall employ a minimum of one qualified individual to function as a Level 3 SSHO, who must be present at the project site at all times during active operations. For a project of this magnitude ($100,000 to $250,000), please clarify if the SSHO may also perform the duties of the Project Superintendent and/or Quality Control (QC) Manager on-site, provided they meet all safety and experience requirements, or if the Government strictly requires a dedicated, stand-alone SSHO with no other duties.

Response 6: The SSHO is permitted to fill other roles, such as the Project Superintendent and/or Quality Control Manager provided that the SSHO meets the qualifications, certifications, experience requirements for each position in accordance with the solicitation and EM 385-1-1.

Question 7: Rope Access Certification Applicability (Solicitation Survey, Section 7): Section 7 of the mandatory Solicitation Survey lists "Rope Access" as an applicable certification. Since this requirement involves standard, ground-level administrative trailer deck and access road gate replacements, please clarify if rope access training or certifications are actively required for this scope of work, or if this item is non-applicable ("N/A") to this procurement.

Response 7: Rope Access is not indicated as applicable to this solicitation on the solicitation survey. Only those certifications/licenses with an "X" are applicable.

Question 8: 240V Electrical Utility Disconnect and Reconnect Responsibilities (Amendment 0001, Response 5): SOW Section 2.3 (per Amendment 0001) states that the Contractor must coordinate with the TPOC to de-energize the 240V utility line running in a 4-inch conduit between the IAGWSP office trailers, replace framing in the immediate vicinity, and install new hangers. Please clarify if the physical electrical disconnection, pull-back of wires (if required), and subsequent reconnection/re-energization must be executed by a licensed electrician provided by the Contractor, or if the base utility staff will perform the physical electrical work, leaving the Contractor responsible only for structural coordination and hanger installation.

Response 8: Base (Government) personnel shall de-energize and re-energize the power. There is no requirement in this solicitation for physical electrical disconnection, pull back of wires, and reconnection. The existing conduit shall not be moved, relocated, or altered in any way. The Government will de-energize power for safety, not so the Contractor can perform work involving the conduit or wires inside the conduit.

Question 9: Existing Post Footing Demolition and Placement (SOW Section 1.8 / SOW Section 2.3, Task 2): SOW Section 1.8 and SOW Section 2.3, Task 2 require the removal of existing wooden gates and "old wood posts cut at grade". Please clarify if the sub-grade concrete or wood footings for these demolished posts must be completely excavated and removed, or if cutting the posts cleanly flush with the grade is sufficient. Additionally, are the new steel gate posts required to be set in the exact same footprint as the old posts, or can they be slightly offset to avoid subsurface structural conflicts?

Response 9: For demolished gates, cutting the wooden posts cleanly flush at grade is sufficient;

complete excavation of sub-grade footings is not required unless they directly obstruct the new installation. To avoid subsurface structural conflicts with old concrete footings, the new steel gate posts may be slightly offset from the original footprint, provided the final gate installation remains fully functional, aligns properly with the access road, and is approved by the TPOC prior to setting the new posts.

Question 10: Optional CLIN Quantities and Scope (CLIN 0002 & CLIN 0003): SOW Section 2.3 and Section B detail Option Task 1a (Substrate Repair up to 60 SF) and Option Task 1b (Ledger and Flashing Repair up to 60 LF) as contingent items. If the subsurface wood rot or structural damage exposed during demolition exceeds these 60 SF or 60 LF limits, how will the additional quantities be evaluated, authorized, and compensated under the Firm-Fixed-Price structure?

Response 10: The Contractor shall only complete work as included in awarded Purchase Order, or via a subsequent modification. The Government retains the right to issue a Request for Proposal for additional work within the scope of the Purchase Order if necessary.

Question 11: "Suitable Teaming Arrangement" Standards (Solicitation Survey, Section 7 & 10):

The Solicitation Survey states that subcontractor certifications and past performance will only be evaluated if a "suitable teaming arrangement" is provided at the time of quote submission. Please confirm if a signed teaming agreement letter or a completed, signed copy of the Subcontractor Technical Capability Assessment (using the template provided in the solicitation attachments) satisfies the Government's requirement for a "suitable teaming arrangement."

Response 11: A suitable teaming arrangement is considered signed documentation from the subcontractor that they are willing to complete the work required by this solicitation in conjunction with the prime contractor. A signed copy of a "Subcontractor Technical Capability Assessment" is not sufficient if it does not provide documentation that the subcontractor is willing to perform work in conjunction with your company. The solicitation survey is to be completed by the Prime Contractor unless sections permit subcontractor information to be included with the appropriate documentation. A solicitation survey completed by the subcontractor will not be considered, and may result in a quote being deemed non-responsive.

IDCode: J
Page: 1
Pages: 5
AmendNo: 0002
EffDate: 20 AUG 2026
ReqNo:
ProjNo:
IssCode: W912WJ
AdmCode:
IssuedBy: W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD

CONCORD, MA 01742-2751

UNITED STATES

JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE: 978-318-8324

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912WJ26QA152
SolDate: 10 AUG 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: Amendment is necessary to provide responses to questions from industry. Questions/responses #6-#11 are applicable to this amendment.

Closing remains August 27, 2026 at 5:00 PM Eastern.

All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: JENNIFER SAMELA
ContDate:
CODate: 20 AUG 2026