This is Amendment 0002 to Solicitation W912WJ26QA069, issued by the U.S. Army Corps of Engineers (USACE), New England District on April 13, 2026. The amendment extends the response due date from April 13, 2026 to April 16, 2026 at 5:00 PM Eastern Time. All other terms and conditions of the original solicitation remain unchanged.
The amendment provides responses to four industry questions regarding construction work involving river channel installation and slope protection. Key clarifications include: (1) the contractor is responsible for dewatering means and methods if necessary, but may work in the water as the Government holds the required State permit; (2) no asphalt paving or repaving work is required; existing pavement must be protected from damage; (3) a three-foot, seven-inch aggregate shoulder must be maintained from existing pavement to grubbing material, with slopes established at the shoulder terminus; and (4) both slope protection details provided in the solicitation must be used in combination to meet the stated requirements. Contractors must acknowledge receipt of this amendment prior to the extended closing deadline through completion and return of the amendment, acknowledgment on offer copies, or separate written communication referencing the solicitation and amendment numbers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA069-0001.pdf | ||
| Solicitation W912WJ26QA069.pdf | ||
| Attachments.pdf | ||
| Solicitation Survey 26QA069.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
J 1 3
0002 13 APR 2026
W912WJ
W2SD ENDIST NEW ENGLAND
KO CONTRACTING DIVISION, 696 VIRGINIA ROAD
CONCORD, MA 01742-2751
UNITED STATES
JENNIFER SAMELA, EMAIL: JENNIFER.M.SAMELA@USACE.ARMY.MIL TELEPHONE:
978-318-8324
SCD: PAS:
W912WJ26QA069
31 MAR 2026
SEE SECTION G - CONTRACT ADMINISTRATION DATA
Amendment is necessary to provide responses to questions from industry.
Closing is extended until April 16, 2026 at 5:00 PM Eastern.
All other terms and conditions remain unchanged.
JENNIFER SAMELA
13 APR 2026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Response Due Date
13 Apr 2026 16 Apr 2026
Miscellaneous text in this section has been added to:
REQUEST FOR INFORMATION
Question 1: Is the Contractor expected to dewater in regard to installing the bottom boulders 4' below the channel bottom? Can the Contractor work in the water?
Response 1: If dewatering is necessary, the Contractor is responsible for the means and methods to do so. The Government does hold a permit through the State for the work required in this section of river, therefore, the Contractor may work in the water.
Question 2: Is repaving existing asphalt expected once work is complete?
Response 2: No paving/repaving work is required by this scope of work. Existing pavement should be protected to prevent further damage.
Question 3: Is the Contractor expected to re-establish the existing road edge and run the slope out from there? It appears that would run the slope out beyond the existing toe. Can the road shift over to allow for toe of slope to go where it is currently?
Response 3: Per informational photos 3 and 5, from existing pavement to grubbing material, there must be a three (3) foot, seven (7) inch aggregate shoulder. The slope shall be established starting at the terminus of the aggregate shoulder.
W912WJ26QA0690002
Question 4: There appear to be two details for project "slope" that appear to differ in small aspects. Which detail should be used, or is a combination of the two to be used?
Response 4: Both details must be used to achieve the appropriate slope protection meeting the requirements of the solicitation.