About this file

This document is a Statement of Work (SOW) for Ball Mountain Lake Paving by the U.S. Army Corps of Engineers located in Jamaica, Vermont. The document contains 15 informational photos detailing a paving project within the Winhall Brook Camping Area and along the boat launch road at Ball Mountain Lake.

The photos illustrate the precise areas for road and parking area improvements, including a main work area near the West River Trail gate (marked as Campsite S70), a curved road leading to campsites, and multiple sections of the boat launch road requiring repair. The project involves paving new sections, extending existing pavement, repairing road surfaces, and defining new parking area boundaries. The photographs include detailed red markings indicating the exact extent of proposed paving and repair work, with annotations showing specific locations like the WBCA Contract Station, Slason Bridge, and the project's property lines. An optional task is also identified for repairs along the boat launch road, with five distinct sections mapped out.

View the file

Other files

File Type Posted
Amendment W912WJ25QA066-0002.pdf PDF
Amendment W912WJ25QA066-0001.pdf PDF
Solicitation W912WJ25QA066.pdf PDF
Attachments 25QA066.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BALL MOUNTAIN LAKE PAVING

U.S. ARMY CORPS OF ENGINEERS

BALL MOUNTAIN LAKE

JAMAICA, VERMONT

STATEMENT OF WORK

Informational Photos (REVISED)

Photo 1: Map showing work area within the Winhall Brook Camping Area.

Photo 2: Close up of work area and indications of Campsite S70 and gate for West River Trail.

Photo 3: Transition from paved access road to turnaround, leading to gate for West River

Trail.

Photo 4: Markings indicate where new pavement will end: 18ft before the gate to the West River Trail.

Photo 5: Road curving towards campsites.

Photo 6: Continuation of curve. Painted markings indicate the extent of the finished pavement.

Photo 7: Continuation of curve back towards access road.

Photo 8: Second joint with existing pavement. Painted markings indicate the extent of the finished pavement.

Photo 9: Existing parking area with lawn markings indicating the limit and angle of extension.

Photo 10: Section one- repair along boat launch road at Ball Mountain Lake. (Option

Task)

Photo 11: Section two-repair along boat launch road at Ball Mountain Lake. (Option Task)

Photo 12: Section three- repair along boat launch road at Ball Mountain Lake. (Option

Photo 13: Section four- repair along boat launch road at Ball Mountain Lake. (Option Task)

Photo 14: Section five- repair along boat launch road at Ball Mountain Lake. (Option

Photo 15: Location of boat launch road at Ball Mountain Lake(Option Task)

File details come from the government source that posted it. Updated .