Solicitation W912WJ26QA069.pdf

PDF 1 MB Posted

Attached to
Streambank Stabilization, Old Route 30, Townshend Lake, Townshend, VT
Solicitation number
W912WJ26QA069
Issued by

About this file

This is a Request for Quotation (RFQ) issued by the U.S. Army Corps of Engineers, New England District, for streambank stabilization work at Old Route 30 in Townshend, Vermont. The contract number is W912WJ26QA069, with quotations due by April 13, 2026. The single line item calls for furnishing all labor, materials, and equipment necessary to stabilize 310 feet of streambank along the West River using a firm fixed-price arrangement. Work must be completed by August 1, 2026, with performance scheduled Monday through Friday, 7:00 AM to 3:30 PM. The estimated contract cost is between $25,000 and $100,000. Site visits are highly recommended and should be arranged with the Technical Point of Contact, Jordan Luks (978-318-8970). Quotations should be submitted via email to Contract Specialist Jennifer M. Samela (Jennifer.M.Samela@usace.army.mil, 978-318-8324).

The Statement of Work specifies that all work must comply with U.S. Army Corps of Engineers Safety and Occupational Health Requirements (EM 385-1-1), Vermont Standard River Management Principles and Practices, and the Vermont Rivers and Roads Field Manual. Pre-construction submittals must be provided within 21 days of Notice to Proceed, including an Accident Prevention Plan, Activity Hazard Analysis, Site Safety and Health Officer designation, Safety Data Sheets, and erosion control plans. The contractor must employ a Level 3 SSHO and provide First Aid and CPR certified personnel. Specific materials include three-to-five-foot rip-rap for footer and toe wall construction, three-inch minus stone for erosion control, bedding material, native grass seed (conservation mix), mulch, and erosion control devices. The Government will provide suitable topsoil valued at $35 per yard. This is not a small business set-aside. Bonding requirements include a Payment Bond or Irrevocable Letter of Credit (100% of contract price) within 10 days of award; for contracts at or above $150,000, a Performance Bond is also required. Wages are subject to determination VT20260064 dated January 2, 2026.

View the file

Other files

File Type Posted
Amendment W912WJ26QA069-0002.pdf PDF
Amendment W912WJ26QA069-0001.pdf PDF
Attachments.pdf PDF
Solicitation Survey 26QA069.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

c. CITY

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

1 64

W912WJ26QA069 31 MAR 2026

W2SD ENDIST NEW ENGLAND

KO CONTRACTING DIVISION, 696 VIRGINIA ROAD CONCORD, MA 01742-2751 UNITED

STATES

JENNIFER SAMELA 978 318-8324

13 APR 2026

SEE SCHEDULE

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price

Amount

0001 Old Route 30 Streambank Stabilization, Townshend Lake, Townshend, VT Contractor shall furnish all labor, materials, and equipment necessary to stabilize the streambank along old Route 30, Townshend Lake, Townshend, VT in accordance with the Statement of Work.

Pricing Arrangement: Firm Fixed Price

1 Job

W912WJ26QA069

Section C - Description/Specifications/Statement of Work

INTERESTED VENDORS SHALL REVIEW SECTION L AND SECTION M FOR INSTRUCTIONS

AND EVALUATION CRITERIA. VENDORS ARE RESPONSIBLE FOR ENSURING THEIR

QUOTE SUBMISSION MEETS ALL REQUIREMENTS. FAILURE TO DO SO MAY RESULT IN

QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.

THE MANDATORY SOLICITATION SURVEY SHALL BE COMPLETED IN ITS ENTIRETY AND

RETURNED WITH QUOTES. FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED

NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.

