BE-1-1120.026.pdf
PDF 194 KB Posted
- Solicitation number
- W912WJ25Q0022
About this file
This is a technical engineering drawing from the U.S. Army Corps of Engineers showing the General Plan for the Woonsocket Falls Mill/Dam flood control project on the Blackstone River in Rhode Island. The drawing depicts a detailed site plan view of the dam structure, including elevation markers, a bridge (South Main Street Bridge), machinery platforms, water tanks, and a canal.
The drawing provides specific engineering details like contour lines, structural elements of the dam, and various technical annotations. It appears to be part of the historical documentation for the dam facility that is now requiring drainage trough installation and sealing work as specified in solicitation W912WJ25Q0022. The drawing shows various components that would be relevant to bridge drainage systems, including the bridge deck area where the new drainage troughs are to be installed according to the current contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ25Q0022-0003.pdf | ||
| Drainage Holes.pdf | ||
| Amendment W912WJ25Q0022-0002.pdf | ||
| BE-1-1138.044.pdf | ||
| BE-1-1123.029.pdf | ||
| Amendment W912WJ25Q0022-0001.pdf | ||
| Solicitation W912WJ25Q0022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .