Amendment W912WJ26QA152-0001.pdf
PDF 4 MB Posted
- Solicitation number
- W912WJ26QA152
About this file
This is an Amendment of Solicitation (Standard Form 30, Amendment 0001) issued by the W2SD ENDIST New England KO Contracting Division on August 19, 2026, for solicitation W912WJ26QA152. The amendment extends the response due date from August 24, 2026, to August 27, 2026, at 5:00 PM Eastern. All other terms and conditions remain unchanged.
The amendment adds responses to five industry questions regarding deck demolition and reconstruction work at federal installation trailers. Key clarifications include: federal buildings are not subject to municipal building department jurisdiction and no building permits are required; contractors must provide safe, EM 385-1-1 compliant temporary access during active demolition or phase work to maintain at least one usable exit per trailer; self-adhering butyl joist/flashing tape must be installed over all framing joists and stair stringers prior to composite decking installation; asphalt repair at the handicap ramp base is outside the scope; and contractors must furnish and install heavy-duty, corrosion-resistant conduit hangers (hot-dipped galvanized steel or UV-resistant polymer) for the existing 240V utility power feed conduit running between office trailers, with coordination required with the Technical Point of Contact for de-energization, phased work execution, and rapid re-energization, with hangers installed at intervals not exceeding 5-7 feet per NEC Article 352.30 standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA152-0004.pdf | ||
| Attachment 4.pdf | ||
| Amendment W912WJ26QA152-0003.pdf | ||
| Attachment 3.docx | DOCX document | |
| Amendment W912WJ26QA152-0002.pdf | ||
| Solicitation Survey 26QA152.pdf | ||
| Attachment 2 - Gate Replacement.pdf | ||
| Solicitation W912WJ26QA152.pdf | ||
| Attachment 1 - Deck Replacement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date
24 Aug 2026 27 Aug 2026
Miscellaneous text in this section has been added to:
REQUEST FOR INFORMATION:
Question1: Building Department Jurisdiction: Under which municipal building department or authority having jurisdiction (AHJ) does this federal installation fall for any required building permits (e.g., Town of Bourne or Sandwich)?
Response 1: Federal buildings/property are not under the jurisdiction of any municipal building department. As such, there is no authority having jurisdiction other than the Federal Government itself. No building permits are required.
Question 2: Temporary Access: During active deck demolition and reconstruction, will temporary egress/access (e.g., temporary steps or ramps) be required for building occupants to enter and exit the trailers?
Response 2: The trailers will remain occupied during normal business hours. The Contractor shall provide safe, EM 385-1-1 compliant temporary access (e.g., temporary steps) if primary access points are disabled. Alternatively, the Contractor may phase the work to ensure at least one usable, safe exit is maintained for each trailer at all times. The UXO trailer has a second set of stairs that will not be impacted by this project therefore allowing for entrance and egress by its occupants.
W912WJ26QA1520001
Question 3: Joist Tape: Is installing self-adhering joist butyl/flashing tape over the top of framing joists required or included in the scope to extend frame life?
Response 3: Yes. To maximize the lifespan of the pressure-treated substructure, the Contractor shall install self-adhering butyl joist/flashing tape over the top of all framing joists and stair stringers prior to installing the composite decking. Tape shall be wide enough to cover all joints, or overlapped to prevent water intrusion into joints.
Question 4: Asphalt Repair Scope: Is repairing or patching the damaged asphalt hole located at the base landing of the existing handicap ramp included in the scope of work?
Response 4: No. Asphalt repair is outside the scope.
Question 5: What is the operating voltage of the existing 4-inch conduit running between the IAGWSP office trailers? Does the contract require furnishing and installing new support hangers for this conduit during deck reconstruction?
Response 5: The 4-inch conduit running between the IAGWSP office trailers houses a 240V utility power feed linking the structures. The Contractor shall coordinate with the TPOC to de-energize the power lines fed through the conduit. To minimize electrical downtime and operational impact on the occupied trailers, the Contractor shall utilize a phased approach. The Contractor shall replace the deck framing in the immediate vicinity of the conduit in the shortest time possible, install the new hangers, and coordinate with the TPOC for rapid re-energization. The Contractor shall furnish and install new, heavy-duty, corrosion-resistant conduit hangers (specifically hot-dipped galvanized steel or heavy-duty UV-resistant polymer matching the 4-inch conduit exterior diameter). Hangers shall be securely anchored to the new structural framing members and installed at intervals not to exceed 5 to 7 feet in accordance with NEC Article 352.30 support standards.
W912WJ26QA1520001
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0001 |
| EffDate: 19 AUG 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W912WJ |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW ENGLAND |
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE: 978-318-8324
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912WJ26QA152 |
| SolDate: 10 AUG 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: Amendment is necessary to provide responses to questions from industry. |
Closing is extended until August 27, 2026 at 5:00 PM Eastern.
All other terms and conditions remain unchanged.