OLD RT 30 STREAMBANK STABILIZATION

U.S. ARMY CORPS OF ENGINEERS

TOWNSHEND LAKE

TOWNSHEND, VERMONT

STATEMENT OF WORK

I. General:

1. Scope - Furnish all labor, materials, and equipment necessary to stabilize three hundred and ten feet (310') of streambank along the West River, located in Townshend, VT. This streambank restoration will follow the standard practices in the Vermont Rivers and Roads Field Manual (see excerpts below listed as informational photos 3-6). All work shall be performed in accordance with the following Statement of Work.

2. Location - Townshend Lake Office is located at, 3845 VT Rte. 30 Townshend, VT 05353

3. Site Visit - Contact the Technical Point of Contact (TPOC) to arrange a site visit. The TPOC for the project is Natural Resource Specialist, Jordan Luks 978-318-8970 or Jordan.D.Luks@usace.

army.mil

Interested vendors should conduct a site visit to confirm understanding of the scope, inspect existing conditions, and familiarize themselves with the site(s) prior to submitting a quote. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements.

4. Schedule - Period of performance shall be from Notice to Proceed, through 1 August 2026. The Contractor will coordinate with the Government for the estimated start date of field work. Work shall be performed Monday through Friday 7:00 AM to 3:30 PM unless otherwise approved by the TPOC. No work shall be performed on weekends or Government holidays.

All pre-construction submittals shall be submitted within twenty one (21) days of Notice to Proceed.

The Government reserves up to twenty one (21) days for review and acceptance on each submittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within fourteen (14) days of the Government's response, unless additional time is granted by the Government in writing.

5. Safety Requirements-

a. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_2023Aug31.pdf

A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the TPOC upon request.

c. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_2023Aug24.pdf

d. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.

b and 2-4.b.

Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.pdf

e. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.

Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.

f. Additional Personnel Requirements:

Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.

g. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the TPOC in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the TPOC within seven (7) days of an incident: https://www.publications.usace.army.mil/Portals/76/Publications /EngineerForms/Eng_Form_3394_2021Aug.pdf

h. Employee Exposure Data:

The Contractor shall electronically report total employee work hours (including subcontractors) to the TPOC by close of business on the 10th calendar day of the following month.

6. Contractor's Personnel -

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified work properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

b. Employee Conduct - The Contractor shall be responsible for seeing that the firm's employees strictly comply with the Code of Federal Regulations Title 36, Chapter III, Part 327, and all, federal, state, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other Contractors

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other Contractors.

iii. Unsafe operation of vehicles while on USACE property.

c. Removal of Contractor's Employees - The TPOC may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the TPOC, is incompetent, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform assigned work.

Notification to the Contractor shall be promptly made in writing if time and circumstances permit.

Otherwise, notification shall be verbal or by telephone and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

7. Pre-Construction Conference - Prior to the start of any work, the TPOC will schedule and conduct a "Pre-Construction Conference". The Contractor's Project Manager and Quality Control Personnel will be physically present to attend this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Construction conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Pre-Construction Conference:

i. Authority of the TPOC and Quality Assurance Inspectors.

ii. Contractor's Safety Program (including sub-contractors).

iii. Accident Prevention Plan and Activity Hazard Analysis

iv. Accident Reporting (ENG Form 3394)

v. Safety Data Sheet (SDS) requirements

vi. Contractor's Equipment

vii. Correspondence, Communication, Security and Administrative Procedures.

viii. Invoice and payment.

8. Permits - USACE has already permitted this work through the Vermont Agency of Natural Resources. The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary additional licenses, permits, and letters of certification. The Contractor shall comply with any applicable federal, state, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

9. Security - The Contractor will comply with all established security policies at Townshend Lake.

Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent work. The Contractor shall be given at least twenty four

(24) hours' notice of any such closure.

10. Flooding -Townshend Lake is a flood control project, and the work area outlined in this contract is subject to becoming inundated during periods of excessive rainfall. If such an event should occur, in-progress work shall immediately cease, and all equipment, materials, and personnel will be vacated from the area within twenty four (24) hours' notice by the TPOC. When flooding ends and waters recede, the TPOC will notify the Contractor as areas reopen and work may resume.

11. Payment - After final inspection and acceptance by the Government, the Contractor must submit an invoice to the TPOC. The invoice shall include the invoice date, contract number, dates of work, description of work, quantities, process, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM). For jobs greater than 30 days the Contractor may request progress payments.

All invoices may be mailed to:

U.S. Army Corps of Engineers

Ball Mountain Lake

88 Ball Mountain Lane

Jamaica, VT 05343

Or emailed to Jordan.D.Luks@usace.army.mil

II. Technical Requirements:

Part 1 General:

1. Summary - Furnish all labor, materials, and equipment necessary to stabilize three hundred and ten feet (310') of streambank along the West River. This streambank restoration will follow the standard practices in the Vermont Rivers and Roads Field Manual (see excerpts below listed as informational photos 3-6). All work shall be performed in accordance with the following Statement of Work.

2. Submittals - Although the Government reviews submissions required by this Statement of Work, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to twenty-one (21) days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in acceptable form within fourteen (14) days of the Government's response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and accepted by the Government.

a. Pre-construction: Submitted within twenty-one (21) days of Notice to Proceed. Submittals must be accepted prior to the commencement of any field work.

i. Accident Prevention Plan (ENG Form 6293)

ii. Activity Hazard Analysis

iii. Site Safety and Health Officer Designation Letter (ENG Form 6282)

iv. Safety Data Sheets

v. Spill response plan for petroleum, oils and lubricants and other hazardous materials.

vi. First-Aid, CPR Certifications

vii. Commercial Driver's License (CDL) - for all operators of vehicles requiring a CDL

viii. Material specifications

ix. Erosion and sediment control plan measures to include: dips, water bars, culverts, silt fencing, check dams, filter socks, straw rolls, etc.

3. References - All work shall be in conformance with:

a. Vermont Standard River Management Principles and Practices (2015) and the Vermont Rivers and Roads Field Manual (2016).

b. 2024 Vermont Standard Specifications for Construction sections 755.04.

4. Existing Conditions -

a. The scope of this work covers three hundred and ten (310') feet of undercut streambank. The streambank is approximately sixteen (16) feet tall. The area of bank erosion varies from six (6) to sixteen (16) feet in width from the original bank and river channel location. The upstream and downstream limits of the work area are clearly identified and marked with grade stakes. (see informational photos 7-8)

b. Access to this area will include utilizing the Townshend Lake Nature Area.

i. The Townshend Lake Nature Area is located approximately two and one half (2.5) miles north of the office on Vermont Route 30, West Townshend, Vermont 05359. The work area is located one half (0.5) mile from the yellow gate at the Nature Area via the Old Route 30.

5. Other Contracts - The Government may undertake or award other contractors for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act which will interfere with the performance of work by another Contractor or by Government employees.

6. Clean Up and Waste Disposal - The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any designated storage areas free from accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from Contractor activities shall be restored by the Contractor to the satisfaction of the TPOC. All waste material will be disposed of offsite in accordance with all federal, state, and local regulations.

7. Environmental Protection - Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/ cleaned on a daily basis. No burning is permissible. Water, air, and land resources shall not be adversely impacted during the course of the work. Storage, fueling and lubrication of equipment and motor vehicles shall be conducted in a manner that affords the maximum protection against spills and evaporation.

Storage and usage of lubricants and daily fueling of machinery and equipment shall occur at least fifty feet (50') from any drainage inlets, water bodies (rivers, streams, and lakes), environmentally sensitive areas (wetlands and vernal pools). Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.

8. Sustainability & Environmentally Preferred Products - Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.

epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.

The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio-based content level. Visit the BioPreferred web site https://www.

biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio-based content level requirements.

9. Personal Protective Equipment - It is the Contractor's responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

10. Government Resources -There are no restrooms or potable water available at the contract site.

The Contractor shall supply their own means of communication (telephone). There is no access to electricity at the contract site. The Contractor would have to provide these resources or have an acceptable alternative plan for these resources.

11. Damage to Government and Private Property - The Contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the Contractor's operation.

The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the Contractor's operation. The Contractor shall notify the TPOC immediately of damage to Government and private property and injury to any person resulting from the Contractor's operation. Also, the Contractor shall notify the TPOC of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the Contractor's operation. Damaged or destroyed grass areas shall be re-planted as directed by the TPOC, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

12. Quality Assurance - The Contractor is responsible for the quality control of the contract work.

The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

13. Receiving and Storing Materials -Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to the Contractor's equipment or materials.

14. Omissions - This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

Part 3 Equipment:

1. Condition of Equipment- All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements. A regular schedule of preventive maintenance must be followed on all equipment. All vehicles utilized under this contract will be presentable, serviceable, and shall comply with safety standards.

2. Mobilization, Demobilization, and Other Equipment Costs: The scope will include mobilization and demobilization, fuel surcharge and any permits to get the equipment to Townshend Lake and the Contractor shall be included in the quote and not listed separately.

Part 2 Products:

1. Provided by Contractor-

a. Rip-Rap, Toe Wall and Stone Filled Slope Material:

i. Three-to-five-foot (3' to 5') material for use as footer (keyway), toe wall, and stone filled slope for stabilizing streambank.

b. Erosion Control Stone:

i. 3-inch (3") minus stone for use as erosion control stone to backfill for voids between larger rip-rap material.

c. Bedding Material:

i. Bedding material shall consist of granular material such as crushed stone or gravel. Bedding material shall be free of soft, nondurable particles, organic material, and thin or elongated particles.

d. Grass Seed:

i. Conservation Mix: 35% creeping red fescue, 25% tall fescue, 15% annual ryegrass, 12% perennial, 10% Kentucky bluegrass, 3% white clover.

ii. State-approved seed of the latest season's crop shall be provided in original sealed packages bearing the producer's guaranteed analysis for percentages of mixture, purity, germination, hard seed, weed seed content, and inert material.

iii. Substitutions will not be allowed without written request and approval from the Government.

iv. Quality: Weed seed shall not exceed one (1) percent by weight of the total mixture. Wet, moldy, or otherwise damaged seed shall be rejected.

e. Mulch:

i. Hay shall be native hay, sudan-grass hay, broomsedge hay, or other herbaceous mowings furnished in an air-dry condition.

f. Erosion Control:

i. Silt Fence, hay bales, silt blankets, and waddles.

2. Provided by the Government-

a. Grubbing material:

i. Suitable topsoil for dressing the top of the slope will be provided by the Government valued at $35/yard. Material is stockpiled approximately one tenth (1/10) mile from work site.

Part 4 Execution:

1. Placed Rip Rap Toe Wall and Slope -

a. The Contractor shall remove enough material to allow for embedding footer rock (keyway) a minimum of four feet (4') below the channel of the river.

b. Stone footer (keyway) and stone toe wall shall be constructed with stones of primarily five feet (5') dimensions to resist erosion. The intermediate dimension of any stone shall not be less than three feet (3').

c. Stone toe wall shall be constructed with staggered (running) joints between rocks on adjacent tiers. Stacked section of wall shall have no more than four feet (4') of exposed wall.

d. Contractor shall carefully select and place individual stones to maximize contact with adjacent stones and minimize voids. Backfill voids with three inches (3") minus erosion control stone. To extent practical, stones shall be angled toward embankment to better resist sliding.

e. Bedding material shall be at least eighteen inches (18") thick between the toe wall and native soil of the streambank or backfill. Bedding material shall consist of granular material placed in a layer, where required, on the ground surface prior to placing stone filling or riprap. The purpose of the bedding material is to prevent underlying finer materials from passing into the stone filling or riprap.

f. The material that is removed may be used as backfill, bedding or grubbing where appropriate or as specified by the Vermont Rivers and Roads Field Manual.

g. The uniform rip rap slope that starts above the toe wall shall consist primarily of five-foot (5') dimension rip rap as specified by the field manual. The upper portion of the stone filled slope may consist of smaller three-foot rip rap. The riprap portion of the stone filled slope shall be at least four feet (4') in depth along its entire length with the largest stones at the bottom of the slope. The rip rap slope shall be at a three to one (3:1) gradient or thirty-three-point three percent (33.3%) grade.

Rip-rap stones shall be placed and aligned in a way to minimize void spaces between adjacent stones. Bedding material between the rip rap stone filled slope and preexisting soil of the streambank shall be nine inches (9") in depth.

h. Grubbing material should start at the ordinary highwater mark (as defined by 33 CFR

329.11(a)(1)] and continue upward to the top of the slope until it reaches the preexisting topsoil.

Grubbing material depth should be at least one foot (1') compacted. After compaction grubbing material must be leveled and conditioned for the placement of seed.

i. Prior to any work, erosion control measures must be taken to prevent the movement of soil and debris into the West River. The TPOC will be immediately notified if control measures fail.

j. Silt fence or other erosion control measures shall be maintained following best management practices.

k. All work shall be in accordance with the Vermont Rivers and Roads Field Manual.

Note: The Contractor shall conduct periodic inspections of the silt fence to ensure its function and integrity is maintained during the duration of the contract. If the silt fence is damaged or breached, the Contractor shall repair, reinstall, or add additional silt fence as necessary before dumping or grading additional material.

2. Seeding -

a. Shall meet requirements of 2024 Vermont Standard Specifications for Construction sections 755.04.

b. Seed shall be spread uniformly at a rate of one hundred thirty pounds (130lbs) per acre minimum.

c. Seed may be applied using a hydraulic application or by hand. If done by hand, seed will be incorporated into the top one quarter inch (1/4") of soil by hand raking or other approved methods.

3. Mulching -

e. Coverage must be at least one eighth inch (1/8") thick over entire area.

*** END OF NARRATIVE ***

Requirements Streambank Stabilization, Old Route 30, Townshend Lake, Townshend, VT

Product Service Code : Y1QA

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.246-12 Inspection of Construction. 1996-08

Section F - Deliveries or Performance

0001 Delivery Schedule Delivery On Or Before Delivery Date 01 Aug 2026

1 JobQuantity

Address and POC Place of Performance DoDAAC: 961604 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

PROJECT MANAGER TOWNSHEND LAKE, TOWNSHEND VT 05353 TOWNSHEND,

VT 05353 UNITED STATES

ALEX J. COTE, DELIVER_TO_EMP_ID_NO

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.

2018-12

252.236-7000 Modification Proposals--Price Breakdown.

1991-12

DFARS Clauses Incorporated by Full Text

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.232-7006 Wide Area WorkFlow Payment Instructions.

2023-01

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause-

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____ Admin DoDAAC ____ Inspect By DoDAAC ____ Ship To Code ____

Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

SECURITY REQUIREMENTS:

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures -this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

WAGE DETERMINATION:

The Wage Determination for this project can be found at:

https://sam.gov/wage-determination/VT20260064/0

Wage Determination No.: VT20260064

Modification No.: 0

Date: 02 January 2026

*** END OF NARRATIVE ***

Section I - Contract Clauses

UAI 5152.249-9000 Basis for Settlement of Proposals

Actual costs will be used to determine equipment costs for a settlement proposal submitted on the total cost basis under Federal Acquisition Regulation (FAR) 49.206-2(b). In evaluating a termination settlement proposal using total cost basis, the following principles will be applied to determine allowable equipment costs.

(a) Actual costs for each piece of equipment, or groups of similar serial or series equipment, need not be available in the contractor's accounting records to determine total actual equipment costs.

(b) If equipment costs have been allocated to a contract using predetermined rates, those charges will be adjusted to actual costs.

(c) Recorded job costs adjusted for unallowable expenses will be used to determine equipment operating expenses.

(d) Ownership costs (depreciation) will be determined using the contractor's depreciation schedule (subject to the provisions of Federal Acquisition Regulation (FAR) 31.205-11).

(e) License, taxes, storage and insurance costs are normally recovered as an indirect expense and unless the contractor charges these costs directly to contracts, they will be recovered through the indirect expense rate.

MAGNITUDE OF CONSTRUCTION

The estimated cost of the work is between $25,000 and $100,000

COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 21 calendar after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, days and (c) complete the entire work ready for use not later than 6. The time stated for August 1, 202 completion shall include final cleanup of the premises.

(End of clause)

SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: Jordan Luks

Address: 3845 VT Route 30, Townshend, VT 05353

Telephone: 978-318-8970

(End of Provision)

*** END OF NARRATIVE ***

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.204-9 Personal Identity Verification of Contractor Personnel.

2011-01

52.204-13 System for Award Management- Maintenance. (Deviation)

2026-02

52.204-19 Incorporation by Reference of Representations and Certifications.

2014-12

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.

(Deviation)

2026-02

52.219-6 Notice of Total Small Business Set-Aside. (Deviation)

2026-02

52.222-6 Construction Wage Rate 2026-02

Requirements. (Deviation)

52.222-7 Withholding of Funds. (Deviation) 2026-02

52.222-8 Payrolls and Basic Records.

(Deviation)

2026-02

52.222-9 Apprentices and Trainees.

(Deviation)

2026-02

52.222-10 Compliance with Copeland Act Requirements. (Deviation)

2026-02

52.222-11 Subcontracts (Labor Standards).

(Deviation)

2026-02

52.222-12 Contract Termination-Debarment. 2014-05

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.

2014-05

52.222-14 Disputes Concerning Labor Standards. (Deviation)

2026-02

52.222-15 Certification of Eligibility. 2014-05

52.223-2 Reporting of Biobased Products Under Service and Construction Contracts. (Deviation)

2026-02

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.

2024-05

52.228-2 Additional Bond Security. 1997-10

52.228-11 Pledges of Assets (DEVIATION 2020-O0016)

2021-02 Deviation 2020- O0016

2020-04

52.228-14 Irrevocable Letter of Credit. 2014-11

52.232-23 Assignment of Claims. 2014-05

52.232-27 Prompt Payment for Construction Contracts.

2017-01

52.236-10 Operations and Storage Areas.

(Deviation)

2026-02

52.236-11 Use and Possession Prior to Completion. (Deviation)

2026-02

52.236-12 Cleaning Up. (Deviation) 2026-02

52.236-13 Accident Prevention. (Deviation) 2026-02

52.236-21 Specifications and Drawings for Construction. (Deviation)

2026-02

52.240-91 Security Prohibitions and Exclusions. (Deviation)

2026-02

52.242-14 Suspension of Work. 1984-04

52.243-5 Changes and Changed Conditions. (Deviation)

2026-02

52.246-21 Warranty of Construction. 1994-03

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form).

1984-04

52.249-10 Default (Fixed-Price Construction).

1984-04

DFARS Clauses Incorporated by Reference

Alternate Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials.

2011-09

252.203-7002 Requirement to Inform Employees of Whistleblower Rights.

2022-12

252.204-7003 Control of Government Personnel Work Product.

1992-04

252.204-7004 Antiterrorism Awareness Training for Contractors.

2023-01

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION 2024-

O0013 REVISION 1)

2024-05 Deviation 2024- O0013

2024-05

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

2023-01

252.204-7020 NIST SP 800-171 DoD Assessment Requirements.

2023-11

252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials.

2014-09

252.223-7008 Prohibition of Hexavalent Chromium.

2023-01

252.225-7001 Buy American and Balance of Payments Program.

2024-02

252.225-7002 Qualifying Country Sources as Subcontractors.

2022-03

252.225-7012 Preference for Certain Domestic Commodities.

2022-04

252.225-7048 Export-Controlled Items. 2013-06

252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.

2023-01

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.

2023-06

252.232-7004 DoD Progress Payment Rates

(DEVIATION 2020-O0010)

2014-10 Deviation 2020- O0010

2020-03

252.232-7010 Levies on Contract Payments. 2006-12

252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel.

2023-01

252.243-7001 Pricing of Contract Modifications. 1991-12

252.244-7000 Subcontracts for Commercial Products or Commercial Services.

2023-11

252.247-7023 Transportation of Supplies by Sea.

2024-10

FAR Clauses Incorporated by Full Text

Alternate Deviation

Variation Effective Date

52.213-4 Terms and Conditions--Simplified Acquisitions (Other Than Commercial Products and Commercial Services).

(DEVIATION 2025-O0003 and 2025-O0004)

2026-02 Deviation 2025- O0004

2025-03

Terms and Conditions-Simplified Acquisitions (Other Than Commercial Products and Commercial Services) (MAR 2025) (DEVIATION 2025-O0003 )and 2025-O0004

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (section 743 of Division E, Title VII, of the Consolidated and Further (Jan 2017) Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Section 1634 of Pub. L. 115-91).(Dec 2023)

(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Section 889(a)(1)(A) of Pub. L. 115-232).(Nov 2021)

(iv) 52.204-27, Prohibition on a ByteDance Covered Application (Section 102 of (Jun 2023) Division R of Pub. L. 117-328), unless the agency grants an exception - see paragraph (b) of 52.204-27.

(v) 52.204-30, Federal Acquisition Supply Chain Security Act Orders-Prohibition. (Dec 2023) (Pub. L. 115-390, title II).

(vi) 52.222-3, Convict Labor (E.O.11755).(Jun 2003)

(vii) [Reserved]

(viii) [Reserved]

(ix) 52.225-13, Restrictions on Certain Foreign Purchases ( ) (E.O.s, proclamations, Feb 2021 and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(x) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).

(xi) 52.233-3, Protest After Award (31 U.S.C. 3553).(Aug 1996)

(xii) 52.233-4, Applicable Law for Breach of Contract Claim (Pub. L. 108-77 and 108-(Oct 2004) 78 (19 U.S.C. 3805 note)).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments .(Apr 1984)

(ii) 52.232-8, Discounts for Prompt Payment .(Feb 2002)

(iii) 52.232-11, Extras .(Apr 1984)

(iv) 52.232-25, Prompt Payment (Jan 2017).

(v) 52.232-39, Unenforceability of Unauthorized Obligations .(Jun 2013)

(vi) 52.233-1, Disputes .(May 2014)

(vii) 52.244-6, Subcontracts for Commercial Products and Commercial Services .(Jan 2025)

(viii) 52.253-1, Computer Generated Forms .(Jan 1991)

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-17, Contractor Employee Whistleblower Rights (41 U.S.C. 4712); this (Nov 2023) clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community-see FAR 3.900(a).

(ii) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).

(iii) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (E.O. 13126) (Jan 2025) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in 2.101 on the date of award of this contract).

(iv) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment., Contracts for Materials, Supplies, Articles, and Equipment (41 U.S.C. chapter 65) (Applies to (Jun 2020) supply contracts over the threshold specified in FAR 22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).

(v) 52.222-35, Equal Opportunity for Veterans (38 U.S.C. 4212) (Applies to contracts (Jun 2020) valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(vi) 52.222-36, Equal Employment for Workers with Disabilities (29 U.S.C. 793) (Jun 2020) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, "United States" includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)

(vii) 52.222-37, Employment Reports on Veterans (38 U.S.C.

This is the start of the file's text. The full file is on GovTribe.